HomeMy WebLinkAbout2023-07-20
PLANNING AND ZONING COMMISSION MEETING
City Council Chambers, 33 East Broadway Avenue Meridian, Idaho
Thursday, July 20, 2023 at 6:00 PM
MINUTES
PRESENT
Commissioner Maria Lorcher
Commissioner Patrick Grace
Commissioner Jared Smith
Commissioner Andrew Seal
ABSENT
Commissioner Nathan Wheeler
Commissioner Enrique Rivera
Commissioner Mandi Stoddard
ADOPTION OF AGENDA Adopted
CONSENT AGENDA \[Action Item\] Approved
1. Approve Minutes of the July 6, 2023 Planning and Zoning Commission Meeting
2. Findings of Fact, Conclusions of Law for Loose Screw Brewery (H-2023-0025) by
Michael Garcia, located at 105 E. Carlton
3. Findings of Fact and Conclusions of Law for Milano Animal Care Facility (H-2023-
0026) by Blue Frog, LLC, located at 3020 W. Milano Dr.
Motion to approve made by Commissioner Smith, Seconded by Commissioner Lorcher
Voting Yea: Commissioner Lorcher, Commissioner Grace, Commissioner Smith, Commissioner
Seal
ACTION ITEMS
4. Public Hearing for Jump Creek South Apartments (H-2023-0016) by Kent Brown
Planning Services, generally located on the northwest corner of N. Black Cat Rd.
and W. McMillan Rd. Approved
A. Request: Conditional Use Permit for a multi-family development consisting
of 11 buildings and 44 multi-family units on 3.29 acres of land in the R-15
zoning district.
Motion to approve made by Commissioner Smith, Seconded by Commissioner Grace
Voting Yea: Commissioner Lorcher, Commissioner Grace, Commissioner Smith
Voting Nay: Commissioner Seal
5. Public Hearing for Stapleton Apartments (H-2023-0033) by The Architects Office,
PLLC., generally located on the NW corner of S. Meridian Rd. and W. Harris St.
Approved
A. Request: Conditional Use Permit for a multi-family development consisting
of 5 two-story buildings and 19 multi-family townhome style units on 2.07
acres of land in the R-15 zoning district.
Motion to approve made by Commissioner Smith, Seconded by Commissioner Grace
Voting Yea: Commissioner Grace, Commissioner Smith, Commissioner Seal
Voting Nay: Commissioner Lorcher
ADJOURNMENT 9:10 pm
---------------------------------------------------------------------------------------------------------------------
To view upcoming Public Hearing Notices, visit https://apps.meridiancity.org/phnotices
---------------------------------------------------------------------------------------------------------------------
Meridian Planning and Zoning Meeting July 20, 2023.
Meeting of the Meridian Planning and Zoning Commission of July 20, 2023, was called to
order at 6:00 p.m. by Chairman Andrew Seal.
Members Present: Chairman Andrew Seal, Commissioner Maria Lorcher, Commissioner
Jared Smith and Commissioner Patrick Grace.
Members Absent: Commissioner Nate Wheeler, Commissioner Mandi Stoddard and
Commissioner Enrique Rivera.
Others Present: Joy Hall, Kurt Starman, Bill Parsons, Stacy Hersh and Dean Willis.
ROLL-CALL ATTENDANCE
Nate Wheeler X Maria Lorcher
Mandi Stoddard X Patrick Grace
Enrique Rivera X Jared Smith
X Andrew Seal - Chairman
Seal: All right Good evening. Welcome to the Planning and Zoning Commission meeting
for July 20th, 2023. At this time I would like to call the meeting to order. The
Commissioners who are present for this evening's meeting are at City Hall. We also have
staff from City Attorney and Clerk's offices, as well as City Planning Department. If you
are joining us on Zoom this evening we can see that you are here. So, if you are joining
us on Zoom this evening we have already talked about the technical --technical difficulties
that we are having and you will need to come to City Hall in order to give testimony this -
- this evening, instead of being able to do it on Zoom. Let me see here. During the public
testimony portion of the meeting -- oh, gosh. This is going to throw me way off here, so -
- that's for everybody online. Okay. With that debacle we will begin with roll call. Madam
Clerk.
ADOPTION OF AGENDA
Seal: Thank you. First item on the agenda is the adoption of the agenda. We have no
modifications. Can I get a motion to adopt the agenda?
Smith: So moved.
Grace: Second.
Seal: It's been moved and seconded to adopt the agenda. All in favor, please, say aye.
Opposed nay? Motion carries.
MOTION CARRIED: FOUR AYES. THREE ABSENT.
Meridian Planning&Zoning Commission
July 20,2023
Page 2 of 51
CONSENT AGENDA [Action Item]
1. Approve Minutes of the July 6, 2023 Planning and Zoning
Commission Meeting
2. Findings of Fact, Conclusions of Law for Loose Screw Brewery (H-
2023-0025) by Michael Garcia, located at 105 E. Carlton
3. Findings of Fact and Conclusions of Law for Milano Animal Care
Facility (H-2023-0026) by Blue Frog, LLC, located at 3020 W. Milano
Dr.
Seal: Next item on the agenda is the Consent -- Consent Agenda. We have three items
on the Consent Agenda. First is to approve the minutes of the July 6th, 2023, Planning
and Zoning Commission meeting. Then we have Findings of Facts and Conclusions of
Law for File No. H-2023-0025 for Loose Screw Brewery and File No. H-2023-0026, Milano
Animal Healthcare Facility. Can I get a motion to accept the Consent Agenda as
presented?
Smith: So moved.
Seal: Do I have a second?
Lorcher: Second.
Seal: It's been moved and seconded -- seconded to adopt the Consent Agenda. All in
favor, please, say aye. Opposed nay? Motion carries.
MOTION CARRIED: FOUR AYES. THREE ABSENT.
Seal: Okay. I would like to explain the public hearing process. We will open each item
individually and begin with the staff report. Staff will report their findings on how the item
adheres to our Comprehensive Plan and Unified Development Code. After staff has
made their presentation the applicant will come forward to present their case and respond
to staff comments. They will have 15 minutes to do so. After the applicant is finished we
will open the floor to public testimony. Each person will be called on only once during the
public testimony. The clerk will call the names individually of those who signed up in
advance to testify. You will need to state your name and address for the record and you
will have three minutes to address the Commission. If you have previously sent pics --
pictures or a presentation for the meeting it will be displayed and you can run the -- run
the screen and presentation and we will give assistance if needed. If you have -- if you
have established that you are speaking on behalf of a larger group, like an HOA, where
others from that group will allow you to speak on their behalf, you will have up to ten
minutes. After all those who have signed up in advance have spoken we will invite others
who may wish to testify. When you are finished if the Commission does not have
questions for you you will return to your seat in Chambers and you will no longer have
Meridian Planning&Zoning Commission
July 20,2023
Page 3 of 51
the ability to speak and, please, remember we generally do not call people back up. After
all testimony has been heard the applicant will be given another ten minutes to come back
and respond. When the applicant is finished responding to questions and concerns we
will close the public hearing and the Commissioners will have the opportunity to discuss
and, hopefully, be able to make final decisions or recommendations to City Council as
needed.
ACTION ITEMS
4. Public Hearing for Jump Creek South Apartments (H-2023-0016) by
Kent Brown Planning Services, generally located on the northwest
corner of N. Black Cat Rd. and W. McMillan Rd.
A. Request: Conditional Use Permit for a multi-family development
consisting of 11 buildings and 44 multi-family units on 3.29 acres of
land in the R-15 zoning district.
Seal: So, at this time I would like to open the public hearing for Item No. H-2023-0016
for Jump Creek South Apartments and we will begin with the staff report.
Hersh: Good evening, Mr. Chair and Commissioners. The applicant has submitted a
conditional use permit for Jump Creek South Apartments. The site consists of 3.29 acres
of land, zoned R-15, located at the northwest corner of North Black Cat Road and
McMillan. The history on the property is there is an existing development agreement and
multiple final plats approved. The Comprehensive Plan FLUM designation is medium
density residential. The subject property is one of two multi-family properties that was
approved with the preliminary plat. The gross density for the multi-family portion of this
development is at 13.37 dwelling units to the acre, which is higher than the medium
density residential -- residential designation of the Comprehensive Plan. However, this
was contemplated during the review and approval process of the Jump Creek
development. The overall gross density for the Jump Creek development is
approximately 4.54 dwelling units to an acre, including the 44 multi-family units proposed
with this development and the previous approval of the 28 multi-family units, which is
consistent with the medium density residential land use designation. A two story multi-
family development containing 44 dwelling units, consisting of 11 residential apartment
buildings with a leasing office that is 400 square feet and serving -- is to be served -- used
by both multi-family developments once built out of the project is complete. During the
review of the previous multi-family development the applicant did not commit on the
record to -- or did commit on the record to constructing the leasing office with this phase
of the development. The buildings meet the design setbacks for the multi-family
development as proposed on the site plan. The site plan depicts screen trash standards
for only one trash enclosure provided for the multi-family development. Staff
recommends that the applicant work with Republic Services to --to establish an approved
location for the enclosures, as well as an adequate quantity of trash and recycle bins to
service this development prior to the Certificate of Zoning Compliance. A minimum of 80
square feet of private usable open space shall be required for each unit in the plans -- the
Meridian Planning&Zoning Commission
July 20,2023
Page 4 of 51
floor plans and the architectural plans state that there will be decks and patios and those
are depicted on the floor plans that meet this standard. Open space and design
requirements. Because the site is only 3.29 acres, the total baseline layering -- land area
of common qualified open space is ten percent of the gross land for multi-family
developments of five acres or more does not does -- not apply. The site was required to
develop with a minimum of 15 percent open space to include the following amenities.
Three tot lots, internal walking paths, a ten foot wide multi-use path on the south side of
West Gondola Drive and five percent open space. Additionally, the master pathways plan
requires a ten foot -- ten foot multi-use pathway to be included as part of the development
plan for this site. Both multi-family developments approved as part of the Jump Creek
overall development have access to the common areas and site amenities throughout the
entire development and in addition to the baseline open space requirement, a minimum
of outdoor open space shall be provided, 250 square feet for each unit, containing more
than 500 square feet up to 1,200 square feet of living area. All 44 units are between 500
and 1 ,200. So, therefore, 11,000 square feet of common open space is required.
Because the site is below the five acres in size, the baseline requirement does not apply.
The submitted plans include two open grassy areas. These appear to be over 5,000
square feet in size and are illustrated as a drainage swale and a subsurface sand
drainage area. Additionally, a picnic area located behind the leasing office is shown on
the site plan. Staff recommends that the applicant open or submit an open space exhibit
that demonstrates compliance with this. To satisfy the specific use standards for the
proposed multi-family -- 44 multi-family units, a minimum of three amenities, one from
each category, must be provided. These -- these proposed amenities were the leasing
office, with an outdoor barbecue that serves both multi-family developments. A picnic
area with tables, benches, landscaping. A shade structure attached to the office. A
bicycle repair station. A community garden and charging stations for electric vehicles.
Additionally, there is a multi-use pathway that surrounds the site serving as another
amenity. The amenities meet the standards in the UDC. The dimensional standards.
This -- this development meets the dimensional standards for the R-15 zoning district, as
well as the multi-family development. However, staff recommends that the applicant
reorientate Building H to face south and move the lease office to face east in a central
location within the development to improve the accessibility and convenience. All access
was previously approved with the Jump Creek preliminary plat. The primary access for
this will occur from West Daphne Street, which connects to North Black Cat Road. There
is additional access through numerous roads in the Jump Creek Subdivision which will
eventually terminate at West Riva Capri Street and North Maplestone Drive. Since the
drive aisle within this development is not classified as a private street, the street name
shown on the site plan should be removed. The common drive located on Lot 10, Block
1, of Jump Creek Subdivision No. 6 serves as access for Lots 22 and 23, Block 1, of Jump
Creek South Subdivision and functions solely as a secondary fire access point for the
multi-family development and as per the fire department's requirements two bollards need
to be installed on the property line of the multi-family development spaced out 20 feet
apart. These bollards should be accompanied by a heavy chain and Knox padlock on the
property line of the multi-family development. The buildings within this development will
have their address assigned based on West Daphne Street and furthermore it is
recommended to place a wayfinding sign near the entrance of the multi-family
Meridian Planning&Zoning Commission
July 20,2023
Page 5 of 51
development to provide clear directions. Off-street parking for the multi-family
development is required to be provided per the UDC based on the number of bedrooms
per unit. The applicant is proposing 46 units consisting of 36 two-bedroom units and eight
three bedroom units. In addition, one guest space for every ten units is required per the
UDC. Based on the total number of units proposed and their bedroom count distribution
a minimum of a hundred parking spaces, with a minimum of 44 of these spaces to be
covered in a garage or by a carport. According to the plan -- site plan submitted the
applicant is proposing a hundred spaces with 43 of these spaces to be covered by a
carport. The proposed parking just meets the minimum code requirements. However,
one additional parking stall should be -- covered parking stall should be added.
Additionally, the plan submitted is deficient in trash enclosures, for which may impact the
proposed parking. Bicycle parking is required per the standards of the UDC and that
complies with the site plan. A five foot wide sidewalk is existing along West Daphne
Street connecting to the multi-family development. The applicant is proposing attached
sidewalks on either side of the pedestrian walkways throughout the entire site. Internal
pedestrian walkways are required to be distinguished from vehicular services through the
use of pavers, colored or scored concrete. The proposed pedestrian sidewalk shall be
constructed with a different material than the driving surface, with the plan submitted with
the certificate of zoning compliance. A ten foot wide multi-use pathway is required within
the landscape buffer along North Black Cat Road from West Daphne Street to the
intersection -- intersection of West McMillan as part of the path -- pathways master site
plan. The pathway should be placed in a 14 foot wide easement, which would be
submitted to the planning division prior to certificate of zoning compliance and the --
additionally the applicant's engineer shall provide written documentation that the pathway
was constructed per the recommended specifications in accordance with the UDC.
Landscaping is required along all pathways in accordance with the UDC. Landscaping.
The applicant is required to construct 25 foot wide landscape along the North Black Cat
Road and along McMillan and the landscape plan does comply with this. All fencing
constructed on the site is required to comply with the standards of the UDC and they also
comply -- or are in compliance on the landscape plan. The applicant has submitted
conceptual building elevations for the future multi-family fourplex buildings and residential
projects require administrative design review and approval. So, staff will look through
that once that is submitted and a certificate of zoning compliance for the site design. And
written testimony is none and staff recommends approval of the conditional use permit
with the conditions listed in the staff report and that concludes staff's presentation and I
stand for any questions.
Seal: Thank you very much. Would the applicant like to come forward?
Brown: For the record Kent Brown. 3161 East Springwood is my address. Stacy, if you
could put up the little slides that I -- it's kind of interesting. I have been doing this for 33
years -- doing planning work and when I created my own company this is one of the first
projects I worked on. So, in 2014 is when this preliminary plat was approved -- the fall of
2014. 1 wasn't involved in the entitlement part, but I have done all the phases. So, I have
been very involved with it. It's not on this screen. I just thought it was my touch that I
couldn't make it work. What this preliminary plat shows -- in the very northeast corner is
Meridian Planning&Zoning Commission
July 20,2023
Page 6 of 51
where we did some other apartment buildings. I will just look this way and not talk. So,
the open spaces that are there are for both the single family residents and the multi-family
residents. What -- if-- if you look at the vicinity map that's on the right-hand side you can
see that when this was originally approved this was like the only thing that's out there. It
doesn't look that way today. Stacy's plan and what's in your staff report shows a much
different view. If you would go to the next slide. So, Building H that Stacy talked about
that she wants rotated is down at the bottom of the screen right there where the cursor
is. We are in agreement with that. That really opens things up I think and by putting that
office patio and all of that there I think that that really helps in the overall view there. It
kind of moves it closer to the center and we are in agreement with that. We -- I had the
engineer look at it and we can make that work. So, the office that is on the left will be
basically where the north part of that building is. The trash enclosure that's on the other
side -- today I got a letter from Republic Storage and they said that we are adequately
taking care of the trash and that they liked the location of where we are putting the trash
enclosure. So, I can provide staff with a copy of that -- that letter. This plan also shows
at the very top that we have a map that is required for any of your apartment complexes
that there is a directional map. It's on the left-hand side as you are pulling in. So, where
the driver is pulling you can see the map to know which buildings are -- and where those
buildings are located at. I just thought it was me. The next --
Seal: Seems like technology is running rampant tonight.
Brown: Yes, it is tonight. So, this is the landscape plan and you can better see from that
the -- the office. There is raised beds for a community garden. There is a bike repair
station. There is a barbecue that's attached right next to the office with -- there you go.
Thank you. And now it's gone. That's weird, isn't it? It was on until I turned and looked
at it, so --
Seal: It knows you are looking -- that you are watching.
Brown: It really does. The only reason I show you that is so that you can see where that
clubhouse is at and realistically that the buildings are the same size. So, if we rotate it
around there shouldn't be any issues with that. The next slide. This is a picture of the
office and as you look at that, the upper part is where the picnic tables, the barbecue and
the bike repair thing is and, then, the office to --to the south. When we did the apartments
in phase four we temporarily provided one of the units as a temporary office until we got
this one built. So, it will remain. But, then, it will be responsible for the entire amount of
apartments that are within the entire development and, then, they will -- they will have it
manned from there. The next one. It's just another picture of the office. We have -- we
have been working with this for quite some time. The reason I -- I brought up that I started
-- this started nine years ago is just sometimes as planning and zoning commissioners,
which I -- I have been for the City of Meridian, you -- you get something approved and
you -- and I would say even the general public and they view that it's going to be there
next week and this project we tried to move along as quickly as possible and we still have
a number of homes, but we have recorded seven phases of the development for single
family of -- six for single family and one for multi-family. This requirement from the staff
Meridian Planning&Zoning Commission
July 20,2023
Page 7 of 51
is asking us to record a plat on this one. So, by the time we are done we -- we have been
working on this for a decade and not all those projects, you know,just immediately happen
and traffic has changed. Highway district has already taken up the right of way. We have
given them the right of way that's adjacent to this site, so that they can make those
highway district improvements as a part of this moving this forward and we just seek your
approval and I will stand for any questions you might have.
Seal: All right. Thank you much. Commissions, do we have questions?
Lorcher: Mr. Chair?
Seal: Commissioner Lorcher, go ahead.
Lorcher: You said there were seven phases. What phase are you in now?
Brown: This -- so, we had -- we had -- this would be the eighth phase of doing it. It will
eventually be called the -- it's kind of confusing. We -- we had to call one phase Jump
Creek South, so we did six numerical phases and, then, Jump Creek South and this one
will be called Jump Creek seven as we go forward, so --
Lorcher: And which phase are you in now? Jump Creek two, three, four?
Brown: We have built -- all of them are built and all -- all seven have been recorded.
Lorcher: So, this is the last --
Brown: This is the last hurrah in this entire development. Yeah. It kind of started in the
middle and, in fact, we had a temporary access to Black Cat Road until we could meet
emergency fire provisions and, then, we actually had to go in and vacate that road --
roadway, because when we did phase one we did it incorrectly. We shouldn't have
dedicated it. We should have just had it as a lot -- common lot and providing access to
the public and, then, make it go away. But this was the first time -- I mean ten years ago
the highway district hadn't thought about providing a temporary means in that looks like
a main entrance and, then, making it go away. So, today they have -- they have worked
that out and I'm recording a plat in Boise that we are -- we are calling it a common area,
but when you go look at it it looks like the main entrance to the subdivision, but the only
reason they are allowing us to have that is for a temporary purpose, because they want
to limit the access points to major roads.
Lorcher: Got you. Thank you.
Smith: Mr. Chair?
Seal: Commissioner Smith, go ahead.
Smith: Yeah. So, you talked about building -- I don't think I heard anything about the
Meridian Planning&Zoning Commission
July 20,2023
Page 8 of 51
additional parking spaces in close proximity that's recommended in the staff report. Do
you have any -- is that amenable to you or --
Brown: I -- I did ask the client, you know, what -- what are our possibilities that we could
do. As Stacy was reading the number she said that we had eight three bedroom units. I
asked, you know, how critical is it for them to have the three bedroom units and they said,
actually, the two bedrooms rent better, so they even had a suggestion, which I'm excited
about, if that's -- if you wanted to pick up, you know, from the code standpoint, is tell us
not to have three bedrooms and they will -- apparently if you don't put a closet in there it's
considered a den and the world has changed from when this was originally approved.
COVID is having more people work at home. I would have that as an office in a rental
facility. So, just change the floor plan to remove the closet and, then, it's -- then it's not a
bedroom anymore, so -- but we could remove eight bedrooms or four bedrooms or
whatever to increase the number of parking, if that's -- if that's what you so choose to.
Seal: Any other questions? Commissioner Grace?
Grace: Yeah. Thanks, Mr. Chairman. So, I had a similar question related to parking.
So, you talked to Republic trash I guess.
Brown: Republic. Yeah.
Grace: And they were good with the location. Were they good with the adequacy, the
amount that you had?
Brown: Yes.
Grace: Okay. So, that won't affect the -- the --
Brown: Sorry about that. And that's not technology, that's just old. Yeah. They -- the --
the approval letter speaks to it being adequate for this facility and large enough for
holidays and weekends and that kind of thing to cover the -- the amount of waste that
would be generated by 44 units.
Grace: And, then, second question. If you reorient that Building H and move the office
you don't lose any open space I wouldn't think.
Brown: Shouldn't. I mean we still got the same amount of footprint.
Grace: Right.
Brown: I totally get why staff is asking for it. I mean we have -- we have looked at that
plan over and over again trying to address like parking. What the site -- in the original
approval was a lot larger because they weren't planning on a roundabout on the corner
and so this site has had that kind of change a little bit over -- over time and it's gotten
smaller, but at the same time -- I think in the original plan it showed 12 buildings and we
Meridian Planning&Zoning Commission
July 20,2023
Page 9 of 51
only have 11, so --
Grace: Okay. Thank you.
Seal: Quick question for staff. On the comment in the staff report for the inadequacy for
the -- essentially the trash receptacle -- receptacle. Is our code around that or is it --
Hersh: Republic Service -- sorry, Mr. Chair. Republic Services is actually the -- the
governing body that they have to submit the approval with the certificate of zoning
compliance and design review. But they are good with it.
Seal: Okay. I -- I tend to agree with staff and -- and the only reason that I say that is
because if you only have one option it only takes one person being a jerk to make that
not an option and -- and I have seen that in different locations over and over. One person
decides they don't want a mattress frame and they throw it in there, nobody else can
throw anything in it. So, it would be nice to see two of them in there.
Brown: There is two inside the -- the enclosure. What we are talking about is that it's
adequate. We only have one location for the enclosure.
Seal: Okay.
Brown: But two -- there is two inside.
Seal: Okay. So, you can accommodate one jerk and still have adequate storage. Got
you.
Brown: Depending on the jerk.
Seal: That's right. Well, we can't measure that, so -- okay. That -- that makes much
more sense, so -- because I was kind of thinking, man, one for the -- all those just doesn't
make sense. Got you.
Brown: One -- one structure, physical structure that's there. Actually, on one side of the
structure, if you look closely at the plan, there is the cluster mailboxes attached to the
side of the -- the cement structure that's there. But there is two --
Seal: Got you.
Brown: So many yards --
Seal: Dumpsters.
Brown: Yeah. Dumpters.
Seal: Got you. Okay. That makes much more sense. So, if I would have been paying
more attention to the picture I would have seen that. Commissioners?
Meridian Planning&Zoning Commission
July 20,2023
Page 10 of 51
Brown: It was technology.
Seal: It was -- technology got in the way for sure. Is there any other-- no more questions
we will have you take a seat and --
Brown: Thank you.
Seal: Thank you. Joy, so do we have anybody signed up?
Hall: Mr. Chair, we have Jonathan Davis. Mr. Davis, you want to come up and testify?
Oh. Okay. Got you. And -- and real quick, because I see somebody else has come
online. For our -- for the folks that are joining us online tonight we are having technical
difficulties where you will be able to hear us, but we cannot hear you. So, if you would
like to give testimony on either of the applications this evening, either for Jump Creek or
Stapleton, you will have to come down to Council Chambers in order to do that. Sorry.
Go ahead.
Hall: Mr. Chair, there is no one else.
Seal: Okay. Is there anybody in the audience that would like to come up and testify? No
takers? Okay. Anything else? All right. With that we will take a motion to close the
public hearing for File No. H-2023-0016.
Smith: So moved.
Grace: Second.
Seal: It's been moved and seconded to close the public hearing for File No. H-2023-0016
for Jump Creek South Apartments. All in favor say aye. Opposed nay? Okay. The
public hearing is closed.
MOTION CARRIED: FOUR AYES. THREE ABSENT.
Seal: Who wants to start on this one?
Grace: Mr. Chairman, I don't mind. I -- it is an awful lot of buildings on a 3.29 acre spot,
but it's been going on for a little while and I like the layout and I like the idea of moving --
reorienting that building. I would say that -- I don't know that I'm comfortable telling them
that they have to eliminate bedrooms and things like that. I feel more comfortable saying
you just have to have adequate parking. So, to the extent that the applicant made that
offer that we could compel them to do that, I -- I, for one, don't feel comfortable telling
them that. I just -- I would rather tell them that they need to have adequate parking. But
other than that I think it's a good -- it's a good project for that corner and, like I said, it's
been going on for a little while, so I'm in -- I'm in favor of it.
Meridian Planning&Zoning Commission
July 20,2023
Page 11 of 51
Smith: Mr. Chair?
Seal: Go right ahead.
Smith: I'm kind of in the same spot on the parking for bedroom removal and one thing I
have been bouncing around is a question for Kurt, but also for Commissioner Grace. A,
is it possible, Kurt? And, then, B, is would you be more comfortable with something that
would compel them either to add parking spots or to limit bedrooms, so it's their choice,
but it creates the ability to say, hey, if you can't-- if you can't find more spots, then, I mean
that's -- if you don't want to put more spots that -- that's a choice you have to make. So,
I guess, A, Kurt. B, Commissioner Grace.
Starman: Thank you, Mr. Chairman, Commissioner Smith, I think this is a conditional use
permit and you are -- the Commission is able to place conditions to mitigate the impact of
the project. So, that would be an appropriate mitigation. You know, you can do A,
additional parking or, B, fewer bedroom counts. I think that's within your purview. So, to
answer the first part of your question, yes, that is possible.
Seal: Commissioner Lorcher, go right ahead.
Lorcher: Commissioner Seal, I'm a little challenged on this one for two reasons. Number
one, it was approved in 2014 and that was -- I can't add that fast, but that was many years
ago and the area has changed quite a bit. So, based on 36 two bedrooms and eight three
bedrooms you are looking at -- at an average of 96 more cars and 192 movements of
cars per day at an intersection that can't handle the -- the traffic that's already there. So,
in one sense it's kind of grandfathered in, because they are just trying to cross their T's
and dot their I's and finish their project and it wasn't anybody's fault there was a recession
or supply chain issues or whatever and he is just trying to finish it up and the other sense
that, you know, adding 96 more cars or families with -- you know, in and out almost 200
a day on the intersection that can't even handle it, with ACHD not even getting ready to
build the roundabout for another, what, two years. They are just taking public comments
now. I struggle with this because, yes, it should be there, but the question is should it be
there right now? Now, if we all wait for ACHD to catch up with development we will all be
gone from the planet before that actually happens. So, the question, then, becomes as
a Council and what's best for the City of Meridian -- to go ahead and say yes for the
conditional use permit for you to go forward or we ask them to wait, but, then, that
becomes a financial hardship for the development that's already been approved since
2014 when they are just trying to complete their project. So, I guess I'm asking rhetorical
questions here or making just comment. I'm -- I'm -- I'm on the fence, because, yes, they
should be able to complete it, but, no, we can't really add 200 more trips for cars per day.
So, I'm a -- I'm a big maybe on this one.
Seal: Yeah. And I kind of on purpose wanted to wait until last. We have had many long
hearings and many a late night over McMillan and Black Cat. We have denied an
application that was on the southeast corner of Black Cat and McMillan. We
recommended denial. City Council denied it. So, it is still an empty piece of land based
on the, you know, traffic alone. The issue that I have with this -- well, I will -- I will start
Meridian Planning&Zoning Commission
July 20,2023
Page 12 of 51
with everything that I like about it. I -- I like, you know, the way that the multi-family is put
together, the fact that it has ten foot pathways, you know, there is some room to breathe
in here as it would be. So, I have no issues with that. I have no issues with -- with multi-
family at all. What I do have issues with is that we are working on an approved report
from ACHD that used data from 2013. And that is quick math. That is ten years ago.
That's a decade. So, I didn't have gray hair when this was -- study was completed, so
that said it was approved back then and -- and like Commissioner Lorcher said, nobody
said -- nobody knew that it was going to take ten years to get to this point. But, you know,
I -- I'm having a very difficult time with needing to approve this, because, essentially, what
our purview is is this -- is this -- essentially the multi-family function a good use for this
plot of land and, traffic aside, I would say yes. The problem is is that we are using a traffic
report from 2013 in order to make that decision and we have no other option than -- than
to honor it, because we don't own the roads. ACHD does. So, to be perfectly honest, I
just -- I have such a hard time with that at this point in time and I'm getting so tired of
having these meetings and having to talk about McMillan and Black Cat and how it is just
adequately -- or inadequately it -- it does not provide for the traffic load that's on it today,
much less a few years from now when they decide to start planning for the roundabout
that--you know, that's going to go in there in 2028, as well as further down the road when
they might include Black Cat or McMillan in any further plans to do anything else. You
know, we are putting in a lot of homes, a lot of multi-family and I stress the word family.
A lot of kids along this corridor. A lot of schools along these corridors as well. And you
can't so much as put a foot between your -- the white line and the gravel on the road. I
mean when I was a kid I rode my bike everywhere. You can't here. And I have been to,
you know, few roads in this valley for kids that will never be able to do that again because
of inadequate roadways. So, to -- to be honest, I would rather vote no and have City
Council have to weigh in on this. I'm just -- I have nothing against the builder. I have
nothing against multi-family, I just think that it is wrong to approve this knowing the traffic
troubles that we have there. That's just kind of where I'm at and I don't know if that's
shared with my other Commissioners, but I just -- I struggle with this.
Smith: Mr. Chair?
Seal: Go right ahead.
Smith: Yeah. Just some thoughts tonight. I am frustrated. You know, you said you didn't
have gray hairs. I still had gray hair when this was approved. Or I still had hair. Sorry.
Not gray hair. Lost the punch line there. But it -- yeah, it's -- it's frustrating that ACHD is
moving as slowly as it is on this, but I -- I think there -- there is two things that are -- are
keeping this that -- to where I probably, you know, with -- with some heartburn and I'm
leaning toward a yes. One is that, you know, there is additional, you know, multi-family
on this corridor and also schools on this corridor. Now, there is the -- the Issue of
inadequate service, but there is also the benefit of having, you know, more multi-family,
more children closer to schools when you can consider that if someone is living here and
has to live in multi-family housing say in a different spot in Meridian, you know, you are
not really necessarily reducing -- you know, reducing the strain on the -- on the schools
in those areas, you are just shifting the load somewhere else. So, if I'm -- if I'm looking
Meridian Planning&Zoning Commission
July 20,2023
Page 13 of 51
at kind of a 30,000 foot level, I'm trying to think in terms of -- for the good of the entire
city, not just for this corridor. I still think that kind of edges out as a benefit of, you know,
there is -- we are growing out out there, there are growing pains and it's really frustrating
to see ACHD move so slowly on this, but I don't know that the answer is to shift that load
to other corridors and other schools that are also, frankly, kind of impacted because of
some of the ACHD issues. Yeah. The other side -- the other-- the other issue I'm having
-- and this is the -- the heartburn I would be having if I'm voting no is that in a sense we
are saying because you took long to build this we are going to make it take longer and it
-- I started to get into a mindset of, well -- and maybe not legally, but philosophically --
how long before this kind of becomes a taking? If we say this is a -- this is a pretty good
development, just not the right time, you know, and in a year it's not the right time and in
two years it's not the right time and I know that no one's recommending that, but there is
kind of a -- if we are saying this -- this roundabout it's going to take forever, you know,
how long do -- are we forcing this developer to kind of just sit with this, you know, and I'm
not comfortable -- I'm not comfortable having to hold them hostage to the whims of ACHD.
So, I -- I -- you know, I'm -- I'm -- I'm -- I'm half kind of talking about my position, half
thinking about that -- thinking out loud. I just -- I don't know that I'm -- I think probably
where you are if you are not quite comfortable with approving -- I'm not quite comfortable
voting no on it. I -- I think for all its flaws it -- it does benefit the city as a whole. It does,
you know, kind of start to -- to address some of the need for additional housing out there
and, you know, it's -- I don't know that we can -- I don't know that I'm comfortable saying
no just because ACHD moves slower than -- than we wish they would. So, this is where
I'm at at the moment.
Starman: Mr. Chairman, can I just interject about two minutes of some legal background
and I will let you all continue your deliberations. I think it's an excellent discussion and
exactly, you know, why we like to have, you know, citizens on our commissions and you
bring a great insight. So, excellent conversation. A couple legal points I wanted the
Commission to be mindful of as you deliberate. One is we are sort of in a difficult spot in
the sense that this project largely has most of its entitlements in place. We annexed the
property some years ago. It has a development agreement that's been approved and is
binding on both parties and the property's been platted. So, this property is far along in
the process in terms of city entitlements and that provides certain legal protections for the
property owner. With that said, this is a conditional use permit and the Commission
definitely does have the ability to place conditions on the project to mitigate impacts, but
we don't have the ability to just simply say we don't like the project anymore, we don't
want to do it. That -- that really is not legally viable. And, then, related to that is my next
point and I will be quiet and let you continue deliberations -- is that if for argument's sake
the Commission was inclined to say to deny the application, I just want the Commission
be mindful that there are specific findings that you all make when you approve or deny a
project that are required for conditional use permits. Those are in your staff report on
page -- starting on page 23, if you want to refer to those. But I would encourage you to
just be mindful of -- of the findings that you are required to make to approve or to deny
and, then, particularly if -- if you are in denial situation articulate your reasons why you
are denying, what those findings would -- are going to be when you adopt them, why you
are denying the project and, then, also importantly, you need to provide the applicant with
Meridian Planning&Zoning Commission
July 20,2023
Page 14 of 51
some information about how the project could be modified to address your concerns, so
that they could proceed with the project. So you need to give the -- you need to tell them
what they could do to fix their application essentially. So, that's just some legal ideas I
wanted to put on the table and I will let you all continue your deliberations.
Seal: Thank you. I always appreciate anything you have to add to keep us on track for
sure. Commissioner Grace.
Grace: Mr. Chairman. The points I guess I would make are that we need the housing,
the multi-family, the apartments and so that -- that's a -- that's a big concern of mine and
it's been around -- it's been in the process for a long time. I would ask somewhat
rhetorically maybe, but what else are we going to put there? You know, what are our
options? I understand the concerns about ACHD, but sort of in line with maybe what
Council was thinking, one of my points was simply the decision in front of us and, you
know, I know we have some discretion in that regard, but I -- you know, it's a CUP in front
of us and I -- I guess I would ask the -- you know, if there are additional conditions that --
that we think are reasonable and -- and might help some of the concerns that you have,
I'm willing to listen to those. I am. I know it's probably a tough question off the top of your
head right now, so I don't want to put you on the spot, but I'm not unwilling to consider
those and listen to those. A final point just to Commissioner Smith, your -- your sort of
compromise. I like that. If we go down that road of approval I do like the idea of giving
them the choice to decide how they want to meet the parking requirements, so that's all.
