HomeMy WebLinkAboutCC - Revised Landscape Plan 2023--7-07
Charlene Way
From:Sonya Allen
Sent:Friday, July 7, 2023 6:19 PM
To:Clerks Comment
Cc:Bill Parsons
Subject:Cole Valley Christian School - Additional Documents
Attachments:D 230706 CVCS CUP Revised_Landscape 121048.pdf
From: Amber Van Ocker <amber@lkvarchitects.com>
Sent: Friday, July 7, 2023 1:22 PM
To: Sonya Allen <sallen@meridiancity.org>; Sean Conner <sean@thelandgroupinc.com>; Wayne Thowless AIA
<wayne@lkvarchitects.com>; Toby Norskog <toby@lkvarchitects.com>
Subject: CVCS Additional Documents
External Sender - Please use caution with links or attachments.
Sonya,
Hot of the presses. Please refer to the attached plans that address the additional information that has been required.
Overview:
1. We have shown the split rail type fencing along the south property lines and separating the "Bentley" parcel. We are
requesting approval of black coated chain link fencing along the east, west, and north property lines because of security
issues. A split rail solution at those locations will just not be feasible due to security and safety of the students. We feel
that utilizing a black coated chain link solution will elevate the design from just a standard fence and also provide the
security that is required for the school.
2. Sheet L1.50 shows examples of all fencing types and landscape solutions.
3. Sheet L1.03 Phasing Plan details the two different phases and what will be included in each. We do want to request
from City Council that we don't have to extend the sidewalks and landscaping beyond the Construction Limits of the
second phase until the 20 acres are improved. That area will continue to be farmed and having equipment drive over
and around sidewalk and landscape features will not be possible. Damage to those improvements would certainly be a
factor and money would be spent in vain. This is the same request for the 4.25 acres along McMillan Road.
4. The other item that I want to make sure everyone is on the same page is the approval from ACHD that Ersatz and
Owyhee Storm will only be improved to the 1/2 road section on CVCS property with Phase 2, but will extend to the north
property line. The remaining road section and improvements would be completed by the adjacent landowners /
developers with future projects.
Thanks Sonya - let us know if you have any questions or comments. The clarification on the ADA County assessor
paperwork is great news.
See you on Tuesday.
Amber
1
--
Amber Van Ocker, A.I.A , NCARB
LKV Architects
2400 Riverwalk Dr.
Boise, Idaho 83706
208-336-3443 Extension 101
amber@lkvarchitects.com
Idaho - Oregon
2
MATCH LINE - SEE SHEET L1.02
MATCH LINE - SEE SHEET L1.01
MATCH LINE - SEE SHEET L1.02
MATCH LINE - SEE SHEET L1.01 OPP.284 SFBASEBALL DUGOUT6STORAGE9113 SFCONCESSIONS2WOMEN3MEN4STORAGE5R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W5040302010G40302010G5040302010G40302010G102030405040302010102030405040302010VANVANVANVANVANVANEPEGEPEPEPEPEPEP
EP
EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPGIRR
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
GIRR
GIRR
GIRR
GIRR
VANFSFSMTRMTR
MTR
MTRMTRGIRR
R/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WGIRR
GIRR
TICKET BOOTH1
UP
UPOPP.
