Loading...
HomeMy WebLinkAboutCC - Engineer Statement km E N G I N E E R I N G November 18,2022 Project No.22-053 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: Apex Northwest Subdivision No.4 Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Apex Northwest Subdivision No.4 are designed a minimum of three (3)feet above the seasonal high ground water elevation. The geotechnical investigation, "Apex West Subdivision", prepared by Atlas and dated February 8, 2022, was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP SS\pN A L fNc \�\r�ENSe Digitally signed by Lachlin C Kinsella, P.E. 860 Date:2022.11.18 s� 11/18/22 0 08:37:49-07'00' �C, qTF OF \�P tiZ HIV C Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way 0 Boise,Idaho 83713 • 208.639.6939 • kmengllp.com