Thank you.
Seal: Well, that--yeah. I want to say-- I mean this --this is of no fault of the developer's,
so, honestly, I think -- you know, I mean usually try -- don't try and point fingers or, you
know, throw blame, but I mean as a city I think this is our problem that we have created
and so -- and -- and the hesitation that I have -- I mean I -- I understand that legally,
basically, we have to approve this, so we can put some conditions in there. You know, I
mean the parking, you know, one or two spots isn't going to make a difference in my mind,
you know, one way or the other. So -- you know. And, again, I think it's a quality multi-
family development and, again, I have nothing against multi-family development and I
understand the need that we have. The one thing I will say on record -- and we have
shown that, again, with the -- the application that was put in on the southeast corner of
Black Cat Loop and McMillan that, you know, we can't tell people that they can't develop
it. I can't imagine that we will annex in anything else in this corridor until at least 2028
and I mean the only thing that they are going to do is add a roundabout here, which to
me is like putting a fire hose connector on the end of a garden hose. It just doesn't make
any sense, so -- I mean you are going to let the -- you are going to let the traffic move
faster? Great. That's awesome that they can move faster. You know, I just -- just -- I
have a lot of heartburn with this -- not necessarily this application, but just with that traffic
corridor and what we are allowing to go in there. So, again, it's not the applicant's fault
at all, but it kind of speaks to where we are at as a community and I mean the need that
we have is being generated by ourselves, so -- yeah. I mean -- I don't know that housing
can get more expensive here. I would hope not. But I mean everything that we deny just
helps drive up the price, because, then, the demand just gets higher, so -- I don't know.
Meridian Planning&Zoning Commission
July 20,2023
Page 15 of 51
1 just really struggle with where we are at. But the city itself is not in control of its own
future as far as roads go and we are just held hostage by ACHD in -- in situations like
this, so I -- I don't know what we do about that.
Lorcher: Mr. Chair?
Simison: Commissioner Lorcher, go ahead.
Lorcher: I agree if this was a preliminary plat it would be an easy denial, but the fact that
it's been going on for so long, as legal said, you have to come up with a good reason for
denial and traffic is not one of them, because it's something he can't modify or control.
So, I guess we have made our peace with public record. You know, we don't like it. We
-- there is no fault for your development. I mean it's taken ten years and as the phases
have come through, but, you know, like I said I'm still -- I was on the fence, but I -- I don't
have a reason to deny it, except for traffic and that's not something he can fix, so --
Seal: I would agree with that.
Smith: Mr. Chair?
Seal: Commissioner Smith, go ahead.
Smith: I'm going to try to make a motion and I'm like -- I will echo what Commissioner
Grace said, if there are any amendments I'm happy to discuss them. So, after considering
all public testimony -- apologies -- staff, applicant and public testimony, I move to approve
File No. H-2023-0016 as presented in the staff report for the hearing date of July 20th,
2023, with a modification to require the developer either add additional parking spaces
for overflow parking or reduce the number of bedrooms to reach a -- a ratio that is
desirable with staff.
Grace: Second.
Seal: It's been moved and seconded to approve File No. H-2023-0016, Jump Creek
South Apartments. All in favor say aye. I will be a nay on this still. But motion passes.
Thank you very much. Appreciate it.
MOTION CARRIED: THREE AYES. ONE NAY. THREE ABSENT.
5. Public Hearing for Stapleton Apartments (H-2023-0033) by The
Architects Office, PLLC., generally located on the NW corner of S.
Meridian Rd. and W. Harris St.
A. Request: Conditional Use Permit for a multi-family development
consisting of 5 two-story buildings and 19 multi-family townhome
style units on 2.07 acres of land in the R-15 zoning district.
Seal: And with that I would like to open the public hearing for File No. H-2023-0033 for
Meridian Planning&Zoning Commission
July 20,2023
Page 16 of 51
Stapleton Apartments and we will begin with the staff report.
Hersh: The applicant has submitted a conditional use permit for Stapleton Apartments.
The site consists of 2.07 acres of land. It is currently zoned R-15, located at the northwest
corner of South Meridian Road and West Harris Street. History on the property is there
currently is a development agreement that governs the property and multiple -- multiple
phases of various final plats have already been approved. The comprehensive FLUM
designation is medium high density residential. A two story multi-family development
containing 19 dwelling units consisting of five residential apartment buildings with a gross
density of 9.18 units per acre consistent with the density in the medium high density
residential designation. The conceptual development plan included in the development
agreement initially proposed 18 units on this lot. So, they reduced it down to 19.
However, the applicant believes that this location would be better served with larger units
instead and, therefore, reduced the number of total units, thereby increasing the square
footage for each unit. The applicant's decision took into consideration the proximity of a
larger future multi-family project planned directly to the west of the site. Because the site
is only 2.07 acres, the total baseline area of qualified open space of ten percent of the
gross land for multi-family developments of five acres or more does not apply. In addition
to the baseline open space requirement, a minimum out -- area of outdoor common open
space shall be provided based on the square foot of living area per the UDC. The
applicant is required to provide common open space based on the square footage for
each unit. The submitted plans did not depict the square -- the square footage for each
unit, for the 19 three bedroom units. Staff recommends that the applicant revise the plan
submitted with the future certificate of zoning compliance that meets this requirement. To
satisfy the specific use standards for the 19 multi-family units a minimum of two amenities,
one from each category, must be provided and according to the plans and narrative
applicant has not provided any amenities within this development, so they do provide on-
site storage with roll-up doors. That can be counted. We just need to see floor plans for
this, each unit, and how big those are. The buildings shall provide the minimum setbacks
and the site plan does comply with this for the multi-family development. The site plan
depicts screen trash standards for only one trash enclosure provided for the multi-family
development. Staff, again, recommends the applicant work with Republic Services to
establish an approved location for the trash enclosures, as well as the adequate quantity
that would be required for this development. A minimum of 80 square feet of private
usable open space shall be provided for each unit. The requirement can be satisfied
through porches, patios, decks and other enclosed yards. Landscaping entry or other
excess ways shall not count toward this requirement. The submitted elevations depict
several outdoor patios and balconies that may qualify for this -- for this requirement.
However, without floor plans staff cannot verify it. So, we would like the applicant to
submit floor plans with the certificate of zoning compliance so we can do the analysis to
make sure that complies. This development complies with the dimensional standards for
the R-15 zoning district in the multi-family development and the landscape buffers next to
collector streets for the R-15 zoning district and also the height limit of 40 feet. They are
depicting 35. All access was previously approved with the Stapleton preliminary plat.
There are two primary accesses for this project that will occur on North Lone Pine Way
via West Harris Street, which connect to South Meridian Road. There is an additional
Meridian Planning&Zoning Commission
July 20,2023
Page 17 of 51
access through numerous roads in Stapleton Subdivision. According to the development
agreement the applicant is required to provide an emergency vehicular connection
between the site and the planned multi-family development to the west for
interconnectivity and they have shown that on their site plan to the southwest. Off-street
parking for multi-family developments is required to be provided per the UDC based on
the number of bedrooms per unit. The applicant is proposing 19 units consisting of all 19
being three bedrooms. In addition, there is one guest space for every ten units is required
per the UDC. Based on the total number of units and bedroom count distribution, a
minimum of 59 parking spaces with a minimum of 19 of these spaces to be covered in a
garage or by a carport. According to the submitted site plan the applicant is proposing
58 spaces with 24 of these spaces to be covered by the carport. The proposed parking
is short one stall from meeting the minimum code requirements. Staff is asking that they
add that additional stall and additionally plan for the deficient trash enclosures for this
site, which may impact the parking proposed, depending on what Republic Services
comes back for. And, then, there is also one -- one bicycle parking space is required for
every 25 proposed vehicle parking spaces. Based on the 59 spaces a minimum of two
are required and they provided four. Staff recommends that the applicant include an
additional parking stall to meet the parking requirements and allocate additional parking
spaces within close proximity to the development to accommodate the overflow needs for
this development and add a detail of the bicycle rack with the plan submitted for their
certificate of zoning compliance application. Existing detached sidewalks along West
Harris and Lone Pine Way connecting to the multi-family development, the applicant is
proposing attached sidewalks and other pedestrian walkways throughout the entire site.
Internal pedestrian walkways are required to be distinct -- distinguished from vehicular
driveway services, services through the pavers of colored or scored concrete or bricks
and they shall be constructed with a different material than the driving surface with the
plan submitted with the CZC. The landscape requirements for the street buffers are in
compliance on the landscape plan. All fencing is also --the proposed fencing and existing
fencing meet the requirements of the UDC code for this project. The applicant has
submitted conceptual elevations for the future multi-family buildings. Multi-family
residential projects also require administrative design review, so staff will perform the
thorough analysis at that time and they will also be required to submit a certificate of
zoning compliance that requires to be submitted for the entire development for us to
analyze as well based off of the conditional use permit conditions. And staff also wanted
to add that the roll-up doors adds a value -- is-- adds a valuable amenity to this developed
to the rear of these buildings. We haven't seen that before, so we thought that was kind
of neat. In addition, the conceptual elevations depict buildings with various roof lines and
materials, including stone, horizontal lap siding, vertical board batten siding, stained wood
and fenestration. Written testimony. We had one written testimony by Stacy Cable.
Concerns with cut-through traffic and neighborhoods exceeding 25 miles an hour. Safety
due to drivers making left turns from Harris Road onto Meridian Road without a traffic
light. And, then, staff does recommend approval with the conditions listed in the staff
report and staff stands for any questions.
Seal: Thank you very much. Would the applicant like to come forward? Good evening,
sir. I need your name and address for the record.
Meridian Planning&Zoning Commission
July 20,2023
Page 18 of 51
Ruby: Good evening. Can you hear me?
Seal: Yes, sir.
Ruby: Okay. David Ruby. 499 Main, Boise, Idaho. Thank you for taking the time to hear
me tonight. Here for the Stapleton Apartments. I'm here to present the questions about
the multi-family aspect. As you know, the single family subdivision has been approved
and is under construction. Most of the homes are going in. Our goal -- or this all started
back with the annexation and rezone with case number H-2018-1029. Our goal tonight
is to obtain approval for a conditional use permit. The next steps in the process would
be submittal of design review and CZC applications, which we are working on. And, then,
following that we will submit plans for building permit -- building plan review. This project
is for 19 units. I -- I believe the original approval was 24-28, but as staff mentioned in the
time frame that has elapsed and doing a market study with that large project nearby, they
have opted to proceed with only three bedroom units, because they felt that was the --
the greatest need in that area right now. So, that is what we are showing. So, it's 19
units total in five two-story buildings. The buildings are designed to be similar both in
height and overall mass with the other rural neighborhoods that are around. The
materials, roof lines and -- and whatnot are very similar to those homes. We have
reviewed the staff report and we are in agreement with all conditions of approval in that
report. We will update various drawings as requested in our upcoming design review and
CZC application. There are only two conditions that I just want to touch on briefly and,
then, I will keep it short. Condition A-3 -- or A.3.F, Amenities. Over the past day or so
we have been in communication with staff and we are -- I think between my client and
other planners involved in the -- the overall Stapleton project are -- my understanding
coming here tonight was that we are basically in agreement with providing two amenities,
one of which is the storage shed that Stacy mentioned. The other -- and I just realized I
didn't bring a thumb drive with a drawing of it, but the -- the plan that was up there, the
site plan -- and you can't really see it, but on the very right-hand corner of that site that's
almost touching the title block there, there is actually a dog park -- that was another dog
park that was put in with phase one. That was not part of the previous requirement. They
just -- the other one was so popular they added another one and it's my understanding --
maybe staff could comment on that -- that they discussed that and that would be
amenable to them. If that is the case we are completely in agreement with that. The
other condition is A.3.E, open space. I just wanted to comment that the -- the patios are,
in fact, large enough to meet the common open space -- or the -- the private open space
requirement and, then, I have double checked it and I will do an exhibit that shows that
we do have adequate space on site for the common open space as well. So, with that I
will stand with questions.
Seal: Commissioners, do we have any questions of the applicant or staff?
Smith: Mr. Chair?
Seal: Commissioner Smith, go ahead.
Meridian Planning&Zoning Commission
July 20,2023
Page 19 of 51
Smith: Question for Stacy if she could comment on the discussion of the dog park and
any staff thoughts or considerations on that.
Parsons: Okay. Chair, Members of the Commission, yes, the applicant and I had a
discussion this afternoon about that and -- and I -- we did discuss this with -- this topic
with the chair as well as we deliberated as we got prepared for tonight's hearing. So,
there -- there is some gray area here for sure and that's and just like the legal counsel
tells you, you know, it is a conditional use permit. So, this is your opportunity to say, okay,
do you find that a dog park on the adjacent -- abutting adjacent from this property meets
the intent of the code or do you want to physically see two amenities on this particular
development. When Stacy and I looked at the record it was very clear to us that although
conceptually multi-family was approved here, it was still required that it would go through
a conditional use process and we would analyze open space and amenities and parking
at that time and the design, which I think the applicant's done a pretty good job here. I
really -- I really like what they have done with it. I like the fact that they also reduced the
number of units. I think it fits in better with the character of the neighborhood. So, that's
the other caveat that we are not privy to, Stacy and I or the city in general, is there are
CC&Rs out there that govern this particular property and, then, those CC&Rs -- this -- it's
apparent that these are shared. They are --they are joined together as one development.
So, that's something that at least we want to bring -- put on the record, then, inform you
that, yes, although this site doesn't have the two required amenities, it has one, there are
amenities in this subdivision that are above what code required at the time that it came
in, along with the open space. So, again, that's kind of your purview tonight. Do you want
to see more amenities on this site? I'm -- I'm -- we are in agreement with the applicant. I
think he's going to have plenty of open space with the 19 units here. No -- no doubt about
that. So, it really comes down to whether or not you guys are comfortable with the CC&Rs
and that the two developments are married together and -- and joined in sharing in all the
open space and amenities, because if I lived in Stapleton and there was an amenity --
obviously, the amenity for these apartments won't be used for the -- by these neighbors
if they are here to testify in that, because it's storage for the apartment renter. So, that's
-- that's something that you have to take under consideration when you look at this, yes,
although it's all integrated and meant to be one development, there is really no benefit for
these -- the single family homeowners to go to the multi-family development, because
there is nothing for them to share. So, that's something to take -- to take into account
when you look at a dog park across the street. Yes, can that work? I think it can work.
I'm comfortable with that. I'm comfortable with the CC&R language. But, again, it's
whether-- this is a conditional use permit, we have people who --that may feel differently,
but certainly just wanted to go on the record and share that conversation with you.
Seal: Okay. Thank you, Bill. Appreciate it.
Lorcher: Mr. Chair?
Seal: Commissioner Lorcher.
Meridian Planning&Zoning Commission
July 20,2023
Page 20 of 51
Lorcher: Dave, you mentioned there was annex-- annexation and rezone. How long has
this project been in the works?
Ruby: The number says 2018 as a part of that. So I'm assuming --
Lorcher: Okay. So, 2018.
Ruby: Yes.
Lorcher: And are all the single family homes already built?
Ruby: No. No. There is -- you know, the -- the neighbors probably can attest better than
me. About half.
Lorcher: About half.
Ruby: It looked pretty empty when I went out there.
Lorcher: Oh, you have another phase to go for single family houses?
Ruby: Two. Yeah.
Lorcher: Two or three.
Ruby: I believe so, yeah.
Lorcher: Okay.
Ruby: Yeah.
Lorcher: All right. Just curious. Thank you.
Ruby: Yeah. Thank you.
Seal: Commissioner Grace?
Grace: Mr. Chairman, I had a -- Dave, I just had a question about the storage units. What
-- can you just elaborate a little bit on the storage units and what those are and -- and --
Ruby: If you -- Stacy or Bill, would you mind going to one of the exterior elevations? They
are attached to the backs of the units and they have -- they have a roll-up door. So, a lot
like people would have out the back of their garage to their yard. Can you zoom -- can
you zoom in on any of that? Is that possible or is that high tech? The -- the bottommost
elevation that you are seeing is the rear and, Bill, you can kind of see the door. They are
fairly large. So, they are per unit right attached -- right next to their patio.
Meridian Planning&Zoning Commission
July 20,2023
Page 21 of 51
Grace: And, then, if I'm mischaracterizing this tell me, but are -- for lack of a better way
to say it, are you getting credit for the second amenity for something that's already there?
Ruby: That's one way to put it. And I -- I guess I'm going to bring it up now even though
I wasn't going to, because we have had -- staff and I had a disagreement and we have a
staff attorney here, so I would love to know what the true legal basis is, because as
someone on the outside of that world -- I'm the architect-- I read through the development
agreement, which told me which amenities the entire development had to have. It
specifically told me how I calculate parking for a multi-family development. Told me all of
that. That was a few years ago. So, when I'm going through it, the difference in opinion
we had is do you ignore all that that's in a legally binding development agreement or to -
- to use the current recently updated parking counts, open space calculations, that sort of
thing, does that trump a legally binding development agreement? Which the reason I
bring that up is because all the amenities were supposed to be shared and so we wouldn't
have to provide any.
Grace: Okay.
Ruby: That's my point. So, we opted to not try to pick a fight about that language with
staff and we --when they had those discussions about the amenities, the shared dog park
being something they just voluntarily built with -- and it sounded like staff was okay with
that. Let's proceed with that. So, I wasn't even going to bring that up, but to answer your
question, because I -- I'm -- I'm not trying to -- that kind of sounds bad when you are like,
oh, yeah, we are trying to take credit for something that's already there, but --
Grace: So -- so -- I and -- in my mind I -- I can understand. What you are saying, then,
that it was your understanding that -- that it would be a shared amenity and you could use
it in this nature in this way.
Ruby: Probably the -- the better way is it was my understanding that we were required to
provide zero amenities. They were already required -- and as a part of the development
agreement, which we did. This multi-family lot was not required to provide anymore and
it didn't say provide them per the UDC for multi-family standards. It lumped everything
together. If that makes any sense. Sorry.
Seal: Yeah. Yeah. Yeah. And I mean as -- as we go through this -- and that might be
something that we work on in the code to better structure that, but generally speaking,
especially when we see something like multi-family, we want it to stand on its own. I
mean I'm -- I'm just -- you know --
Ruby: I -- and I don't agree with that, Mr. Chairman, but what is confusing is it doesn't
just say meet the parking requirements -- and I'm using parking because it's more
detailed. It literally says this is how you calculate it and it doesn't follow that paragraph -
- and this is the development agreement I'm talking about -- with language that says or
as modified in the future. It's -- it's a contract. So -- so, is everything else. I think it's a
difference of the world I'm working in day to day versus city staff; right? They are reading
it through their lens. I'm reading it through mine. But I would love to know truthfully,
Meridian Planning&Zoning Commission
July 20,2023
Page 22 of 51
because it is no fun being told you didn't provide amenities when you thought you did
what you were supposed to do. We are not trying to get out of anything, we are just --
Seal: Yeah. I mean I can't speak to it legally, but I mean as I look at this piece of property
I would hope that you would be able to enjoy amenities without having to cross the street.
That's my point.
Ruby: Well, the true goal of this is it's not -- it's not a big multi-family that just happens to
be out on the street in front of the subdivision. It's part of this neighborhood. It just is
both ways. I mean it's very small. I mean if it was bigger we would probably have a pool
that could be shared. It's not. It's 19 units, so --
Seal: Okay. Bill, do you want to offer anything? I mean, you know, I -- I would like to
hear the -- the other -- you know. Or more information on that as far as how the -- the
legality of it occurred. I mean if you want to pile in on that I'm -- I'm more than fine hearing
from either one of you, because I am not an expert in this.
Parsons: I'm happy to chime in on -- on some of that topic and, then, Kurt, if he wants to
weigh in on it he's more -- he's -- he can do that as well. So, that -- that's -- that's where
I think staff and the applicant are in agreement. It's gray. That -- and that's -- because
when -- when you guys approved -- or recommended approval -- or the city approved
Stapleton in 2018, the concept plan showed 28 multi-family units. As part of our review
of the annexation and we had to make findings how do we get them compliant with the
density requirements of the Comprehensive Plan. We worked with the applicant. They
threw on this token multi-family development to try to increase the density on the particular
property and we -- they weren't ready to submit a conditional use permit at that time. So,
when staff analyzes that and you see that in the -- in the body of the staff report, it's -- it's
generalities. It's not thou shall do this. When we are looking at it. We are like keep in
mind when you come forward think about these things. Parking is -- open space and
parking always drives the design for multi-family and I know David can attest to that,
because he does a lot of projects in this valley for this. He's got the niche on this, so he
understands our standards very well. In this particular case -- and this is what I have told
the developer-- is you got caught where you had an entitlement and, then, code changed.
So, now -- so, right now as an example we have a -- a screen here in front of you -- when
we look at it it says very clearly to us that everything will be evaluated with a future
conditional use permit. However, when I go to the development agreement all it says is
you need a conditional use permit. It didn't say you need to comply with the specific use
standards. So, that's where I can side with both the applicant and I can side with us
saying, yeah, we didn't -- we weren't specific enough to say that the multi-family
development needs to do X, Y and Z. All we did was conceptually approve it for a multi-
family development in the future and now we are here tonight to debate or arbitrate what
we think is appropriate. So, looking at the letter of the law, if-- that's why I said if you feel
like the intent was there and the intent was always there to integrate these two things,
then, that's one thing. But, again, it's a conditional use permit and it's your purview if you
still feel -- to make it in the best interest of the community to have additional amenities for
this development. That's your purview tonight. So, that's why we really put it on you. I -
Meridian Planning&Zoning Commission
July 20,2023
Page 23 of 51
- I'm comfortable -- that's why I said I'm comfortable either way. All the amenities in a
residential subdivision -- you have to walk to them unless you live right -- right next to
them; right? So, again, that was the intent here. Yes, it's -- is it a perfect situation? No.
But I think all of us are learning -- kind of going through this and saying we need to
reevaluate that, because if we truly wanted something different, then, we truly should
have said we want it -- the multi-family to have its own amenities and open space. And
to your point they really should stand alone. It -- but it should still integrate. So, that's --
again -- and, then, just the fact that the CC&Rs showed that it was -- that integration did
occur, I -- I think there is kind of -- I could see it both ways I guess and that's why I say
it's gray. I don't -- and that's why we will leave it up to you guys on how you guys want to
go with it. But to me I -- again, it was always one development and they added it at the
request of staff to make sure that we got additional density. And the fact that they reduced
the density, again, I think they are trying to, again, help integrate a little bit better into the
community.
Seal: Okay. I appreciate that, Bill.
Lorcher: Mr. Chair?
Seal: Commissioner Lorcher, go ahead.
Lorcher: So, if the conversation is revolving around amenities as a standalone multi-
family development of 19 units, is your client amiable of putting in a tot lot and a dog park
to be able to accommodate, so that those things are withhold -- I mean you have plenty
of space since you went from 28 units to 19, so there should be plenty of open space to
be able to have your -- even though the community is integrated with the entire thing, but
if I'm in the unit at the front of the development and the dog park is all the way at the other
end, you know, it -- it might be not necessarily a challenge, but it would be -- it would be
inconvenient. But if there was something closer where all the buildings clustered, then, I
feel like, well, now I'm part of my little community in front, even though I'm part of a bigger
one. Does that makes sense? So, would your client be an amiable to possibly putting in
a couple more amenities?
Ruby: Madam Commissioner, you put me in a tough spot. My client -- and when I shared
the staff report -- is completely adamant that this was all agreed upon up front and he --
I'm trying to walk a finer line, a more compromising line, because he -- just his memory
and his stance of being a part of it was -- and he told me this from day one, actually, and
I -- I think I brought it up in the --the --the pre-app -- is -- because I thought it was strange.
No amenities. No open space; right? Because that's -- that's -- and that's where I start.
And so it -- and to answer your question specifically, I don't -- I mean I could put a token
tot lot, like -- but I couldn't fit a real amenity with the open space that I have to get, even,
though we did reduce the numbers, because I did that calculation yesterday, drew them
out, and it eats up the space pretty good, actually. Just a final --just a little comment on
the -- the -- I guess part of his adamant -- the reason he is so adamant about that is -- he
was like, well, why do we have a DA then? Because that's --from a developer standpoint
-- and I'm not a developer, I'm just an architect. But it helps mitigate some of their risk. It
Meridian Planning&Zoning Commission
July 20,2023
Page 24 of 51
takes some of the unknowns away, so that as they move forward -- and it's not black and
white, because, obviously, that's like the last project times change and you have to adapt
a little bit. But some of the risk goes away. So, that's kind of the question is which one.
Smith: Mr. Chair?
Seal: Commissioner Smith, go ahead.
Smith: So, two questions. One to make sure -- so, as I'm understanding the previous
development there are two dog parks and those are the two amenities. Or is there one
dog park?
Ruby: Mr. Commissioner, in the -- in the phase -- I don't know which phase, but in the
single family subdivision I understand there is a large dog park and, then, a -- I think it's
a half acre community park with tot lot, climbing dome -- yeah, there is a whole list. It's a
pretty substantial park and it's also fenced. Yeah. There is a basketball court. And I was
told to make sure -- to mention that it's fenced, so that parents can sit with their kids and
not worry about them just darting out into the road. But those were not -- that's -- that's
the only reason I can kind of in good conscience even come up and propose that is it was
not part of those -- those amenity package at all. I don't know if it was a corner just
happened to be right across from this that was available. I don't -- I'm sorry, I don't know
the history of that as well.
Smith: Okay. Thank you. And my next question is -- I did want to confirm -- it sound -- I
believe I heard Stacy -- this is -- this is part of -- there are additional phases expected or
is there additional -- like a multi -- larger multi-family development?
Ruby: Not -- not -- Mr. Commissioner, not in Stapleton. These 19 units are the large -- it
-- it -- I mean as we are all growing it's to our west. I believe there is plans for a much
larger --
Smith: But that's not --
Ruby: No, it has nothing. No. Different client. Different everything.
Smith: Okay.
Ruby: Yeah. That -- that was -- that was my concern was less -- the way -- the way that
I was thinking was less about -- we are kind of straddling the line here, but I wanted to
make sure it wasn't going to be --okay, there is another 19 units and that's what's included
in that. That was my concern, so --
Ruby: No.
Smith: Okay. Thank you. That helps.
Meridian Planning&Zoning Commission
July 20,2023
Page 25 of 51
Parsons: Mr. Chair, Members of the Commission, if I could just let you know also Mr.
Ruby doesn't know all the entitlements out there, but there -- and some of you are newer
commissioners and you don't know all the history out there either, but you are correct
there is a 200 plus unit multi-family development that potentially could come down the
road in the future and, then, as part of those residential developments that have been
approved in that section the developer was required to give a certain amount of land
towards the dedication of a city park in that area. So, I just -- I just wanted to put that out
there, too, that there will be a public amenity out there for the residents to use and that
will come in the future when those developments start happening and final plats come in
and those pieces get put together and the park gets built out there. But I think it was a --
I can't remember if it was a neighborhood park or a community park, but I think pretty --
pretty nice amenity happening in the future.
Ruby: I think I heard about that in the pre-app, too. Yeah. Much larger.
Seal: Quick -- quick question for staff. Lone Pine Way that's ACHD's road; correct?
Hersh: Mr. Chair, yes, that is.
Seal: And to be honest, the -- the only heartburn -- and I -- I get it that -- I mean different
parts of subdivisions share all the amenities and everything, but we have had issues in
the past where people have to cross a busy road to get from, you know, where they live
to their amenities, so -- and where this is -- you know, the entire thing is basically on the
entrance and exit to the subdivision, I just -- I -- you know, I hesitate for the safety of
people that have to cross that street in order to get to the -- you know, to the different
amenities that they are there. So, is there something that can be done in order to help
mitigate that? And I pose that question to staff and the applicant as well as far as, you
know, can -- can there be a signalized crossing put in there or something along those
lines? So, you know, when kids, families, you know, moms pushing strollers or dads
pushing strollers, for that matter, you know, want to go over and enjoy, you know, the
park-like setting that's over there, can they get there safely.
Ruby: Mr. Commissioner, my only comment would be -- and I'm not trying to make light
of it, but I -- I think a majority of the houses in the subdivision will have to go further to go
to any park or dog park and these folks to walk to that one dog park -- if that's kind of
where we are focusing and crossing streets -- I mean I think one of the things that we --
we did -- we didn't do because we couldn't, because the fence was already up, but Caleb
was actually asking for a connection north to that future city park, which there probably
will be a crosswalk of some kind at some point, but nobody knows when that's coming in.
The fence is already built, so we didn't -- we were trying to focus everything inward. I --
don't -- I mean I as the applicant and his agent don't have the authority to agree to like
put a tot lot on here. You definitely do have the authority to require that if that's what you
think we need to do. I just can't. Because he's told me -- I asked him what stance do you
want me to take and he's just -- he firmly believes that the DA did not require any of that
and that it can't be added at this point.
Meridian Planning&Zoning Commission
July 20,2023
Page 26 of 51
Seal: Okay. I mean I find it interesting he's willing to die on his sword for something like
that, but at the same time I get it, so --
Ruby: And I -- I -- I probably should be quiet, because I shouldn't be putting words in his
mouth. I don't know if it was e-mailed and text discussion, so --
Grace: Mr. Chairman?
Seal: Go ahead.
Grace: I'm getting the sensation that we may hear from -- opinions from neighbors and
before we do that I wanted to ask you what kind of conversations, if any, do you -- are
you aware of that have occurred, whether related to the amenity in particular or anything
else from your perspective?
Ruby: Mr. Commissioner, I received two e-mails out of the letters that we had sent out.
I think they were both from neighbors of the subdivision that's north and a little bit west
and they were -- they had really nothing to do with amenities or unit, it just was all about
traffic. Just issues with traffic, which, again, I plead the Fifth a little bit. I don't know that
area as well. I spent more time out there during the neighborhood meeting just to try to
get familiar with it, but there was nothing about amenities or -- and I have not heard
anything since.
Seal: Okay. If nothing further I think we will move on to public comment portion. Thank
you, sir.
Ruby: Thank you.
Seal: Joy, do we have anybody signed up?
Hall- Mr. Chair, we do. And let's start with Mary Scheller.
Seal: Good evening. I will need your name and address for the record, please.
Scheller: My name is Mary Scheller. My address is 4220 South Chesman Avenue. I'm
one of the residents in the Stapleton community. My husband and I bought our home in
August of 2022. We like the neighborhood as it was quiet. Currently there is a lot of
construction traffic, but once that stops the only traffic in the community would be from
homeowners and visitors to the homeowners. This is a nice -- there is a nice community
park. This was the appeal for us to buy a Black Rock home in a community where we
did. We were never informed, nor was it disclosed to us prior to buying our property that
there was going to be a multi-family apartment building in our subdivision. We had -- had
that been the case we would not have bought in that --we wouldn't have bought our home
there. If you look up the Stapleton community it states the following: Black Rock Homes.
Stapleton embodies a nice mix of highly sought after two story and single family homes
in Meridian, Idaho, featuring a community park with open space and playground,
community dog park, walking paths. Centrally located with great access to the interstate.
Meridian Planning&Zoning Commission
July 20,2023
Page 27 of 51
The plat maps that I looked at -- that we looked at when we bought the property has four
phases. We are in the first phase. They are just now starting the second phase. So,
they have phase two, they have phase three and they have phase four to go and that
doesn't even include this multi-family development. We did not see that on our plat maps.
I have -- this was the original plat map that I did look up, because I noticed on the
information that, yeah, homeowners all shared with one another. This is the original plat
map. This does not in the common land, looking at this, does not show anything about a
multi-family apartment complex. It also -- if you look up this Stapleton community
currently it shows you the plats available, which, again, doesn't show the multi-family.
This one I just pulled up. This one is from July 8th. Today is the 20th. So, 12 days ago.
Again, this looks like --this is where I'm guessing that the multi-family apartment complex
is supposed to go, but to us the common person -- this looks like trees and landscaping.
It doesn't show anything -- and it was never disclosed to us that we -- it's supposed to be
a multi-family unit there. Now, we did get the CC&Rs after we signed all of the final
paperwork and I have -- we went around to our neighbors and this many people signed
that, again, had they known that there was going to be a multi-family sub -- a multi-family
building there they would not have bought or they would have -- they are voting no to do
the apartment -- the multi-family complex, because there are literally two ways in our
subdivision. You come in off of Meridian Road and, then, we happen to live -- we happen
to live right here and if you go -- you have to go up this road and this is where the multi-
family unit is going to be. So, this is one exit and the other exit the -- is right here. You
have literally two exits. All the rest are residential streets and where they want to put this
multi-family -- the dog park -- right here is where they want to put the multi-family unit.
Right here is the dog park and right next to that is the community park. So, there -- if they
are doing three --
Seal: You will need to wrap up here pretty quick.
Scheller: Okay. If they are doing three bedrooms, those families with those little kids are
going to be walking all the way down here just to go to the park. So, I would say vote no
on it, but -- and you are going to hear from a lot of other homeowners who are going to
tell you the same thing, because they were never--we were never informed that that was
in there. Yes, it could have been in the CC&Rs, like he said, but we didn't get those until
after we already signed the final paperwork. Thank you.
Seal: Thank you.
Hall: We have a Natalie -- and I won't even try your last name. Sorry.
Knighton: Good afternoon -- or good evening, everyone. Mr. Commissioner. Committee
Members. Staff. My name is Natalie Knighton. I am a new resident in the Stapleton
community, so --
Seal: Your address, ma'am.
Knighton: I'm sorry?
Meridian Planning&Zoning Commission
July 20,2023
Page 28 of 51
Seal: We will need your address, ma'am.
Knighton: 4193 South Chesman. Right next to Mary.
Seal: Thank you.
Knighton: So, this developer sounds like a gem. So, David --
Seal: Ma'am, can you speak into the microphone.
Knighton: Oh. I'm sorry. I said the developer sounds like a gem. So, I appreciate David
coming and falling on the sword for him. So, I stand before you today strongly opposing
this multi-family unit complex and our peaceful housing unit. While I understand the need
for urban development and this particular project proved -- I'm sorry. I'm going to have to
wear my old lady glasses. This particular project poses significant concerns that we
cannot afford to ignore. First and foremost is the addition of this complex undoubtedly
will lead to increased traffic congestion as you heard Mary say. If you are not familiar
with our road you should go out and try to pull out on Meridian Road. You take your life
into your own hands. Okay? It's pretty uncomfortable.
Seal: If people in the audience can keep their comments down. Thanks.
Knighton: So, it also compromises our safety. So -- so, there are two exits, as Mary said.
The first one coming out on Harris, which you can turn left at our own risk and the second
one we cannot turn left, we have to go up and make a U-turn. So, imagine adding another
59 cars plus to that process. Very congested. So, really this is going to create a
tremendous traffic jam and also be humanly treacherous. Moreover, a construction
project with a complex like this will have an adverse effect on our environment. In addition
to the concrete and the infrastructure, it will disturb the aesthetic balance as described in
the homeowners website about where we live and why we bought here. Furthermore --
and it -- allowing the complex next to our housing development will significantly lower
property values, as you all know. I'm interested in how many of you have a complex in
your communities or how many of you would purchase your home in the community if you
had known, as we did not, that this was coming. Of course, David and probably many of
you would have been smart enough to know where to find that information, but we were
not and it was never mentioned. So, as a personal testimony -- I don't know if you are
familiar with Hazelwood Village, but I just sold a beautiful home there. Do you know why?