284 SFBASEBALL DUGOUT
6STORAGE9
OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8TICKET BOOTH1VANVAN1
2
43
5
76
8
109
342 1342 1342 1342 1jumprunjumpbalancehop
run
tip t
o
e
1
2
43
5
76
8
109
1
2
43
5
76
8
109
1
2
43
5
76
8
109
816485672962410SANSAN
UP2' - 8"A2.1345B101B104B105B103B106aB107B108aB102B106bB106cGIRR
WGIRR
GIRRGIRR
GIRR
GIRR
GIRRGIRR
EP EP EP EP
25' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFEREGPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION
PHASE TWO CONSTRUCTION
PHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE
CONSTRUCT
IONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTION
CALCULATION TABLENUMBER OF STREET TREES - N OWYHEE STORM AVE.41(REQUIRED)37 (PROVIDED)* - ERSATZ PLACE ROAD41(REQUIRED)38 (PROVIDED)* - MCMILLAN ROAD14(REQUIRED)14 (PROVIDED)LINEAL FEET OF STREET FRONTAGE (N OWYHEE STORM AVE.)1446 LINEAL FEETLINEAL FEET OF STREET FRONTAGE (ERSATZ PLACE ROAD)1436 LINEAL FEETLINEAL FEET OF STREET FRONTAGE (MCMILLAN ROAD)487 LINEAL FEETWIDTH OF STREET BUFFER (EXCLUSIVE OF RIGHT-OF-WAY) - SEE STREET BUFFER NOTES BELOW. - N OWYHEE STORM AVE.20-FT - ERSATZ ROAD20-FT - MCMILLAN ROAD25-FTWIDTH OF PARKING LOT PERIMETER LANDSCAPE STRIPREFER TO PLANSBUFFER WIDTH BETWEEN DIFFERENT LAND USES - NORTH644.46-FT - EAST25-FT - SOUTH6.3-FT - WEST53.3-FTNUMBER OF PARKING STALLS651 PARKING STALLSPERCENT OF PARKING AREA WITH INTERNAL LANDSCAPING25.2%TOTAL NUMBER OF TREES AND TREE SPECIES MIX270 (TOTAL TREES); 15 SPECIESMITIGATION FOR REMOVAL OF EXISTING TREESSEE TREE MITIGATION SCHEDULELANDSCAPE CALCULATIONS - BUILDING (FIRST FLOOR) SQUARE FOOTAGE422,484 S.F. (TWO BUILDINGS) - LANDSCAPE SQUARE FOOTAGE930,035 S.F. - PARKING LOT SQUARE FOOTAGE171,618 S.F.A.EXISTING NATURAL FEATURES ON SITE INCLUDE THE FOLLOWING CANAL: CREASON LATERAL (CREASON LATERALASSOCIATION) AND WILL BE TILED.B.EXISTING TREES AND MITIGATION SCHEDULE ARE SHOWN ON PLAN.C.NO SLOPES GREAT THAN 20% SLOPE EXIST OR ARE PROPOSED ON THIS SITE.Landscape Notes*DECREASE IN NUMBER OF PROVIDED TREES DUE TO EASEMENTS FOR WATER AND GRAVITY IRRIGATIONHorizontal Scale: 0100'200'1" = 100'Overall - Landscape PlanCONSTRUCTIONNOT FOR2400 E RIVERWALK DRIVEBOISE, IDAHO 83706WWW.LKVARCHITECTS.COM208.336.3443DATE: 03.01.2023LKV PROJECT #:REVISIONS:DRAWN BY:CHECKED BY:Conditional Use PermitDRAWING NO.P R E L I M I N A R YN O T F O RC O N S T R U C T I O NCole Valley Christian Schools
Meridian, Idaho
Site Development Plan
TLG PN:1210481.06/30/23 - CITY COMMENTSAREA 1AREA 2L1.00N.I.CAGRICULTURE ANDFUTURE SCHOOL SITE(19.6 ACRES)N.I.CAGRICULTURE ANDFUTURE SCHOOL SITE(4.25 ACRES)OWYHEE STORM AVE.OWYHEE STORM AVE.ERSATZ ROADERSATZ ROAD
McMILIAN RDNOT A PART
MATCH LINE - SEE SHEET L1.02
MATCH LINE - SEE SHEET L1.01
MATCH LINE - SEE SHEET L1.02
MATCH LINE - SEE SHEET L1.0120'20'30
'30'30'OPP.284 SFBASEBALL DUGOUT6STORAGE9113 SFCONCESSIONS2WOMEN3MEN4STORAGE55040302010G40302010G5 0 4 0 3 0 2 0 1 0 G40302010G
102030405040302010102030405040302010EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPSAN
SANSAN
SAN SAN
GIRR
MTR
MTR
MTRMTRGIRRR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WUPUPOPP.284 SFBASEBALL DUGOUT6STORAGE9OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8TICKET BOOTH1VANVAN1
2
43
5
76
8
109
342 1342 1342 1342 1jumprunjumpbalancehop
run
tip
t
o
e
1
2
43
5
76
8
109
1
2
43
5
76
8
109
1
2
43
5
76
8
109
816485672962410UP2' - 8"A2.1345B101B104B105B103B106aB107B108aB102B106bB106cGIRR
WGIRR
GIRRGIRR
GIRR
GIRR
GIRRGIRR
PHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION
PHASE TWO CONSTRUCTION
PHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION
PHASE TWO CONSTRUCTION20' LANDSCAPE BUFFER20' LANDSCAPE BUFFER30' CREASON LATERAL EASEMENT
30' C
R
E
A
S
O
N
L
A
T
E
R
A
L
E
A
S
E
M
E
N
T
30' CREASON LATERAL EASEMENT
30' CREASON LATERAL EASEMENTPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONSTORAGE, MAINTENANCE,& CTE BUILDINGPROPOSED SCHOOLBUILDINGOWYHEE STORM AVEERSATZ PLACE ROAD70'PROPOSED R.O.W.31'
70'
70'PROPOSED R.O.W.
