BEFORE THE MERIDIAN CITY COUNCIL
C/C February 7, 2006
IN THE MATTER OF THE )
APPLICATION OF BOLL YBROOK, )
LLC FOR FINAL PLAT APPROVAL )
OF 53 SINGLE-FAMILY )
RESIDENTIAL BUILDING LOTS )
AND 9 COMMON LOTS ON 15.32 )
ACRES IN AN &-8 ZONE LOCATED )
AT 3265 NORTH CURT DRIVE; A )
PARCEL OF LAND LYING IN THE )
SW v.. OF T. 4N., R. IE., SECTION )
31 )
)
)
CASE NO. FP-05-082
ORDEROFCONDnaONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval pursuant to Unified
Development Code II-6B-3 on February 7,2006, and the Council finding that the Administrative
Review is complete from Sonya Watters, Assistant City Planner for the Planning and Zoning
Department, and Michael Cole, Development Services Coordinator for the Public Works Department,
dated: Hearing Date: February 7, 2006, to the Mayor and Council, and the Council having
considered the requirements of the preliminary plat the Council takes the following action:
IT IS HEREBY ORDERED THAT:
L The Final Plat of "PLAT SHOWING HOLL YBROOK SUBDIVISION NO. 1 A
PARCEL OF LAND LYING IN THE SW % OF T. 4N., R IE., SECTION 31,
BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2005,
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR HOLL YBROOK SUBDIVISION NO. 11 (FP-05-082)
Page I of 4
HANDWRITTEN DATE: 11/30/05, SHEET 1 OF 4, LAND SOLUTIONS",
HOLL YBROOK, LLC, Developer, is Conditionally Approved subject to those
conditions of Staff comments as set forth in the Memorandum to the Mayor and City
Council from Sonya Watters, Assistant City Planner for the Planning and Zoning
Department and Michael Cole, Development Services Coordinator for the Public
Works Department, dated: Hearing Date: February 7, 2006, listing 19 SITE
SPECIFIC REQUIRE.MENTS/FINAL PLAT and
14 GENERAL
REQUIREMENTS, a true and correct copy of which is attached hereto marked
Exhibit "A", and consisting of 4 pages, and by this reference incorporated herein, and
the response letter form Erickson-Civil, Inc., a true and correct copy of which is
attached hereto marked Exhibit "B" and consisting of I page, and by this reference
incorporated herein, and the response letter from the Meridian Fire Department, a
true and correct copy of which is attached hereto marked Exhibit "C" and consisting
of 1 page, and by this reference incorporated herein, and the response letter from
Nampa & Meridian Irrigation District, a true and correct copy of which is attached
hereto marked Exhibit "D" and consisting of 1 page, and by this reference
incorporated herein, and the additional requirements from the action of the Council
taken at their February 7,2006 meeting as follows, to-wit:
1.1 Adopt the Recommendation of the Central District Health
Department as follows:
The Central District Health requires after written approval
from the appropriate entities are submitted, they can approve
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR HaLL YBROOK SUBDMSION NO. 1/ (FP-05-082)
Page 2 of 4
this proposal for central sewage and central water; that plans
must be submitted to and approved by the Idaho Department
of Health and Welfare, Division of Environmental Quality for
central sewage and central water; that nm-offis not to create a
mosquito breeding problem; and it is suggested that the
stormwater be pretreated through a grassy swale prior to
discharge to the subsurface to prevent impact to groundwater
and surface water quality; that engineers and architects should
obtain current best management practices for stormwater
disposal and design a stormwater management system that is
preventing groundwater and surface water degradation.
Manuals for guidance:
L State of Idaho Catalog of Stonnwater Best
Management Practices for Idaho Cities and Counties.
Prepared by the Idaho Division of Environmental
Quality, July 1997.
2. Stormwater Best Management Practices Guidebook.
Prepared by City of Boise Public Works Department,
May 2000.