Because they put a multi-family apartment complex in. Okay. I sold my home. And
loved my home. So, I was sick to my stomach when I heard this. Our housing
development was built with a vision of fostering a close knit and serene community. In
addition, the larger complex might disrupt this harmony and potentially leading to noise
disturbance, privacy issues and a sense of overcrowding. I am curious about what the -
- the study is on crime increasing as well, because I'm certain, as I heard in my other
neighborhood, I lived kitty corner to a policeman who told his ten year old daughter -- she
could no longer walk alone in our neighborhood when the apartment complex came in.
Okay. So, you might look at us -- a lot of us have gray hair. We came here to sunset;
Meridian Planning&Zoning Commission
July 20,2023
Page 29 of 51
right? So, we are not very thrilled about having to share our community with folks who
may come in from a larger city may not respect our peace and our values here. So, there
are certainly-- there is certainly a need for housing in our community, but have we known
I personally and many of us here would not have purchased our home, put our life savings
into this development. I want to retire here. If this passes I will reconsider. Thank you.
Seal: Thank you. Joy?
Hall: Georgia --
Konkoly: Put my timer on here.
Seal: Good evening, ma'am. We will need your name and address for the record. If you
just want to grab the microphone and speak into it, please.
Konkoly: Georgia Konkoly. 3790 South Lone Pine Avenue. I'm a resident of Oakwood.
I'm here to give you a reality check. I don't know if any of you live in this area. It's very
dangerous to make a left-hand turn on Meridian Road. It's a 55 mile an hour speed limit.
Most people go 60 and 65. The only access -- we have already heard -- through to
Meridian. There is also another one. If they back up and they go down Kentucky Way,
which is our area. And I -- I'm -- I'm up at 6:00 o'clock. I'm out of my house at 6:30. 1
swim every morning for an hour. I have to go -- if I go straight down Victory and I want to
make a left turn with a light, I have to take my life in my hands, because people just run
through the red lights on -- on Meridian Road. It's -- it's standard. If I'm the first car I give
it ten seconds before I hit my gas to make sure that I can get across free. I go on Stoddard
Road up to Overland and it's a bigger cross and I still give it ten seconds. I come back to
my house about 8:15 in the morning. The traffic on Meridian Road is so backed up people
have to wait for two, sometimes three lights to get through a light going north and south.
It's not even giving those people a chance to get out. And I had another point -- I'm sorry.
I'm 78. I'm losing my -- my thoughts. I'm -- I'm totally against this, because our -- our
area is a very sweet quiet area. It's a wonderful place to live. Everybody gets along.
There is no hassles. We help our neighbors out. And I don't want to be really negative
about apartment dwellers. I was one for sometimes in my life. But they don't have the
homeowner spirit and they don't take care of things the way homeowners do. Yeah, you
have got landscapers, but you have also got people who don't watch their kids necessarily
and people going on a 25 mile an hour speed limit going 30 and 35. That's on Kentucky
Way where I have to make my right turn to get -- get -- to get down to Victory Street. It's
going to be crazy. They are building another -- what -- they said they were going to build
between 140 and 200 homes west of Stapleton. How are we -- how are we even going
to get our cars out? It's crazy. I -- I urge you to vote no on this. Please. Thank you.
Seal: Thank you.
Hall: Ruth Brogdon.
Seal: Good evening, ma'am.
Meridian Planning&Zoning Commission
July 20,2023
Page 30 of 51
Brogdon: Good evening, Chair, Commissioners, staff and attendees. Before you start
my time I did have one house cleaning thing I would like to ask. If we had a technical
difficulty where -- we had a lot of other people that would have come here if they knew
they could not attend by Zoom -- who really wanted to share their concerns with you this
evening and many couldn't make last minute -- I have already had texts -- couldn't make
last minute childcare et cetera because our technical things did not work. So, I would
implore you, besides my comments, to at least give them an opportunity to e-mail after
this hearing, because they are disenfranchised by not being able to speak when they had
planned to, but we had a -- we understand you had some technical difficulties, but I don't
think we can just say, well, if you can't get down here they can't -- they may not even be
able to hear you. They may not be able to get on to even listen and you don't have any
phone lines open now. So, I would just ask that that would be the fair thing to do. Number
one. Number two, my name is Ruth Brogdon. I am a resident at 103 West Norwich
Street. I purchased my home just in March. As you have already heard, we saw a
Stapleton block that looked like a -- no one ever said a word Stapleton Apartments. I
have never heard it before. I wouldn't even know now. I never-- none of us ever received
letters. We never received any postcards. What we saw this week or last week was a
posting by somebody on our mailboxes that said did you know this was happening? Here
is information. Go look on the city site. That's how we found out about it. So, that's a
concern. Also as you have already heard, I'm concerned about this approved permit in
2018, because what I also heard is that you are able, because you did not have a new
open space study, a traffic design, it was a conceptual idea that you would have the right
to say no to this from what I can see. Also I -- I purchased based on the plans that I saw
that didn't show any kind of apartment buildings, no Staples -- we have a -- we have a
name of Stapleton, which are homes and now there is going to be -- Stapleton is going to
be known as these, you know, all these apartments and things. So, that was another
thing. We -- has there been an updated traffic flow study for all of these apartment
conditions? When was the last traffic study done? You have already heard -- I have
never seen anything like trying to turn left there on Harris or trying to go through all the
construction we can hardly -- I already have two brand new tires with holes in them trying
to go through the back construction way as she's talking about, down Kentucky. Either
way you are taking your life in your hands, because you can't even get through that street
and we don't have -- like we have already said, we have hardly any of our single family
homes finished in the other phases. We haven't even gotten to these multiple -- you
know. And how do we know how many cars will be coming out of there, how many drivers
will be in each three bedroom unit et cetera. So, none of this was explained to us. The
other thing is -- is my concern also is that a light is desperately needed somewhere there
and here is the thing I heard you in the last conditional use permit. So, we make a plan
ten years ago or five years ago here, we don't have the street structure and process yet
or we don't know whether it's going to be. But, of course, you are approving a future plan
and you don't know what the situation is going to be. All these homes that are built out
already are going out and you have to get through these lights on -- but, then, you are
going to say, well, this developer, for whatever reason, we didn't have COVID in 2014.
We didn't have COVID in 2018. So, for whatever reason they get to just wait ten or 20
years and say, hey, we get the old plan we can still buy that traffic -- not by the reality of
Meridian Planning&Zoning Commission
July 20,2023
Page 31 of 51
what the citizens are living through now and we haven't got to here yet. So, that's another
issue. If -- if the planners did -- made these decisions on prior traffic patterns, how can
you not make them update these plans now and go through another process? The last
thing is, you know, we bought these things with a builder and with what we could see
which was not this apartment situation and so now we have paid our money, we -- and
we count on you, the Commissioners, we count on you to find an alternative area without
these existing approved plans that we were not privy to, to protect our property values,
protect our traffic situation and safety. We would ask that you say no to this conditional
use permit. We appreciate that this is not good use of land when you are going to further
impede traffic and cause many more issues. I noticed that also it was said that technology
issues weren't addressed. So, I would like to ask you to vote no. And I would also like to
know -- we keep talking about this person. What's the name of the client -- we should be
able to know who that is. What builder? We have a lot of builders out there. What's the
name of the builder that is wanting to do this and did not share this information? Thank
you.
Seal: Thank you.
Hall: Linda Stevens.
Stevens: Good evening, Commissioners. I am Linda Stevens and I live at 3900 South
Lone Pine Avenue and I wanted to also -- not to beat a dead horse, but the road
infrastructure. I'm always wondering why builders do not get permits for the infrastructure
when they build homes. At the end of Harris Road there are 200 KBH road -- KBH homes
going in there and that's in back of Stapleton. I know that Stapleton has about a hundred
homes, so that's 300 homes that go in and out of Harris Street, which is only a two lane
road and at least -- everybody I know has at least two cars. So, that's 600 additional cars
already that are going to be going back and forth on Harris Road. Needless to say with
more Stapleton apartments and more townhouses going in it just increases the traffic so
much. I also wanted to address the -- it seems silly the dog park issue on Stapleton. I'm
well aware that the people that live in Stapleton -- and no offense to any of you -- they
bring their dogs over to our dog park, which is clearly for our subdivision. They let their
dogs run rampant and they do not pick up dog stuff. So, an additional dog park would
only be great. But when you addressed earlier, Mr. Seal, about your traffic concerns,
about the project that -- at Jump Creek that was approved ten years ago, the -- I just can't
imagine the traffic and I wish that ACHD would have to approve building permits before
they allow builders to put two and three hundred homes in when there is not adequate
roads to go in and out. Thank you.
Seal: Thank you. Madam Clerk?
Hall: There is no one else signed up, sir.
Seal: Who else would like to come up and testify? Sir?
Johnson: Good day, everyone. My name is Mitchell Johnson. I live at 162 West Haniken
Meridian Planning&Zoning Commission
July 20,2023
Page 32 of 51
Street in the Stapleton community. First thank you so much for staying so late this
evening to hash this out. I have lived there since March, like my neighbor there. And like
them I only heard of this Monday of this week. When we were buying none of this was
mentioned. Nothing like this was disclosed when they were describing the future plans
of the community. They told us about phase one that was finished. Phase two, three and
four that were coming up and like my neighbor said they are currently in the beginning of
phase two. I was looking at the Stapleton plat map for available lots. Currently the map
shows this area of land, but it is not labeled as any kind of future development. It's totally
blank, so to speak. Which in my mind would lead potential buyers to believe that nothing
will actually be there, unless, you know, some sort of notice was given. The 200 houses
are planned in this area. Probably 30 to 40 are built right now. So, that's potentially, you
know, 70 more buyers who, under the status quo would not be aware of this upcoming
development that's planned. I understand that, you know, builders and developers have
an incentive to, you know, maintain house values so they can sell and currently, since our
community is still under development, the developer is still head of the HOA board, which
is fine, but they -- you know, they already nitpick on very minor things that we do to our
houses in order to maintain their image, maintain house values, which is fine, but the fact
that they are not disclosing this development to people gives them an unfair advantage
during the buying process for negotiation; right? They can keep the house prices high
without us knowing what's going to go in next door. You know, empirically vicinity to
apartments does drive house prices down. Had we known about this, like my neighbors,
we would have absolutely thought twice about buying in this neighborhood, especially
given that, you know, we are in an era of record house prices for this valley and they are
likely not going to go back down much, probably going to go much higher. So, I don't
want to accuse anyone of deliberate deception, but this is very concerning to me as, you
know, a longtime resident of this valley and a new resident of the Stapleton community.
I think the traffic issue has been addressed quite thoroughly. I would like to know if there
is a recent traffic study, especially if it accounts for the, you know, 70 more houses in
Stapleton and probably about -- actually, sorry, 170 more houses in Stapleton, as well as
KB homes and also why was it not mentioned or labeled in the -- you know, Stapleton
plat so that people could see, you know, what are you planning with this community that
the developer clearly owns together, especially if it was, you know, planned initially in
2018 and they are planning to share amenities with the community that is clearly labeled
with the community that is not labeled on the map. So, thank you very much. Appreciate
it.
Seal: Thank you, sir.
Hall: Mr. Chair, there is no one else online, but may I add to the record that if people
would like to get their comment on record in the file they can comment us -- I mean e-
mail us at comment@meridiancity.org.
Seal: Okay. Thank you. Ma'am.
Helms: Hi. My name is Karen Helms.
Meridian Planning&Zoning Commission
July 20,2023
Page 33 of 51
Seal: Just before you -- thanks.
Helms: Karen Helms. I live at 469 West Oak Springs Drive in Oakwood Estates. Our
house backs up to Harris Road, which is where the apartments are going to be. So, they
are going to be directly across from my backyard and I guess I wasn't planning on talking
tonight, so I don't have anything to read from, but I can tell you that I have lived there for
five years in Oakwood. I did attend the meeting when Stapleton was being discussed
and I don't remember anything being said about apartments and if that were the case I
probably would have sold my house by now, because they are -- again they are going to
be right behind me on Harris Road and we have had to put in -- or felt like we have had
to put in security cameras now because of the apartments being leased, not being owned,
and I guess -- yeah. Traffic trying to get off of Harris Road onto Meridian -- we are right
in between Victory Road and Amity and those have stoplights. So, I can't imagine anyone
approving another stoplight at Harris, because, you know, that would be three very close
stoplights in a row. But it's extremely dangerous to try to get out and make a left turn onto
Meridian. People are flying down Meridian Road to Kuna and that traffic has just -- it's
not -- practically nonstop to try to get out onto Meridian Road now and make a left and I
guess the other main thing I just wanted to say is that when you -- when you buy in a
community that's houses you don't expect thereto bean apartment complex. I think when
you buy or lease an apartment complex and you know there is other -- you know,
apartments around you, you expect that and everybody's there for the same, you know,
reason. But when you buy in a subdivision like we did and all the people who live in
Stapleton right now, you just -- I just don't believe that's a place to stick apartments. It
should stay houses and as you all discussed in the previous review to give an alternative
is to just put more houses there. I understand the builder wants to make money and they
want to pack in as many people and units as they can, but I think to preserve our
community and Stapleton and all the other subdivisions that are going in right around us,
it should just stay homes. Single story and -- and second story homes I mean. That's
the only thing that I feel is appropriate to be put there. Thank you.
Seal: Thank you. Ma'am?
Rogers: Good evening. Thank you so much for staying and hashing this out with us.
Like they said earlier my name is Cameo Rogers. I live at 4253 South Chesman Avenue.
I'm a resident at Stapleton. I was not planning on talking either, but I did want to mention
that it was not disclosed. I -- I'm hearing now it's in the CC&Rs. I probably should have
read that better, but it was not disclosed when we bought our homes. 1, too, probably
would not have bought in the subdivision. But what I really wanted to touch on is I am a
first responder here. I have been a first responder for 20 years and I have a huge concern
for the traffic. There are already a lot of accidents on Meridian Road as is and to turn off
of Harris what people haven't mentioned is across Meridian Road there is also another
street that turns on to Meridian. You can turn -- it goes into another subdivision. So, if
you pull out into the median -- and I have seen this happen numerous times -- other cars
coming to turn there are in that wanting to turn left into their subdivision as we are trying
to turn left out onto Meridian Road. I have a huge concern for the accidents that can
occur. We have to go through a subdivision to get to Victory to be able to use the light
Meridian Planning&Zoning Commission
July 20,2023
Page 34 of 51
and as they said people do U-turns at Amity, but Amity is not a U-turn signal. So, again,
it's there -- the traffic there is very dangerous. So, thank you for your time. That's all
really wanted to address.
Seal: Thank you very much. Ma'am, come on up. Good evening. Just state your name
and address for the record.
C.Helms: Good evening honored commissioners and also honored guests. I didn't plan
anything either, but you can ditto me on all those people that spoke.
Seal: We will need your name and address.
C.Helms: Oh, I'm sorry. It's Charmaine Helms. 469 West Oak Springs Drive. I'm Karen's
mother. So, I have lived there since '18 also. I have only two issues. One would be the
apartments look right down in my bedroom. Of course I could keep my shades closed,
but, then, I like to see some sunlight and I like to see the yard. So, that's one issue.
Because we are right there where those apartments are going right in our backyard.
Secondly, Harris Street, that's going to be a bugger. When I'm laying in bed watching TV
every weekend I can hear all the hot rods, all the racers on Harris Street. Now, I can just
imagine -- they must think that's a -- a speedway or something. I can imagine when there
are so many more people and apartments, what that's going to be like. It's just like living
in the roadway. A speedway. So, that's -- that's all I have to say and I ditto everything all
these great people have said.
Seal: Thank you very much. Sir.
Stone: Good evening. My name is Steele Stone and I'm at 443 West Oak Springs Drive.
After listening to everybody's concerns here they pretty much said everything that I was
going to say. I had -- I took some notes and kind of wanted to just add some additional
points to each -- each one of the topics trying not to stress too much on them anymore.
Obviously traffic is a continuing thing you are hearing on Harris Road. Knowing that the
ACHD, with the other developments, KB Homes, L2, Stapleton and I believe one other
development, builders all jointly had to allocate money to improve Harris. ACHD just
completed that last year'ish. At that time they widened the road. They put sidewalks all
the way down. But they did absolutely nothing to address the fact that there is no safe
way to get onto Meridian Road in the four hours in the morning when there is heavy traffic
and the four hours in the evening when they are not there. So, as a precondition that you
would potentially put on them to improve with a streetlight to help mitigate this issue, it's
probably not going to happen given that they just redid the entire Harris Road. So, I just
wanted to put that out there as that's probably not going to be something that can be fixed
in any timely manner. As several of the people in Stapleton here that have represented
they have been misled, I have actually, since my home is actually -- if you can go to the
plat that shows the -- the -- actually, a little bit more of Harris. My house is directly behind
the entrance of Stapleton. So, I -- I am probably the most impacted home when it comes
to traffic, which we know is going to be hundreds of cars over the next three years as this
gets finished and, then, KB Homes right behind it gets finished as well. So, being -- so,
Meridian Planning&Zoning Commission
July 20,2023
Page 35 of 51
yeah, that's -- misled on having this multi-family complex here. I want to be the bad
person in the room and say that I did find in 2021 the claim that they actually were going
to put multi-family homes there and I did see a preliminary plat, but, then, when I tried to
pull it up in the last year and a half it has been removed and it went to this blank spot.
So, initially, I did see it when I first moved into my home, because I wanted to know it was
going there, but, then, it magically vanished from all of their drawings that they had
available online. So, that was kind of interesting. Let's see. Also to -- to mirror other
people's comments about apartments being right in the middle of single family homes,
there really are no apartments anywhere in the immediate area that we are. It would be
very random to just have these apartment complexes. I know it's not a huge facility that's
going in, but it's still -- I'm not sure if it really fits the space. Going back to tie in -- it's
actually not a hundred homes in Stapleton --
Seal: Sir, you will need to wrap up pretty quick.
Stone: Okay. It's 212 homes that are in Stapleton without the -- without the -- the multi-
family. The so-called amenity of a dog park is a joke. My border collie could take five
steps and be across it. It's not really a dog park. They just fenced it off and gave a two
way gate. The roll-up garage doors on the back of the home, that's really affecting curb
appeal. I mean when you are driving through there and you see that -- that's -- I mean it
doesn't look like it's going to be very appealing to look at. Obviously, reflect the reduced
value of-- of homes coming from this being put in. Also when this was approved most of
all the homes that exist there now did not exist. So, there was nobody to come and speak
on behalf of the approval -- pre-approval of this in 2018. Karen that spoke earlier, her
house was built right around that time. My house, which was the last part of her phase,
didn't finish until the end of 2020. So, really there was nobody here to speak on behalf.
And --
Seal: Sir, I'm going to have to cut you off. Wrap it up.
Stone: The solution is not to -- to deny it, but maybe change it to keep the same structure
that they have in Stapleton already, which everybody seems to like. And I don't think that
anybody would really have a concern with that if we were to just keep it the same that the
rest of the development is.
Seal: Okay. Thank you very much.
Stone: Thank you for your time.
Seal: Anybody else? Just raise your hand if you want to come up and testify. All right.
Seeing none, would the applicant like to come back up?
Ruby: David Ruby. 499 Main Street. I don't probably have a lot to rebut about most of
the comments, but I did want to clarify a couple things and I -- I seriously doubt it will sway
the public's opinion behind me, but I think it's good information regardless. The drawings
of the --the exterior elevations of the buildings and the floor plans are --will be developed
Meridian Planning&Zoning Commission
July 20,2023
Page 36 of 51
through the CZC process. What these are, just so you can kind of put it in your minds as
you deliberate, they are townhome style apartments. They are two stories. Each unit will
be two stories. So, you walk in the front door, you will have your living, kitchen downstairs,
bedrooms upstairs. They are only two stories. So, they are no taller than any other house
in the subdivision likely. I just wanted to again reiterate kind of our thoughts about the --
trying to follow through with the development agreement. It's a legally binding document
and that's what we are trying to follow. I'm a little -- one of the comments that was just
made that I'm kind of digesting as I'm standing here was the comment about changing it
to houses for one. I believe -- you can correct me if I'm wrong, but the city required the
density to be what it is and that's why there is apartments here in the first place. That
aside, a vast majority of the comments I heard about traffic and those concerns would be
almost identical with four or five homes with -- with 19 apartments. I mean it's not that
different. I mean -- and, you know, I go to a lot of these hearings and I -- I -- I -- there is
a lot of emotion involved and I'm a homeowner, too. I get it. I mean it -- this stuff is hard
and I -- I usually put out a little pitch that maybe somewhere in the universe someone will
pick it up and -- and educate realtors, because I see this a lot that the realtors do not
disclose this kind of thing and it just -- it leads to bad blood and people feeling like they
have been taken advantage of. That's my soapbox moment. Thank you.
Seal: All right. Thank you. Commissioners, any last questions?
Grace: Yeah. Mr. -- David --
Seal: Come on backup. Sorry.
Grace: Just a question. There seemed to be a theme running through a lot of the public
comments about being misled or not knowing. I'm just wondering if you have any
comment in response to that?
Ruby: Mr. Commissioner, I -- I'm probably a bad one to ask, because I do this for a living
and so I do dig into records and maybe I'm weird, because I do this for a living. But when
I built my last house I went searching and found the plats, found every building permit or
pulled whatever permit in the neighborhood. I would read the life story of the developer.
I -- I just -- similarly -- I mean people are invested in knowing what they live around and I
have been a little helpless in that, because as the architect I don't -- I mean, again, I don't
know -- I'm on one side of this world. That sounds like the sales side, whether that's a
realtor or developer -- I think in realtors -- so whether the developer-- sounds like a lot of
the misleading might be potentially the website -- or I don't know that. I just -- because
the plats I see show-- everything I have seen shows landscaping around here and it talks
about the -- the apartments -- more of them actually.
Grace: And that's where I was wondering if you could help me and -- and put it on -- out
for the public consumption -- is what is ground truth on when -- when -- when was it
publicly available that this was going to be multi-family?
Ruby: I believe when the previous --the annexation and the rezone we are going through.
That was part of it. It had to -- they had to designate up to 24 units to meet the density
Meridian Planning&Zoning Commission
July 20,2023
Page 37 of 51
requirement for this approval.
Grace: Do you know when that was?
Ruby: That's what-- I believe that's what the zone required. Getting a little bit to the edge
of my --
Parsons: Mr. -- Mr. Chair, Members of the Commission.
Seal: Ma'am, please keep your comments down in the gallery. Thank you.
Parsons: Yeah. As I testified earlier, you know, when this project came through we felt
it was a little underserved and we wanted a -- a more integrated, cohesive -- a mix of unit
types. This particular development has duplex style homes. It has single family homes
at one single story. It has two story homes and, then, now the developer is coming
forward with his third product type that he proposed with the original annexation in '18.
So, to Mr. Ruby's point, it is more of a townhome style development than a true multi-
family. Really more of a triplex, four-plex. It is a smaller neighborhood multi-family
development. The reason why we call it multi-family is because it's more than three units
on a single parcel. That's how our code is -- defines a multi-family development. But I
would let the neighbors probably know this already, but there is an R-40 piece of property
directly to the west of this piece that will have 200 plus units on it in the future and that's
owned by -- it's surrounded by KB residents. So, I hope they are aware of that as well,
because they are buying expensive homes in that -- that -- that development as well,
because I live in the area, so I'm very familiar with it as well, so -- and I wanted to speak
to a little bit about the light that -- the signal at -- at Harris. It's not an ACHD requirement,
it's an ITD requirement. They control the timing for that signal and at the time that
Stapleton came through the developer was required to pay -- pay their proportionate
share towards the installment of that signal. So, I don't have the timing for you as to when
that light is going to go in, but there will be lights there. I would -- we probably need to
get in contact with ITD and see when they anticipate that happening. In looking at the
public record, ITD said this property does not abut a state facility, which, again, the lot
doesn't, but the Stapleton development does and because of the number of units that
were involved, neither ACHD or ITD required an updated traffic study. I just wanted to go
on the record there that this is a -- this is a small development. I know how you feel. The
motions are -- are high. We get it. It was planned for. It's actually less than what was
planned for, to be honest with you. It was -- originally the concept plan showed 28 four-
plex units, if I'm not mistaken. This is 19 -- what, three and four-plex units. So, again, it's
-- it's -- Stacy and I analyze these things. Staff looks at it. We go through the contract.
We make sure everything is -- it's met. It's meeting the intent of the original approval. We
feel comfortable we did and that's why we recommended approval with -- with changes,
of course, with -- with conditions, but that's how it works in our world. We verify, we look
at past history, we make sure everything is in alignment with that and we make a
recommendation to you.
Seal: Thank you, Bill.
Meridian Planning&Zoning Commission
July 20,2023
Page 38 of 51
Smith: Mr. Chair?
Seal: Commissioner Smith, go ahead.
Smith: Bill, question for you. I would wager the -- the 200 unit development would
warrant, you know, a traffic study by step one. Is there --just really roughly speaking. I
don't need an exact number. Is there kind of -- do you have any idea what that line is of
numbers of properties? For example, this is 19. If it were 20 would it have -- you know.
Or is it something more substantial?
Parsons: Mr. Chair, Members of the Commission, Commissioner Smith, the threshold for
ACHD is typically a development with a hundred or more units is the threshold for them
in my experience.
Smith: Thank you. And, then, Mr. Chair?
Seal: Go ahead.
Smith: Question for the applicant. So, one thing I have heard -- and I just kind of want to
figure out a little bit what the -- kind of -- kind of order of events has -- has been, for lack
of a better term. I believe -- so, I have heard a lot from the community that a lot of people
said, you know, I learned about this on Monday -- or, you know, I just learned about this.
But I believe you said at some point you sent out some sort of letters that got a-mails
back. Could you help me kind of square the two. What happened then?
Ruby: Mr. Commissioner, yes, we -- what we do is we -- we reach out actually to the city
who helps us with a special vicinity -- within like 500 feet of the outside property and they
have software that picks up every property that's touched by that and they actually send
us the labels and we draft a letter, which I think is included in the record and we invite
them to a neighborhood meeting. And that's when I said -- it was right after that -- two
days after that I received the two letters or e-mails, because I had my address on there
and, then, I went out and hung out at the site for an hour and nobody came.
Seal: Any questions?
Ruby: Which is what I'm required to do. I mean that --
Seal: Completely understood.
Smith: Mr. Chair?
Seal: Commissioner Smith.
Smith: Sir, what -- what -- around what date was that, do you know?
Meridian Planning&Zoning Commission
July 20,2023
Page 39 of 51
Ruby: I looked at it, it just says -- I think it's May 4th. Is that -- sorry. It's right here on
the -- I just saw it when I was sitting back in there, because I was -- yeah. May 4th. I was
like, wow, it's over two months.
Smith: Thank you very much.
Seal: All good? Okay. Thank you very much, sir. Appreciate it.
Ruby: Thank you.
Seal: With that I will take a motion to close the public hearing for File No. H--2023-0033
for Stapleton Apartments.
Starman: Mr. Chairman, before you do that let me -- I don't -- let me just take a minute to
brainstorm with the Commission collectively.
Seal: Absolutely.
Starman: So, there was a -- you made the announcement earlier of our technologies,
such as Zoom and you had at least one speaker address that issue as well. The
testimony received tonight at the public hearing that was conducted tonight complies with
state law and with the city code. So, you know, the Commission can close this hearing
and you can proceed with your action. I just want to make it clear to the audience in
particular, but for everybody that once the -- once you close the public hearing, however,
the record is closed and you are in deliberation. So, we are not able to accept additional
e-mails or telephone calls after that. That won't be part of your deliberation. I just want
you to be aware of that. You are -- that's perfectly fine within your purview and you are
able to close the hearing, but I just wanted you to be aware we are not able to accept e-
mails tomorrow morning, for example. So, if you wanted to be able to do that, the solution
would be to continue the public hearing and allow the hearing to stay open. But that's not
required. I just wanted to be clear on what your options were.
Seal: Okay. Thank you. Commissioners, do we have a --
Smith: Mr. Chair?
Seal: Go ahead.
Smith: I guess a question for Kurt -- and I guess for -- for Joy regarding if say someone
was, you know, planning on -- on attending via Zoom and they -- maybe they sent the
e-mail that Joy provided something. Would we be able to, I don't know, take a short
recess and then -- would that -- would we be able to have that in the public record, those
e-mails that just recently came in or is that kind of outside of the scope of normal
procedure?
Starman: Mr. Chairman and Commissioner Smith, if I understood your question correctly
-- let me kind of paraphrase. Is your question can you take a brief recess, see if we have
Meridian Planning&Zoning Commission
July 20,2023
Page 40 of 51
received an e-mail, see if anyone wants to make -- or send an e-mail very quickly and,
then, you can consider that when you return from your recess. Yes, you can do that
before you close. But don't close it. If you want to do that don't close the public hearing
yet then.
Seal: Understood.
Lorcher: Or if we could close the public hearing and make a continuance, so that other
people can -- do we close the public hearing then and, then, do a continuance for other
people to comment?
Seal: We would leave -- a continuance comes as part of the public hearing process. So,
we would leave it --we would not close the public hearing, but we would do a continuance
during that. But -- and that's -- I guess my question to you is what -- I mean do you guys
feel that we need to continue -- and, you know, I can't make the motion, so you guys are
going to make the motion on this.
Starman: Maybe to help the Commission with that discussion out there, if the City Clerk
has additional information about this -- my recollection at least early that we only had two
people that attempted to even watch the proceedings via Zoom. We don't know if any of
them intended to even testify or not and they were notified that they could come to City
Hall. So, from a legal perspective you are fine. I don't know if we had any additional
people come on Zoom after that occurred.
Hall: No, we did not and no one has e-mailed me during the meeting.
Starman: So, that's just facts for -- to help you through discussion.
Seal: Okay. I understood.
Lorcher: I'm not really sure if, you know, the additional comments from the neighbors
would be any different than what we have already heard. It was a broad -- it was a broad
list of concerns and even if there were two more e-mails I think we have enough
information to make a decision.
Smith: I -- Mr. Chair. I tend to agree. I think it's just striking the balance of information
gathering on our end and, then, also just kind of allowing people to -- to say their piece
on their end. I -- I don't think I would be, you know, wanting to continue this to a future
meeting. But it's just a question if we want to -- say if there is someone who is just really
burning up, but they have to watch the kids, you giving them, you know, five, ten minutes
to -- to send something our way to -- you know, to -- to give that -- that's -- you know,
don't feel like very strongly one way or the other. That's just an option I wanted to just
surface in case. So --
Seal: Yeah. I mean the -- the two people that were on, one of them dropped off as soon
as the last hearing was done and so the other person very quickly thereafter. So, I don't
know that they were even on for this, to be honest. And no e-mails have been received.
Meridian Planning&Zoning Commission
July 20,2023
Page 41 of 51
So, I mean -- I'm -- honestly I'm comfortable closing the public hearing on this one.
Lorcher: All right. So, in that case, Mr. Chair, I motion that we close the public hearing.
Seal: For File No. H-2023-0033?
Lorcher: Sounds good to me.
Seal: Do I have a second?
Grace: Second.
Seal: Okay. It's been moved and seconded to close the public hearing for File No. H-
2023-0033. All in favor say aye. Opposed nay? Motion passes. The public hearing is
closed.
MOTION CARRIED: FOUR AYES. THREE ABSENT.
Starman: And, Mr. Chairman, can I interject one more time on --
Seal: Absolutely.
Starman: -- the topic that came up on a couple of occasions. The applicant in particular
brought up, that Mr. Parsons described as well as -- for this inter -- interplay between the
development agreement from 2018 and your proceedings tonight relative to the
conditional use permit. So, I don't have the benefit -- I didn't have the opportunity to
review the development agreement prior to tonight's meeting, because I wasn't aware this
would be a topic, but I was able to skim it as you were -- having receiving testimony and
-- so I don't have the benefit of looking at the entire record and I only had the time to
quickly review the development agreement, but my tentative -- I'm just going to give you
my initial thoughts on that. So, not a legal opinion per se. Preliminary thoughts. And that
is that I can understand why there is some -- may be some ambiguity here and why the
applicant may feel the way the applicant feels that I thought we had an agreement from
2018 and that's what's binding. I don't read the agreement that way and there is two
relevant sections that I just want to point out to the Commission. Well, three, actually, by
extension. The first condition is five -- that are relevant to our discussion is conditions 5-
G. This is site amenity. This is referring to the entire annexation and this includes all
phases, including the multi-family parcel or area you are talking about today, as well as
the other phases. The site amenities shall be provided within the development per those
described in Section 7.D. Comparable amenities as determined by staff may be
considered as substitutions. So, the applicant -- paraphrasing what Mr. Ruby had
mentioned earlier that -- I think the applicant is reading is that that is the maximum the
city can require. That's not what the language says. The language says you -- you will
build -- when you came to us to annex you said you were going to do certain things,
including certain amenities and this provision says you shall build those amenities. It
doesn't say that's -- that's the only thing you are ever going to be required to do. It says
basically you are going to do what you told us when you said you wanted to annex.
Meridian Planning&Zoning Commission
July 20,2023
Page 42 of 51
Coupled with sub I, which is the other relevant section, says a conditional use permit is
required to be submitted and approved for the multi-family development prior to
application for certificate of zoning compliance and design review, which is what we are
doing tonight. By definition. The conditional use permit process, under state law and the
city code, the whole purpose of a CUP process is for you to provide conditions that
mitigate the impacts of the project. So, if that--that--that provision wouldn't make sense
unless it was intended to give you, the Commission and the city, the intent--the possibility
of applying conditions to mitigate negative impacts of this project. So, my conclusion just
within the four corners of the document and reading that language in a very sterile
attorney-like way, is that, you know, there is -- you have to -- the applicant is required
by this development agreement to build a minimum number of amenities and those are
specified in the document via an attachment. But it also says you have to do a certificate
-- conditional use permit for the multi-family and by definition that -- that means that the
Commission has the ability to apply conditions or place conditions that are needed to
mitigate the impacts. There is no other reason why that condition would be there. So, I
think you have the ability to do that. I will close by saying I understand the applicant's
perspective that, hey, we made a pitch in 2018 and it had these certain amenities. Our
impression was we will do that and we are good. So, I -- I understand that, but if I just
look at the -- at the sterile language of the document it doesn't say that necessarily.
Seal: Okay. And appreciate that input. Commissioner Lorcher.
Lorcher: I had a question for staff. In 2018 when this was annexed and rezoned and you
mentioned that in order to meet its density requirements. Multi-family housing had always
been a portion -- a part of this project. So, if the community is saying, yes, we want to
see it developed, but we would rather see single family housing, from a density standpoint
and city code, that's not -- it's not eligible, is it? It needs to be multi-family housing in
some capacity? And when we say multi-family housing -- a townhouse is a building like
a house, except it's super skinny and it's connected to two or three other ones together;
right? It's not a huge apartment complex where it's two stories and everybody has a
balcony. So, I think the perspective of what the unit looks like needs to be addressed
here as well, because if you have a two-story house it's just like your two-story house,
except it's super skinny and, then, the guy next to him doesn't have like a walkway in
between. They are connected. So, to carry out -- sorry, my little rant.