63.33'
30.94'
25'113123456791315161718192081011121447.17.17.17777.17.17.17.1777.1777777777777777.1TREESCOMMON NAMESIZEACER X FREEMANIIFREEMAN MAPLE2" CAL. B & BACER GINNALA `FLAME`FLAME AMUR MAPLE2" CAL. B & BACER X FREEMANII `MARMO`CELEBRATION MAPLE2" CAL. B & BBETULA NIGRARIVER BIRCH MULTI-TRUNK2" CAL. B & BCERCIS CANADENSISEASTERN REDBUD MULTI-TRUNK2" CAL. B & BCRATAEGUS PHAENOPYRUMWASHINGTON HAWTHORN2" CAL. B & BFRAXINUS PENNSYLVANICA `AUTUMN PURPLE`AUTUMN PURPLE ASH2" CAL. B & BGLEDITSIA TRIACANTHOS INERMIS `SKYCOLE` TMSKYLINE THORNLESS HONEY LOCUST2" CAL. B & BLIRIODENDRON TULIPIFERA `EMERALD CITY` TMEMERALD CITY TULIP TREE2" CAL. B & BLIRIODENDRON TULIPIFERA `FASTIGIATA`COLUMNAR TULIP TREE2" CAL. B & BMALUS X `PRAIRIFIRE`PRAIRIFIRE CRAB APPLE2" CAL. B & BMALUS X `SPRING SNOW`SPRING SNOW CRAB APPLE2" CAL. B & BPLATANUS X ACERIFOLIA `BLOODGOOD`BLOODGOOD LONDON PLANE TREE2" CAL. B & BTILIA CORDATA `GREENSPIRE`GREENSPIRE LITTLELEAF LINDEN2" CAL. B & BZELKOVA SERRATA `VILLAGE GREEN`SAWLEAF ZELKOVA2" CAL. B & BPLANT SCHEDULETREE MITIGATIONSYMBOLSPECIESCALIPER INCHESSTATUS/MITIGATE1ELM24REMOVE/NO2ELM20REMOVE/NO3ELM18REMOVE/NO4ELM10REMOVE/NO5ELM36REMOVE/NO6ELM12REMOVE/NO7ELM12REMOVE/NO8ELM12REMOVE/NO9ELM12REMOVE/NO10ELM12REMOVE/NO11ELM12REMOVE/NO12ELM12REMOVE/NO13ELM12REMOVE/NO14ELM12REMOVE/NO15ELM12REMOVE/NO16ELM24REMOVE/NO17ELM24REMOVE/NO18ELM30REMOVE/NO19ELM6REMOVE/NO20ELM24REMOVE/NOMaterial Legend:TURF - SEEDDRY LAND SEEDMIX , SEE DETAIL13/L1.50.NON-TURF PLANTERWITH 4-IN DEPTHROCK MULCH, SEEDETAIL 7/L1.50.TURF SODBASALT BOULDERS,SEE DETAIL 6/L1.50.MEADOW SEED MIX,SEE DETAIL 3/L1.50.DRY CREEKDRAINAGE AREA, SEEDETAIL 1/L1.50.4-IN DEPTH BASECOURSEFencing Legend:SPLIT RAIL FENCE (4-FT. HT.)CMU WALL (3-FT. HT.) WITH TUBE STEEL FENCING (3-FT. HT.)CHAIN LINK FENCE (6-FT & 10-FT HT.)1.SIGHT TRIANGLES AS DEFINED IN 11-3A-3 IN MERIDIAN CITY CODE.2.CMU TRASH ENCLOSURE3.PRIVATE GRAVITY IRRIGATION PUMP STATION WITH CMU ENCLOSURE.4.SECONDARY IRRIGATION WATER SOURCE WELL5.SPLIT-RAIL FENCE (4-FT. HT), SEE DETAIL 8/L1.50.6.CMU WALL (3-FT. HT.) WITH TUBE STEEL FENCING (3-FT. HT.) ON TOP OF WALL, SEEDETAIL 9/L1.50.7.6-FT OR 10-FT GALVANIZED CHAIN LINK FENCE, SEE DETAIL 10/L1.50.7.1.6-FT BLACK POWDER COATED CHAIN LINK FENCE.8.DRY STREAM BED, SEE DETAIL 1/L1.50 FOR REFERENCE IMAGE.KeynotesCALLOUT NUMBERS COORDINATEDTO NUMBERED NOTES BELOW.NOTE: THE ELM SPECIES DOES NOT REQUIRE MITIGATION IN MERIDIAN, IDAHO. EXISTING TREESHAVE BEEN IDENTIFIED BY THE LAND GROUP AND ARE TO BE VERIFIED BY MERIDIAN CITYARBORIST KYLE YORITA.CALLOUT NUMBERS COORDINATEDTO NUMBERED NOTES BELOW.##Horizontal Scale: 050'100'1" = 50'Landscape Plan - Area 1CONSTRUCTIONNOT FOR2400 E RIVERWALK DRIVEBOISE, IDAHO 83706WWW.LKVARCHITECTS.COM208.336.3443DATE: 03.01.2023LKV PROJECT #:REVISIONS:DRAWN BY:CHECKED BY:Conditional Use PermitDRAWING NO.P R E L I M I N A R YN O T F O RC O N S T R U C T I O NCole Valley Christian Schools