2. The final plat upon which there is contained the Certification and signature of the City
Clerk and the City Engineer verifYing that the plat meets the City's requirements shall be
signed only at such time as:
I. The Plat dimensions are approved by the City Engineer; and
2. The City Engineer has verified that all off-site improvements are completed
and! or the appropriate letter of credit or cash has been issued guaranteeing the
completion of off-site and required on-site improvements.
NOTICE OF FINAL ACTION
AND RIGHT TO REGULA TORY TAKINGS ANALYSIS
The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may
request a regulatory taking analysis. Such request must be in writing, and must be filed with the City
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR HOLL YBROOK SUBDMSION NO. 1/ (FP-05-082)
Page 3 of4
Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A
request for a regulatory takings analysis will toll the time period within which a Petition for Judicial
Review may be filed.
Please take notice that this is a final action of the governing body of the City of
Meridian, pursuant to Idaho Code ~ 67-6521. An affected person being a person who has an interest
in real property which may be adversely affected by this decision may, within twenty-eight (28) days
after the date of this decision and order, seek ajudicial review as provided by Chapter 52, Title 67,
Idaho Code.
-rth
By action of the City Council at its regular meeting held on the J
day of
ful:wuo. ~
)
, 2006.
\".Bv:' ,; .
\' \ -;..-' ;\\.'., r.'. .. I
",\ \ or ".q-:raroin e eerd
~..... ::\..~ --..,~~~:, Y"......... .. .. ..
; 0 0C?00F1~ I,l;{~ " _ Ity of Mendmn
Attest: g -i;. '. .) \ ~
::: :::
= -
::: ~. ::
/(,(1 , ^ L 1__ ,'. :"> "-
,~<~... 0 ~
William G. Berg, Jr., City CI rk ~... ~^'~ '<::~~~/^t/-~ ,f"
'l/, "..., a \V ",,,,
'''/1/ OUNli, "",
Copy served upon Applicant, the Planning and~(jning,Jj)epartment, Public Works Department, and
City Attorney.
By: h h OJ! nl I~l~: rft~
City Clerk's Office
Dated: 02 -ll.pv ~
ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT
FOR HOLL YBROOK SUBDIVISION NO. 11 (FP-05-082)
Page 4 of 4
CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT
STAFF REPORT:
Hearing Date: February 7, 2006
Transmittal Date: January 31, 2006
. ,.~,.,:...;ti
i:' i
f..'~Q
e:Jv{;;~~idi~~
\'.'c IU.\H(I .,:
Mayor & City Council ~j:".." /../4'}
Sonya Watters, Assistant City Planner ~ ~~':'i;tJi
Michael Cole, Development Services Coordinator (Y\ C
\-'
."
TO:
FROM:
SUBJECT:
Hollybrook Subdivision
Request for Final Plat Approval of Hollybrook Subdivision Consisting of 53
Single-family Residential Building Lots and 9 Common/other Lot on 15.32
Acres in an R-8 Zone by Hollybrook, LLC. (File#FP-05-082)
We have reviewed this submittal and offer the following comments and conditions of the applicant.
These conditions shall be considered in full, unless expressly modified or deleted by motion of the
Meridian City Council:
APPLICA TION SUMMARY & LOCATION
The applicant, Hollybrook, LLC, has applied for final plat approval of Hollybrook Subdivision which
consists of 53 single-family residential building lots and 9 common/other lots on 15.32 acres in an R-8
zone. The gross density for this subdivision is 3046 dwelling units per acre. The net density for this
subdivision is 4.72 dwelling units per acre.
Hollybrook Subdivision is a subdivision of a previously un-platted parcels of land located in a portion of
the SW 1/4 of Section 31, TAN, R.IE. The property is located on the north side of E. Ustick Road,
approximately 1/3 mile east ofN. Meridian Road.
A conditional use penuitlplanned development was approved for this subdivision that allowed for
reductions to the minimum development standards required for street frontage (min. 55 feet) and lot size
(min. 4,428 s.t.) for Lots 2-13, Block 4. The front setback to living area was reduced to 15 feet for all lots
within the subdivision; a minimum of20 feet is required between garages and the back of sidewalks.