Parsons: Mr. Chair, Members of the Commission, I -- I like this discussion tonight,
because it is to -- kind of the discussion tonight it's -- it's all discretionary; right? And I say
that because at the time that someone comes up with an annexation and a concept plan,
they don't have it fully vetted as to the open space, the amenities, the parking and so
that's why we add that condition -- come back and do a CUP, because that's where we
are checking for compliance with the multi-family standards and those things. So, even
though it was the intent possibly to get 28 units, the reality is when you look at the size of
the property and what code requires, it's not realistic to get that. So, that's why you see
a decrease in that density. So, there is always a little latitude in our code that says you
can reduce your density somewhat. So, when the developer came through there was
actually more -- and I -- I did go to the website for this development just to kind of look at
Meridian Planning&Zoning Commission
July 20,2023
Page 43 of 51
it -- it showed five buildable lots in that area -- in that corner. But it was probably their
intent at the time that they would build each one of those multi-family units on a separate
parcel. So, it looks misleading that it was going to be single family homes when, in fact,
the city had approved it conceptually as a multi-family development. So, today we are at
the reality that 28 units can't really fit on this property, unless they went vertical, you know,
three story apartments. So, again, what they are trying to do is turn the architect loose
and say design -- this is your parameters, here is your parcel, design us a multi-family
development consistent with our plan and David goes out and -- and digs into that. So,
yes, we have some wiggle room to manipulate some of that density, if you will, per the
code. So, when the final plat comes in the applicant has -- they may have showed five
multi-family lots here, they have the ability to show one, because the lot doesn't correlate
to density. The density is correlating to what you are acting on tonight and what's
specified in the development agreement. So, in this particular case you lose a few units
-- they may have made up some additional buildable lots elsewhere and it kind of
averages itself out. So, again, that's where Stacy and I come in, look at that, analyze that
and make sure that they are still being consistent with their conditions of approval and
their contract and that's where we landed tonight, that we find they are.
Lorcher: But one of the conditions we can't make is to change it to single family housing.
Parsons: That would require a modification to their plat and their -- their DA.
Lorcher: Okay.
Parsons: So, they would have to resub divide it or, essentially, do a five lot -- put five
single family homes on one parcel. Still meets the definition of multi-family, but to me that
wouldn't be the intent of the original agreement.
Lorcher: Okay. Thank you.
Starman: Mr. Chairman, if I could just add one additional thought, which is very similar
to your last hearing. That's essentially what was just discussed. But to Mr. Rudy's point
earlier in a different sense, there is a development agreement that applies to this property
that was done at the time of annexation. It contemplates multi-family explicitly in the
concept plan and elsewhere in the verbiage. So, there is a certain entitlement for this
property today. It's subject to a conditional use permit, but once --just like our last project,
we really don't, as a city, have the ability to say we changed our mind and don't build
anything or build something different. That's really not a possibility without incurring legal
liability for the city.
Seal: Okay. Commissioner Grace.
Grace: Well, just -- just on that point, I want to make clear I think that -- I think the term
misled is a really hot button item here and while you may have been able -- while you
may have looked at the -- at maybe a map and thought something else, there seems to
be -- unless I'm wrong -- plenty of documentation and, you know, summary in the record
Meridian Planning&Zoning Commission
July 20,2023
Page 44 of 51
to demonstrate what this was always going to be and that's why I asked Mr. Ruby -- tell
me when it became public that this was going to be multi-family. I want to -- I would like
to know that, so that I can at least have some ability to say, well, it's been this way for
years and I understand the frustration from folks who don't have the time or maybe the -
- the expertise to look through a public record and -- and -- and the city files and things
and they believe that they -- this is not what they thought and I appreciate that, but that's
what I was trying to drill down on is it sounds like that's what it was going to be, though,
and so I -- this conversation I really appreciate the -- the back and forth.
Parsons: Mr. Chair, Members of the Commission, if I could just give you a little bit more
history on this property and -- and to the residents, too, because I am definitely sensitive
to what -- what they have to say tonight. But, believe it or not, the developer actually
wanted to do all single family here and as part of our work with them and --we requested
that they add that multi-family component. So, I just -- I just want to go on the record that
that's something that we encouraged, planning staff did, as part of this project to -- to get
that density up a little bit more and get them in alignment to what -- what we thought was
appropriate on this particular property, so --and they--the developer put it there, because
they knew there was another R-40 piece next to it. So, they thought that made the
adequate transition and density as they transitioned to this single family. So, that's kind
of some more food for thought on -- on how this all kind of transpired and happened. But
to Commissioner Grace's point, this was always on the books from when it -- when it first
got noticed for public hearing in 2018 it was always disclosed that there was a multi-family
lot here.
Smith: Mr. Chair?
Seal: Commissioner Smith.
Smith: Yeah. I just -- I think it's a transitory density as well. I think that was the word I
have been looking for. I think it's -- it's critical to remember that, hey, this is -- am I on?
Am I? Okay. All right. Just -- I will just have better microphone technique. Appreciate
that. There we go. Is that better? Okay. Awesome. Yeah. I -- I think it's -- it's just -- it's
critical to remember that there -- this is -- is zoned and -- and it's in the -- it's in the future
land use map as high density residential and I think, you know, that -- that transitory
density is helpful. I think that, you know, when there is going to be 200 homes in the
development to the west, 150 to 200 homes, something like that, it's helpful to have some
sort of, you know, lower density, high density residential -- you know, there is -- having --
having some kind of transitory where it slightly gets more dense over time -- I would rather
have that than it, you know, go for transition from single family to immediately, you know,
much more dense property. So -- so, I get that -- and as someone who lives on Meridian
I get the -- especially during rush hour. I live right near Settler's Park where it's down to
one lane each way and if I have to turn left into my neighborhood it's -- sometimes I'm
sitting there and I'm causing a backup behind me for five minutes, because I can't find a
way to turn. I get the frustration. It -- it -- it's -- it's rough sometimes. But, you know, it's
-- I think this is a good fit and a good project for the area. You know, ITD said that it
doesn't need a traffic study and I think that it makes sense with it being kind of the small
Meridian Planning&Zoning Commission
July 20,2023
Page 45 of 51
-- you know, I think when you look at the alternative of traffic studies for, yeah, kind of a
lot of small different parcels you get something like California where San Francisco has
built eight homes this year I think last time I checked and -- and prices there are -- you
know, it's -- it's so unaffordable to live there. And I think that's something that -- it's
important to balance the livability, the responsible growth with kind of, you know, fitting
into the community needs and keeping -- you know, matching the --the demand that there
is to live in Meridian and I think that that's, you know, important to remember, that multi-
family is coming in this area. Having this transitory density it is good and, then, also just
to hopefully give some people an outlet if there are red light concerns if there are, you
know, speeding concerns. I believe in the state of the city the mayor said he wants to --
there is a plan to hire more police officers, but, you know, Meridian Police is always there.
For cut through traffic
ACHD is always willing to do a -- a study. They are also looking at maybe reducing the
barriers to getting I think speed tables is what they are calling them. There is specific,
you know, traffic calming. There are a bunch of things that -- I think, actually, most of this
is -- some of this is ITD, but there are a lot of things that we can do to calm the traffic
issues within the neighborhood. Crossing the street, et cetera. So, I just -- I'm a little bit
on a soapbox here, but I -- I really empathize, as I live on Meridian and I have seen this
kind of stuff, this -- these traffic concerns. But I think this is a good fit for the area. I think
it's a good transitory density into larger development and -- and as much as that
information asymmetry, that not knowing is bad and as much as we need to probably
improve the -- you know, so people don't need to do a ton of research. I don't know that
that's a good enough reason to deny this.
Seal: Yeah. I was going to say as far -- as far as the -- I mean the stoplight from Harris
Road onto Meridian Road, I'm -- you know, I'm sure it's needed, I just don't know when
ITD is going to get to it. That said everybody that bought a home in there understood that
when they moved in, so -- I mean that one was pretty obvious I would have to think, so -
- I mean you all turned in, you all looked at the places you were going to live, so, you
know, is it a hazard? Yes. Is there something that's going to be done about it? Yes.
There will be a stoplight on Meridian Road. So, when -- when it's going to be put in we
are not quite sure, so -- but that's something that--you know, ITD, they own the highways.
So, if-- if you are interested in knowing when that stoplight will put in, please, contact ITD.
So, you know, unfortunately, we -- we can't do a lot about roadways here, so -- we don't
own them. The city doesn't anyway. It's -- you know, as far as, you know, the developer
or, you know, whoever being deceptive about this, if the entire community feels that way
-- I mean there is -- there is legal avenues to approach that. So, you know -- and I mean
if the entire community feels that way I recommend that you look into that. You know, I -
- I mean I want to carefully address the stigma around apartments as well. So, I mean
these aren't apartments, they are actually kind of more of a townhome thing, but just multi-
family developments in general. So, have a stigma tied to them. So, I have kids that live
in apartments, so they are pretty decent human beings and trying to take care of stuff. I
realize there is people out there that don't, so -- we have owners in our subdivision that
don't, so I don't think it's fair to tie to multi-family developments that there is going to be
nefarious elements in there. So, I mean I think that we have all seen developments
everywhere that -- you know, these people exist everywhere. So, it only takes one or two
Meridian Planning&Zoning Commission
July 20,2023
Page 46 of 51
people to kind of ruin it for everybody, so that's kind of my soapbox moment about that,
just because -- it's really expensive to live here. I mean one of my children don't -- doesn't
live in Meridian anymore just because can't afford it, so -- and that's in a rental. That's
unfortunate. But as far as the -- as far as the development, it's -- I mean in front of us, I
mean my big concern is -- you know and -- and I usually defer to supporting staff. I mean
I generally don't vary from that very much. So, I think as staff has pointed out that some
things need to be done in here, then, I will support that. I mean I -- I agree if there is only
one --you know, if they have -- like the last application you have one place, multiple trash
bins and things like that, then, that makes sense to have a centrally located just as long
as there is more than one opportunity to -- or more than one receptacle to put stuff into,
so -- as far as the parking -- I mean if you are having trouble meeting the minimum --
come on. I mean just put some extra in there. It's not going to kill anybody. So, you
know, I mean -- I don't know. My -- it's -- I always think back to my dad, you know, he
always told me you are never going to get anywhere if you just want to meet the minimum.
So, be willing to give a little bit. So, as far as the amenities I understand the gray area in
it. You know, the one thing I don't want is some kludgy little thing that's just thrown in
there at the last second in order to kind of satisfy some requirement where, you know,
you get this little five foot area for a dog park or something along those -- those lines. It
would be nice for something to be meaningful in there. You know what I mean? I think
that there are some common area in here that would accommodate something that would
be usable by the folks that are in here. That said, I would be more interested in seeing a
walk -- you know, some kind of traffic mitigation that allows people to get across Lone
Pine Way to get to the other parts of the subdivision where there are better amenities,
because, honestly, I don't see that as a -- a bad alternative and I think that would help
with the safety overall of the -- you know, the entire subdivision, to be honest. The one
thing that I do like about it -- I know some people don't share this feeling, but I do like the
-- the storage units, to be perfectly honest. So, we just -- we see a lot of stuff comes in -
- come in where, you know -- and generally speaking it comes with garages. So, people
that have garages like to, you know, park 40,000 dollars worth of cars outside to stack a
thousand dollars worth of stuff in their garage, so that's never made sense to me. But I
do like the fact that these have storage that's there. We are finding that some people
move into the community, they are looking for a place to live, to rent while something's
being built, so -- I mean it's very conceivable that the very people that live in these
apartments are going to live in your neighborhood right next to you, you know, eventually,
so -- and the fact that there is storage that comes along with this, that's something that's
going to be highly sought after. I mean a lot of people move here and it's taking six
months to a year to build a house, so they got to live somewhere. I mean there is some
other things that I like about the layout of it. The fact that the density did come down is
nice. I mean it's almost -- it's part of a bigger project, but this little -- this piece right here
would be what we would consider in-fill at some point in time if it didn't get flushed out,
you know, with this, you know, basic element of it -- or basic design of it, so I can
appreciate what -- what -- where it's at and the -- you know, what it's doing. That said I
don't see anything -- you know. And I understand the traffic problems and everything. I
mean you heard me on the last one -- on the last application, so not happy with where
the city stands as far as what we can do about the roadways. We don't own them. We
don't have a lot of sway in them to say the least. So, we are not included in any kind of
Meridian Planning&Zoning Commission
July 20,2023
Page 47 of 51
approval for a roadway system through ACHD or ITD. So, I find that to be an unfortunate
part of the way that our government is set up. But that's not going to be solved tonight.
So, I will quit rambling on and let somebody else talk or make a motion.
Grace: Mr. Chairman, I just wanted to make a couple comments and -- and I would --
would try to do so without repeating what -- what you said or what Commissioner -- the
other Commissioners have said, because I do agree with -- with a lot of that. I like the
town homestyle. We don't control the streets. I mean I know some of this was said, but
it's worth emphasizing. And I'm really glad, Commissioner Seal, that you said something
about the -- sort of the characterization of folks who live in apartments, because it was on
my list of items to address and I guess I won't say anything more than, you know, they --
I -- I have a daughter, too. I have a -- a professional young daughter who cannot afford
a home and she lives in an apartment with her family and I know other professionals and
they pay higher rent than I pay mortgage and so these folks are just trying to -- trying to
get ahead as well and get started and they didn't come from out of state and -- and were
able to sell a home and buy a single family home here. They grew up here and they
struggle. So, I would be -- I would welcome to call someone like that and other people I
know -- other families I know to call them neighbors and -- and what they have done here
and -- and coming down in the -- the units and -- and making them the -- the townhome
style, I really like that. So, again, without trying to repeat what's already been said, I will
be voting in favor of this.
Seal: Okay. Commissioner Smith?
Smith: Mr. Chair. Yeah. I guess the only thing that I am -- I think maybe we should
probably identify before a motion is made is kind of how we want to approach the
amenities issue kind of more specifically and others discussion of -- you know, I -- I guess
the question is -- is on Lone Pine is that -- since that's internal to the development does
the developer have control over that? Are we able to actually -- you know, is there any
way to have a provision in the -- in the CUP that they have some sort of crosswalk or
something like that across the road? Because, if not, where my position is -- is I -- I --
probably think that they should have -- if -- if not that they probably should have an
additional amenity. I would also like for it not to be thrown together, but even if it's just a
bike repair station I think that can be a valuable amenity for a community to use and I
would like for there to be an additional amenity that can be accessible by the entirety of
the community, if there is one, not just the storage sheds. So, there is -- those are just
kind of my thoughts there. I don't know, again, what we can require in terms of
connectivity to the other amenities. So, I -- I mean if there is any thoughts around that.
Seal: I will kind of throw that question back to staff a little bit. So, if we modify nothing
and we are speaking to the -- pretty much to the parking, the trash receptacles, and the
amenities, if we make no modifications at all, essentially, I think what that does is we
support. What staff has asked, which is basically add the amenities, put more trash
receptacles in and add the parking required. Is that correct?
Hersh: Mr. Chair, Commissioners, yes, that would be correct. Staff will work with the
Meridian Planning&Zoning Commission
July 20,2023
Page 48 of 51
applicant on the additional amenity to add to the site if you would like to keep it the way it
is with our conditions.
Seal: Okay. So, with no modifications then -- and that's kind of the statement I made
before is where -- generally speaking I try and support staff and -- and their
recommendations. So, they have -- you know, although we have spent a lot of time on
this tonight, they have spent a lot more time on this.
Smith: Mr. Chair, I guess the only -- in that case the only thing I would add is I -- if we
could --what would -- I guess make me say it a little -- ma'am, I appreciate that. I'm -- I'm
trying to. I'm -- I'm trying not to get the mic in my mouth, but I appreciate that and I hope
this is better. Where I was at is I -- I would hope that -- if we could modify to ask that that
second amenity be accessible by the entirety of the subdivision, something like a bike
rack or something that isn't just closed off to new developments, you know, hopefully to
just provide some kind of additional benefit to the existing residents and things like that is
the only thing I would maybe consider modifying. But I -- that's I agree with that. I just
wanted to see if there is anything we could do about the interconnectivity, but --
Starman: Mr. Chairman and Commissioner Smith -- and I'm going to ask my planning
colleagues to comment on this as well. I'm a -- I'm a bit hesitant to go -- go down that
path in that -- you know, the reason we are doing the size of the conditional use permit
for the multi-family parcel -- to the extent the condition sort of now kind of bleeds over to
beyond those boundaries to other parts of the overall subdivision, I don't know whether
that's within your purview tonight. You know, your conditional use permit applies to this
particular use being proposed, not to adjacent phases of a broader development. Mr.
Parsons, do you have thoughts about that?
Parsons: Mr. Chair, Members of the Commission, I think for me the only thought I had is
the fact that if the development agreement -- the findings are gray and, technically, it's --
it's -- those are to be shared and that's how I get there. But to your point, I -- I almost like
where Commissioner Smith is going about adding the bicycle repair facility or something
like that, because it doesn't take a lot of area up and it does kind of contribute that extra
value to the community in my opinion, because you are going to have multi-use pathways
in the areas, you are going to have a park, you know, I think that's a -- that's a good
balance striking that -- that balance. Whenever we are talking about improvements to
roadways or linking open spaces together, I get-- I'm -- I'm -- like legal I get a little hesitant
on that, because we are always at the -- I don't want to put you in a situation or give the
neighbors expectation that may not be realistic because of who we have to work with and
try to get those, because it may not be approved or maybe an obstacle that the developer
will have to go to to get a crosswalk. I don't know how all of that works with ACHD and
whether or not they would support -- although I do like that -- that idea. It makes a lot of
sense if you are -- if you are going -- you want to take credit for something, then, lead
people to --to that amenity. I really like that suggestion, so, again, we are going to default
to you. We have our recommendation. You have our conditions of approval. You have
heard the -- the testimony tonight. CUP is your purview. You can require things to
mitigate some of the concerns you heard tonight.
Meridian Planning&Zoning Commission
July 20,2023
Page 49 of 51
Smith: Mr. -- Mr. Chair?
Seal: Commissioner Smith.
Smith: Question for Kurt in terms of the legality. Would it be possible to maybe say an
amenity that is not enclosed, because it seems like most of the things on this list that are
-- would be kind of the -- would be limited to the existing -- to this present CUP, residents
are -- you know, enclosed storage and -- and things like that. Would it be possible to say
something like an amenity that is not enclosed? Because, obviously, trying to strike the
line between publicly accessible, meaning with the entire public, versus -- I -- I guess I'm
just spitballing some -- some ways to -- is it possible to even do this even if -- if we want
to?
Seal: With something like easily accessible to the entire -- oh, I was going to say -- you
can't say subdivision. Easily accessible to the entire community. No. I mean --
Starman: Mr. Chairman, Commissioner Smith, so my -- my concern is the same in that,
you know the condition applies to this project. It's not really -- the Commission is not
intended --the purpose of the CUP is not intended to put amenities or mitigations in place
that's going to benefit a neighboring parcel or a different phase of a subdivision. Mr.
Parsons makes a fair point that the original development agreement does contemplate
shared amenities and things of that nature. So, that's -- I like that thought as a reason to
-- as to word the condition in that manner. My general -- my -- the safest place to be is to
have the condition apply to the multi-family development area period and leave it at that,
which is sort of how the conditions are worded today. I think if you wanted to go a little
bit beyond that -- I don't want to wordsmith with you -- wordsmith with you on the fly, but
maybe it's something that says something to -- to the extent practical, to the extent
possible, you know, make these -- make these amenities available to the remainder of
the subdivision consistent with the provisions of the development agreement, something
of that nature might be -- work a little -- little less of a safe harbor, but I think because the
original DA did contemplate shared amenities that makes some sense to me, to extent
practical, consistent with the DA, you know, the amenity will be available to the overall
develop -- the original development that's covered by the original DA.
Smith: Sorry. Taking notes.
Seal: That's okay.
Smith: In that case, Mr. Chair, I think I'm ready to make a motion.
Seal: Feel free.
Smith: All right. After considering all staff, applicant, and public testimony, I move to
approve File No. H-2023-0033 as presented in the staff report for the hearing date of July
20th, 2023, with a modification that the developer to the extent possible -- or to the extent
Meridian Planning&Zoning Commission
July 20,2023
Page 50 of 51
practical. Ensure that the additional amenity recommended by staff is accessible by the
remainder of the subdivision consistent with the original development agreement.
Seal: Is there a second?
Grace: Mr. Chairman, I will second that.
Seal: We have been moved and seconded to approve File No. H-2023-0033, Stapleton
Apartments. All in favor, please, say aye. All opposed?
Lorcher: Nay.
Seal: Okay. Motion passes.
MOTION CARRIED: THREE AYES. ONE NAY. THREE ABSENT.
Seal: All right. And with that I will take one more motion.
Lorcher: Mr. Chair, I motion we adjourn.
Smith: Second.
Grace: Second.
Seal: It's been moved and seconded we adjourn. All in favor say aye. None opposed.
We are adjourned.
MOTION CARRIED: FOUR AYES. THREE ABSENT.
MEETING ADJOURNED AT 9.10 P.M.
(AUDIO RECORDING ON FILE OF THESE PROCEEDINGS. )
APPROVED
8-3-2023
ANDREW SEAL - CHAIR MAN
ATTEST:
CHRIS JOHNSON - CITY CLERK
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Approve Minutes of the July 6, 2023 Planning and Zoning Commission
Meeting
Meridian Planning&Zoning Commission
July 6,2023
Page 43 of 43
Wheeler: Oh.
Seal: -- to approve or deny.
Wheeler: I'm sorry, I was already thinking that it got --
Seal: You were home already. I know.
Wheeler: You know, I was one step ahead then. I apologize. So, I will -- I will refrain
and let discussion happen if need be. Sorry about that.
Rivera: Oh, I will make the motion.
Seal: Go -- go right ahead. Please do. And unless there is any other discussion
points, which are called for, please, go right ahead and --
Rivera: See if I can help my neighbor here. All right. After considering all staff,
applicant and public testimony, I move to recommend approval of File No. H-2023-0029
as presented in the staff report for the hearing date of July 6, 2020, with -- with no
modifications.
Lorcher: Second.
Seal: It's been moved and seconded to approve File No. H-2023-0029. All in favor,
please, say aye. Opposed nay? Motion passes.
MOTION CARRIED: SIX AYES. ONE ABSENT.
Wheeler: Is this where I do it now? Am I -- Mr. Chair, I make a motion we adjourn.
Smith: Second.
Seal: It's been moved and seconded we adjourn. All in favor say aye. Opposed nay?
We are adjourned. Thanks, everyone.
MOTION CARRIED: SIX AYES. ONE ABSENT.
MEETING ADJOURNED AT 8:10 P.M.
(AUDIO RECORDING ON FILE OF THESE PROCEEDINGS. )
APPROVED
7 I20 1 2023
ANDREW SEAL - CHAIR MAN DATE APPROVED
ATTEST:
CHRIS JOHNSON - CITY CLERK
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Findings of Fact, Conclusions of Law for Loose Screw Brewery (H-2023-0025)
by Michael Garcia, located at 105 E. Carlton
CITY OF MERIDIAN C�
E IDIAN ---
FINDINGS OF FACT, CONCLUSIONS OF LAW
AND I D A H O
DECISION& ORDER
In the Matter of the Request for a Conditional Use Permit to operate a brewery(food and beverage
processing,minor) as the primary use AND a drinking establishment to extend the operating hours
beyond those allowed by the specific use standards for a brewery(UDC 11-4-3-46)from an existing
8,185 square-foot building located at 105 E. Carlton Avenue on 0.45 acres of land in the O-T zoning
district Zoning District,by Michael Garcia,Garcia Family Ventures,LLC.
Case No(s).H-2023-0025
For the Planning& Zoning Commission Hearing Date of: June 15,2023 (Findings on July 6, 2023)
A. Findings of Fact
1. Hearing Facts(see attached Staff Report for the hearing date of June 15, 2023, incorporated by
reference)
2. Process Facts(see attached Staff Report for the hearing date of June 15, 2023, incorporated by
reference)
3. Application and Property Facts(see attached Staff Report for the hearing date of June 15,2023,
incorporated by reference)
4. Required Findings per the Unified Development Code(see attached Staff Report for the hearing
date of June 15,2023,incorporated by reference)
B. Conclusions of Law
1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use
Planning Act of 1975,"codified at Chapter 65,Title 67,Idaho Code(I.C. §67-6503).
2. The Meridian Planning&Zoning Commission takes judicial notice of its Unified Development
Code codified at Title 11 Meridian City Code,and all current zoning maps thereof. The City of
Meridian has,by ordinance, established the Impact Area and the Amended Comprehensive Plan
of the City of Meridian,which was adopted April 19,2011,Resolution No. 11-784 and Maps.
3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A.
4. Due consideration has been given to the comment(s)received from the governmental
subdivisions providing services in the City of Meridian planning jurisdiction.
5. It is found public facilities and services required by the proposed development will not impose
expense upon the public if the attached conditions of approval are imposed.
6. That the City has granted an order of approval in accordance with this decision,which shall be
signed by the Chairman of the Commission and City Clerk and then a copy served by the Clerk
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). [Loose Screw Brewery#H-2023-0025]
Page I
upon the applicant,the Planning Department,the Public Works Department and any affected
party requesting notice.
7. That this APPROVAL is subject to the conditions of approval in the attached staff report for the
hearing date of June 15,2023, incorporated by reference. The conditions are concluded to be
reasonable and the applicant shall meet such requirements as a condition of approval of the
application.
C. Decision and Order
Pursuant to the Planning&Zoning Commission's authority as provided in Meridian City Code § 11-
5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby
ordered that:
1. The applicant's request for a conditional use permit(CUP)is hereby approved in accord with the
conditions of approval in the staff report for the hearing date of June 15,2023,attached as Exhibit
A.
D. Notice of Applicable Time Limits
Notice of Two(2)Year Conditional Use Permit Duration
Please take notice that the conditional use permit,when granted, shall be valid for a maximum
period of two(2)years unless otherwise approved by the City in accord with UDC 11-5B-6F.1.
During this time,the applicant shall commence the use as permitted in accord with the
conditions of approval, satisfy the requirements set forth in the conditions of approval, and
acquire building permits and commence construction of permanent footings or structures on or
in the ground. For conditional use permits that also require platting,the final plat must be
signed by the City Engineer within this two(2)year period in accord with UDC 11-5B-6F.2.
Upon written request and filed by the applicant prior to the termination of the period in accord
with 11-513-6.F.1,the Director may authorize a single extension of the time to commence the
use not to exceed one (1)two(2)year period.Additional time extensions up to two (2)years as
determined and approved by the Commission may be granted. With all extensions,the Director
or Commission may require the conditional use comply with the current provisions of Meridian
City Code Title 11.
E. Judicial Review
Pursuant to Idaho Code § 67-652 1(1)(d), if this final decision concerns a matter enumerated in Idaho
Code § 67-6521(1)(a), an affected person aggrieved by this final decision may,within twenty-eight
(28)days after all remedies have been exhausted, including requesting reconsideration of this final
decision as provided by Meridian City Code § 1-7-10, seek judicial review of this final decision as
provided by chapter 52,title 67, Idaho Code. This notice is provided as a courtesy; the City of
Meridian does not admit by this notice that this decision is subject to judicial review under LLUPA.
F. Notice of Right to Regulatory Takings Analysis
Pursuant to Idaho Code §§ 67-6521(1)(d) and 67-8003, an owner of private property that is the
subject of a final decision may submit a written request with the Meridian City Clerk for a regulatory
takings analysis.
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). [Loose Screw Brewery#H-2023-0025]
Page 2
G. Attached: Staff Report for the hearing date of June 15,2023
By action of the Planning&Zoning Commission at its regular meeting held on the 20th day of
July ,2023.
COMMISSIONER ANDREW SEAL, CHAIRMAN VOTED
COMMISSIONER MARIA LORCHER,VICE CHAIRMAN VOTED
COMMISSIONER NATE WHEELER VOTED
COMMISSIONER JARED SMITH VOTED
COMMISSIONER PATRICK GRACE VOTED
COMMISSIONER MANDI STODDARD VOTED
COMMISSIONER ENRIQUE RIVERA VOTED
Andrew Seal, Chairman 7-20-2023
Attest:
Chris Johnson, City Clerk 7-20-2023
Copy served upon the Applicant,the Planning and Development Services divisions of the Community
Development Department,the Public Works Department and the City Attorney.
By: Dated: 7-20-2023
City Clerk's Office
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). [Loose Screw Brewery#H-2023-0025]
Page 33
STAFF REPORT C:�*%_
W IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT
HEARING 6/15/2023 Legend
DATE: � ,
I�Jt�,-svtLuv -
t
TO: Planning&Zoning Commission a . .
FROM: Linda Ritter,Associate Planner
-
208-489-0573 "
SUBJECT: H-2023-0025 -
Loose Screw Brewery-CUP
r
LOCATION: 105 E. Carlton Avenue
I. PROJECT DESCRIPTION
The Applicant applied for a conditional use permit(CUP)to operate a brewery(food and beverage
processing,minor)as the primary use AND a drinking establishment to extend the operating hours
beyond those allowed by the specific use standards for a brewery(UDC 11-4-3-46) from an existing
8,185 square-foot building on 0.45 acres of land in the O-T zoning district.
The Director has approved an Administrative Design Review(A-2023-0073) for the proposed
modifications to the exterior fagade of the existing building.
II. SUMMARY OF REPORT
A. Project Summary
Description Details
Acreage 0.45 acres(contains existing building)
Future Land Use Designation Old Town
Existing Land Use(s) Vacant commercial building ■
Proposed Land Use(s) Food products processing,minor(brewery)and drinking establishment
Neighborhood meeting date;#of 03/08/2023
attendees:
History(previous approvals) A-2023-0073—Fagade improvement only
Page 1
B. Project Area Maps
Aerial Map
Future Land Use Map
E GRUBER
Legend � AVE Legend 0
Project Locafon E QA DLEY A.Ln
Prc ect Location
s+ Poxry
ic
w
. �Z
w �..
— ---ST i
- � IC}�kZLTOhf AVE
cn 4
- — x
�F
XJ1L 0 O_I �^Y� ice❑ . y w r ,
— T. 1Y�1 �n cnT=C
LLJ
E
E FDAHOAV
� 1-
LL
BROr'lAC _ f E BROADWAY AIDE + —
L AVE IH
Zoning Map Planned Development Map
1 �40 E GRUBER
Legend TF E AVE Legend
[a Prc{ect Loc c fon —� BARLEY.,.�. [a Project Loc utian L
Q o -C $ = rt-' aV Li nits
yl . LQ-1 °� — Panned Parses �C
Tj - EWASHINGTO"AVE WWASHINGTONS.I.L . f w_
1[ C-C L-O" R-1� ST � �
LLJ E C} , f f ACE WLTOha AVE _-
ESTATE �.1 ESTAT AVE
AVE
� �
O-i
R-4 R-8 TJ FL�ftl � An
w LU
T i w LJ
— p EIDAHOAVE IDAHOAVE
E B ROADk45d Y AVE W BRM R,iA j AVE z
III. APPLICANT INFORMATION
A. Applicant:
Michael Garcia, Garcia Family Ventures, LLC 6700 N. Linder Rd., Ste. 156-411, Meridian, ID
83646
Page 2 —
B. Owner:
Robert Shappee,JTR Holdings,LLC— 141 E. Carlton Ave.,Meridian, ID 83642
C. Representative:
Michael Garcia, Garcia Family Ventures,LLC—6700 N. Linder Rd., Ste 156-411,Meridian,ID
83646
IV. NOTICING
Planning&Zoning
Posting Date
Newspaper Notification 5/25/2023
Radius notification mailed to 5/23/2023
properties within 300 feet
Site Posting Date 6/l/2023
NextDoor posting 5/25/2023
V. STAFF ANALYSIS
A. Future Land Use Map Designation(https:llwww.meridiancitE.or /g compplan)
Old Town-The purpose of this designation is to accommodate and encourage further
intensification of the historical city center in accord with the Meridian Comprehensive Plan. The
intent of the O-T district is to delineate a centralized activity center and to encourage its renewal,
revitalization and growth as the public,quasi-public, cultural, financial and recreational center of
the city. Public and quasi-public uses integrated with general business,and medium-high to high
density residential is encouraged to provide the appropriate mix and intensity of activities
necessary to establish a truly urban city center.
The subject site is already zoned Old Town (OT). The proposed use will be located on a 0.45 acre
parcel and located within an existing 8,815 square foot building. The proposed brewery will
include brewery equipment, a taproom, an event center, an outdoor beer garden, and a grain silo
along N.Main Street.As food and beverage processing, minor is an allowed use and will be
subject to specific use standards listed in UDC 11-4-3-46. The drinking establishment request is
being requested to allow extended hours of operation beyond 10 pm (see analysis below).
B. Comprehensive Plan Policies(https://www.meridiancily.orgIcompplan):
Goals, Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be
applicable to this application and apply to the proposed use of this property(staff analysis in
italics):
• Encourage infill development. (3.03.01E)
The Comprehensive Plan defines infill as "development on vacant parcels, or
redevelopment of existing parcels to a higher and better use that is surrounded by
developed property within the City of Meridian."The brewery is proposed within an
existing vacant building in the O-T district that is currently being underutilized. This
property is part of the Meridian Urban Renewal District boundary.
Page 3
• Preserve private property rights and values by enforcing regulations that will prevent and
mitigate against incompatible and detrimental neighboring uses. (3.05.01C)
The conditional use is a process to ensure any impacts associated with a particular use
are mitigated. Based on the location, currently the proposed use is only allowed to
operate between the hours of 11 AM to 10 PM. In accordance with MCC 6-3-6 any loud
noise which emanates from the building shall cease at 11 PM. However, the applicant is
requesting extended hours to operate until 12 am on occasion. It is important to note that
the City is currently processing a code change to allow the extended hours. If this is not
approved by the City the applicant should operate in accordance with the hours specified
above. To further reduce impacts on nearby residential properties, staff recommends a
condition of approval that all outdoor seating and events associated with this use be
limited to the fenced beer garden and the upper deck areas.
• Minimize noise,lighting, and odor disturbances from commercial developments to
residential dwellings by enforcing city code.
As mentioned above, operating hours will be from 11 AM to 10 PM. No additional
lighting for the parking lot has been proposed. In accordance with MCC 6-3-6 any loud
noise which emanates from the building shall cease at 11 PM. Any odor that may
emanate from the brewery shall be mitigated.
• Require appropriate building design, and landscaping elements to buffer, screen,beautify,
and integrate commercial,multifamily, and parking lots into existing neighborhoods.
(5.01.02D)
Exterior building modifications were reviewed and approved through administrative
design review application (DES)A-2023-0073. As this is an existing developed site and
no expansion of the building is being proposed, no additional landscape screening or
buffering is required.
C. Existing Structures/Site Improvements:
The proposed project is within an existing 8,185 square foot building and the applicant is
proposing to renovate the exterior of the building. The proposed updates include adding
horizontal and vertical wood siding and using a darker gray color to transform the remaining
brick. The stucco around the second level event space and outdoor deck will also be painted a
lighter gray to match the color palette of the ground floor and create a contemporary pattern.
Additionally, all existing windows will be replaced, and the street facing fagades will have varied
fenestration, material changes, textures,patterns, and recesses. This approach will add visual
interest and depth to the building's exterior.
Exterior lighting is being proposed to promote a safe pedestrian environment. Downlit signage
on the building and a grain silo is being proposed, which can enhance the project's visibility and
branding. Overall, these updates seem to align with contemporary design trends and can
contribute positively to the aesthetics of the area. The Director has approved the administrative
design review application for these improvements.
D. Proposed Use Analysis:
The proposed use will be a brewery(food and beverage processing, minor) as the primary use
and a drinking establishment(for extended hours only)within the existing 8,185 square foot
Page 4
commercial building.Approximately 943 sf of the business will be dedicated to brewing and
associated equipment, with the remainder for tasting and events.
A brewery is categorized as minor food and beverage products processing use and it allowed and
is use by right unless it exceeds 5,000 sf.. The existing building is approximately 8,185 which
requires CUP approval.
The applicant is proposing approximately ten (10) tables inside, bar seating and lounging areas.