Meridian, Idaho
Site Development Plan
TLG PN:1210481.06/30/23 - CITY COMMENTSL1.01
MATCH LINE - SEE SHEET L1.02MATCH LINE - SEE SHEET L1.01MATCH LINE - SEE SHEET L1.02MATCH LINE - SEE SHEET L1.01
AREA CURRENTLY CONTAINS PICEA PUNGENS TREE FARMPREVIOUSLY OWNED AND OPERATED BY DEAN R. BENTLY. MR.BENTLY SIGNED AN AGREEMENT WITH COLE VALLEY CHRISTIANSCHOOL WHICH INCLUDED "RIGHT TO TRANSPLANT TREES FROMTHE AREA [...] FOR ONE YEAR FROM THE DATE OF LANDTRANSFER OR UNTIL CONSTRUCTION OF THE EXTENSION OFOWYHEE STORM AVENUE BEGINS." AS SUCH, TREE MITIGATION ISNOT INCLUDED IN THIS APPLICATION.10'25'35'35'20'25'25'20'20.03'
R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WEP10200201VANVANVANVANVANVANEPEP
E
P
EP EP EP EP EP EP EP EP EP EP EP EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPGIRR
8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SS8''SSSAN
SAN
SAN
GIRR
GIRRGIRR VANMTRGIRR
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
GIRR
GIRR
TICKET BOOTH1
PHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE
CONSTRUCT
IONPHASE ONE CONSTRUCTIONEPEP EP EP EP EP EP EP EP EP
PHASE TWO CONSTRUCTION
25' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFERERSATZ PLACE ROADN.I.CAGRICULTURE ANDFUTURE SCHOOL SITE(4.25 ACRES)PROPOSED SCHOOLBUILDINGOWYHEE STORM AVEMcMILLAN ROAD ERSATZ PLACE
ROADNOT A PART70'PROPOSED R.O.W.35'23.91'10'25'15.67'108'9'108'9'108'9'25'21.19'10'43.15'25'40'25'45'25'10'30'40'25'40'40'25'40'25'40'25'20'25'10'9'63'72'9'25'9'20'6.3'278.51'30.33'70'PROPOSED R.O.W.53.33'63.33'20'5'22.98'10'20'25'20'5'20'25'40'25'40'25'40'25'40'25'40'25'40'25'40'25'20'25.47'70'PROPOSED R.O.W.10'10'30.94'1125555557.17.17.17.188555557.15666690'138.15'7.1R/WR/WR/WR/W
R/W R/W R/W R/WEPEPEPEPEPEPEPEPEPEPEPEPEPEP8'
'W8''WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/W PHASE ONE
CONSTRUCT
IONERSATZ PLACE