The final plat submitted for this subdivision substantially compIles with the approved preliminary plat.
Staff recommends approval of Hollybrook Subdivision with the comments and conditions stated in this
report.
SITE SPECIFIC REQUIREMENTS
1. Applicant is to meet all tenus of the approved annexation and zoning (AZ-05-026), development
agreement (Inst. #105195857), conditional use permit (CUP-05-033), and preliminary plat (PP-
05-025).
2. The applicant has not indicated who will own the pressurized irrigations system in this proposed
development. If it is to be owned and operated by an Irrigation District then a letter of plan
approval shall be submitted prior to the scheduling of a pre-construction meeting.
If it is to be owned and operated as a private system then plans and specifications shall be
reviewed by the Public Works Deparhnent as part of the construction plan review. A draft
Exhibit "A"
FP-05-082 Hollybrook Sub FP.doc
PAGE 1
CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT
operations and maintenance manual shall be submitted prior to plan approval with the final draft
being submitted prior to signature on the final plat.
3. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water. If a creek or well source is not available, a single-point connection to the
culinary water system shall be required. If a single~point connection is utilized, the developer
shall be responsible for the payment of assessments for the irrigable common areas prior to
signature on the final plat by the Meridian City Engineer.
4. All fencing installed on the site must be in compliance with UDC 11~3A-6 and 11~3A-7.
5. The applicant will be responsible for all costs associated with the sewer and water service
extension. Any existing domestic wells and/or septic systems within this project will have to be
removed from their domestic service, per City Ordinance Section 5-7-517, when services are
available from the City of Meridian. Wells may be used for non-domestic purposes such as
landscape irrigation.
6. The applicant shal1 install all sewer mains necessary to serve this development. The applicant
shall coordinate main size and routing with the Public Works Department. Cover over sanitary
sewer mains shall be no less than three feet from finish grade to the top of the pipe. If cover is
less than three feet from the sub-grade to the top of the pipe, alternated pipe materials shall be
used per the Meridian Public Work's Standard Specifications.
7. The applicant will be responsible to construct water mains to and through this proposed
development. Subdivision designer to coordinate main sizing and routing with the Public Works
Department. Applicant shall execute City of Meridian standard forms of easements, for any
mains that are required to provide service.
8. Include the instrument number for the Settlers Irrigation Easement shown on the plat.
9. Include the bearing and distance for the western property line of Lot 8, Block 8.
10. The bearings along the subdivision boundary lines do not appear to meet the bearings of record.
The applicant shall confirm this information and include bearings of record on the plat.
11. Dedicate additional public utilities, drainage and irrigation easements adjacent to the street right~
of-way where the sidewalk is not located in the right-of-way. The utility companies need a 10-
foot free and clear easement past the sidewalk.
12. Revise the domestic water service origin statement in the certificate of owners to reference the
City of Meridian instead of United Water.
13. The applicant shall be responsible for the payment of assessments and the actual hook up to
municipal services for the existing house.
14. Remove all buildings that do not meet setbacks or the zoning ordinance, prior to signature on the
final plat by the City Engineer.
15. No parking is allowed in front of Lots 8 & 9, Block 6 per the requirement of the Meridian Fire
Department. Comply with the Meridian Fire Department's requirements for any signage and/or
curb-painting adjacent to Lots 8 & 9, Block 6.
Exhibit "A"
FP-05-082 Hollybrook Sub FP.doc
PAGE 2
CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT
16. The micropath on Lot 17, Block 8 shall be designed and constructed in accordance with UDC 11-
3B-L2.
17. The landscape plan, prepared by Jensen Belts Associates, and dated 11/30105, shall be revised as
follows:
a. Include the tree class in the plant schedule for all trees shown.
b. Depict and construct a la-foot wide gravel shoulder on Ustick Road abutting the site,
with the remaining portion of the right-of-way landscaped with lawn or other vegetative
groundcover. (Landscaping improvements within the right-of-way require a license
agreement between the property owner and the ACHD.)