There will be four(4) 8-seat picnic-style tables underneath the covered patio and four(4)
additional tables on the north side of the covered patio for a total of 8 tables outside. The Event
Area and upstairs patio are f ex spaces and the number of tables will be determined by the event.
The brewery will operate from 11 AM to 10 PM. The proposed use complies with the zoning for
the site but is subject to specific use standards as listed in 11-4-3-46.
E. Specific Use Standards(UDC 11-4-3):
UDC-11-4-3-10 states the following:
The drinking establishment shall not be located within three hundred(300)feet of a property
used for a church or any other place of worship, or any public or private education institution,
nor shall the drinking establishment be located within one thousand(1,000)feet of an adult
entertainment establishment;provided, that this limitation shall not apply to any duly licensed
premises that at the time of licensing did not come within the restricted area but subsequent to
licensing came therein; the expansion of an existing establishment may be allowed with the
approval of a conditional use permit as set forth in Section 11-5B-6 of this Title.
• The property is located within three hundred(300)feet of a property used for a church or
any other place of worship, or any public or private education institution. Therefore, the
operating hours shall be limited to 11 AM to 10 PM with this conditional use permit.
Because the specific use standards for a brewery are limited the applicant has requested
that they are deemed a drinking establishment to allow extended hours to 12 AM.As
noted above the specific use standards for a drinking establishment do not allow the
operation of such a use within three hundred feet of a school or church. However; Staff is
currently processing a code change remove this requirement. Staff anticipates the
proposed code changes to be discussed with the Commission during the July 6`h
Commission hearing. Upon approval of the code amendment, the proposed project will
be allowed to extend its operating hours.
For properties abutting a residential district, no outside activity or event shall be allowed on the
site, except in accord with Chapter 3, Article E, "temporary use requirements", of this Title.
• N/A—This property does abut a residential use but not a residential district as defined in
Chapter 1.
At a minimum, one(1)parking space shall be provided for every two hundred fifty(250)square-
feet of gross f oor area. Upon any change of use for an existing building or tenant space, a
detailed parking plan shall be submitted that identifies the available parking for the overall site
that complies with the requirements of this Title.
• This property is zoned OT and requires one (1)parking space per one thousand(1,000)
square feet of gross f oor area, and requires eight(8)parking spaces for this proposal.
However, the change in use requires the applicant to meet the higher parking
requirement listed above. The proposed change of use will require thirty-three(33)
Page 5
parking spaces. Currently there are only twenty-eight(28)parking spaces to serve this
site. Since the property is under common ownership with the adjacent property at 129
E. Carlton Avenue, the applicant will be required to enter into a parking agreement to
meet the required parking needed for the proposed change of use or submit written
documentation from the owner to use the adjacent law office parking.
UDC 11-4-3-46 allows minor food and beverage products processing as follows:
The building tenant space shall not exceed five thousand(5,000)square feet. In the commercial,
industrial and traditional neighborhood districts additional square footage may be approved with
a conditional use permit. In no case shall the maximum square footage in any of these districts
exceed ten thousand(10,000)square feet.
• The existing building is 8,158 square foot and does not exceed the ten thousand(10,000)
square feet threshold.
In the commercial districts, a conditional use permit shall be required when the use is located
within three hundred(300)feet of a residential district or existing residence.
• NA—The property is not located in a commercial district.
In the commercial and traditional neighborhood districts, the dining area, tasting area, retail
showroom or any combination thereof, shall comprise a minimum of twenty-five (25)percent of
the building and/or tenant space, as applicable.
• Approximately nine hundred forty-three(943)square feet will be dedicated to brewing
and the associated equipment. The event and deck areas are a little over one thousand
seven hundred(1,700)square feet. Building floor plans are shown below in the Section
VII Exhibits.
Storage of materials, storage and equipment must be within fully enclosed structures, (outdoor)
mechanical equipment associated with the manufacturing may be reviewed as integral
architectural elements.
• N/A -No outdoor storage has been proposed with is application.All equipment shall be
within an enclosed structure.
Mechanical equipment associated with the manufacturing of the beverage may be reviewed and
approved as an integrated architectural element of the building through administrative design
review as a design standards exception.
• The applicant has proposed a grain silo as part of the design of the building. The Design
Review(DES A-2023-0073)was approved for the exterior remodel of the existing
building on May 5, 2023.
• The applicant is proposing to construct a new trash enclosure on the east side of the
property. The applicant will coordinate with Republic Services of Meridian for the
appropriate size and location of the trash enclosure. The applicant shall provide this
information to the City with their CZC submittal.
Alcohol serving is limited to 11 AM to 10 PM.
• The hours of operation will be limited to 11 AM to 10 PM until the new code goes into
effect then the applicant will be allowed to remain open and serve patrons until 12 AM as
noted above.
Page 6
F. Dimensional Standards(UDC 11-2):
This use will occupy an existing commercial building.A Design Review application (DESA-
2023-0073) was approved for the exterior remodel of the existing building on May S, 2023. The
applicant is required to apply for Certificate of Zoning Compliance for review and approval
prior to building permit issuance.
G. Access(UDC 11-3A-3, 11-3H-4):
Access to this development is via E. Carlton Avenue which is an existing access point. Per
ACHD a traffic impact study for this proposal was not required. It was determined no
improvements to the adjacent streets are required.
H. Parking(UDC I1-3C):
UDC 11-3C-5B requires one space for every one thousand(1,000)square feet of gross floor area
for the O-T district. This amounts to eight(8)parking spaces for the existing 8,185 square foot
building. The proposed change of use will require thirty-three(33)parking spaces. Currently
there are only twenty-eight(28)parking spaces to serve this site. Since the property is under
common ownership with the adjacent property at 129 E. Carlton Avenue, the applicant will be
required to enter into a parking agreement to meet the required parking needed for the proposed
change of use.
I. Landscaping(UDC 11-3B):
As this an existing developed site, landscaping is not required to comply with the requirements of
this section. The applicant is proposing to replacing the existing grass along N.Main Street and
E. Carlton Avenue with artificial turf. The applicant is proposing to enhance the landscape
island at the rear of the property. Changes to the landscaping will be required with the certificate
of zoning compliance application.
J. Fencing(UDC 11-3A-6, 11-3A-7):
The applicant is proposing to place a four(4)foot wrought iron fence around the beer garden
area. The details for the proposed fence shall be submitted to staff for review and approval prior
to permit issuance. No additional fencing is being proposed.
K. Building Elevations
This is an existing vacant commercial building on this site. The Director has approved an
Administrative Design Review(A-2023-0073)for the proposed modifications to the exterior
fagade of the existing building. Building elevations are shown below in the Section VII Exhibits.
L. Food Trucks
The use of a food truckfor this proposal cannot be approved under this conditional use permit as
it is not an allowed use through unified development code. However; the applicant can apply for
a temporary use permit(TUP) through the City Clerk's office for the use of a food truck.
VI. DECISION
A. Staff:
Staff recommends approval of the proposed conditional use permit with the conditions in Section
VIII per the Findings in Section IX.
Page 7
B. The Meridian Planning&Zoning Commission heard these items on June 15,2023.At the public
hearing,the Commission moved to approve the subject CUP requests.
1. Summary of Commission public hearing_
a. In favor: Michael Garcia,Applicant
b. In opposition:None
c. Commenting: Michael Garcia,Applicant
d. Written testimony: None
e. Staff presenting application: Linda Ritter,Associate Planner
f. Other Staff commenting on application:None
2. Key issue(s) public testimony
a. None
3. key issue(s)of discussion by Commission:
a. Concerns with parking. The gpplicant assured there would be no issues and that they
would be entering into a written agreement with the adjacent property owner to utilize
their parking lot after 6:00 PM to meet the required parking standards as the properties
are under common ownership.
4. Commission change(s)to Staff recommendation:
a. None
VII. EXHIBITS
PROPOSED LANDSCAPE PLAN(CZC 2018-0052, MARCH 7, 2018)
----------------
6 5:31
\/
z i
i
w
` o _
1 �c9
M a
SITE d LAN05C.APE PLAN ® A9.D
Page 8
Existing Landscape(date: 5/10/2023)
A. Approved Elevations (A-2023-0073, (5/8/2023)
PRIM
E%ISTING ' j
STUCCO
NEW
SHINGLES
� SNINGLES
A
114
WOGO SIGING PAINT E%ISTINO BRICK
N.MAIN STREET NZP A T _
SNINGLE6
U
U
K
W -
m
U
WIN WINDOWS \^.'DOG SIGtNG WINDOWS
� GOOSE
SCREW
SEER CO. o
E.CARLTON AVE. As.a
Page 9
WOOD SIDING
PAINT
E%ISTING
S-cco
NEW
- -'❑ ASPFIALT
SHINGLES
Y
ti
FILL-INE%ISTING NEW RNNr WOOD SIDING
�1 LOOSE -COVERED AREA N WIN OOws EM
BR STI
MC;C0 wnu M
SCREW D RHE O Doors
BEER CO.
PARKING LOT
B. Existing Elevations N. Main Street and E. Carlton Avenue(date: 5/10/2023)
-1;
Page 10
Existing Elevations Parking Lot(date: 5/10/2023)
y
1
Page 11
C. Proposed Lower and Upper Floor Plans (date: 4/18/2023)
i
COLD •
[�INIGE
STORAGE
STAFF
BAR ................ t
................. .................... ............................................
o
_ TAPROOM
�1 BREWHOUSE
ENTRY
o7b
LOON O w
ocean �� K
tp —
aINCi M
PATIO ••
nPLOOR LEVEL
---- /
�h
E-------- --------------------- -
,
0
U
w i
u
4 �
————————————_
z
LFVEL 2 AA AZ.Z
Page 12
VIII. CITY/AGENCY COMMENTS & CONDITIONS
A. PLANNING
1. A Certificate of Zoning Compliance(CZC) application is required to be submitted to the Planning
Division and approved prior to building permit submittal to address parking and site
modifications associated with the construction of the new trash enclosure (see condition 7 and 8
below).
2. The Applicant shall have a maximum of two (2)years to commence the use as permitted in
accord with the conditions of approval. If the use has not begun within two(2)years of approval,
a new conditional use permit must be obtained prior to operation or a time extension must be
requested in accord with UDC 11-5B-6F.
3. All outdoor seating and events associated with this use shall be restricted to the fenced in beer
garden and the upper deck areas.
4. Hours of operation shall be restricted from 11 AM to 10 PM. Upon approval of the code revision
to the Drinking Establishment specific use standards,the operating hours may be extended from
10 PM to 12 AM.
5. Applicant shall comply with the standards as set forth in UDC 11-3A-12 for any outdoor service
and equipment areas.
6. Applicant shall comply with all specific use standards required for a Drinking Establishment and
Minor Food and Beverage Products Processing,UDC 11-4-3-10 and 11-4-3-46.
7. The applicant shall coordinate with Republic Services of Meridian for the appropriate size and
location of the proposed trash enclosure.
8. The applicant shall enter into a parking agreement with the property owner at 129 E. Carlton
Avenue to meet the required parking needed for the proposed change of use or submit written
documentation from the owner to use the adjacent law office parking since the parcels are under
common ownership.
B. ADA COUNTY HIGHWAY DISTRICT
1. Pay a traffic impact fee. If applicable,a traffic impact fee may be assessed by ACHD and will be
due prior to the issuance of a building permit by the lead agency. This is a separate review
process and it is the applicant's responsibility to submit plans directly to ACHD.
2. Comply with all ACHD policies and ACHD standard conditions of approval for any
improvements or work in the right-of-way.
3. Obtain a permit for any work in the right-of-way prior to the construction,repair,or installation
of any roadway improvements(curb, gutter, sidewalk,pavement widening, driveways, culverts,
etc.).
C. IDAHO TRANSPORTATION DEPARTMENT(ITD)
Click on link to review comments
D. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ)
Click on link to review comments
Page 13
E. NAMPA&MERIDIAN IRRIGATION DISTRICT (NMID)
Click on link to review comments
IX. FINDINGS
A. Conditional Use Permit
The Commission shall base its determination on the conditional use permit request upon the
following:
1. That the site is large enough to accommodate the proposed use and meet all the dimensional and
development regulations in the district in which the use is located.
The proposed project is within an existing structure in the O-T district. No expansion of the
building or site is being proposed and therefore no additional site improvements are required for
this proposal. Staff finds the site is large enough to accommodate the proposed use.
2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord
with the requirements of this title.
The Comprehensive Plan identifies this area for public and quasi public uses integrated with
general business, and medium high to high density residential is encouraged to provide the
appropriate mix and intensity of activities necessary to establish a truly urban city center.
A neighborhood brewery connected to the adjacent residential including outdoor seating is the
type of neighborhood serving use envisioned by the Plan.
3. That the design, construction, operation and maintenance will be compatible with other uses in
the general neighborhood and with the existing or intended character of the general vicinity and
that such use will not adversely change the essential character of the same area.
The proposed project is within an existing building and on an existing built out lot. The applicant
is proposing to update the exterior of the existing building with horizontal and vertical wood
siding. A more modern darker gray color will transform the existing, remaining brick. Existing
stucco around the second level event space and outdoor deck will be painted a lighter gray to
compliment the color palette of the ground floor and create a subtle contemporary patterning.
All existing windows will be replaced, and street facing fagades will have varied fenestration,
material changes, textures,patterns and recesses. Exterior lighting will be proposed to promote a
safe pedestrian environment. Downlit signage on the building and grain silo is being proposed.
Hours of operation will be limited to between 11AMand IOPM. However, staff is proposing a
code change to extend the operating hours for drinking establishments located within three
hundred(300)feet of a place of worship and education facility located within the OT zone to
12AM. Upon approval of the code amendment, the proposed project will be allowed to extend its
operating hours.
This type of neighborhood serving brewery enhances the essential character of the area.
4. That the proposed use,if it complies with all conditions of the approval imposed,will not
adversely affect other property in the vicinity.
The hours of operation for the proposed use will be IIAM to IOPM. Staff is proposing a code
change to extend the operating hours for drinking establishments located within three hundred
(300)feet of a place of worship and education facility located within the OT zone to 12".. Upon
approval of the code amendment, the proposed project will be allowed to extend its operating
Page 14
hours.All outdoor seating and events associated with this use shall be limited to the fenced in
beer garden and upper deck areas.
5. That the proposed use will be served adequately by essential public facilities and services such as
highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal,
water, and sewer.
The proposed use will be adequately served by all public facilities and services.
6. That the proposed use will not create excessive additional costs for public facilities and services
and will not be detrimental to the economic welfare of the community.
Staff ,finds the proposed use will not create any additional costs for public facilities and services
and will not be detrimental to the economic welfare of the community.
7. That the proposed use will not involve activities or processes,materials, equipment and
conditions of operation that will be detrimental to any persons,property or the general welfare by
reason of excessive production of traffic,noise, smoke, fumes, glare or odors.
This proposed project will operate within an existing commercial building and will operate
between the hours of I IAM to IOPM. Staff is proposing a code change to extend the operating
hours for drinking establishments located within three hundred(300)feet of a place of worship
and education facility located within the OTzone to 12AM. Upon approval of the code
amendment, the proposed project will be allowed to extend its operating hours.
The proposed project will be located in an area recommended for neighborhood mixed use which
typically includes a mix of commercial and multifamily residential at an arterial intersection.
This location is well-suited for the proposed use as it adds to the lively and vibrant downtown
area.
8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or
historic feature considered to be of major importance. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005)
The proposed use will operate within an existing commercial building and will not result in
damage of any such features.
Page 15
E IDIAN
'aAHO
AGENDA ITEM
ITEM TOPIC: Findings of Fact and Conclusions of Law for Milano Animal Care Facility (H-
2023-0026) by Blue Frog, LLC, located at 3020 W. Milano Dr.
CITY OF MERIDIAN C�
E IDIAN ---
FINDINGS OF FACT, CONCLUSIONS OF LAW
AND I D A H O
DECISION& ORDER
In the Matter of the Request for Conditional Use Permit Conditional use permit request to operate
an animal care facility offering general practices such as examinations,wellness visits,surgery,
dental and x-ray procedures from a new 3,100 square-foot building on 0.75 acres of land in the L-O
zoning district by Latoysha Burton,Blue Frog,LLC.
Case No(s).H-2023-0026
For the Planning& Zoning Commission Hearing Date of: July 6,2023 (Findings on July 20,2023)
A. Findings of Fact
1. Hearing Facts(see attached Staff Report for the hearing date of July 6,2023, incorporated by
reference)
2. Process Facts(see attached Staff Report for the hearing date of July 6,2023, incorporated by
reference)
3. Application and Property Facts(see attached Staff Report for the hearing date of July 6,2023,
incorporated by reference)
4. Required Findings per the Unified Development Code(see attached Staff Report for the hearing
date of July 6, 2023, incorporated by reference)
B. Conclusions of Law
1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use
Planning Act of 1975,"codified at Chapter 65,Title 67,Idaho Code(I.C. §67-6503).
2. The Meridian Planning&Zoning Commission takes judicial notice of its Unified Development
Code codified at Title 11 Meridian City Code,and all current zoning maps thereof. The City of
Meridian has,by ordinance, established the Impact Area and the Amended Comprehensive Plan
of the City of Meridian,which was adopted April 19,2011,Resolution No. 11-784 and Maps.
3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A.
4. Due consideration has been given to the comment(s)received from the governmental
subdivisions providing services in the City of Meridian planning jurisdiction.
5. It is found public facilities and services required by the proposed development will not impose
expense upon the public if the attached conditions of approval are imposed.
6. That the City has granted an order of approval in accordance with this decision,which shall be
signed by the Chairman of the Commission and City Clerk and then a copy served by the Clerk
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). Milano Animal Care Facility#H-2023-0026
Page 1
upon the applicant,the Planning Department,the Public Works Department and any affected
party requesting notice.
7. That this APPROVAL is subject to the conditions of approval in the attached staff report for the
hearing date of July 6, 2023, incorporated by reference. The conditions are concluded to be
reasonable and the applicant shall meet such requirements as a condition of approval of the
application.
C. Decision and Order
Pursuant to the Planning&Zoning Commission's authority as provided in Meridian City Code § 11-
5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby
ordered that:
1. The applicant's request for a conditional use permit is hereby approved in accord with the
conditions of approval in the staff report for the hearing date of July 6,2023,attached as Exhibit
A.
D. Notice of Applicable Time Limits
Notice of Two(2)Year Conditional Use Permit Duration
Please take notice that the conditional use permit,when granted, shall be valid for a maximum
period of two(2)years unless otherwise approved by the City in accord with UDC 11-5B-6F.1.
During this time,the applicant shall commence the use as permitted in accord with the
conditions of approval, satisfy the requirements set forth in the conditions of approval, and
acquire building permits and commence construction of permanent footings or structures on or
in the ground. For conditional use permits that also require platting,the final plat must be
signed by the City Engineer within this two(2)year period in accord with UDC 11-5B-6F.2.
Upon written request and filed by the applicant prior to the termination of the period in accord
with 11-5B-6.F.1,the Director may authorize a single extension of the time to commence the
use not to exceed one (1)two(2)year period.Additional time extensions up to two (2)years as
determined and approved by the Commission may be granted.With all extensions,the Director
or Commission may require the conditional use comply with the current provisions of Meridian
City Code Title 11.
E. Judicial Review
Pursuant to Idaho Code § 67-652 1(1)(d), if this final decision concerns a matter enumerated in Idaho
Code § 67-6521(1)(a),an affected person aggrieved by this final decision may,within twenty-eight
(28)days after all remedies have been exhausted, including requesting reconsideration of this final
decision as provided by Meridian City Code § 1-7-10, seek judicial review of this final decision as
provided by chapter 52,title 67, Idaho Code. This notice is provided as a courtesy; the City of
Meridian does not admit by this notice that this decision is subject to judicial review under LLUPA.
F. Notice of Right to Regulatory Takings Analysis
Pursuant to Idaho Code §§ 67-6521(1)(d) and 67-8003, an owner of private property that is the
subject of a final decision may submit a written request with the Meridian City Clerk for a regulatory
takings analysis.
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). Milano Animal Care Facility#H-2023-0026
Page 2
G. Attached: Staff Report for the hearing date of July 6,2023
By action of the Planning&Zoning Commission at its regular meeting held on the 20th day of
July ,2023.
COMMISSIONER ANDREW SEAL, CHAIRMAN VOTED
COMMISSIONER MARIA LORCHER,VICE CHAIRMAN VOTED
COMMISSIONER NATE WHEELER VOTED
COMMISSIONER JARED SMITH VOTED
COMMISSIONER PATRICK GRACE VOTED
COMMISSIONER MANDI STODDARD VOTED
COMMISSIONER ENRIQUE RIVERA VOTED
Andrew Seal, Chairman 7-20-2023
Attest:
Chris Johnson, City Clerk 7-20-2023
Copy served upon the Applicant,the Planning and Development Services divisions of the Community
Development Department,the Public Works Department and the City Attorney.
By: Dated: 7-20-2023
City Clerk's Office
CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER
CASE NO(S). Milano Animal Care Facility#H-2023-0026
Page 3
STAFF REPORT E COMMUNITY
N --
COMMUNITY DEVELOPMENT DEPARTMENT .►A H O
HEARING 7/6/2023 Legend 0
DATE:
Project Location
TO: Planning&Zoning Commission
FROM: Linda Ritter,Associate Planner C-C EH -8 E
208-884-5533LTI
SUBJECT: H-2023-0026 L_ L1LW1llIRU 4
Milano Animal Care Facility CUP a 8
LOCATION: 3020 W.Milano Drive, near the northeast
corner of Ten Mile Road and McMillan C G L-O C-C R=13 :U -
Road, in the SW 1/4 of the SW 1/4 of R-4 a `RUT
Section 26,Township 4N,Range 1 W.
(Parcel#R9010670030)
� 8 _0J C-N R�8
I. PROJECT DESCRIPTION
Conditional use permit request to operate an animal care facility offering general practices such as
examinations,wellness visits, surgery, dental and x-ray procedures from a new 3,100 square-foot
building on 0.75 acres of land in the L-O zoning district.
II. SUMMARY OF REPORT
A. Project Summary
Description Details Page
Acreage 0.75 acres
Future Land Use Designation Office
Existing Land Use(s) Vacant
Proposed Land Use(s) Animal care facility
Lots(#and type;bldg./common) One(1)vacant lot with proposed office/pet hospital
Neighborhood meeting date;#of 3/9/2023
attendees:
History(previous approvals) Verona Subdivision(AZ-03-005),DA#103097612;
Verona Subdivision No.3 Rezone(RZ-05-006);Verona
Subdivision No. 3 FP(FP-05-046);DA Mod(MI-08-006,
DA#108101152);H-2021-0080.
Page 1
B. Community Metrics
Description Details Page
Ada County Highway District
• Staff report(yes/no) Not at the time of report publication
• Requires ACHD Commission No
Action es/no
• Traffic Impact Stud es/no
Access(Arterial/Collectors/State One(1)drive aisle access point to N. Cortona Way along
Hwy/Local)(Existing and Proposed) the east boundary is proposed through an existing curb cut.
This drive aisle is shown to continue west through adjacent
sites and connect to an existing commercial drive aisle that
has an access point to W.Milano Drive.
Existing Road Network Public road network is existing adjacent to site(W.Milano
Drive and N. Cortona Way);drive aisle network for unit
access is not existing.
C. Project Area Maps
Future Land Use Map Aerial Map
Legend 0 Legend
■Project Location Project Location
IH
edium Density
C e Rsidential _- =
r TM
Comme vial Resi a is w ,
Low De�sitL Resient i id ll
Page 2
Zoning Map Planned Development Map
Legend 0 Legend
Project Location t 11 Project Location
®
R-4 � ;� City Limits
—Planned Parcels
_8 ed'1 ULMW Density
MU-C Residential
C-CU f � f
�- Office
° R4 � High Density°
Commerc al Residential
C-G -O C-C n �.
kL�RUT �V O LE) �
R-8 ,
wrc_:W_�� RUSTLo��w DerisrtL Resic�nt
III. APPLICANT INFORMATION
A. Applicant:
Latoysha Burton,Blue Frog,LLC—3011 Sutton Gate Drive, Ste. 120, Suwanee, GA 30024
B. Owner:
David Yorgenson,Timberland Building Partners LLC, 14254 W. Battenburg,Boise,ID, 83716
C. Representative:
Same as Applicant
IV. NOTICING
Planning& Zoning City Council
Posting Date Posting Date
Notification published in
newspaper
6/20/2023
Notification mailed to property
owners within 300' 6/15/2023
Applicant posted public hearing
notice sign on site 6/21/2023
Nextdoor posting 6/20/2023
V. COMPREHENSIVE PLAN ANALYSIS(Comprehensive Plan)
A. Future Land Use Map Designation(https://www.meridiancity.org/compplan)
This property is designated Office on the Future Land Use Map(FLUM)in the Comprehensive Plan.
This designation is meant to provide opportunities for low-impact business areas. These uses would
include professional offices,technology and resource centers; ancillary commercial uses may be
considered(particularly within research and development centers or technological parks).
Page 3
The property was annexed and zoned in 2003 to the R-8 zoning district. In 2005, a rezone application
was approved to change the zoning to the current L-O zoning district. Consistent with this rezone, a
final plat was approved for six(6)office lots as part of Verona Subdivision No. 3. The DA from 2008
is the relevant agreement for this site but did not have a concept plan for these lots. In lieu of a
concept plan,the DA references specific limitations to the allowed commercial area and included a
provision that a minimum of three(3) office buildings in this office development. This provision has
been satisfied with the existing development of three(3)office buildings. In addition, specific
elevations were included as part of the DA that the current proposal generally complies with. Staff
notes, despite no Development Agreement Modification being required,the relevant DA
contemplates all commercial uses within the subject office lots.
To the east and north of the subject sites are detached single-family residential that are part of the
Verona Subdivision. To the south is approximately 10 acres of C-G zoned property that includes a
number of commercial properties under development. The existing use is on the hard corner of
McMillan and Ten Mile and is a fuel service station and convenience store. Directly to the south and
across W. Milano,the largest commercial parcel has approvals for a 164 unit 55 and older multi-
family development. Staff anticipates future residents of that site could utilize the service of the
proposed development.As the Applicant is proposing to develop a veterinary hospital offering
general practices such as examinations,wellness visits, surgery, dental and x-ray procedures on this
site. The proposed use is listed as a conditional use in the L-O zoning district in UDC Table 11-2B-2.
B. Comprehensive Plan Policies (https://www.meridiancioy.orglcompplan):
Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to
the proposed use of this property(staff analysis in italics):
• "Permit new development only where it can be adequately served by critical public facilities and
urban services at the time of final approval, and in accord with any adopted levels of service for
public facilities and services."(3.03.03F)
City water and sewer services are available and can be extended by the developer with
development in accord with UDC 11-3A-21.
• "Ensure that quality fire protection,rescue and emergency medical services are provided within
Meridian."(4.11.03)
The proposed veterinary hospital is within a reasonable response time zone for emergency
services.
• "Require all new development to create a site design compatible with surrounding uses through
buffering, screening,transitional densities, and other best site design practices."(3.07.01A)
There is an existing 6-foot tall fence and a 20 foot wide landscaped buffer along the north
property boundary bordering the existing residential uses to assist in screening and buffering the
proposed use.
• "Encourage compatible uses and site design to minimize conflicts and maximize use of land."
(3.07.00)
The proposed veterinary hospital is located adjacent to a residential neighborhood to the north
and east. This development is within a low office area and the proposed use will not create
conflicts between land uses as the uses.
• "Ensure development is connected to City of Meridian water and sanitary sewer systems and the
extension to and through said developments are constructed in conformance with the City of
Meridian Water and Sewer System Master Plans in effect at the time of development."
Page 4
(3.03.03A)
The proposed development will connect to City water and sewer systems;services are required to
be provided to and through this development in accord with current City plans.
• "Require urban infrastructure be provided for all new developments, including curb and gutter,
sidewalks,water and sewer utilities."(3.03.03G)
Urban sewer and water infrastructure and curb, gutter and sidewalks are required to be provided
with development as proposed. Curb, gutter and sidewalks have already been installed for this
development.
• "Slow the outward progression of the City's limits by discouraging fringe area development;
encourage development of vacant or underutilized parcels currently within City limits." (4.05.03B)
Development of the subject vacant land, currently in the City limits, is encouraged over parcels on
the fringe of the City. The development of this property will result in better provision of City
services.
VI. UNIFIED DEVELOPMENT CODE ANALYSIS(UDC)
A Conditional Use Permit is requested to develop a 3,100 square foot animal care facility offering
general practices such as examinations,wellness visits, surgery, dental and x-ray procedures on 0.75-
acres of land in the L-O zoning district as required by UDC Table 11-2B-2. See application narrative
for more information.
A. Existing Structures/Site Improvements:
There are no existing structures on this site. Attached sidewalks and a twenty (20)foot
landscaping buffer along N. Cortona Way have been installed. A twenty (20)foot
landscape buffer has been installed on the north side of the property as it is adjacent to a
residential neighborhood.
B. Proposed Use Analysis:
The proposed use "Animal Care Facility" is an allowed use with an approved
conditional use permit.
C. Specific Use Standards(UDC 11-4-3):
1. All animals shall be indoors at all times, except when being exercised.At such times,
animals shall be under the supervision and direct control of a caretaker.
The applicant is proposing to install two (2) wooden privacy fenced areas are located on the
north and west side of the building to ensure animal safety. These areas will be used to walk
the animals while in the hospital care in a safe environment and to prevent escape and/or
injury to the animals.
2. The facility owner and/or operator shall comply with all state and local regulations
relative to such a facility and shall maintain housekeeping practices designed to prevent
the creation of a nuisance and to reduce noise and odor to a minimum.
The animals will be indoors at all times except when exercising. All animal waste shall be
maintained and discarded in a manner that minimizes odor. The applicant will need to
coordinate with Republic Services for the appropriate size and location of the proposed
trash enclosure and relocate to it to an area that is away from the residential development.
Page 5
D. Dimensional Standards(UDC 11-2):
The proposal meets the dimensional standards for setbacks, landscape buffers,parking
requirements, landscape requirements and maximum building height.
E. Hours of Operations(UDC 11-2B-3B):
Business hours of operation within the L-O and C-N Districts shall be limited from 6:00 a.m. to
10:00 p.m. The applicant is proposing to operate the business within the following hours:
Monday through Friday- 7 a.m. to 6p.m.;Saturday-8 a.m. to 12Am.
F. Access(UDC 11-3A-3, I1-3H-4):
Access for the proposed project has been installed along the south side of the property and
connects to N. Cortona Way, which is a residential neighborhood street, along the east boundary
of the site. This is the only direct access to a public street for the project. The applicant will be
required to construct the entire length and width of the two-way drive aisle along the southern
border of the property.
G. Parking(UDC 11-3C):
Off-street vehicle parking is required per the standards listed in UDC 11-3C-6B.1. Based on the
3,100 square foot facility, a minimum of 6 parking spaces are required.A total of 14 spaces are
proposed, in excess of UDC standards.
H. Sidewalks(UDC 11-3A-17):
Sidewalks along N. Cortona Way currently exist for this development.
I. Landscaping(UDC 11-3B):
Interior landscaping is being proposed. See the attached landscape plan in Section VIII(B).
J. Fencing(UDC 11-3A-6, 11-3A-7):
There is an existing six (6)foot fence on the north side of the property separating the adjacent
residential neighborhood from the proposed commercial use.
K. Utilities (UDC 11-3A-21):
Water and sewer services were installed with the construction of N. Cortona Way and stubbed to
the parcel. Street lights were installed to the east across N. Cortona Way with the construction of
N. Cortona Way. No additional street lights are being proposed with this development.
There are existing fire hydrants at the corner of W.Milano Drive and N. Cortona and Way N. Cortona Way
and W. Wapoot Street.
L. Building Elevations(UDC 11-3A-19 I Architectural Standards Manual):
Conceptual building elevations were submitted for the proposed structure as shown in Section
VIII(C). Building materials consist of Nardi board trim, Nardi board lap siding, Nardi board
fascia, Nardi board shake siding, synthetic stone sill, synthetic stone wainscot, and shingle roof.
Final design is required to comply with the design standards in the Architectural Standards
Manual and recorded development agreement.
Page 6
VII. DECISION
A. Staff:
Staff recommends approval of the Conditional Use Permit with the conditions noted in Section IX
below.
B. The Meridian Planning&Zoning Commission heard this item on July 6,2023. At the public
hearing.the Commission moved to approve the subject Conditional Use Permit request.
1. Summary of the Commission public hearing:
a. In favor: All
b. In opposition:None
c. Commenting: Dan Lardie.Levin Associates, Danielle Berry,Blue Frog,LLC: Dave
Yorgason,Joshua Smith.Veterinarian.
d. Written testimony: None
e. Staff presenting application: Linda Ritter.Associate Planner
f. Other Staff commenting on application:None
2. Key issue(s)of public testimony:
a. None
3. Key issue(s)of discussion by Commission.
a. Noise concerns regardinganimals being outdoors and barkin fora significant period of
time. The Commission was reassured all animals will be under direct control of a
technician and on a leash when outside.No more than one animal at a time will be
outside.
4. Commission change(s)to Staff recommendation:
a. None
Page 7
VIII. EXHIBITS
A. Site Plan(date: 6/8/2023)
3020 W.MILANO DRIVE
<Z
MERIDIAN,IDAHO
2023Z 1_
m_ gg
47
aW so
_ m
. S
e
ee
A•m= �.� NOTAPPROVED
FORCONSTRDCTIONp'S�
Page 8
B. Landscape Plan(date: 6/9/2023)
BILK 3—SUB LANDSCAPE LEGEND
ERONA VERERI NMY CLINIC
O
a o o j
PARKING - � // �e�� ,•
PLANT SCHEDULE'°=%—�"
r �
1010193
VICINITY MAP ...,� �Ei
LANDSCAPING INFORMATION
CALLOUT LEGEND
j7�OVERALL LANDSCAPE PLAN 4-i n F� m O-•�..�. uNoscaPE
LANDSCAPE NOTES. W
- IRRIGATION NOTES LANDSCAPE SHEET INDEX
.... m �zourvossAPe oerARs- ��r
-- - DISCLAIMER: 0
Page 9
C. Building Elevations—Front and Right(date: 12/13/2022)
— PEVIEW PLAN3
ONLYI
xarFOP
.� ...._...�.... CDNSTROCTDN
r�aA .,wm E
m® K
W
A62
•^•••" RENEW PLnas
ONLY
® .m NOT FOR
coxsmucrION
�rx�Wr
L_
E
rn
Of
e a a e
—A-6.1
Page 10
IX. CITY/AGENCY COMMENTS & CONDITIONS
A. PLANNING
1. Future development of this site shall comply with the previous conditions of approval and
terms of the existing Development Agreement and the conditions contained herein [AZ-03-
005,DA#103097612; RZ-05-006; FP-05-046;MI-08-006, DA Inst. # 108101152; H-2021-
00801.
2. The proposed project shall comply with the standards listed in UDC 11-4-3-22 for animal
care facilities.
3. The site and landscaping plans shall depict the location and a detail of the bicycle rack that
complies with the location and design standards listed in UDC 11-3C-5C.
4. The hours of operations shall be limited to 6:00 a.m. to 10:00 p.m.per UDC 11-2B-3B.
5. The applicant shall construct the entire length and width of the two-way drive aisle along the
southern border of the property prior to occupancy.
6. Protect the existing landscaping on the site during construction,per UDC 11-3B-10.
7. The area labeled future parking on the site plan is not been approved for parking until the area
is approved per the standards set forth in UDC 11-3C-5B.