ROADTREESCOMMON NAMESIZEACER X FREEMANIIFREEMAN MAPLE2" CAL. B & BACER GINNALA `FLAME`FLAME AMUR MAPLE2" CAL. B & BACER X FREEMANII `MARMO`CELEBRATION MAPLE2" CAL. B & BBETULA NIGRARIVER BIRCH MULTI-TRUNK2" CAL. B & BCERCIS CANADENSISEASTERN REDBUD MULTI-TRUNK2" CAL. B & BCRATAEGUS PHAENOPYRUMWASHINGTON HAWTHORN2" CAL. B & BFRAXINUS PENNSYLVANICA `AUTUMN PURPLE`AUTUMN PURPLE ASH2" CAL. B & BGLEDITSIA TRIACANTHOS INERMIS `SKYCOLE` TMSKYLINE THORNLESS HONEY LOCUST2" CAL. B & BLIRIODENDRON TULIPIFERA `EMERALD CITY` TMEMERALD CITY TULIP TREE2" CAL. B & BLIRIODENDRON TULIPIFERA `FASTIGIATA`COLUMNAR TULIP TREE2" CAL. B & BMALUS X `PRAIRIFIRE`PRAIRIFIRE CRAB APPLE2" CAL. B & BMALUS X `SPRING SNOW`SPRING SNOW CRAB APPLE2" CAL. B & BPLATANUS X ACERIFOLIA `BLOODGOOD`BLOODGOOD LONDON PLANE TREE2" CAL. B & BTILIA CORDATA `GREENSPIRE`GREENSPIRE LITTLELEAF LINDEN2" CAL. B & BZELKOVA SERRATA `VILLAGE GREEN`SAWLEAF ZELKOVA2" CAL. B & BPLANT SCHEDULETREE MITIGATIONSYMBOLSPECIESCALIPER INCHESSTATUS/MITIGATE1ELM24REMOVE/NO2ELM20REMOVE/NO3ELM18REMOVE/NO4ELM10REMOVE/NO5ELM36REMOVE/NO6ELM12REMOVE/NO7ELM12REMOVE/NO8ELM12REMOVE/NO9ELM12REMOVE/NO10ELM12REMOVE/NO11ELM12REMOVE/NO12ELM12REMOVE/NO13ELM12REMOVE/NO14ELM12REMOVE/NO15ELM12REMOVE/NO16ELM24REMOVE/NO17ELM24REMOVE/NO18ELM30REMOVE/NO19ELM6REMOVE/NO20ELM24REMOVE/NOMaterial Legend:TURF - SEEDDRY LAND SEEDMIX , SEE DETAIL13/L1.50.NON-TURF PLANTERWITH 4-IN DEPTHROCK MULCH, SEEDETAIL 7/L1.50.TURF SODBASALT BOULDERS,SEE DETAIL 6/L1.50.MEADOW SEED MIX,SEE DETAIL 3/L1.50.DRY CREEKDRAINAGE AREA, SEEDETAIL 1/L1.50.4-IN DEPTH BASECOURSEFencing Legend:SPLIT RAIL FENCE (4-FT. HT.)CMU WALL (3-FT. HT.) WITH TUBE STEEL FENCING (3-FT. HT.)CHAIN LINK FENCE (6-FT & 10-FT HT.)1.SIGHT TRIANGLES AS DEFINED IN 11-3A-3 IN MERIDIAN CITY CODE.2.CMU TRASH ENCLOSURE3.PRIVATE GRAVITY IRRIGATION PUMP STATION WITH CMU ENCLOSURE.4.SECONDARY IRRIGATION WATER SOURCE WELL5.SPLIT-RAIL FENCE (4-FT. HT), SEE DETAIL 8/L1.50.6.CMU WALL (3-FT. HT.) WITH TUBE STEEL FENCING (3-FT. HT.) ON TOP OF WALL, SEEDETAIL 9/L1.50.7.6-FT OR 10-FT GALVANIZED CHAIN LINK FENCE, SEE DETAIL 10/L1.50.7.1.6-FT BLACK POWDER COATED CHAIN LINK FENCE.8.DRY STREAM BED, SEE DETAIL 1/L1.50 FOR REFERENCE IMAGE.KeynotesCALLOUT NUMBERS COORDINATEDTO NUMBERED NOTES BELOW.NOTE: THE ELM SPECIES DOES NOT REQUIRE MITIGATION IN MERIDIAN, IDAHO. EXISTING TREESHAVE BEEN IDENTIFIED BY THE LAND GROUP AND ARE TO BE VERIFIED BY MERIDIAN CITYARBORIST KYLE YORITA.CALLOUT NUMBERS COORDINATEDTO NUMBERED NOTES BELOW.##Horizontal Scale: 050'100'1" = 50'Landscape Plan - Area 2CONSTRUCTIONNOT FOR2400 E RIVERWALK DRIVEBOISE, IDAHO 83706WWW.LKVARCHITECTS.COM208.336.3443DATE: 03.01.2023LKV PROJECT #:REVISIONS:DRAWN BY:CHECKED BY:Conditional Use PermitDRAWING NO.P R E L I M I N A R YN O T F O RC O N S T R U C T I O NCole Valley Christian Schools
Meridian, Idaho
Site Development Plan