Submit 3 copies of the revised landscape plan to the Planning Department prior to signature on
the final plat by the City Engineer.
18. Revise or add the following note(s) on the face of the plat dated 11/30/05, prepared by Land
Solutions, prior to signature on the final plat by the City Engineer:
(10.) Include instrument number.
(12.) ".. .modified building setbacks per CUP-05-033 us follO'.r.'s:..." (delete specific setback
information)
18. Complete the Certificate of Owners and accompanying aclmowledgement.
19. Staffs fallure to cite specific ordinance provisions or terms of the approved development
agreement, conditional use permit, or preliminary plat does not relieve the Applicant of
responsibility for compliance.
GENERAL REQUIREMENTS
1. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or
lying adjacent and contiguous to the area being subdivided shall be tiled per UDC 11-3A-6.
Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users
association (ditch owners), with written approval or non-approval submitted to the Public Works
Department. If lateral users association approval can't be obtained, alternative plans will be
reviewed and approved by the meridian City Engineer prior to final plat signature.
2. Sh'eet signs are to be in place, water system shan be approved and activated, fencing installed,
drainage lots constructed, road base shall be approved by the Ada County Highway District, and
the Final Plat for this subdivision shall be recorded, prior to applying for building permits.
3. A letter of credit or cash surety in the amount of 110% shall be required for all uncompleted
fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to
signature on the final plat.
4. All development improvements, including but not limited to water, sewer, fencing, micro-paths,
pressurized irrigation and landscaping shall be installed and approved prior to obtaining
certificates of occupancy.
5. A written certificate of completion shall be prepared by the landscape architect, landscape
designer or qualified nurseryman responsible for the landscape plan upon completion of the
landscape installation. The Certificate of Completion shall verify that all landscape
Exhibit "A"
FP-05-082 Hollybrook Sub FP.doc
PAGE 3
CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT
improvements, including plant materials and sprinkler installation, are in substantial compliance
with the approved landscape plan.
6. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as detennined during the plan review process, prior to signature on the final plat
per Resolution 02-374.
7. Any existing domestic wells and/or septic systems within this project will have to be removed
from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for
non-domestic purposes such as landscape irrigation.
8. Compaction test results must be submitted to the Meridian Building Department for all building
pads receiving engineered backfill, where footing would sit atop fill material.
9. Applicant shaH be responsible for application and compliance with any Section 404 Permitting
that may be required by the Army Corps of Engineers.
10. Applicant shall be responsible for application and compliance with and NPDES Permitting that
may be required by the Environmental Protection Agency.
11. All development features shall comply with the Americans with Disabilities Act and the Fair
Housing Act.
12. Any tree over 4" in caliper that is removed from the property shall be replaced by installing
additional trees, being the equivalent number of caliper inches of trees that were removed.
Required landscaping trees will not be considered as replacement trees for those trees that have to
be removed.
13. One hundred watt, high-pressure sodium streetlights shall be required at locations designated by
the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical
locations are at sh'eet intersections and/or fire hydrants, Final design locations and quantity are
determined after power designs are completed by Idaho Power Company. The street light
contractor shall obtain design and permit from the Public Works Department prior to
commencing installations.
14. Approval of the preliminary plat shall become null and void if the applicant fails to record the
final plat within two years of the approval of the preliminary plat per UDC II-6B-7A. In the
event that the development of the preliminary plat is made in successive phases in an orderly and
reasonable manner, and conforms substantially to the approved preliminary plat, such segments,
if submitted within successive intervals of eighteen months, may be considered for final approval
without resubmission for preliminary plat approval per UDC II-6B-7B.
STAFF RECOMMENDATION
Staff recommends approval of the final plat for Hollybrook Subdivision (FP-05-082) with the above
stated comments and conditions.