8. A Certificate of Zoning Compliance and Design Review application shall be submitted and
approved for the proposed use prior to submittal of a building permit application. The design
of the site and structures shall comply with the standards listed in UDC 11-3A-19; the design
standards listed in the Architectural Standards Manual.
9. The applicant shall coordinate with Republic Services for the appropriate size and location of
the proposed trash enclosure. The trash enclosure shall be relocated away from the residential
development.
10. The conditional use permit is valid for a maximum period of two (2) years unless otherwise
approved by the City. During this time,the Applicant shall commence the use as permitted in
accord with the conditions of approval, satisfy the requirements set forth in the conditions of
approval, and acquire building permits and commence construction of permanent footings or
structures on or in the ground as set forth in UDC 11-5B-6.A time extension may be requested
as set forth in UDC 11-5B-6F.
B. FIRE
1. Must meet final approval for subsequent future buildings for permitted process.
2. Must meet current IFC codes.
C. PUBLIC WORKS
1. Ensure no sewer services pass through infiltration trenches.
2. Call out removal of the blow off.
D. Ada County Highway District(ACHD)
1. Click on link to review comments.
E. Idaho Transportation Department(ITD)
Page 11
1. Click on link to review comments.
X. FINDINGS
Conditional Use(UDC 11-5B-6)
Findings: The commission shall base its determination on the conditional use permit request upon the
following:
1. That the site is large enough to accommodate the proposed use and meet all the dimensional and
development regulations in the district in which the use is located.
Staff finds the site is large enough to accommodate the proposed use.
2. That the proposed use will be harmonious with the Meridian comprehensive plan and in accord
with the requirements of this title.
Staff ,finds the proposed veterinary hospital will be harmonious with the Comprehensive Plan and
is consistent with applicable UDC standards with the conditions noted in Section IX of this
report.
3. That the design,construction, operation and maintenance will be compatible with other uses in
the general neighborhood and with the existing or intended character of the general vicinity and
that such use will not adversely change the essential character of the same area.
Staff ,finds the proposed design, construction, operation and maintenance of the proposed use will
be compatible with other uses in the general neighborhood, with the existing and intended
character of the vicinity and will not adversely change the essential character of the area.
4. That the proposed use,if it complies with all conditions of the approval imposed,will not
adversely affect other property in the vicinity.
Stafffinds the proposed use will not adversely affect other properties in the vicinity if it complies
with the conditions in Section IX of this report.
5. That the proposed use will be served adequately by essential public facilities and services such as
highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal,
water, and sewer.
Stafffinds the proposed use will be served by essential public facilities and services as required.
6. That the proposed use will not create excessive additional costs for public facilities and services
and will not be detrimental to the economic welfare of the community.
Staff ,finds the proposed use will not create additional costs for public facilities and services and
will not be detrimental to the economic welfare of the community.
7. That the proposed use will not involve activities or processes,materials, equipment and
conditions of operation that will be detrimental to any persons,property or the general welfare by
reason of excessive production of traffic,noise, smoke, fumes, glare or odors.
Stafffinds the proposed use will not be detrimental to any persons,property or the general
welfare by the reasons noted above.
8. That the proposed use will not result in the destruction,loss or damage of a natural, scenic or
historic feature considered to be of major importance. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005)
Staff ,finds the proposed use will not result in the destruction, loss or damage of any such features.
9. Additional findings for the alteration or extension of a nonconforming use:
Page 12
a. That the proposed nonconforming use does not encourage or set a precedent for additional
nonconforming uses within the area; and,
This finding is not applicable.
b. That the proposed nonconforming use is developed to a similar or greater level of conformity
with the development standards as set forth in this title as compared to the level of
development of the surrounding properties.
This finding is not applicable.
Page 13
E K IDIAN:---
iuAn
Planning and Zoning Presentations and outline
Planning and Zoning Commission Meeting July 20, 2023
Item #4: Jump Creek South Apartments (H AERIAL MAPZONING MAPFUTURE LAND USE MAP Conditional Use Permit0016)-2023-
Site Plan
Landscape plan
Conceptual Building Elevations
Item #5: Stapleton Apartments (H AERIAL MAPZONING MAPFUTURE LAND USE MAP Conditional Use Permit0033)-2023-
Site Plan
Landscape Plan
Conceptual Building Elevations
Stapleton Subdivision Development Agreement 110907-0129/Inst. #2019-2018-H
Changes to Agenda:
Item #4: Jump Creek South Apartments (H-2023-0016)
Application(s):
Conditional Use Permit
Size of property, existing zoning, and location: This site consists of 3.29 acres of land, zoned R-15, located at the Northwest corner
of N. Black Cat Road and W. McMillan Road.
History: Development Agreement 2014-105206, H-2018-0113
Comprehensive Plan FLUM Designation: Medium-Density Residential (MDR)
Summary of Request: The subject property is one of two multi-family properties that was approved with the preliminary plat. The
gross density for the multi-family portion of the development is at 13.37 dwelling units to the acre which is higher than the MDR
designation of the Comprehensive Plan, however, this was contemplated during the review and approval of the Jump Creek
development.
The overall gross density for the Jump Creek development is approximately 4.54 dwelling units to the acre, including the 44 multi-family
units proposed with this development and the previous approval of the 28 multi-family units, which is consistent with the MDR land use
designation.
A two-story multi-family development containing 44 dwelling units consisting of eleven (11) residential apartment buildings with a
leasing/release office (400 square feet) serving to be used by both multi-family developments once build-out of the project is complete.
During the review of the previous multi-family development, the applicant did commit on the record to constructing the leasing office
with this phase of development.
Site Design: Buildings shall provide a minimum setback of ten (10) feet unless a greater setback is otherwise required. The proposed
site plan complied with this standard.
The site plan depicts screened trash standards for only one (1) trash enclosure provided for the multi-family development. Staff
recommends that the Applicant work with Republic Services to establish an approved location for the trash enclosures, as well as, an
adequate quantity of trash and recycle bins to service this development prior to the submittal of the CZC Application
A minimum of eighty (80) square feet of private, usable open space shall be provided for each unit. The submitted elevations depict
several outdoor patios and balconies that may qualify for the requirement. The Architectural plan states a minimum of 80 square feet
of private usable open space will be provided for each unit in the form of decks and patios as depicted on the floor plans.
Common Open Space design requirements: Because the site is only 3.29 acres, the total baseline land area of qualified common
open space of 10% of the gross land for multi-family developments of five (5) acres or more does not apply.
The site was required to develop with a minimum of 15% open space (12.89 acres) to include the following amenities: three (3) tot lots,
internal walking paths, a 10-foot wide multi-use pathway on the south side of W. Gondola Drive, and 5% additional open space.
Additionally, the Pathways Master Plan requires a 10-foot multi-use pathway to be included as part of the development plan for this site.
Both multi-family developments approved as part of the Jump Creek overall development have access to the common areas and site
amenities throughout the entire development.
In addition to the baseline open space requirement, a minimum area of outdoor common open space shall be provided - two hundred
fifty (250) square feet for each unit containing more than five hundred (500) square feet and up to one thousand two hundred (1,200)
square feet of living area. All 44 units are between 500 and 1,200 s. f.; therefore, a total of 11, s.f. (or 0.25-acre) of common open
space is required. Because this site is below 5-acres in size, the baseline requirement in UDC 11-4-3-27C.1 does not apply. The
submitted plans include two open common grassy areas. These areas appear to be over 5,000 square feet in size and are illustrated
as a drainage swale and a subsurface sand filter drainage area. Additionally, a picnic area located behind the leasing office is shown
on the site Plan. Staff recommends that the Applicant submit an open space exhibit that demonstrates compliance with UDC 11-4-3-
27.C.4.
To satisfy the specific use standards for the proposed 44 multi-family units, a minimum of three amenities, one from each
category, must be provided. These proposed amenities consist of a leasing/release office with an outdoor BBQ area (400 square feet)
serving both multi-family developments, a picnic area with tables, benches, landscaping, a shade structure attached to the office, a
bicycle repair station, a community garden, and charging stations for electric vehicles. Additionally, there is a multi-use pathway that
surrounds the site, serving as another amenity. The Applicant meets the requirements of UDC Code 11-4-3-27.D for the site.
Dimensional Standards: The proposed development is required to comply with the dimensional standards listed in UDC Table 11-2B-
3 for the R-15 zoning district and those within the specific use standards for Multi-family Development (UDC 11-4-3-27). The submitted
plans show compliance with all dimensional and specific use standards, including but not limited to, building height, setbacks,
accesses, and required parking spaces. Staff recommends that the Applicant reorient Building H to face south and move the
lease/release office space to face east in a central location within the development to improve accessibility and convenience.
Access: All-access was previously approved with the Jump Creek preliminary plat. Primary access for this project will occur from W.
Daphne Street. which connects to N. Black Cat Road. There is additional access through numerous roads in the Jump Creek
Subdivision which eventually terminate at W. Riva Capri Street into N. Maplestone Drive. Since the drive aisle within this development
is not classified as a private street, the street names shown on the site plan should be removed. The common drive located on Lot 10,
Block 1 of Jump Creek Subdivision No. 6 serves as access for Lots 22 and 23, Block 1 of Jump Creek South Subdivision, and functions
solely as a secondary fire access point for the multi-family development. As per the Fire Department's requirements, two bollards need
to be installed on the property line of the multi-family development, spaced 20 feet apart. These bollards should be accompanied by a
heavy chain and Knox padlock on the property line of the multi-family development. The buildings within this development will have
their addresses assigned based on W. Daphne Street. Furthermore, it is recommended to place a wayfinding sign near the entrance of
the multi-family development to provide clear directions.
Off-street Parking: Off-street parking for multi-family developments is required to be provided per the table in UDC 11-3C-6 based on
the number of bedrooms per unit. The Applicant is proposing 46 units consisting of 36 2-bedroom units and 8 3-bedroom units. In
addition, one (1) guest space for every 10 units is required per UDC 11-3C-6.
Based on the total number of units proposed and their bedroom count distribution, a minimum of 100 parking spaces, with a minimum
of 44 of these spaces to be covered in a garage or by a carport. According to the submitted site plan, the Applicant is proposing 100
spaces with 43 of these spaces to be covered by a carport. The proposed parking just meets the minimum code requirements;
however, one additional covered parking stall should be added. Additionally, the plan submitted is deficient in trash enclosures for this
site, which may impact the proposed parking.
Bicycle parking is required per the standards listed in UDC 11-3C-6G and complies with the standards listed in UDC 11-3C-5C.
Sidewalks and pedestrian walkways: A 5-foot wide attached sidewalk is existing along W. Daphne Street connecting to the multi-
family development. The Applicant is also proposing attached sidewalks and other pedestrian walkways throughout the entire site.
Internal pedestrian walkways are required to be distinguished from the vehicular driving surfaces through the use of pavers,
colored or scored concrete, or bricks per UDC 11-3A-19B.4b. The proposed pedestrian sidewalks shall be constructed
with a different material than the driving surface with the plans submitted the CZC Application.
Pathways: The Applicant is required to construct 25-foot wide street buffers along N. Black Cat Road, an arterial street, and along W.
McMillan Road, another arterial street, in accordance with UDC 11-3B-7.3. Landscaping is required within parking lots in accordance
with the standards listed in UDC 11-3B-8C.
According to the submitted landscape plans, all required landscaping appears to be shown including the required number of trees
adjacent to N. Black Cat Road, W. McMillan Road, and within the parking lot islands, and next to drive aisles. A landscape strip a
minimum of five (5) feet wide shall be provided along each side of the pathway per UDC 11-3B-12.
Fencing: All fencing constructed on the site is required to comply with the standards listed in UDC 11-3A-7. A 6-foot tall solid vinyl
fence is proposed along the east and south sides of the development; an existing fence is located on the north and west side of the
development as shown on the landscape plan. The landscape plan appears to be in compliance with this requirement.
Building Elevations: The Applicant has submitted conceptual elevations of the future multi-family 4-plex buildings. Multi-family
residential projects require Administrative Design Review (DES) approval with future applications so Staff will perform a thorough
analysis at that time against the requirements in the Architectural Standards Manual. Further, an application for a Certificate of Zoning
Compliance (CZC) will also be required to be submitted for this entire development before the building permit submission
Initial review of the conceptual elevations depicts multiple 4-plex buildings with varying roof profiles and materials including stone, fiber-
cement lap siding in different layouts, horizontal lap siding, and fenestration. The
Written Testimony: None
Staff Recommendation: Staff recommends approval of the requested Conditional Use Permit per the conditions of approval in the
Staff Report.
Notes:
Possible Motions:
Approval
After considering all staff, applicant and public testimony, I move to approve File Number H-2023-0016, as presented in the staff
report for the hearing date of July 20, 2023, with the following modifications: (Add any proposed modifications to conditions)
Denial
After considering all staff, applicant and public testimony, I move to approve File Number H-2023-0016, as presented during the
hearing on July 20, 2023, for the following reasons: (You should state specific reasons for denial)
Continuance
I move to continue File Number H-2023-0016 to the hearing date of (insert continued hearing date here) for the following
reason(s): (You should state specific reason(s) for continuance)
___________________________________________________________________________________________________________
Item #5: Stapleton Apartments (H-2023-0033)
Application(s):
Conditional Use Permit
Size of property, existing zoning, and location: This site consists of 2.07 acres of land, zoned R/15, located at the Northwest
corner of S. Meridian Road and W. Harris Street.
History: Development Agreement Inst. #2019-1100907, H-2019-001; Multiple Final Plats for Phase 1, 2, 3 & 4.
Comprehensive Plan FLUM Designation: Medium-high Density Residential (MHDR)
Summary of Request: A two-story multi-family development containing 19 dwelling units consisting of five (5) residential apartment
buildings with a gross density of 9.18 units per acre consistent with the density in the MHDR designation. The conceptual development
plan included in the Development Agreement initially proposed 28 units. However, the Applicant believes that this location would be
better served with larger units instead, and therefore, reduced the number of total units thereby increasing the square footage for each
unit. The Applicants decision took into consideration the proximity of a larger future multi-family project planned directly to the west of
this site.
Common Open Space design requirements: Because the site is only 2.07 acres, the total baseline land area of qualified common
open space of 10% of the gross land for multi-family developments of five (5) acres or more does not apply.
In addition to the baseline open space requirement, a minimum area of outdoor common open space shall be provided based on the
square feet of the living area per the UDC. The Applicant is required to provide common open space based on the square footage for
each unit type. The submitted plans do not depict the square footage for each unit type (19 three-bedroom units are included on the
plans). Staff recommends that the Applicant revise the plans submitted with the future Certificate of Zoning (CZC) application that meets
the requirements of UDC Code 11-4-3-27.C for the site.
To satisfy the specific use standards for the proposed 19 multi-family units, a minimum of two amenities, one from each category, must
be provided. According to the submitted plans and narrative, the Applicant has not provided any amenities within this development. The
Applicant should revise the plans submitted with the future Certificate of Zoning (CZC) application that meets the requirements of
UDC Code 11-4-3-27.D for the site.
Site Design: Buildings shall provide a minimum setback of ten (10) feet unless a greater setback is otherwise required. The proposed
site plan complied with this standard.
The site plan depicts screened trash standards for only one (1) trash enclosure provided for the multi-family development. Staff
recommends that the Applicant work with Republic Services to establish an approved location for the trash enclosures, as well as, an
adequate quantity of trash and recycle bins to service this development prior to the submittal of the CZC Application
A minimum of eighty (80) square feet of private, usable open space shall be provided for each unit. This requirement can be satisfied
through porches, patios, decks, and/or enclosed yards. Landscaping, entryway, and other accessways shall not count toward this
requirement.
The submitted elevations depict several outdoor patios and balconies that may qualify for the requirement. However, without
floorplans, Staff cannot verify if each unit is proposed with the minimum required area. Compliance with this standard will occur with
the future Certificate of Zoning Compliance (CZC) application; the Applicant is required to comply with this requirement or submit an
Alternative Compliance application to seek a reduction to the required private open space standards.
Dimensional Standards: The proposed development is required to comply with the dimensional standards listed in UDC Table 11-2B-
3 for the R-15 zoning district and those within the specific use standards for Multi-family Development UDC 11-4-3-27).
The R-15 zoning district has a minimum landscape buffer requirement of 20 feet to any adjacent collector street . According to the
submitted concept plan, the 20-foot landscape buffer to W. Harris Street and N. Lone Pine Way are compliant with the required
dimensional standards.
The R-15 zoning district has a maximum height limit of 40 feet. The submitted conceptual elevations depict 35 feet for all buildings
proposed as two-story in height. The Applicant meets this standard. With a future CZC application, Staff will confirm conformance with
the required dimensional standards of the R-15 zone.
The submitted plans show compliance with all dimensional and specific use standards, including but not limited to, building height,
setbacks, and accesses.
Access: All-access was previously approved with the Stapleton preliminary plat. There are two primary accesses for this project that
will occur from N. Lone Pine Way via W. Harris Street. which connects to S. Meridian Road. There is additional access through
numerous roads in the Stapleton Subdivision. According to the Development Agreement (Inst. #2019-110907), the Applicant is
required to provide an emergency vehicular connection between this site and the planned multi-family development to the west for
interconnectivity. The submitted plans depict a drive aisle on the south side that stubs to the R-40 property to the west. Prior to CZC
submittal the applicant shall submit and record an emergency access easement.
Off-street Parking: Off-street parking for multi-family developments is required to be provided per the table in UDC 11-3C-6 based on
the number of bedrooms per unit. The Applicant is proposing 19 units consisting of nineteen (19) 3-bedroom units. In addition, one (1)
guest space for every 10 units is required per UDC 11-3C-6.
Based on the total number of units proposed and the bedroom count distribution, a minimum of 59 parking spaces, with a minimum of
19 of these spaces to be covered in a garage or by a carport. According to the submitted site plan, the Applicant is proposing 58
spaces with 24 of these spaces to be covered by a carport. The proposed parking is short 1 stall from meeting the minimum code
requirements; nevertheless, one additional parking stall should be added. Additionally, the plan submitted is deficient in trash
enclosures for this site, which may impact the proposed parking. The trash enclosure shown on the plan should be designed to
accommodate recycling. The applicant is required to obtain Republic Services approval of the trash enclosure prior to the submittal of
the CZC application.
One bicycle parking space is required for every 25 proposed vehicle parking spaces or portion thereof. Based on 59 spaces, a
minimum of 2 spaces are required; a total of 4 spaces are proposed in excess of UDC standards. A detail of the bicycle rack is not
included on the plans submitted. Staff recommends that the Applicant include an additional parking stall to meet the parking
requirements in UDC 11-3C-6 and allocate additional parking spaces within close proximity to the development to accommodate
overflow parking needs. Additionally, a detail of the bicycle rack should be included on the plans submitted with the CZC Application.
Sidewalks and pedestrian walkways: A 5-foot wide detached sidewalk is existing along W. Harris Street and N. Lone Pine Way
connecting to the multi-family development. The Applicant is also proposing attached sidewalks and other pedestrian walkways
throughout the entire site. Internal pedestrian walkways are required to be distinguished from the vehicular driving surfaces through
the use of pavers, colored or scored concrete, or bricks per UDC 11-3A-19B.4b. The proposed pedestrian sidewalks shall be
constructed with a different material than the driving surface with the plans submitted the CZC Application.
Landscaping: The Applicant is required to construct a 20-foot wide street buffer along W. Harris Street and N. Lone Pine Way, both
are collector streets, in accordance with UDC 11-3B-7.3. Landscaping is required within parking lots in accordance with the standards
listed in UDC 11-3B-8C.
According to the submitted landscape plans, all required landscaping appears to be shown including the required number of trees
adjacent to W. Harris Street, N. Lone Pine Way, within the parking lot islands, and next to drive aisles. Any existing landscaping
installed with Stapleton No. 2 should remain protected during construction on the site.
Fencing: All fencing constructed on the site is required to comply with the standards listed in UDC 11-3A-7. A 5-foot tall solid wrought
iron fence is proposed along the west side of the development; an existing 6-foot vinyl fence is located on the north and south side of
the development as shown on the landscape plan. The landscape plan appears to be in compliance with this requirement.
Building Elevations: The Applicant has submitted conceptual elevations of the future multi-family buildings. Multi-family residential
projects require Administrative Design Review (DES) approval with future applications so Staff will perform a thorough analysis at that
time against the requirements in the Architectural Standards Manual. Further, an application for a Certificate of Zoning Compliance
(CZC) will also be required to be submitted for this entire development before the building permit submission. The Applicant has
included roll-up doors for additional storage, which adds a valuable amenity to this development.
Initial review of the conceptual elevations depicts multiple buildings with varying roof profiles and materials including stone, horizontal
lap siding, vertical board and batten siding, stained wood, and fenestration
Written Testimony: Stacy Cable – Concerns with cut-through traffic in neighborhoods exceeding 25 mph, safety due to drivers
making left turns from Harris Road onto Meridian Road without a traffic light.
Staff Recommendation: Staff recommends approval of the requested Conditional Use Permit per the conditions of approval in the
Staff Report.
Notes:
Possible Motions:
Approval
After considering all staff, applicant and public testimony, I move approve File Number H-2023-0033, as presented in the staff
report for the hearing date of July 20, 2023, with the following modifications: (Add any proposed modifications to conditions)
Denial
After considering all staff, applicant and public testimony, I move to deny File Number H-2023-0033, as presented during the
hearing on July 20, 2023, for the following reasons: (You should state specific reasons for denial)
Continuance
I move to continue File Number H-2023-0033 to the hearing date of (insert continued hearing date here) for the following
reason(s): (You should state specific reason(s) for continuance)
W IDIAN�
AGENDA ITEM
ITEM TOPIC: Public Hearing for Jump Creek South Apartments (H-2023-0016) by Kent
Brown Planning Services, generally located on the northwest corner of N. Black Cat Rd. and W.
McMillan Rd.
Application Materials: https:Hbit.ly/H-2023-0016
A. Request: Conditional Use Permit for a multi-family development consisting of 11 buildings and
44 multi-family units on 3.29 acres of land in the R-15 zoning district.
PUBLIC HEARING SIGN IN SHEET
DATE: July 20, 2023 ITEM # ON AGENDA: 4
PROJECT NAME: Jump Creek South Apartments (H-2023-0016)
Your Full Name Your Full Address Representing I wish to testify
(Please Print) HOA? (mark X if yes)
If yes, please
provide HOA name
1
3
4
5
6
7
8
9
10
11
12
13
14
E IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT i4 H O
HEARING July 20,2023 V
Legend E-
DATE: , IW
Project Location
TO: Planning&Zoning Commission -:77
FROM: Stacy Hersh,Associate Planner ;- -
208-884-5533
SUBJECT: Jump Creek South Apartments -
CUP
H-2023-0016
LOCATION: Northwest corner of N. Black Cat
jn. ap�l i 'I �•.A
Road and W. McMillan Road in 7
the SE 1/4 of the SE 1/4 of Section -
28,TAN.,R.1W. (Parcel
#S0428449815).
I. PROJECT DESCRIPTION
Conditional use permit for a multifamily development consisting of I I buildings and 44 multi-family
units on 3.29 acres of land in the R-15 zoning district.
IL SUMMARY OF REPORT
A. Project Summary
Description Details Page
Acreage 3.29-acres(R-15 zoning district)
Future Land Use Designation Medium Density Residential(MDR)
Existing Land Use(s) Vacant
Proposed Land Use(s) Multi-Family Residential
Lots(#and type;bldg./common) One(1)multi-family residential building lot
Number of Residential Units 44 multi-family units—Eleven(11)two-story buildings
(type of units)
Density Gross—13.37 du/ac.
Open Space(acres,total Jump Creek Subdivision approved with 13.54 acres of common
[%]/buffer/qualified) open space which amounts to 15.73%
Amenities At a minimum,3 amenities are proposed—See the amenity
Exhibit in Section VII below. 6 amenities approved with Jump
Creek Subdivision No. 3—tot lots,multi-use pathway,
connection to pathway systems,and 5%additional open space.
Jump Creek No. 5 includes micro-paths and a tot lot.
Neighborhood Meeting date 3/15/2023
History(previous approvals) AZ-14-011,PP-14-013(Development Agreement(Inst.#2014-
105206);H-2018-0113);Jump Creek#1 FP-14-046;Jump Creek
#2 FP H-2016-0134;Jump Creek#3 FP H-2018-0113;Jump
Page 1
Description Details Page
Creek#5 FP H-2020-0003;Jump Creek South PP H-2022-0006;
Jump Creek South FP-2022-0031;Jump Creek#6 FP-2022-0004
B. Community Metrics
Description Details Page
Ada County Highway
District
• Staff report(yes/no) Yes
• Requires ACHD No
Commission Action
es/no
Traffic Impact Stud es/no No
Access Access is proposed to N.Black Cat Road(arterial)via W.Daphne Street,a
(Arterial/Collectors/State local street connection at the very northeast corner of the site.
Hwy/Local)(Existing and
Proposed)
Existing Road Network N.Black Cat Road and W.McMillan Road are existing 2-lane arterial
streets.
Existing Arterial Sidewalks/ The arterial multi-use pathways along the Black Cat and McMillan
Buffers frontages is not complete;no buffers are existing.
Proposed Road The intersection of McMillan Road and Black Cat Road is scheduled in
Improvements the IFWP to be constructed as a multi-lane roundabout with 4-lanes on
the north/south legs and 2-lanes on the east/west legs and is currently in
design and the construction date has not been determined.
Police Service
• Development Location 7.3 miles from the Meridian Police Department
• Police Response Time 8:46 minutes
• Response Time Goal Response time goal for emergencies is within 3-5 minutes.
• Calls for Service 726 within a mile of the proposed development
• Other All multi-family units shall be clearly marked with addresses and unit numbers visible
day or ni ht for emergency response.
Wastewater •Flow is committed.
Water
•Distance to Service-Water available at site
•Pressure Zone- 1
•Estimated ERU-See Application
•Water Quality Concerns-None
•Project Consistent with Master Plan-Yes
•Impacts/Concerns-
•Fire hydrants require a 20'easement up to and 10'beyond the hydrant.
•The only hydrant on the site does not meet this.
•Water services require a 20'easement up to and 10'beyond the meter.
•The service should be centered in the easement so when you have two
meters each meter should have at least 10'to the edge of easement. This
is not met for any of the meters.This will also impact the carports as they
are not allowed within easements.
•Callout removal of the blow-off valve at the northern connection point
and western connection point to existing main.
Page 2
C. Project Maps
Future Land Use Map Aerial Map
Legend Legend
Project Location El Project Location ' -
r
MediumTDensltC JAI
Re
nEITFM 7
® M
TFFFFFFFn
Zoning Map Planned Development Map
Legend R-4 0 Legend
Project Location IHI Project Location
�jK- RUT R-8 ; City Limits --
® —Planned Parcels
R-
;q M
M"® RUT M MUM
I�CR
RUT � J--_ --- -� �--,
III. APPLICANT INFORMATION
A. Applicant:
Kent Brown,Kent Brown Planning Services—3161 E. Springwood Drive, Meridian, ID 83642
B. Owner:
C. Open Door Rentals, LLC— 1977 E. Overland Rd.,Meridian, ID 83642
D. Representative:
Same as Applicant
Page 3
IV. NOTICING
Planning& Zoning
Posting Date
Newspaper Notification 7/3/2023
Radius notification mailed to
properties within 500 feet 6/30/2023
Public hearing notice sign posted
6/30/2023
on site
Nextdoor posting 6/29/2023
V. STAFF ANALYSIS
A. PROPERTY HISTORY&COMPREHENSIVE PLAN ANALYSIS:
Land Use:
This property is designated Medium-Density Residential(MDR)on the Future Land Use Map
(FLUM). This designation allows for dwelling units at gross densities of 3 to 8 dwelling units per
acre.
The subject property is one of two multi-family properties that was approved with the preliminary
plat(NOTE: the other R-15 zoned property is developed with similar units and density). The
gross density for the multi-family portion of the development is at 13.37 dwelling units to the
acre which is higher than the MDR designation of the Comprehensive Plan,however,this was
contemplated during the review and approval of the Jump Creek development.
The overall gross density for the Jump Creek development is approximately 4.54 dwelling units
to the acre, including the 44 multi-family units proposed with this development and the previous
approval of the 28 multi-family units,which is consistent with the MDR land use designation.
Proposed Use:
A two-story multi-family development containing 44 dwelling units consisting of eleven(11)
residential apartment buildings with a leasing/release office(400 square feet) serving to be used
by both multi-family developments once build-out of the project is complete. During the review
of the previous multi-family development,the applicant did commit on the record to constructing
the leasing office with this phase of development.
COMPREHENSIVE PLAN POLICIES:
Goals,Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be
applicable to this application and apply to the proposed use of this property(staff analysis in
italics):
• Encourage diverse housing options suitable for various income levels, household sizes, and
lifestyle preferences. (2.01.01).
This projectproposes 11 buildings units with 44 units total. This increases the diversity in
housing and meets the needs,preferences, and financial capabilities ofMeridian's present
and future residents.
• "Encourage a variety of housing types that meet the needs, preferences, and financial
capabilities of Meridian's present and future residents."(2.01.02D)
The proposed multi family apartments will contribute to the diversity of housing options in
both the City as a whole and specifically in this area.
Page 4
• "Avoid the concentration of any one housing type or lot size in any geographical area;
provide for diverse housing types throughout the City."(2.01.01G)
The proposed multi family apartments will contribute to the mix of housing types available in
the City. There is currently a mix of single family detached dwellings and multi family
apartments in this area.
• `Ensure development is connected to City of Meridian water and sanitary sewer systems and
the extension to and through said developments are constructed in conformance with the City
of Meridian Water and Sewer System Master Plans in effect at the time of development."
(3.03.03A)
The proposed development will connect to City water and sewer systems;services are
required to be provided to and through this development in accord with current City plans.
• "Maximize public services by prioritizing infill development of vacant and underdeveloped
parcels within the City over parcels on the fringe."(2.02.02)
The area surrounding this site has redeveloped except for the properties to the east.
Development of this vacant site will result in more efficient provision of public services.
• "Require urban infrastructure be provided for all new developments, including curb and
gutter, sidewalks,water and sewer utilities."(3.03.03G)
Urban sewer and water infrastructure and curb, gutter and sidewalks are required to he
provided with development as proposed.
• "Slow the outward progression of the City's limits by discouraging fringe area development;
encourage development of vacant or underutilized parcels currently within City limits."
(4.05.03B)
Development of the subject vacant land, currently in the City limits, is encouraged over
parcels on the fringe of the City. The development of this property will result in better
provision of City services.
Staff finds this development to be generally consistent with the Comprehensive Plan.
B. UNIFIED DEVELOPMENT CODE(UDC)ANALYSIS
Conditional Use Permit(CUP)—Multi-family Development(UDC 11-4-3-2 Specific Use
Standards:
A. Purpose.
1. To implement the goals and policies of the Comprehensive Plan:
a. Plan for safe, attractive, and well-maintained neighborhoods that have ample open space,
and generous amenities that provide varied lifestyle choices.
b. Require the design and construction of pathways connections, easy pedestrian and bicycle
access to parks, safe routes to schools, and the incorporation of usable open space with
quality amenities as part of new multi-family residential and mixed-use developments.
2. To create multi-family housing that is safe and convenient and that enhances the quality of life
of its residents.
a. To create quality buildings and designs for multi-family development that enhance the
visual character of the community.
Page 5
b. To create building and site design in multi-family development that is sensitive to and
well-integrated with the surrounding neighborhood.
c. To create open space areas that contribute to the aesthetics of the community, provide an
attractive setting for buildings, and provide safe,interesting outdoor spaces for residents.
B. Site design.
1. Buildings shall provide a minimum setback of ten (10) feet unless a greater setback is
otherwise required by this title and/or title 10 of this Code. Building setbacks shall take into
account windows, entrances,porches, and patios, and how they impact adjacent properties.
The proposed site plan complies with this standard.
2. All on-site service areas, outdoor storage areas, waste storage, disposal facilities, and
transformer and utility vaults shall be located in an area not visible from a public street, or
shall be fully screened from view from a public street. The site plan depicts screened trash
standards for only one (1) trash enclosure provided for the multi family development.
Staff recommends that theApplicant work with Republic Services to establish an approved
location for the trash enclosures,as well as,an adequate quantity of trash and recycle bins
to service this development prior to the submittal of the CZC Application. All proposed
transformer/utility vaults and other service areas shall comply with this requirement.
3. A minimum of eighty (80) square feet of private, usable open space shall be provided for
each unit. This requirement can be satisfied through porches,patios, decks, and/or enclosed
yards.Landscaping,entryway,and other accessways shall not count toward this requirement.
In circumstances where strict adherence to such standards would create an inconsistency
with the purpose statements of this section,the Director may consider an alternative design
proposal through the alternative compliance provisions as outlined in section 11-5B-5 of this
title. The submitted elevations depict several outdoor patios and balconies that may qualify
for the requirement. The Architectural plan states a minimum of 80 square feet ofprivate
usable open space will be provided for each unit in the form of decks and patios as depicted
on the floor plans(see Sections VUA and D.)
4. For this section, vehicular circulation areas, parking areas, and private usable open space
shall not be considered common open space. None of these areas were used in the open
space calculation.
5. No recreational vehicles, snowmobiles,boats, or other personal recreation vehicles shall be
stored on the site unless provided for in a separate, designated and screened area. The
Applicant shall adhere to this standard.
6. The parking shall meet the requirements outlined in chapter 3, "regulations applying to all
districts",of this title.See the parking section in the general analysis below.
7. Developments with twenty(20)units or more shall provide the following:
a. A property management office.
b. A maintenance storage area.
C. A central mailbox location, including provisions for parcel mail, that provides safe
pedestrian and/or vehicular access.
d. A directory and map of the development at an entrance or convenient location for those
entering the development.
Page 6
The Applicant is proposing more than 20 units (44 units) so the Applicant is required to
provide the items above in compliance with this standard. The submitted plans depict the
location of these items.
C. Common open space design requirements.
1. The total baseline land area of all qualified common open spaces shall equal or exceed ten
(10)percent of the gross land area for multi-family developments of five (5) acres or more.
Because the site is only 3.29 acres, this standard does not apply.
2. All common open spaces shall meet the following standards:
a. The development plan shall demonstrate that the open space has been integrated into the
development as a priority and not for land use after all other development elements have
been designed.Open space areas that have been given priority in the development design
have:
(1) Direct pedestrian access;
(2) High visibility;
(3) Comply with Crime Prevention through Environmental Design(CTED) standards;
and
(4) Support a range of leisure and play activities and uses.
b. Open space shall be accessible and well-connected throughout the development. This
quality can be shown with open spaces that are centrally located within the development,
accessible by pathway and visually accessible along collector streets or as a terminal
view from a street.
c. The open space promotes the health and well-being of its residents. Open space shall
support active and passive uses for recreation, social gathering, and relaxation to serve
the development.
Staff finds the proposed open space areas within the Jump Creek developments comply
with these standards by providing open space that is well connected, highly visible, and
promotes health and well-being by supporting a range of leisure and play activities with
the proposed amenities and general design of the open space.See the submitted landscape
plan and rendering for a visual of compliance with this standard.
3. All multi-family projects over twenty(20)units shall provide at least one(1)common grassy
area integrated into the site design allowing for general activities by all ages. This area may
be included in the minimum required open space total. Projects that provide safe access to
adjacent public parks or parks under a common HOA,without crossing an arterial roadway,
are exempt from this standard.
a. Minimum size of the common grassy area shall be at least five thousand(5,000)square
feet in area.This area shall increase proportionately as the number of units increase and
shall be commensurate to the size of the multi-family development as determined by
the decision-making body. Where this area cannot be increased due to site constraints,
it may be included elsewhere in the development.
b. Alternative compliance is available for these standards if a project has a unique targeted
demographic; utilizes other place-making design elements in Old-Town or mixed-use
future land-use designations with collectively integrated and shared open space areas.