TLG PN:1210481.06/30/23 - CITY COMMENTSL1.02MATCHLINE - THIS SHEETMATCHLINEMATCHLINEMATCHLINEHorizontal Scale: 050'100'1" = 50'Landscape Plan - Area 2
OPP.284 SFBASEBALL DUGOUT6STORAGE9113 SFCONCESSIONS2WOMEN3MEN4STORAGE5R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W5040302010G40302010G5040302010G40302010G102030405040302010102030405040302010VANVANVANVANVANVANEPEGEPEPEPEPEPEP
EP
EP EPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPEPGIRR
SAN
SAN
SAN
SAN
SAN
SAN
SAN SAN
GIRR
GIRR
GIRR
GIRR
VANFSFSMTRMTR
MTR
MTRMTRGIRR
R/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WGIRR
GIRR
TICKET BOOTH1
UP
UPOPP.
284 SFBASEBALL DUGOUT
6STORAGE9
OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8OPP.247 SFSOFTBALL DUGOUT774 SFSTORAGE8TICKET BOOTH1VANVAN1
2
43
5
76
8
109
342 1342 1342 1342 1jumprunjumpbalancehop
run
tip t
o
e
1
2
43
5
76
8
109
1
2
43
5
76
8
109
1
2
43
5
76
8
109
816485672962410SANSAN
UP2' - 8"A2.1345B101B104B105B103B106aB107B108aB102B106bB106cGIRR
WGIRR
GIRRGIRR
GIRR
GIRR
GIRRGIRR
EP EP EP EP
25' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFER20' LANDSCAPE BUFFEREGPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION
PHASE TWO CONSTRUCTION
PHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTION PHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE
CONSTRUCT
IONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE TWO CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE ONE CONSTRUCTIONPHASE TWO CONSTRUCTION
CALCULATION TABLENUMBER OF STREET TREES - N OWYHEE STORM AVE.41(REQUIRED)37 (PROVIDED)* - ERSATZ PLACE ROAD41(REQUIRED)38 (PROVIDED)* - MCMILLAN ROAD14(REQUIRED)14 (PROVIDED)LINEAL FEET OF STREET FRONTAGE (N OWYHEE STORM AVE.)1446 LINEAL FEETLINEAL FEET OF STREET FRONTAGE (ERSATZ PLACE ROAD)1436 LINEAL FEETLINEAL FEET OF STREET FRONTAGE (MCMILLAN ROAD)487 LINEAL FEETWIDTH OF STREET BUFFER (EXCLUSIVE OF RIGHT-OF-WAY) - SEE STREET BUFFER NOTES BELOW. - N OWYHEE STORM AVE.20-FT - ERSATZ ROAD20-FT - MCMILLAN ROAD25-FTWIDTH OF PARKING LOT PERIMETER LANDSCAPE STRIPREFER TO PLANSBUFFER WIDTH BETWEEN DIFFERENT LAND USES - NORTH644.46-FT - EAST25-FT - SOUTH6.3-FT - WEST53.3-FTNUMBER OF PARKING STALLS651 PARKING STALLSPERCENT OF PARKING AREA WITH INTERNAL LANDSCAPING25.2%TOTAL NUMBER OF TREES AND TREE SPECIES MIX270 (TOTAL TREES); 15 SPECIESMITIGATION FOR REMOVAL OF EXISTING TREESSEE TREE MITIGATION SCHEDULELANDSCAPE CALCULATIONS - BUILDING (FIRST FLOOR) SQUARE FOOTAGE422,484 S.F. (TWO BUILDINGS) - LANDSCAPE SQUARE FOOTAGE930,035 S.F. - PARKING LOT SQUARE FOOTAGE171,618 S.F.A.EXISTING NATURAL FEATURES ON SITE