Loading...
HomeMy WebLinkAbout2023-06-26 ACHD Alexis Pickering,President .Jim D. Hansen,Vice-President ACHD David McKinney,Commissioner Kent Goldthorpe,Commissioner '�� Miranda Gold,Commissioner June 26, 2023 To: Eckhardt Propoerties Cheri Moore 22033 EEL Lane Middleton, Idaho 83644 Subject: MER23-0021/ H-2023-0035 3137 W. Quintale Drive Bridgetower Marketplace — Conditiona Use Permit The applicant is requesting approval for a conditional use permit application to allow for the development of a 5,826 sq. ft. multi-tenant retail commercial building, with a drive-thru component on the north side of the building, Bridgetower is one of the two retail commecercil buildings located on 1.62 acres. The Ada County Highway District (ACHD) has reviewed the submitted application for the application referenced above and has determined that there are no improvements required to the adjacent street(s). The applicant shall be required to: 1. Pay a traffic impact fee. If applicable, a traffic impact fee may be assessed by ACHD and will be due prior to the issuance of a building permit by the lead agency. This is a separate review process and it is the applicant's responsibility to submit plans directly to ACHD. 2. Comply with all ACHD Policies and ACHD Standard Conditions of Approval for any improvements or work in the right-of-way. 3. Obtain a permit for any work in the right-of-way prior to the construction, repair, or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.). connecting you to more Ada County Highway District•377S Adams Street•Garden City,ID•83714• PH 208387-6100•FX 34S-76S0•www.achdidaho.org Traffic Information Below is a list of land uses and estimated trip generation rates for uses that may be included within the site. The current zoning designation is C-G (General Retail & Service Commercial). There are no existing vehicle trips per day or in the PM peak hour. Trip generation rates are based on the Institute of Transportation Engineers Trip Generation Manual, 11th edition Average Daily Use (1,000 sf) Trips (ADT) PM Peak Hour Fast Food with Drive-Thru 467.48 33.03 Fast Food w/ Drive-Thru & No Seats (drive- ---------- 59.50 thru lanes) Coffee/Donut Shop w/ Drive Thru 533.578 38.99 Coffee/Donut Shop w/ Drive Thru & No Seats 179.00 15.08 (drive-thru lanes) Pharmacy/ Drugstore with Drive-Thru 108.40 10.25 Drive-in Bank 100.35 21.01 Drive-in Bank (drive-in lanes) 125.03 27.07 Condition of Area Roadways: Traffic Count is based on Vehicles per hour VPH Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Ten Mile Road 205-feet Minor Arterial 634 Better Than "E" Quintale Drive 0-feet Commercial N/A N/A Collector * Acceptable level of service for a five-lane minor arterial is "E" (1,540 VPH). * Acceptable level of service for a two-lane collector is "D" (425 VPH). Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD's most current traffic counts • The average daily traffic count for Ten Mile Road south of McMillan Road was 18,054 on September 15, 2021. • There are no current traffic counts for Quintale Drive. connecting you to more Ada County Highway District•377S Adams Street•Garden City,ID•83714• PH 2O8387-6100•FX 34S-76S0•www.achdid@ho.org If you have any questions, please feel free to contact me at rhamilton(d)-achdidaho.org or (208) 387-6171. Sincerely, Renata Ball-Hamilton Planner Development Services cc: City of Meridian (Linda Ritter ),Via Email connecting you to more Ada County Highway District•377S Adams Street•Garden City,ID.83714. PH 2O8387-6100• FX34S-76SO.www.achdidaho.org Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers)for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future,ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. connecting you to more Ada County Highway District•377S Adams Street•Garden City,ID•83714• PH 2O8387-6100•FX 34S-76S0•www.achdidaho.org