Page 7
The submitted plans include two open common grassy areas, each over 5,000 square feet
in size. These areas are situated next to the building on the north side and in front of the
Leasing Office. However, it's worth noting that these spaces are currently labeled as a
"surface drainage Swale"and a "subsurface vertical sand filter drainage.". According to
the Jump Creek Annexation and Development Agreement(Inst. #2014-105206);H-2018-
0113), the site was required to develop with a minimum of 15% open space (12.89 acres)
to include the following amenities:three(3)tot lots,internal walking paths,a 10 foot wide
multi-use pathway on the south side of W. Gondola Drive, and 5% additional open space.
Additionally, the Pathways Master Plan requires a 10 foot multi-use pathway to be
included as part of the development plan for this site. Both multi family developments
approved as part of the Jump Creek overall development have access to the common areas
and site amenities throughout the entire development.
4. In addition to the baseline open space requirement,a minimum area of outdoor common open
space shall be provided as follows:
a. One hundred fifty(150)square feet for each unit containing five hundred(500)or fewer
square feet of living area. None of the units are below 500 square feet (s f.) of living
area.
b. Two hundred fifty (250) square feet for each unit containing more than five hundred
(500)square feet and up to one thousand two hundred(1,200)square feet of living area.
All 44 units are between 500 and 1,200 s.f.; therefore, a total of 11, sf. (or 0.25-acre)
of common open space is required.
c. Three hundred fifty(350) square feet for each unit containing more than one thousand
two hundred(1,200) square feet of living area. None of the units are over 1,200 sf. of
living area.
Per this standard, a total of 11,000 sf. (or 0.25-acre) of common open space is required.
Because this site is below 5-acres in size, the baseline requirement in UDC 11-4-3-27C.1
does not apply.
As stated above, the submitted plans include two open common grassy areas. These
areas appear to be over 5,000 square feet in size and are illustrated as a drainage swale
and a subsurface sand filter drainage area. Additionally, a picnic area located behind
the leasing office is shown on the site Plan in Section VIII.A. Staff recommends that the
Applicant submit an open space plan that demonstrates compliance with UDC 11-4-3-
27.C.4.
5. Common open space shall be not less than four hundred(400) square feet in area, and shall
have a minimum length and width dimension of twenty(20)feet.
The common open space areas depicted/approved for the overall Jump Creek development
meet this requirement.
6. In phased developments, common open space shall be provided in each phase of the
development consistent with the requirements for the size and number of dwelling units.
Staff is not aware of any phasing for the proposed project.
7. Unless otherwise approved through the conditional use process, common open space areas
shall not be adjacent to a collector or arterial streets unless separated from the street by a berm
or constructed barrier at least four (4) feet in height, with breaks in the berm or barrier to
allow for pedestrian access.
Page 8
The Applicant is not including or requesting that the required 25 feet street buffer along N.
Black Cat Road(arterial roadway) and W. McMillan Road (arterial roadway) be included
as part of the open space calculations. However, these frontage improvements are required
with the development of the proposed multi family development.
D. Site development amenities.
1. All multifamily developments shall provide for quality of life, open space, and recreation
amenities to meet the particular needs of the residents as follows:
a. Quality of life.
(1) Clubhouse.
(2) Fitness facilities.
(3) Enclosed bike storage.
(4) Public art such as a statue.
(5) Dog park with a waste station.
(6) Commercial outdoor kitchen.
(7) Fitness course.
(8) Enclosed storage
b. Open space.
(1) Community garden.
(2) Ponds or water features.
(3) Plaza.
(4) Picnic area including tables,benches, landscaping, and a structure for shade.
c. Recreation.
(1) Pool.
(2) Walking trails.
(3) Children's play structures.
(4) Sports courts.
d. Multi-modal amenity standards.
(1) Bicycle repair station.
(2) Park and ride lot.
(3) Sheltered transit stop.
(4) Charging stations for electric vehicles.
2. The number of amenities shall depend on the size of the multifamily development as follows:
a. For multifamily developments with less than twenty(20)units,two(2) amenities shall
be provided from two(2) separate categories.
b. For multifamily development between twenty (20) and seventy-five (75) units, three
(3) amenities shall be provided,with one (1) from each category.
Page 9
c. For multifamily development with seventy-five (75) units or more, four (4) amenities
shall be provided,with at least one (1)from each category.
d. For multifamily developments with more than one hundred (100) units, the decision-
making body shall require additional amenities commensurate to the size of the
proposed development.
3. The decision-making body shall be authorized to consider other improvements in addition
to those provided under this subsection (D), provided that these improvements provide a
similar level of amenity.
To satisfy the specific use standards for the proposed 44 multi-family units,a minimum
of three amenities, one from each category, must be provided. According to the
submitted plans and narrative, the applicant believes they have included three
qualifying amenities,each from a different category.These proposed amenities consist
of a leasing/release office with an outdoor BBQ area (400 square feet) serving both
multi-family developments, a picnic area with tables, benches, landscaping, a shade
structure attached to the office, a bicycle repair station, a community garden, and
charging stations for electric vehicles. Additionally,there is a multi-use pathway that
surrounds the site, serving as another amenity. The Applicant meets the requirements
of UDC Code 11-4-3-27.D for the site.
E. Landscaping requirements.
1. Development shall meet the minimum landscaping requirements by chapter 3, "regulations
applying to all districts",of this title.
2. All street-facing elevations shall have landscaping along their foundation. The foundation
landscaping shall meet the following minimum standards:
a. The landscaped area shall be at least three(3) feet wide.
b. For every three (3) linear feet of foundation, an evergreen shrub having a minimum
mature height of twenty-four(24)inches shall be planted.
c. Ground cover plants shall be planted in the remainder of the landscaped area.
According to the submitted landscape plans, the Applicant is showing compliance with
this standard.
F. Maintenance and ownership responsibilities. All multifamily developments shall record legally
binding documents that state the maintenance and ownership responsibilities for the management
of the development, including, but not limited to, structures, parking, common areas, and other
development features.
The applicant shall comply with this requirement and provide said document at the time of
CZC submittal.
Code Analysis—
Dimensional Standards(UDC 11-2A1:
The proposed development is required to comply with the dimensional standards listed in UDC
Table 11-2B-3 for the R-15 zoning district and those within the specific use standards for Multi-
family Development discussed above(UDC 11-4-3-27).
The R-15 zoning district has a minimum landscape buffer requirement of 25 feet to any adjacent
arterial street. The submitted concept plan shows this 25-foot landscape buffer to B. Black Cat
Road and W. McMillan Road are compliant with the required dimensional standards.
Page 10
The R-15 zoning district has a maximum height limit of 40 feet. The submitted conceptual
elevations do not depict measurements but all buildings are proposed as two-story in height so
Staff is not concerned with the Applicant meeting this standard. With a future CZC application,
Staff will confirm conformance with the required dimensional standards of the R-15 zone.
The submitted plans show compliance with all dimensional and specific use standards, including
but not limited to, building height, setbacks, accesses, and required parking spaces. Staff
recommends that the Applicant reorient Building H to face south and move the lease/release
office space to face east in a central location within the development to improve accessibility
and convenience.
Existing Structures/Site Improvements:
There are no existing structures on the property. In addition,there is an existing 5-foot wide
attached sidewalk along W. Daphne Street that will be protected and maintained during
construction.
Access(UDC 11-3A-3):
All-access was previously approved with the Jump Creek preliminary plat. Primary access for this
project will occur from W. Daphne Street. which connects to N. Black Cat Road. There is
additional access through numerous roads in the Jump Creek Subdivision which eventually
terminate at W. Riva Capri Street into N. Maplestone Drive. Since the drive aisle within this
development is not classified as a private street, the street names shown on the site plan should be
removed. The common drive located on Lot 10, Block I of Jump Creek Subdivision No. 6 serves
as access for Lots 22 and 23, Block I of Jump Creek South Subdivision, and functions solely as a
secondary fire access point for the multi family development. Asper the Fire Department's
requirements, two bollards need to be installed on the property line of the multi family
development, spaced 20 feet apart. These bollards should be accompanied by a heavy chain and
Knox padlock on the property line of the multi family development. The buildings within this
development will have their addresses assigned based on W. Daphne Street. Furthermore, it is
recommended to place a wayfinding sign near the entrance of the multi family development to
provide clear directions.
Off-street Parking(UDC 11-3G&
Off-street parking for multi-family developments is required to be provided per the table in UDC
11-3C-6 based on the number of bedrooms per unit. The Applicant is proposing 46 units
consisting of 36 2-bedroom units and 8 3-bedroom units. In addition, one(1) guest space for
every 10 units is required per UDC 11-3C-6.
Based on the total number of units proposed and their bedroom count distribution, a minimum of
100 parking spaces, with a minimum of 44 of these spaces to be covered in a garage or by a
carport.According to the submitted site plan, the Applicant is proposing 100 spaces with 43 of
these spaces to be covered by a carport. The proposed parking just meets the minimum code
requirements; however, one additional covered parking stall should be added. Additionally, the
plan submitted is deficient in trash enclosures for this site, which may impact the proposed
parking.
Bicycle parking is required per the standards listed in UDC 11-3C-6G and should comply with
the standards listed in UDC 11-3C-5C. One bicycle parking space is required for every 25
proposed vehicle parking spaces or portion thereof. Based on 100 spaces, a minimum of 4 spaces
are required; a total of 6 spaces are proposed in excess of UDC standards. A detail of the
bicycle rack is included on the plans submitted. Staff recommends that the Applicant allocate
additional parking spaces within close proximity to the development to accommodate overflow
parking needs.
Page 11
Sidewalks(UDC 11-3A-1 and pedestrian walkways (UDC 11-3A-19):
A 5-foot wide attached sidewalk is existing along W. Daphne Street connecting to the multi-
family development. The Applicant is also proposing attached sidewalks and other pedestrian
walkways throughout the entire site. Internal pedestrian walkways are required to be
distinguished from the vehicular driving surfaces through the use of pavers, colored or scored
concrete, or bricks per UDC 11-3A-19B.4b. The proposed pedestrian sidewalks shall be
constructed with a different material than the driving surface with the plans submitted the CZC
Application.
Pathways(UDC 11-3A-&
A 10-foot wide detached multi-use pathway is required in within the landscape buffer along N.
Black Cat Road, from W. Daphne Street to the intersection at McMillian as part of the Pathways
Master Plan for this site. The pathway should be placed in a 14 foot wide public use easement,
which shall be submitted to the Planning Division prior to submittal for a Certificate of Zoning
Compliance.Additionally,the Applicant's Engineer shall provide written documentation that
the pathway segment was constructed per the recommended specifications in accordance with
UDC 11-3A-8 and UDC 11-313-12 prior to Certificate of Occupancy.
Landscaping is required along all pathways in accord with the standards listed in UDC 11-313-
12C.
Landscaping(UDC 11-3B):
The Applicant is required to construct 25-foot wide street buffers along N. Black Cat Road,an
arterial street, and along W. McMillan Road, another arterial street,in accordance with UDC 11-
3B-7.3. Landscaping is required within parking lots in accordance with the standards listed in
UDC 11-3B-8C.
According to the submitted landscape plans, all required landscaping appears to be shown
including the required number of trees adjacent to N. Black Cat Road, W. McMillan Road, and
within the parking lot islands, and next to drive aisles.A landscape strip a minimum of five(5)
feet wide shall be provided along each side of the pathway per UDC 11-3B-12.
Fencing(UDC 11-3A-6,11-3A- •
All fencing constructed on the site is required to comply with the standards listed in UDC 11-3A-
7. A 6-foot tall solid vinyl fence is proposed along the east and south sides of the development,
an existing fence is located on the north and west side of the development as shown on the
landscape plan. The landscape plan appears to be in compliance with this requirement.
Storm Drainage(UDC 11-3A-18 :
An adequate storm drainage system is required in all developments by the City's adopted
standards, specifications, and ordinances. Design and construction shall follow best management
practices as adopted by the City as outlined in UDC 11-3A-18. Storm drainage will be proposed
with a future Certificate of Zoning Compliance application and shall be constructed to City and
ACHD design criteria.
Pressurized Irrigation(UDC 11-3A-IS):
The Applicant is required to provide a pressurized irrigation system for the development in
accord with 11-3A-15.No irrigation plans have been submitted the CUP Application at this time
but Staff anticipates this will be handled with the future Certificate of Zoning Compliance that is
required prior to building permit submittal.Land Development will review these plans in more
detail at a later date when specific irrigation plans are submitted.
Page 12
Building Elevations(UDC 11-3A-19 I Architectural Standards Manual):
The Applicant has submitted conceptual elevations of the future multi-family 4-plex buildings.
Multi-family residential projects require Administrative Design Review(DES)approval with
future applications so Staff will perform a thorough analysis at that time against the requirements
in the Architectural Standards Manual. Further, an application for a Certificate of Zoning
Compliance(CZC)will also be required to be submitted for this entire development before the
building permit submission.
Initial review of the conceptual elevations depicts multiple 4 plex buildings with varying roof
profiles and materials including stone,fiber-cement lap siding in different layouts, horizontal lap
siding, and fenestration. The elevations also depict the tallest portion of the buildings to face in
towards the site which appears to minimize the building massing facing adjacent properties.
VI. DECISION
A. Staff:
Staff recommends approval of the requested Conditional Use Permit per the conditions of
approval included in Section VIII in accord accordance with Findings in Section IX.
Page 13
i i� 'I�..��II� I��I .III 1 • i
it 0 � ._= i
sl li'11- JIEli
�� �
lu:l.rc�: nail!'N
mu
IOU
el
�.
- - v�aA�R 63dlI�
B. Landscape Plan(dated: March 20,2023):
LANDSCAPE LEGEND y
jr MR
cb
PLANT SCHEDULE �w�•�•• ��O gF !
vim
MOLD
10
_2
=57
CALLOUT LEGEND + p@
_ _ -- "'^ lrrr���y,,, o�,:__ sue= !•7�a
T NO6CAP' PLM'RHEA ONE
SEE 11113CEP LLO 108 OYINALL P80.iiCP FL"
IME f L11 TIMODGN LLB OR MZPAM=LA D SOAF.PLABIS,
m 1111�Lao Nc® - NM@r ,AND PLANTS=
HER Lai FOR 7=01BIG PLAN AND%IrRMAL SWALE MP►i8 L1.1
IKER Lao-81 rON D1MEON NULL➢IB OATI=NZWOa AND I1N•ZAD:®
uUI;;I,N,1,1, LANDSCAPE LEGEND
• ^_:� +I PLANT SCHEDULE 11AiJII i
a
o--� CALLOUT LEGEND
l�L.4lJD50APE PLAN-AREA TWO 4-u'u�"—�f° ®—�,�^",,, Off••
116.i 0133CM17 LIM NXM GvimmA1.L Pip;jm :P PLEA �
SEE 6 L11 TEMOUG8 LLB FO8 DWPAMM L&BIDSOME FLAM,
SEE ear Lao anA LANasoAPa NOTI'L AND PLANTM"DrlADa
SHE LAS FORT F=V=G PLAN AND TYPIOAL SWALE Ri91A78 �U_2
LaO-81 FOB Dffi6Di H ILD�ATZ=IKI MM AND DS1'AUA
Page 15
I
LANDSCAPE MOTES
�.Mi.:;j �,VH1L FENCE PANG� m,.„
PERENNIALSC luMr-oCOVE�� y .e .. .7. .w�'.,�_ r,.....•
PLANTING �CIXJIFERDl15 TREE PLANTINGG
...a -�.�.".C.'..
iRwcAnorr rvorEs: -...,�........-
'.� .�10. _ •. fs BICYCLE REPAIR STATION •�••• ��.
•,• n••••Y• ..�
4 BOULDER INSTALLATION U PICNIC TABLE-A +>-�F U DECIDLIDUSTREE PLANTING L2.D
Page 16
C. Conceptual Building Elevations
—a— 1AJ
yT.1JF .BRIE �:.5:...��'-` —,�.II�•
,fig
`r LOD c
BUILDING TYPE 2.1. BUILDING ME 2.11 —
FRONT ELEVATION
.1RIGXf SqE FLEYlfgN
•iiir rLSlr G
=sue_O-Z"— JUMP CREEK
SOUTH
APA RfM EMTS
BUILDINBTYPE2.1A BUILDIX6 TTPE2-11 RHYEN GlixLw.LaxoatFls
3 REAR ELEVATION A LF FT BqE ELFr1T GN
Y '�.T�i.ti.SY•'•'_
I�I I,�I,I I,,I,li�ICI I,�I, pJ�I�•,;,� �� .1��.a:.-�.
M_W IL
.Y 1wERERIGR FINIEN SCHEDULE
RQ`
BUILDIMGTYPE 2.1B BUILDING TYPED-IA
5 FRDXT ELEVATION par SIDE ELENATgN
.Ei- Kiir _
.GHdF
IF PIP Opp pill 11 1 -1.
BUILDING M112.1 B BUILDING ME12-1 B /{/�1/.�
7 REM ELEVATION $LEFT SIDE ELEVATIGNw"A_w - m ¢Drrmq
.AZv2 .NN4� — ice[
BUILC IN6 TYPE 2-2A BVILDING TYPE 2-2A
7 FRGNf ELEVATIDN 2RIBHT SIDE ELEVATIDN �+rur Wa
® JUMP CREEK
50UTH
APARTMENTS
.EF `� .B9 •r rw�_W....rr
BUILDING ME 2-n BUILDING THE 2-YA GENERAL NOTES
REIN ELEVATION LEFTagEELEVATIGN
`� `fiY` mEDnRlalml NexFD�E QpF:
+GS:
BUILD EL TYPE 2-26 BUILDING TYPE 2.211
VATI
FRUMI ELEXATIDN .� RIGHT SIDE ELEVATION -61
Par ass esa..—
.XFfaV .Itu
� = air•• ,,,
r .- IFIr,& _
BUILD IN6 TYPE 2-26 BV ILDIXC TIDE 2-YB AA5.2
7 REM ELEVATION OLFFT SgFELFWEgN
Page 17
T911
ITN '_.:.. T•!I
^imrr�nts__ 17, -•-
_ _
ill
BUILDING TYPE 34A BUILBINC T PE 7-1A•
'FRONT ELEVATION 2 RIGHT Sig
ELEVATION
>•141d� +Klii `Ci�GfJ7JS�S""����'�:s
JUMP CREEK
SOUTH
APARTMENTS
y G _. �b � � i ••` enowu.oarvowus
BUILDING TYPE i-lA BUILDING TYPE J-lA, GENERAL NMI
3 BEAR ELEVATION A LEFT SIDE ELEVATION
Y
0
EITERIGR FINISH SCHEDULE Vol
AA5.3
Page 18
VIII. CITY/AGENCY COMMENTS & CONDITIONS
A. PLANNING DIVISION
Conditional Use Permit:
1. The Applicant shall comply with the provisions in the existing Development Agreement H-
2018-0113) (DA Inst. #2014-1052061;H-2018-0113)); Jump Creek#1 FP-14-046;Jump
Creek#2 FP H-2016-0134; Jump Creek#3 FP H-2018-0113; Jump Creek#5 FP H-2020-
0003;Jump Creek South PP H-2022-0006; Jump Creek South FP-2022-0031; Jump Creek#6
FP-2022-0004)and all other previous conditions of approval.
2. The multi-family development shall have an ongoing obligation to comply with the specific
use standards listed in UDC 11-4-3-27.
3. A final plat shall be recorded for this development prior to occupancy of the first
structure within such plat.
4. With the future CZC application,the site plan included in Section VII.A, shall be revised as f
follows:
a. Depict a 10-foot wide multi-use pathway within the landscape buffer along N. Black Cat
Road, from W. Daphne Street to the intersection at McMillian Road per the Master
Pathways Plan on the plans submitted with the future Certificate of Zoning Compliance.
b. Provide the 10-foot wide pathway within a 14-foot wide public pedestrian easement and
submit to the Parks Department prior to submittal of a Certificate of Zoning Compliance
Application.
c. All transformer and utility vaults and other service areas shall be located in an area not
visible from a public street,or shall be fully screened from view from a public street in
accord with UDC 11-4-3-27B.2.
e. Applicant shall work with Republic Services to establish an approved location for the
trash enclosure, as well as,an adequate quantity of trash and recycle bins to service this
development prior to submittal of the CZC Application.
f. Reorient Building H to face south and move the Lease Office to face east in a
central location within the development to improve accessibility and convenience.
g. Remove the street names(N. Maplestone Dr. &N. Maplestone Lane)as well as the
depiction of"private street"from the common drive as shown on the site plan.
h. The common drive located on Lot 10, Block 1 of Jump Creek South Subdivision
functions solely as a secondary fire access point for the multi-family development; depict
two (2)bollards 20-feet apart on the property line accompanied by a heavy chain with a
Knox padlock.
i. Place a wayfinding sign near the entrance of the multi-family development to provide
clear directions.
j. Add one (1)additional covered parking stall to the site plan.
k. Include a detail of the bicycle rack should on the plans submitted with the CZC
Application.
Page 19
3. With the future CZC application,the landscape plan included in Section VII.B shall be
revised as follows:
a. Depict a 10-foot wide multi-use pathway within the landscape buffer along N. Black Cat
Road, from W. Daphne Street to the intersection at McMillian Road per the Master
Pathways Plan on the plans submitted with the future Certificate of Zoning Compliance.
b. The Applicant shall construct a 25-foot wide landscape buffer adjacent to Black Cat Road
and McMillan Road in accord with UDC 11-3B-7C.
c. Reorient Building H to face south and move the Lease Office to face the east in a central
location within the development to improve accessibility and convenience
d. Remove the street names(N. Maplestone Dr. &N. Maplestone Lane)as well as the
depiction of "private street" from the common drive as shown on the landscape plan.
e. The Applicant shall submit an open space plan that demonstrates compliance with UDC
11-4-3-27.C.4.
f. Any existing landscaping installed with Jump Creek Subdivision should remain protected
during construction on the site per UDC 11-3B-10.
4. The Applicant shall comply with all specific use standards for the proposed use of Multi-
family Residential Development(UDC 11-4-3-27).
5. The Applicant shall obtain a Certificate of Zoning Compliance(CZC) and Administrative
Design Review(DES) approvals before submitting for any building permit within this
development along with providing elevations for the clubhouse,four-plex, and carports with
the first CZC.
6. At the time of Certificate of Zoning Compliance submittal,the Applicant shall submit a
recorded and legally binding document(s)that state the maintenance and ownership
responsibilities for the management of the development, including,but not limited to,
structures,parking, common areas, and other development features,per UDC 11-4-3-27F
standards.
7. Future development shall be consistent with the minimum dimensional standards listed in
UDC Table 11-2A-7 for the R-15 zoning district.
8. Off-street parking is required to be provided by both the standards listed in UDC Table 1 1-
3C-6 for multi-family dwellings based on the number of bedrooms per unit.
9. The Applicant shall comply with all ACHD conditions of approval.
10. Provide a pressurized irrigation system consistent with the standards as outlined in UDC 11-
3A-15,UDC 11-3B-6, and MCC 9-1-28.
11. Upon completion of the landscape installation, a written Certificate of Completion shall be
submitted to the Planning Division verifying all landscape improvements are in substantial
compliance with the approved landscape plan as outlined in UDC 11-3B-14.
14. The conditional use approval shall become null and void unless otherwise approved by the
City if the applicant fails to 1) commence the use, satisfy the requirements,acquire building
permits and commence construction within two years as outlined in UDC 11-5B-6F.1; or 2)
obtain approval of a time extension as outlined in UDC 11-5B-6F.4.
Page 20
B. PUBLIC WORKS DEPARTMENT
1. Site Specific Conditions of Approval
a. Ensure no sewer services cross infiltration trenches.
b. Sewer should be a minimum 1Oft from edge of easement
c. Ensure no permanent structures(trees,bushes,buildings, carports,trash receptacle walls,
fences,infiltration trenches,light poles, etc.)are built within the utility easement.
d. Fire hydrant laterals and water services up to the meter require 20'easement. Easement to
extend 10'past the fire hydrant/water meter. Locate water meters 10'from buildings.
e. Provide 20'water easement on the eastern portion of the road that extends from the southern
boundary to the northern boundary.
f. Water main must be at least 10'from any portion of buildings.
g. Water main must loop through the site from Ustick Rd to existing water main to the east.
h. There is an existing water meter in the northwest corner of the project that must be
abandoned if it is not used.
2. General Conditions of Approval
1. Applicant shall coordinate water and sewer main size and routing with the Public Works
Department, and execute standard forms of easements for any mains that are required to
provide service outside of a public right-of-way. Minimum cover over sewer mains is three
feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall
be used in conformance of City of Meridian Public Works Departments Standard
Specifications.
2. Per Meridian City Code(MCC),the applicant shall be responsible to install sewer and water
mains to and through this development. Applicant may be eligible for a reimbursement
agreement for infrastructure enhancement per MCC 8-6-5.
3. The applicant shall provide easement(s)for all public water/sewer mains outside of public
right of way(include all water services and hydrants). The easement widths shall be 20-feet
wide for a single utility, or 30-feet wide for two. Submit an executed easement(on the form
available from Public Works), a legal description prepared by an Idaho Licensed Professional
Land Surveyor,which must include the area of the easement(marked EXHIBIT A) and an
81/2"x 11"map with bearings and distances (marked EXHIBIT B)for review. Both exhibits
must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD.
4. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round
source of water(UDC 11-3B-6). The applicant should be required to use any existing surface
or well water for the primary source. If a surface or well source is not available, a single-
point connection to the culinary water system shall be required. If a single-point connection is
utilized,the developer will be responsible for the payment of assessments for the common
areas prior to prior to receiving development plan approval.
5. Any structures that are allowed to remain shall be subject to evaluation and possible
reassignment of street addressing to be in compliance with MCC.
6. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting,
crossing or laying adjacent and contiguous to the area being subdivided shall be addressed
per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-
1207 and any other applicable law or regulation.
7. Any wells that will not continue to be used must be properly abandoned according to Idaho
Well Construction Standards Rules administered by the Idaho Department of Water
Resources. The Developer's Engineer shall provide a statement addressing whether there are
any existing wells in the development, and if so,how they will continue to be used, or
provide record of their abandonment.
Page 21
8. Any existing septic systems within this project shall be removed from service per City
Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment
procedures and inspections(208)375-5211.
9. All improvements related to public life, safety and health shall be completed prior to
occupancy of the structures.
10. Applicant shall be required to pay Public Works development plan review, and construction
inspection fees, as determined during the plan review process,prior to the issuance of a plan
approval letter.
11. It shall be the responsibility of the applicant to ensure that all development features comply
with the Americans with Disabilities Act and the Fair Housing Act.
12. Applicant shall be responsible for application and compliance with any Section 404
Permitting that may be required by the Army Corps of Engineers.
13. Developer shall coordinate mailbox locations with the Meridian Post Office.
14. Compaction test results shall be submitted to the Meridian Building Department for all
building pads receiving engineered backfill,where footing would sit atop fill material.
15. The design engineer shall be required to certify that the street centerline elevations are set a
minimum of 3-feet above the highest established peak groundwater elevation. This is to
ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above.
16. The applicants design engineer shall be responsible for inspection of all irrigation and/or
drainage facility within this project that do not fall under the jurisdiction of an irrigation
district or ACHD. The design engineer shall provide certification that the facilities have been
installed in accordance with the approved design plans. This certification will be required
before a certificate of occupancy is issued for any structures within the project.
17. At the completion of the project,the applicant shall be responsible to submit record drawings
per the City of Meridian AutoCAD standards. These record drawings must be received and
approved prior to the issuance of a certification of occupancy for any structures within the
project.
18. A street light plan will need to be included in the civil construction plans. Street light plan
requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A
copy of the standards can be found at
http://www.meridiancioy.oMIpublic works.aspx?id=272.
19. The City of Meridian requires that the owner post to the City a performance surety in the
amount of 125%of the total construction cost for all incomplete sewer,water and reuse
infrastructure prior to final plat signature. This surety will be verified by a line item cost
estimate provided by the owner to the City. The surety can be posted in the form of an
irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,
which can be found on the Community Development Department website. Please contact
Land Development Service for more information at 887-2211.
20. The City of Meridian requires that the owner post to the City a warranty surety in the amount
of 20%of the total construction cost for all completed sewer,water and reuse infrastructure
for duration of two years. This surety will be verified by a line item cost estimate provided by
the owner to the City. The surety can be posted in the form of an irrevocable letter of credit,
cash deposit or bond.Applicant must file an application for surety,which can be found on the
Community Development Department website. Please contact Land Development Service
for more information at 887-2211.
C. ADA COUNTY HIGHWAY DISTRICT(ACHD)
https://weblink.meridianciiy.org/WebLink/DocView.aspx?id=297570&dbid=0&repo=MeridianCi
iy
Page 22
D. NAMPA MERIDIAN IRRIGATION DISTRICT(NMID)
https:llweblink.meridianciU.org/WebLink/DocView.aspx?id=298841&dbid=0&r0o=MeridianC
hty
E. MERIDIAN FIRE DEPARTMENT(MFD)
The entire common drive on Lot 10,Block I adjacent to the proposed fire access for the multi-
family development shall be signed "No Parking Fire Lane". A full fire plan review will be
required to be completed prior to construction.
F. MERIDIAN POLICE DEPARTMENT(MPD)
https:llweblink.meridianciU.orglWebLinkIDocView.aspx?id=297378&dbid=0&repo=MeridianC
iv
G. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ)
https:llweblink.meridianciU.org/WebLink/Doc View.aspx?id=297935&dbid=0&r0o=MeridianC
H. MERIDIAN PARKS DEPARTMENT
https:llweblink.meridianciU.org/WebLink/Browse.aspx?id=297365&dbid=0&r0o=MeridianCit
X
I. COMMUNITY DEVELOPMENT-SCHOOL IMPACT TABLE
https:llweblink.meridianciU.or,g/WebLink/Doc View.aspx?id=297567&dbid=0&r0o=MeridianC
i &cr=1
J. IDAHO TRANSPORTATION DEPARTMENT(ITD)
No comments received.
IX. FINDINGS
A. Conditional Use Permit Findings (UDC 11-5B-60:
The commission shall base its determination on the conditional use permit request upon the
following:
1. That the site is large enough to accommodate the proposed use and meet all the
dimensional and development regulations in the district in which the use is located.
Staff finds the submitted site plan shows compliance with all dimensional and development
regulations in the R-1 S zoning district in which it resides.
2. That the proposed use will be harmonious with the Meridian comprehensive plan and in
accord with the requirements of this title.
Staff finds that the proposed multi family development is consistent with the overall density
recommendations of the FL UM in the Comprehensive Plan and is allowed as a conditional
use in the R-1 S zoning district per UDC Table 11-2A-2.
Page 23
3. That the design, construction,operation, and maintenance will be compatible with other
uses in the general neighborhood and with the existing or intended character of the
general vicinity and that such use will not adversely change the essential character of
the same area.
Despite the proposed use being different from the residential uses to the west and north, Staff
finds the site design, construction, and proposed operation and maintenance will be
compatible with other uses in the general neighborhood and should not adversely change the
essential character of the same area, so long as the Applicant constructs the site as proposed.
4. That the proposed use,if it complies with all conditions of the approval imposed,will
not adversely affect other property in the vicinity.
Staff finds the proposed use, if it complies with all conditions of approval imposed, will not
adversely affect other property in the vicinity.
5. That the proposed use will be served adequately by essential public facilities and
services such as highways, streets,schools,parks,police and fire protection,drainage
structures,refuse disposal,water,and sewer.
Staff finds the proposed use will be served adequately by essential public facilities and
services because all services are readily available and ACHD have reviewed and approved
the proposed layout and traffic generation due to the intersection of McMillan Road and
Black Cat Road is scheduled on the IFYWP to be constructed as a multi-lane roundabout
with 4-lanes on the north and south legs and 2-lanes on the east and west legs
6. That the proposed use will not create excessive additional costs for public facilities and
services and will not be detrimental to the economic welfare of the community.
All public facilities and services are readily available for the subject site so Staff finds that
the proposed use will not be detrimental to the economic welfare of the community or create
excessive additional costs for public facilities and services.
7. That the proposed use will not involve activities or processes,materials, equipment,and
conditions of operation that will be detrimental to any persons,property,or the general
welfare because of excessive production of traffic,noise,smoke,fumes,glare,or odors.
Although traffic will increase in the vicinity with the addition of more residential units, Staff
finds the proposed use will not be detrimental to any persons,property, or the general
welfare.
8. That the proposed use will not result in the destruction,loss,or damage of a natural,
scenic,or historic feature considered to be of major importance.(Ord. 05-1170,8-30-
2005,eff. 9-15-2005).
Staff is unaware of any natural, scenic, or historic features within the development area,
therefore, Stafffinds the proposed use should not result in damage to any such features.
Page 24
W IDIAN�
AGENDA ITEM
ITEM TOPIC: Public Hearing for Stapleton Apartments (H-2023-0033) by The Architects
Office, PLLC., generally located on the NW corner of S. Meridian Rd. and W. Harris St.
Application Materials: https:Hbit.ly/H-2023-0033
A. Request: Conditional Use Permit for a multi-family development consisting of 5 two-story
buildings and 19 multi-family townhome style units on 2.07 acres of land in the R-15 zoning
district.
PUBLIC HEARING SIGN IN SHEET
DATE: July 20, 2023 ITEM # ON AGENDA: 5
PROJECT NAME: Stapleton Apartments (H-2023-0033)
Your Full Name Your Full Address Representing I wish to testify
(Please Print) HOA? (mark X if yes)
If yes, please
provide HOA name
1 Sf�'0
CA
3
4
5
6
ALA4,J)
14
A,
10
A,)XA Na
. 11
r
4AVV
12
-Li�a
13
NJ < d Ga \
14
PUBLIC HEARING SIGN IN SHEET
DATE: July 20, 2023 ITEM # ON AGENDA: 5
PROJECT NAME: Stapleton Apartments (H-2023-0033)
Your Full Name Your Full Address Representing I wish to testify
(Please Print) HOA? (mark X.if yes)
If yes, please
provide HOA name
1 5f1410 lei^j
MA-
3
4
5
6
A76 c
-Z S - �oL4 <
10
AJ ACA � Nb
, 11
Ajul(J"t,
12
A
l
13
14
E IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT i4 H O
HEARING July 20,2023 Legend '
DATE: t
Project Location
TO: Planning&Zoning Commission
FROM: Stacy Hersh,Associate Planner
208-884-5533 {
SUBJECT: Stapleton Apartments CUP
- a
H-2023-0033
LOCATION: Northwest corner of S. Meridian
Road and W. Harris Street in the
SE '/4 of Section 25,T.3N.,R.1 W. f -1 ,
(Parcel#R8107431420).
o
I. PROJECT DESCRIPTION
Conditional use permit for a multifamily development consisting of 5 two-story buildings and 19
multi-family units on 2.07 acres of land in the R-15 zoning district which is part of the overall
Stapleton Subdivision community.
II. SUMMARY OF REPORT
A. Project Summary
Description Details Page
Acreage 2.07-acres(R-15 zoning district)
Future Land Use Designation Medium-High Density Residential(MHDR)
Existing Land Use(s) Vacant
Proposed Land Use(s) Multi-Family Residential
Lots(#and type;bldg./common) One(1)multi-family residential building lot
Number of Residential Units 19 multi-family units—Five(5)two-story buildings
(type of units)
Density Gross—9.18 du/ac.