Exhibit "A"
FP-05-082 Hollybrook Sub FP.doc
PAGE 4
Erickson-Ci viI. Incorporated
CONSULTING .B.NOIHEliJl.S . LAND PLANHE R.-S
February 6, 2006
Sonya Watters
City of Meridian Planning & Zoning
660 E. Watertower Suite 200
Meridian, Idaho 83642
Fax: 208.888.6854
Pages: 6
RE: HoHybrook Subdivision Final Plat - Response to Staff Report
Dear Sonya,
Please find this letter in response to your staff report for Hollybrook Subdivision, which is
scheduled for a Rnal Plat Hearing on February 7,2006. We have reviewed the staff report and
agree to the conditions of approval with exception of Site Specific Item 17.b.
This condition states that a 10-foot wide gravel shoulder is to be constructed along Ustick Road
abutting the site. We are proposing a 6-foot gravel shoulder along the Ustick Road frontage
with a gmss stoanwater retention area between the edge of shoulder and the detached
sJdewaHc.. The area afthe right-of-way between the edge-of--shoolder and the norther1y right-of-
way boundary of Ustick Road will be planted with grass as part of the project's landscape work
(See landscape Plan)_ We have received approval from ACHD for this design and they are in
the process of drafting the sidewalk easements and landscape license agreements for the
proposed improvements. Please include this change with the Final Plat decision schedu1ed for
Febroary7,2006.
Please <:iOI1tact me at 208.867.3954 if you .should have any questions Of require any additional
information.
Sincerely,
project No.
Cc:
Atten: ACHO Plan Acceptance Letter
l~xhit>it "il"
. .
...n 27 06 03:00p
.
.......
.-. ." -'.
.. . .;, t:.,)
· .~.,;/..... ".~~.~~;:r::;~t~;'-;~'.
· (~ ~~L.r:'_:. /,~.:~~i:.I.!
r"..'V /' r:1.n' ClI.. II,'.IJ!:'~ .~ Ij .
"-Ni erldlili~';~:'J(; '.v..~,
\;
1/
./..'
r ,,:: To insure that your comments and recommendations wlll be considered by
,"OJ the Meridian City Council please submit your
comments and recommendations to Meridian City Hall
1\'1nJ
S()fUY A
p.l
TRANSMITTALS TO AGENCIES FOR COMMENTS ON
DEVELOPMENT PROJECTS WITH TH E CITY OF MERIDIAN
Attn: Planning Department, by: January 31, 2006
Transmittal Dale: January 13, 2006 File No.: FP 05-082
Hearing Date: Febmary 7, 2006
Request: Final Plat approval of 53 single-family residential building
lots and 9 common lots on 15.32 acres in a R-8 zone for Hollybrook
Subdivision
~ I: 1.\1 H)
-'
",..
::."l+/~'J', L' . ~ , "
......__.1... t.t1..\,~.I't1 ,I,..\~.._....
~-- --..
M^'\'Olt
T~mmy de' W~'l'rd
CrTY COlJI\:CIJ. M":MnnRS
Keith Bird
In';l'rh W. LlonoL)
Chari.,:; Jv1, Rc>un(rc,'
Sh,1ltn WJrd k:
CITY D.cI',\KI'MI.:NTS
Ci~)' A\tllrn~y/J-m
703 M,lin SlH:~'
~'iS.55(lt; (City Alt<lrncy)
~;~I$_:;~O::- (HJq
l'.,~ f;R.H023
By: Hollybrook) LLC
Location of Property or Project:
Ustick Drive
3265 North Curt Drive and 540 East
['ire
~40 L Fr,\t)klin Ho~d
i;({<=;.1214 / (,1>': 895-0390
David Zaremba (no FP)
David Moe (no FP)
- Wendy Newton-Huckabay (No FP)
- Michael Rohm (No FP)
Keith Borup (No FP)
- Tammy de Weerd. Mayor
Charlie Rountree. C/C
Christine Donnell, C/C
Keith Bird, C/C
Shaun Wardle, C/C
Water Department
Sewer Department
Sanitary SelViceS{No VAR.. VAC.I'l')
-Yuilding Department
L Fire Department
Pollee Department
City Attorney
City Engineer
Cily Planner
Parks Department
I'M!.:.'; &: Rl'CrC.;Ilion
11 'N. I~o...,'t.: r St ret'l
SSf{-:J~75' / f,.x 89{{.S'.'-Ol
1'lilflnir\J!,
660 1.:". WiIIl:',.towcr LillI.:'
Suill: 202
tit;4..5SlJ / r;-lx SBf<-bHH
l\liil"'.'