Open Space(acres,total Stapleton Subdivision was approved with 4.95 acres of common
[%]/buffer/qualified) open space which amounts to 13.9%
Amenities At a minimum,2 amenities are required—See the amenity
Exhibit in Section VII below. Basketball court,dog park for
small dogs,24'x 36'children's play structure,swings,rock
climbing boulders and a climbing dome structure,big wheel
track,benches,pedestrian pathways,and segment of the multi-
use pathway system is provided for the overall Stapleton
Subdivision
Neighborhood Meeting date 5/4/2023
Page 1
Description Details Page
History(previous approvals) Stapleton Subdivision AZ,PP,VAR H-2018-0129
(Development Agreement Inst.#2019-110907);Stapleton
Subdivision H-2019-001; Stapleton No. 1 FP H-2019-0117;FP-
2020-0014;FP-2023-0003;FP-2023-0006)7.
B. Community Metrics
Description Details Page
Ada County Highway
District
• Staff report(yes/no) Yes
• Requires ACHD No
Commission Action
es/no
Traffic Impact Stud es/no No
Access Access is proposed to S.Meridian Road(SH-69)via W.Harris Street,a
(Arterial/Collectors/State collector street connection at the very northeast corner of the site via N.Lone
Hwy/Local)(Existing and Pine Way.
Proposed) _
Existing Road Network W.Harris Street and N. an existing 2-lane collector street and N. Lone
Pine Way an existing collector street.
Existing Arterial Sidewalks/ The sidewalks along the W.Harris Street and N.Lone Pine Way
Buffers frontages are complete;buffers are existing along W.Harris Street and
the parkway is completed along N.Lone Pine Way.
Proposed Road Victory Road is listed in the CIP to be widened to 3-lanes from Linder
Improvements Road to Meridian Road between 2022 and 2026 is scheduled in the
IFWP. Victory Road is listed in the CIP to be widened to 3-lanes from
SH-69 to Locust Grove Road between 2026 and 2030. The intersection
of Amity Road and SH-69 is listed on the CIP to be widened and
si nalized between 2026 and 2030.
Police Service No comments received.
• Development Location
• Police Response Time
• Response Time Goal
• Calls for Service
• Other
Wastewater •Flow is committed
•Ensure no sewer services pass through infiltration trenches.
Water
•Distance to Service-Water available at site
•Pressure Zone-5
•Estimated ERU-See Application
•Water Quality Concerns-None
•Project Consistent with Master Plan-Yes
Impacts/Concerns-
-No public water infrastructure shown in record.Any changes must be
reviewed by public works.
•Provide water connection to the SW property.
•Ensure no permanent structures(trees,bushes,buildings,carports,trash
receptacle walls,fences,infiltration trenches,light poles,etc.)are built
within the utility easement.
•Fire Hydrants and water meters required 20'easement up to and 10'
beyond the hydrant/meter.
Page 2
• 1 - . 1
1 1 1
IIIn 1111111�j•1�i�i I� �,. , *�r n
- • - e 11111 11/1►��1 III�.��.�� _ � s
1 l\II Don m..on on
�� �)� IIIIIIIIIIII/�j rQ a 111111111111
� ° • ����//1111111111 1"1 ���/1111111111 W '�`
������.. - • e =�' �': III
- p 1111111 -__ W
MIS!1
- • D I - nnnl_� a�j ,r
I
�♦ -.i��;�i�I� � ♦ -.i��;�i Ala E
♦ Poll
��'��\.111�11�1►��1�11��11,� � • -• '• - �11�1►�Q�I��1,���
♦ j11I�\ IIII�i♦ �♦1�♦
���\IIIIIII p��1♦��1�I��� IIII=��.1♦,�1�II�-
\IIII\�/���������+� — IIII! \IIII��I���•�•���+�
1 l-inn m..nn►a 11 ►!1 1 l-_dun w..nn►a I i1
��i ���i ����'II' -.��:J•� ��i� ��i ���/llllllllll
n1►j�����i���
111► �ii�ii��� �-� �-.��- =Ilu���i��i����� =IIIIIIIIII-
- -
�� 11111 _I�=� �ii�i■+O��- 11111111 =IIIIIIIIII
_
22 M II IIIIIIII it 19:1��19r1+ - �������Il:fl' I�1111111
� 1111111111 .�e l�-
�IIIIII� IIIIIIII C I_E
' �IIIp11
1111111.�
11
i
1 •- 1 1 � i � i 1 t i 11
11
IV. NOTICING
Planning& Zoning
Posting Date
Newspaper Notification 7/3/2023
Radius notification mailed to
properties within 500 feet 6/30/2023
Public hearing notice sign posted
7/10/2023
on site
Nextdoor posting 6/29/2023
V. STAFF ANALYSIS
A. PROPERTY HISTORY&COMPREHENSIVE PLAN ANALYSIS:
Land Use:
This property is designated Medium High-Density Residential(MHDR)on the Future Land Use
Map(FLUM).
LAND USE: MHDR areas are locations recommended primarily for relatively dense multi-family
housing types, such as row houses,townhouses, and condominium and apartment buildings and
complexes. These areas should have a mix of housing types that achieve an overall average
density target of 12 dwelling units per gross acre with densities ranging from 8-15 units per acre.
MHDR areas typically are relatively compact areas within a larger neighborhood and generally
should be located around and near more intensely developed areas, such as Mixed Use
Commercial or Employment areas,in order to provide convenient access to these commercial
activity and employment centers for the greatest number of residents.Apartment buildings are
desired to be accessed via shared entrances and hallways.
Proposed Use:
A two-story multi-family development containing 19 dwelling units consisting of five(5)
residential apartment buildings with a gross density of 9.18 units per acre consistent with the
density in the MHDR designation. The conceptual development plan included in the
Development Agreement initially proposed 28 units. However,the Applicant believes that this
location would be better served with larger units instead, and therefore,reduced the number of
total units thereby increasing the square footage for each unit. The Applicants decision took into
consideration the proximity of a larger future multi-family project planned directly to the west of
this site.
COMPREHENSIVE PLAN POLICIES(https://www.meridiancitV.org/compplan):
Goals,Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be
applicable to this application and apply to the proposed use of this property(staff analysis in
italics):
• Encourage diverse housing options suitable for various income levels, household sizes, and
lifestyle preferences. (2.01.01).
This projectproposes S buildings units with 19 units total. This increases the diversity in
housing and meets the needs,preferences, and financial capabilities ofMeridian's present
and future residents.
• "Encourage a variety of housing types that meet the needs, preferences, and financial
capabilities of Meridian's present and future residents."(2.01.02D)
Page 4
The proposed multi family apartments will contribute to the diversity of housing options in
both the City as a whole and specifically in this area.
• "Avoid the concentration of any one housing type or lot size in any geographical area;
provide for diverse housing types throughout the City."(2.01.01G)
The proposed multi family apartments will contribute to the mix of housing types available in
the City. There is currently a mix of single family detached, single-family attached dwellings,
and a future multi family development in this area.
• "Ensure development is connected to City of Meridian water and sanitary sewer systems and
the extension to and through said developments are constructed in conformance with the City
of Meridian Water and Sewer System Master Plans in effect at the time of development."
(3.03.03A)
The proposed development will connect to City water and sewer systems;services are
required to be provided to and through this development in accord with current City plans.
• "Maximize public services by prioritizing infill development of vacant and underdeveloped
parcels within the City over parcels on the fringe." (2.02.02)
The area surrounding this site has redeveloped except for the properties to the west.
Development of this vacant site will result in more efficient provision ofpublic services.
• "Require urban infrastructure be provided for all new developments, including curb and
gutter, sidewalks,water and sewer utilities."(3.03.03G)
Approved with the development of Stapleton Subdivision No. 2.
• "Slow the outward progression of the City's limits by discouraging fringe area development;
encourage development of vacant or underutilized parcels currently within City limits."
(4.05.03B)
Development of the subject vacant land, currently in the City limits, is encouraged over
parcels on the fringe of the City. The development of this property will result in better
provision of City services.
Staff finds this development to be generally consistent with the Comprehensive Plan.
B. UNIFIED DEVELOPMENT CODE(UDC)ANALYSIS
Conditional Use Permit(CUP)—Multi-family Development(UDC 11-4-3-2 Specific Use
Standards:
A. Purpose.
1. To implement the goals and policies of the Comprehensive Plan:
a. Plan for safe, attractive, and well-maintained neighborhoods that have ample open space,
and generous amenities that provide varied lifestyle choices.
b. Require the design and construction of pathways connections, easy pedestrian and bicycle
access to parks, safe routes to schools, and the incorporation of usable open space with
quality amenities as part of new multi-family residential and mixed-use developments.
2. To create multi-family housing that is safe and convenient and that enhances the quality of life
of its residents.
Page 5
a. To create quality buildings and designs for multi-family development that enhance the
visual character of the community.
b. To create building and site design in multi-family development that is sensitive to and
well-integrated with the surrounding neighborhood.
c. To create open space areas that contribute to the aesthetics of the community,provide an
attractive setting for buildings, and provide safe,interesting outdoor spaces for residents.
B. Site design.
1. Buildings shall provide a minimum setback of ten (10) feet unless a greater setback is
otherwise required by this title and/or title 10 of this Code. Building setbacks shall take into
account windows, entrances,porches, and patios, and how they impact adjacent properties.
The proposed site plan complies with this standard.
2. All on-site service areas, outdoor storage areas, waste storage, disposal facilities, and
transformer and utility vaults shall be located in an area not visible from a public street, or
shall be fully screened from view from a public street. The site plan depicts screened trash
standards for only one (1) trash enclosure provided for the multi family development.
Staff recommends that the Applicant work with Republic Services to establish an approved
location for the trash enclosures,as well as,an adequate quantity of trash and recycle bins
to service this development prior to the submittal of the CZC Application. All proposed
transformer/utility vaults and other service areas shall comply with this requirement.
3. A minimum of eighty (80) square feet of private, usable open space shall be provided for
each unit. This requirement can be satisfied through porches,patios, decks, and/or enclosed
yards.Landscaping,entryway,and other accessways shall not count toward this requirement.
In circumstances where strict adherence to such standards would create an inconsistency
with the purpose statements of this section,the Director may consider an alternative design
proposal through the alternative compliance provisions as outlined in section 11-5B-5 of this
title. The submitted elevations depict several outdoor patios and balconies that may qualify
for the requirement. However, without floor plans, Staff cannot verify if each unit is
proposed with the minimum required area. Compliance with this standard will occur with
the future Certificate of Zoning Compliance(CZC)application;the Applicant is required
to comply with this requirement or submit an Alternative Compliance application to seek
a reduction to the required private open space standards.
4. For this section, vehicular circulation areas, parking areas, and private usable open space
shall not be considered common open space. None of these areas were used in the open
space calculation.
5. No recreational vehicles, snowmobiles,boats, or other personal recreation vehicles shall be
stored on the site unless provided for in a separate, designated and screened area. The
Applicant shall adhere to this standard
6. The parking shall meet the requirements outlined in chapter 3, "regulations applying to all
districts",of this title.See the parking section in the general analysis below.
7. Developments with twenty(20)units or more shall provide the following:
a. A property management office.
b. A maintenance storage area.
C. A central mailbox location, including provisions for parcel mail, that provides safe
pedestrian and/or vehicular access.
Page 6
d. A directory and map of the development at an entrance or convenient location for those
entering the development.
The Applicant is not proposing more than 20 units (19 units) so the Applicant is not
required to provide the items above in compliance with this standard.
C. Common open space design requirements.
1. The total baseline land area of all qualified common open spaces shall equal or exceed ten
(10)percent of the gross land area for multi-family developments of five (5) acres or more.
Because the site is only 2.07 acres, this standard does not apply.
2. All common open spaces shall meet the following standards:
a. The development plan shall demonstrate that the open space has been integrated into the
development as a priority and not for land use after all other development elements have
been designed.Open space areas that have been given priority in the development design
have:
(1) Direct pedestrian access;
(2) High visibility;
(3) Comply with Crime Prevention through Environmental Design(CTED) standards;
and
(4) Support a range of leisure and play activities and uses.
b. Open space shall be accessible and well-connected throughout the development. This
quality can be shown with open spaces that are centrally located within the development,
accessible by pathway and visually accessible along collector streets or as a terminal
view from a street.
c. The open space promotes the health and well-being of its residents. Open space shall
support active and passive uses for recreation, social gathering, and relaxation to serve
the development.
Stafffinds the proposed open space areas within the Stapleton development complies with
these standards by providing open space that is well connected, highly visible, and
promotes health and well-being by supporting a range of leisure and play activities with
the proposed amenities and general design of the open space within the Stapleton
Development.
3. All multi-family projects over twenty(20)units shall provide at least one(1)common grassy
area integrated into the site design allowing for general activities by all ages. This area may
be included in the minimum required open space total. Projects that provide safe access to
adjacent public parks or parks under a common HOA,without crossing an arterial roadway,
are exempt from this standard.
a. Minimum size of the common grassy area shall be at least five thousand(5,000)square
feet in area.This area shall increase proportionately as the number of units increase and
shall be commensurate to the size of the multi-family development as determined by
the decision-making body. Where this area cannot be increased due to site constraints,
it may be included elsewhere in the development.
b. Alternative compliance is available for these standards if a project has a unique targeted
demographic; utilizes other place-making design elements in Old-Town or mixed-use
future land-use designations with collectively integrated and shared open space areas.
Page 7
Because the site is only 2.07 acres, this standard does not apply. The submitted plans
include several open common grassy areas, each looking to be under 5,000 square feet in
size. These areas are situated next to buildings B, C, and D. According to the Stapleton
Annexation and Development Agreement(Inst.#2019-110907);H-2018-0129),the site was
required to develop with a minimum of 10% open space (4.95 acres) to include the
following amenities: centrally located half-acre park with children's play structures
consisting of a 24'x 36'play structure, swings, climbing dome, rock climbing boulders,
basketball court,big wheel track, and seating with a 4-foot tall wrought iron fencing with
a gated entry surrounding the park for children's safety; and a dog park for small dogs
with seating areas., internal walking paths, a 10 foot wide multi-use pathway within the
street buffer along SH-69.
4. In addition to the baseline open space requirement,a minimum area of outdoor common open
space shall be provided as follows:
a. One hundred fifty(150)square feet for each unit containing five hundred(500)or fewer
square feet of living area. None of the units are below 500 square feet (sf.) of living
area.
b. Two hundred fifty (250) square feet for each unit containing more than five hundred
(500)square feet and up to one thousand two hundred(1,200)square feet of living area.
Floor plans were not submitted to verify the square footage for the units.
c. Three hundred fifty(350) square feet for each unit containing more than one thousand
two hundred(1,200)square feet of living area. Floor plans were not submitted to verify
the square footage for the units.
The Applicant is required to provide common open space based on the square footage for
each unit type. The submitted plans do not depict the square footage for each unit type(19
three-bedroom units are included on the plans). Staff recommends that the Applicant
revise the plans submitted with the future Certificate of Zoning (CZC) application that
meets the requirements of UDC Code 11-4-3-2 7.Cfor the site.
5. Common open space shall be not less than four hundred(400) square feet in area, and shall
have a minimum length and width dimension of twenty(20)feet.
The common open space areas depicted/approved for the overall Stapleton development meet
this requirement.
6. In phased developments, common open space shall be provided in each phase of the
development consistent with the requirements for the size and number of dwelling units.
Staff is not aware of any phasing for the proposed project.
7. Unless otherwise approved through the conditional use process, common open space areas
shall not be adjacent to a collector or arterial streets unless separated from the street by a berm
or constructed barrier at least four (4) feet in height, with breaks in the berm or barrier to
allow for pedestrian access.
The Applicant is not including or requesting that the required 20 feet street buffer along W.
Harris (collector roadway)and N.Lone Pine Way(local roadway)be included as part of the
open space calculations.
D. Site development amenities.
1. All multifamily developments shall provide for quality of life, open space, and recreation
amenities to meet the particular needs of the residents as follows:
Page 8
a. Quality of life.
(1) Clubhouse.
(2) Fitness facilities.
(3) Enclosed bike storage.
(4) Public art such as a statue.
(5) Dog park with a waste station.
(6) Commercial outdoor kitchen.
(7) Fitness course.
(8) Enclosed storage
b. Open space.
(1) Community garden.
(2) Ponds or water features.
(3) Plaza.
(4) Picnic area including tables, benches, landscaping, and a structure for shade.
c. Recreation.
(1) Pool.
(2) Walking trails.
(3) Children's play structures.
(4) Sports courts.
d. Multi-modal amenity standards.
(1) Bicycle repair station.
(2) Park and ride lot.
(3) Sheltered transit stop.
(4) Charging stations for electric vehicles.
2. The number of amenities shall depend on the size of the multifamily development as follows:
a. For multifamily developments with less than twenty(20)units,two (2)amenities shall
be provided from two(2) separate categories.
b. For multifamily development between twenty (20) and seventy-five (75) units, three
(3) amenities shall be provided,with one(1) from each category.
c. For multifamily development with seventy-five (75) units or more, four (4) amenities
shall be provided,with at least one(1)from each category.
d. For multifamily developments with more than one hundred (100) units, the decision-
making body shall require additional amenities commensurate to the size of the
proposed development.
3. The decision-making body shall be authorized to consider other improvements in addition
to those provided under this subsection (D), provided that these improvements provide a
similar level of amenity.
Page 9
To satisfy the specific use standards for the proposed 19 multi family units,a minimum of
two amenities, one from each category, must be provided According to the submitted
plans and narrative,the Applicant has notprovided any amenities within this development.
The Applicant should revise the plans submitted with the future Certificate of Zoning
(CZC) application that meets the requirements of UDC Code 11-4-3-27.D for the site.
E. Landscaping requirements.
1. Development shall meet the minimum landscaping requirements by chapter 3, "regulations
applying to all districts",of this title.
2. All street-facing elevations shall have landscaping along their foundation. The foundation
landscaping shall meet the following minimum standards:
a. The landscaped area shall be at least three(3) feet wide.
b. For every three (3) linear feet of foundation, an evergreen shrub having a minimum
mature height of twenty-four(24)inches shall be planted.
c. Ground cover plants shall be planted in the remainder of the landscaped area.
According to the submitted landscape plans, the Applicant is showing compliance with
this standard.
F. Maintenance and ownership responsibilities. All multifamily developments shall record legally
binding documents that state the maintenance and ownership responsibilities for the management
of the development, including, but not limited to, structures, parking, common areas, and other
development features.
The applicant shall comply with this requirement and provide said document at the time of
CZC submittal.
Code Analysis—
Dimensional Standards(UDC 11-2A):
The proposed development is required to comply with the dimensional standards listed in UDC
Table 11-213-3 for the R-15 zoning district and those within the specific use standards for Multi-
family Development discussed above(UDC 11-4-3-27).
The R-15 zoning district has a minimum landscape buffer requirement of 20 feet to any adjacent
collector street . According to the submitted concept plan,the 20-foot landscape buffer to W.
Harris Street and N. Lone Pine Way are compliant with the required dimensional standards.
The R-15 zoning district has a maximum height limit of 40 feet. The submitted conceptual
elevations depict 35 feet for all buildings proposed as two-story in height. The Applicant meets
this standard. With a future CZC application, Staff will confirm conformance with the required
dimensional standards of the R-15 zone.
The submitted plans show compliance with all dimensional and specific use standards, including
but not limited to, building height, setbacks, and accesses.
Existing Structures/Site Improvements:
There are no existing structures on the property. In addition,there are existing 5-foot wide
detached sidewalks along W. Harris Street and N. Lone Pine Way that will be protected and
maintained during construction.
Access(UDC 11-3A-3):
All-access was previously approved with the Stapleton preliminary plat. There are two primary
accesses for this project that will occur from N. Lone Pine Way via W. Harris Street.which
Page 10
connects to S. Meridian Road. There is additional access through numerous roads in the Stapleton
Subdivision. According to the Development Agreement(Inst. #2019-110907),the Applicant is
required to provide an emergency vehicular connection between this site and the planned
multi family development to the west for interconnectivity. The submitted plans depict a drive
aisle on the south side that stubs to the R-40 property to the west. Prior to CZC submittal the
applicant shall submit and record an emergency access easement.
Off-street Parking(UDC 11-3G!9:
Off-street parking for multi-family developments is required to be provided per the table in UDC
11-3C-6 based on the number of bedrooms per unit. The Applicant is proposing 19 units
consisting of nineteen(19) 3-bedroom units. In addition, one(1) guest space for every 10 units is
required per UDC 11-3C-6.
Based on the total number of units proposed and the bedroom count distribution, a minimum of
59 parking spaces, with a minimum of 19 of these spaces to be covered in a garage or by a
carport.According to the submitted site plan, the Applicant is proposing 58 spaces with 24 of
these spaces to be covered by a carport. The proposed parking is short I stall from meeting the
minimum code requirements; nevertheless, one additional parking stall should be added.
Additionally, the plan submitted is deficient in trash enclosures for this site, which may impact
the proposed parking. The trash enclosure shown on the plan should be designed to
accommodate recycling. The applicant is required to obtain Republic Services approval of the
trash enclosure prior to the submittal of the CZC application.
Bicycle parking is required per the standards listed in UDC 11-3C-6G and should comply with
the standards listed in UDC 11-3C-5C. One bicycle parking space is required for every 25
proposed vehicle parking spaces or portion thereof. Based on 59 spaces, a minimum of 2 spaces
are required, a total of 4 spaces are proposed in excess of UDC standards. A detail of the
bicycle rack is not included on the plans submitted. Staff recommends that the Applicant
include an additional parking stall to meet the parking requirements in UDC 11-3C-6 and
allocate additional parking spaces within close proximity to the development to accommodate
overflow parking needs.Additionally, a detail of the bicycle rack should be included on the
plans submitted with the CZC Application.
Sidewalks (UDC 11-3A-1 and pedestrian walkways(UDC 11-3A-19):
A 5-foot wide detached sidewalk is existing along W. Harris Street and N. Lone Pine Way
connecting to the multi-family development. The Applicant is also proposing attached sidewalks
and other pedestrian walkways throughout the entire site. Internal pedestrian walkways are
required to be distinguished from the vehicular driving surfaces through the use of pavers,
colored or scored concrete, or bricks per UDC 11-3A-19B.4b. The proposed pedestrian
sidewalks shall be constructed with a different material than the driving surface with the plans
submitted the CZC Application.
Landscaping(UDC 11-3B):
The Applicant is required to construct a 20-foot wide street buffer along W. Harris Street and N.
Lone Pine Way,both are collector streets, in accordance with UDC 11-313-7.3. Landscaping is
required within parking lots in accordance with the standards listed in UDC 11-313-8C.
According to the submitted landscape plans, all required landscaping appears to be shown
including the required number of trees adjacent to W. Harris Street, N. Lone Pine Way, within the
parking lot islands, and next to drive aisles. Any existing landsping installed with Stapleton No. 2
should remain protected during construction on the site.
Page 11
Fencing(UDC 11-3A-6,11-3A_ •
All fencing constructed on the site is required to comply with the standards listed in UDC 11-3A-
7. A 5-foot tall solid wrought iron fence is proposed along the west side of the development,an
existing 6-foot vinyl fence is located on the north and south side of the development as shown
on the landscape plan. The landscape plan appears to be in compliance with this requirement.
Storm Drainage(UDC 11-3A-18 :
An adequate storm drainage system is required in all developments by the City's adopted
standards, specifications, and ordinances. Design and construction shall follow best management
practices as adopted by the City as outlined in UDC 11-3A-18. Storm drainage will be proposed
with a future Certificate of Zoning Compliance application and shall be constructed to City and
ACHD design criteria.
Pressurized Irrigation(UDC 11-3A-157:
The Applicant is required to provide a pressurized irrigation system for the development in
accord with 11-3A-15.No irrigation plans have been submitted the CUP Application at this time
but Staff anticipates this will be handled with the future Certificate of Zoning Compliance that is
required prior to building permit submittal. Land Development will review these plans in more
detail at a later date when specific irrigation plans are submitted.
Building Elevations(UDC 11-3A-19 I Architectural Standards Manual):
The Applicant has submitted conceptual elevations of the future multi-family buildings. Multi-
family residential projects require Administrative Design Review(DES) approval with future
applications so Staff will perform a thorough analysis at that time against the requirements in the
Architectural Standards Manual. Further,an application for a Certificate of Zoning Compliance
(CZC)will also be required to be submitted for this entire development before the building permit
submission.
Initial review of the conceptual elevations depicts multiple buildings with varying roofprofiles
and materials including stone, horizontal lap siding, vertical board and batten siding, stained
wood, and fenestration.
VI. DECISION
A. Staff:
Staff recommends approval of the requested Conditional Use Permit per the conditions of
approval included in Section VIII in accord accordance with Findings in Section IX
Page 12
VII. EXHIBITS
A. Site Plan(dated: May 30,2023):
NE►MITEN m I ECTSMI MN
---------------------------------------------------------------
NRMNG SUMMARY
� IN
~•� .,u__.���� � ��� STAPLETON
`•� APARTMENIS
.1
MILD=N WON RRMNRNF
AMENITYAND OPEN SPACE SUMMARY
r \L.
STORM DRAINAGE SUMMARY
® o1rLLGPEx: MAG...xoM1s .
18]8 N.LOCUST AND,AOAE
L / MERIDIAN,IN 83111
ILRAGNE 1ENSEN MELTS I4�GIATF3
ARGXIflLi: 1538 TTAELL INS
10YERALL SRF PLAN ® // NOSE,INAX013700
I211I 311]1TS
CIVIL
\ ENGINEER: 1M ENGINEERING
ST2S N.DISGDMERY PLACE
NOISE,ID 83713
L—I ES& m
APARTMENT
BUILDING FINISH KEY ARCXITELT: THE AFGNHEGIS OFFICE,PLLL ..��oa
I- Pus am: N91 MAIN ST. 7
`&Ls: NOISE,ID BS]32
• ®�• I211I 31}2831 _I!E l+li
Page 13
B. Landscape Plan(dated: May 30,2023):
_ /M
PLANT PALGTTG _ _ .. 13A — —
_17LHABRl,S�L
w�'�w`� w..mw '�ti,`-• '¢¢77�yy� Sr.JIiP.x1�
„aw&— . .r.�,.k,.. _ STIPLERN
APARTMENTS
NOTES DEVELOPMENT DATA
LANDSGAPG CALCULATIONS u
rr www«.r.w.w. t53k.... k
Q.ws r�-,wriu�����•� ,ate riw,mxbnTwrnas Y' �rscN. ep.... O coxr�.0
Page 14
C. Conceptual Building Elevations
BE'fN�®----
�'"
gLy 1RTBILT 9"UM BUBJ NWPE I
........ STAPLETON
APARTMEN75
GENERAL NOTES
2FRONT ELEVATION-BUILDING TYPE 1 �-
w.w
61,
LEFT ELE1 IDN BUILDING TTPE I
4 REAR ELEVATION BUILDINGTIPE I
A5.1
i
RIB AT ELEVATION BUILDING ME GTAPIETbN
AFARTMEN7G
GENERAL NOTES
— L•Z FRONT ELEVATION•BUILDING TYPE I "� �--� —•T
2 FRO... ss--------•--
LEFT Uwarmmi BUILDING ME I w
R ELEVATION-BUILDING ME 1
4.REA�.
A5.2
Page 15
VIII. CITY/AGENCY COMMENTS & CONDITIONS
A. PLANNING DIVISION
Conditional Use Permit:
1. The Applicant shall comply with the provisions in the existing Development Agreement H-
2018-0129 (DA Inst. #2019-110907); Stapleton No. I FP H-2019-0117; FP-2020-0014; FP-
2023-0003; FP-2023-0006)and all other previous conditions of approval.
2. The multi-family development shall have an ongoing obligation to comply with the specific
use standards listed in UDC 11-4-3-27.
3. With the future CZC application,the site plan included in Section VII.A, shall be revised as
follows:
a. Internal pedestrian walkways are required to be distinguished from the vehicular driving
surfaces through the use of pavers,colored or scored concrete,or bricks in accord with
UDC 11-3A-1913.4b. The proposed pedestrian sidewalks shall be constructed with a
different material than the driving surface with the plans submitted the CZC
Application.
b. Record an emergency access easement for the vehicular connection between this site and
the planned multi-family development to the west per the recorded development
agreement.
c. Revise the site plan to include an additional parking stall to meet the parking
requirements in UDC 11-3C-6 and allocate additional parking spaces within close
proximity to the development to accommodate overflow parking.
d. All transformer and utility vaults and other service areas shall be located in an area not
visible from a public street,or shall be fully screened from view from a public street in
accord with UDC 11-4-3-27B.2.
e. Applicant shall work with Republic Services to establish an approved location for the
trash enclosure, as well as,an adequate quantity of trash and recycle bins to service this
development prior to submittal of the CZC Application.
f. Include two amenities, one from each category on the plans submitted with the future
CZC application that meet the requirements of UDC Code 11-4-3-27.1)for this site.
g. Include a detail of the bicycle rack should on the plans submitted with the CZC
Application.
e. The Applicant shall submit a floor plan of the units and revise the plans submitted with
the future Certificate of Zoning(CZC)application that demonstrates compliance with the
private opens space standards and common open space standards in UDC 11-4-3-27.13
and 11-4-3-27.C.
4. With the future CZC application,the landscape plan included in Section VILB shall be
revised as follows:
a. Include two amenities, one from each category on the plans submitted with the future
CZC application that meet the requirements of UDC Code 11-4-3-27.1) for this site.
b. The Applicant shall submit a floor plan of the units and revise the plans submitted with
Page 16
the future Certificate of Zoning(CZC)application that demonstrates compliance with the
private opens space standards and common open space standards in UDC 11-4-3-27.B
and 11-4-3-27.C.
c. Revise the site plan to include an additional parking stall to meet the parking
requirements in UDC 11-3C-6 and allocate additional parking spaces within close
proximity to the development to accommodate overflow parking.
d. Any existing landscaping installed with Stapleton No. 2 should remain protected during
construction on the site per UDC 11-3B-10.
5. The Applicant shall comply with all specific use standards for the proposed use of Multi-
family Residential Development(UDC 11-4-3-27).
6. The Applicant shall obtain a Certificate of Zoning Compliance(CZC) and Administrative
Design Review(DES)approvals before submitting for any building permit within this
development along with providing elevations for the carports with the first CZC.
7. At the time of Certificate of Zoning Compliance submittal,the Applicant shall submit a
recorded and legally binding document(s)that state the maintenance and ownership
responsibilities for the management of the development, including,but not limited to,
structures,parking, common areas, and other development features,per UDC 11-4-3-27F
standards.
8. Future development shall be consistent with the minimum dimensional standards listed in
UDC Table 11-2A-7 for the R-15 zoning district.
9. Off-street parking is required to be provided by both the standards listed in UDC Table 11-
3C-6 for multi-family dwellings based on the number of bedrooms per unit.
10. The Applicant shall comply with all ACHD conditions of approval.
11. Provide a pressurized irrigation system consistent with the standards as outlined in UDC 11-
3A-15,UDC 11-3B-6, and MCC 9-1-28.
12. Upon completion of the landscape installation, a written Certificate of Completion shall be
submitted to the Planning Division verifying all landscape improvements are in substantial
compliance with the approved landscape plan as outlined in UDC 11-3B-14.
14. The conditional use approval shall become null and void unless otherwise approved by the
City if the applicant fails to 1)commence the use, satisfy the requirements,acquire building
permits and commence construction within two years as outlined in UDC 11-5B-6F.1; or 2)
obtain approval of a time extension as outlined in UDC 11-5B-6F.4.
B. PUBLIC WORKS DEPARTMENT
https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=300198&dbid=0&redo=MeridianC
ity
C. ADA COUNTY HIGHWAY DISTRICT(ACHD)
No comments received.
Page 17
D. BOISE-KUNA IRRIGATION DISTRICT
https:llweblink.meridianciV.ore/WebLink/DocView.aspx?id=300456&dbid=0&r0o=MeridianC
ity
E. NAMPA MERIDIAN IRRIGATION DISTRICT(NMID)
https:llweblink.meridianciU.ore/WebLink/DocView.aspx?id=301361&dbid=0&r0o=MeridianC
ky
F. BOISE PROJECT BOARD OF CONTROL
https:llweblink.meridiancily.orglWebLinkIDocView.aspx?id=300664&dbid=0&repo=MeridianC
ity
G. MERIDIAN FIRE DEPARTMENT(MFD)
No comments received.
H. MERIDIAN POLICE DEPARTMENT(MPD)
https:llweblink.meridiancily.orglWebLinkIDocView.aspx?id=297378&dbid=0&repo=MeridianC
ky
I. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ)
https:llweblink.meridianciU.orelWebLinkIDocView.aspx?id=297935&dbid=0&repo=MeridianC
ky
J. IDAHO TRANSPORTATION DEPARTMENT(ITD)
https:llweblink.meridianciU.oL-glWebLinkIDocView.aspx?id=300731&dbid=0&repo=MeridianC
ky
IX. FINDINGS
A. Conditional Use Permit Findings (UDC 11-5B-6D:
The commission shall base its determination on the conditional use permit request upon the
following:
1. That the site is large enough to accommodate the proposed use and meet all the
dimensional and development regulations in the district in which the use is located.
Staff finds the submitted site plan shows compliance with all dimensional and development
regulations in the R-1 S zoning district in which it resides.
2. That the proposed use will be harmonious with the Meridian comprehensive plan and in
accord with the requirements of this title.
Stafffinds that the proposed multi family development is consistent with the overall density
recommendations of the FL UM in the Comprehensive Plan and is allowed as a conditional
use in the R-1 S zoning district per UDC Table 11-2A-2.
Page 18
3. That the design, construction,operation, and maintenance will be compatible with other
uses in the general neighborhood and with the existing or intended character of the
general vicinity and that such use will not adversely change the essential character of
the same area.
Despite the proposed use being different from the residential uses to the north and east, Staff
finds the site design, construction, and proposed operation and maintenance will be
compatible with other uses in the general neighborhood and should not adversely change the
essential character of the same area, so long as the Applicant constructs the site as proposed.
4. That the proposed use,if it complies with all conditions of the approval imposed,will
not adversely affect other property in the vicinity.
Staff finds the proposed use, if it complies with all conditions of approval imposed, will not
adversely affect other property in the vicinity.
5. That the proposed use will be served adequately by essential public facilities and
services such as highways, streets,schools,parks,police and fire protection,drainage
structures,refuse disposal,water,and sewer.
Staff finds the proposed use will be served adequately by essential public facilities and
services because all services are readily available and ACHD have reviewed and approved
the proposed layout and traffic generation with the Stapleton Development Annexation and
Preliminary Plat.
6. That the proposed use will not create excessive additional costs for public facilities and
services and will not be detrimental to the economic welfare of the community.
All public facilities and services are readily available for the subject site so Stafffinds that
the proposed use will not be detrimental to the economic welfare of the community or create
excessive additional costs for public facilities and services.
7. That the proposed use will not involve activities or processes,materials, equipment,and
conditions of operation that will be detrimental to any persons,property,or the general
welfare because of excessive production of traffic,noise,smoke,fumes,glare,or odors.
Although traffic will increase in the vicinity with the addition of more residential units, Staff
finds the proposed use will not be detrimental to any persons,property, or the general
welfare.
8. That the proposed use will not result in the destruction,loss,or damage of a natural,
scenic,or historic feature considered to be of major importance.(Ord. 05-1170,8-30-
2005, eff.9-15-2005).
Staff is unaware of any natural, scenic, or historic features within the development area,
therefore, Staff finds the proposed use should not result in damage to any such features.
Page 19