HOl E. W;Hl'r!owci. L.:1l1l'
S$!H'l117l:l.' I,IX S'l6-7~M
[',,[,lit: Wt1j"k~
b60 E. Willnl.ower L.1J"ie
SlIill.' 200
S'iK.S5nO f [;,x 89:;-\15'.'- 1
- [luildinf,
(,(iO E, \Y,Hcl'h).....,.r r .aTH'
Sui\<7 150
~B7.2::>l) 1(,,); 887.1 :2.97
IN''l'ICI->.'olICr
}'lOJ N, Tell jv]ih: J,o;1d
$.::>8-2191 / f;i~ 88-1-0744
Your Concise Remarks:
(i)~'JlO fA~l(,tVC (/,) ffiNI
o 'J-t' WI i)i!' &8.1 /JE.J4!U~
W;1lN
2135 N.W. 8th Street
Rf.tS.52<12/ r <:IX BS,~. 1159
Meridian School District (NoFPl
Meridian Post Offic~(FPIPP (lnll')
- AO<;l County Highway District
- Ada County Development Services
Central District Hetllth
Nampa Meridian lrrjg. District
Settlers lrrig. Dislrict
Idaho Power CO. (FP,P"P,CUP)
Qwest (fPIPP OI\IV)
Intermountain Gas (FPIPJ> anty)
Bureau of Reclamation (FP1PP (lnly)
Idaho Transportation OepL (No Fp)
Ada County ASS. Land Records
Meridian Development Corp,
Historical Preservation Comm.
1~ECEI\7ED
J. \; -
JAN 1 3 2TIQS
MERIDIAN
FIRE DEPf',RTr\,~::.NT
vF' 6t..OC.K
s u f.r~I'lC&
(, J...oT ~,9
~A) 9. eN I CMJ1 I
('/v-" I")'! 6(-
CiTY HALL 33 E^Sl J OATID AVENUE MERIDIAN, IDAl-IO 83642. (208) 8f18-4433
CITY CI.EI(K -I'AX K.~;..]1~ FINANel' -'< UTIU'!''!' flfl.IJNG -1'....)( RR7.o\K\~ MAYOR'S OFFICt::- I'/,X !l~H;ll~
I 'riJ ILL:d UII rt.xych.::'\J pi~ pc r
Exhibit "e"
~
~ & ~ 1~ 'Z)i4tUa
1503 FIRST STREET SOUTH NAMPA, IDAHO 83651.<1395
FAX # 208-463-0092
2 February 2006
Phones: Area Code 208
OFFICE: Nampo 466-7861
SHOP: Nompo 466-0663
Planning Department
City of Meridian
6(jO E, \\ratertuVi.~(;l LdUC SuiLe 202
Meridian, JD 83642
RE: FP 05-082/Hollybrook Subdivision
Dear Anna:
I f all storm drainage is retained on-site there will be no impact on Nampa & Meridian Irrigation
District and no further review will be required.
However, ifany surface drainage leaves the site, the Nampa & Meridian In'igation Di:;trict
requires that a Land Use Change Application is filed for review prior to final platting, Please
contact Donna Moore at 466-7861 for ftlrther infonnation.
All laterals and waste ways must be protected. The developer must comply with Idaho Code:; 1-
3805. It is recommended that irrigation water be made available to all developments within the
Nampa & Meridian Inigation District.
ALL WORK WITHIN NAMPA & MERIDIAN IRRIGATION DISTRICT FACILITIES
MUST BE COMPLETED BY MARCH 15,2006.
Sincerely,
iJd/ ,~
Bill Henson
Asst. Water Superintendent
Nampa & Meridian hTigation District
BH/dbg
c: Crew Foreman
rile - Office/Shop
Exhibit "'iT