INCLUDE THE FOLLOWING CANAL: CREASON LATERAL (CREASON LATERALASSOCIATION) AND WILL BE TILED.B.EXISTING TREES AND MITIGATION SCHEDULE ARE SHOWN ON PLAN.C.NO SLOPES GREAT THAN 20% SLOPE EXIST OR ARE PROPOSED ON THIS SITE.Landscape Notes*DECREASE IN NUMBER OF PROVIDED TREES DUE TO EASEMENTS FOR WATER AND GRAVITY IRRIGATIONN.I.CAGRICULTURE ANDFUTURE SCHOOL SITE(19.6 ACRES)N.I.CAGRICULTURE ANDFUTURE SCHOOL SITE(4.25 ACRES)OWYHEE STORM AVE.OWYHEE STORM AVE.ERSATZ ROADERSATZ ROAD
McMILLAN RDNOT A PARTHorizontal Scale: 0100'200'1" = 100'Phasing PlanCONSTRUCTIONNOT FOR2400 E RIVERWALK DRIVEBOISE, IDAHO 83706WWW.LKVARCHITECTS.COM208.336.3443DATE: 03.01.2023LKV PROJECT #:REVISIONS:DRAWN BY:CHECKED BY:Conditional Use PermitDRAWING NO.P R E L I M I N A R YN O T F O RC O N S T R U C T I O NCole Valley Christian Schools
Meridian, Idaho
Site Development Plan
TLG PN:1210481.06/30/23 - CITY COMMENTSL1.03COMPLETE LANDSCAPE ANDSIDEWALK IMPROVEMENTSWITH FUTURE DEVELOPMENTPHASE ONE:·ERSATZ ROAD - HALF SECTION - 22.5' WITH CURB, GUTTER, DETACHED SIDEWALKEXTENDED TO SOUTH ENTRY ACCESS CURB CUT.·OWYHEE STORM - FULL ROAD SECTION - 45' WITH CURB GUTTER SIDEWALK TOSOUTH ENTRY ACCESS CURB CUT.·STADIUM, SPORTS AND PRACTICE FIELDS WITH ASSOCIATED PARKING LOT.Phasing LegendPHASE TWO:·MCMILLAN ROAD - 37' WIDE ROAD EXTENSION NORTH TO RIGHT OF WAY.·ERSATZ ROAD - HALF SECTION - 22.5' WITH CURB, GUTTER, DETACHED SIDEWALKEXTENDED TO NORTH PROPERTY LINE. 20' WIDE LANDSCAPE BUFFER EXTENDED TOSOUTH BOUNDARY OF FUTURE DEVELOPMENT AREA.·OWYHEE STORM - HALF SECTION - 22.5' WITH CURB, GUTTER, DETACHED SIDEWALKEXTENDED TO NORTH PROPERTY LINE. 20' WIDE LANDSCAPE BUFFER EXTENDED TOSOUTH BOUNDARY OF FUTURE DEVELOPMENT AREA.·SCHOOL, CTE BUILDING, AND PLAYGROUND AREAS WITH ASSOCIATED PARKING LOT.FUTURE DEVELOPMENT:·N.I.C. AGRICULTURE AND FUTURE SCHOOL SITE 4.25 ACRE AND 19.6 ACRE AREAS.·MCMILLAN LANDSCAPE BUFFER AT 4.25 ACRE FUTURE DEVELOPMENT AREA.·ERSATZ ROAD SIDEWALK AND RIGHT OF WAY LANDSCAPE AT 19.6 ACRE FUTUREDEVELOPMENT AREA.·OWYHEE STORM SIDEWALK AND RIGHT OF WAY LANDSCAPE AT 19.6 ACRE FUTUREDEVELOPMENT AREA.
CONSTRUCTIONNOT FOR2400 E RIVERWALK DRIVEBOISE, IDAHO 83706WWW.LKVARCHITECTS.COM208.336.3443DATE: 03.01.2023LKV PROJECT #:REVISIONS:DRAWN BY:CHECKED BY:Conditional Use PermitDRAWING NO.P R E L I M I N A R YN O T F O RC O N S T R U C T I O NCole Valley Christian Schools
Meridian, Idaho
Site Development Plan
TLG PN:1210481.06/30/23 - CITY COMMENTSL1.501Dry Creek BedScale: NTS2No Mow FescueScale: NTS3Wildflower Meadow MixScale: NTS4Pollinator PlantsScale: NTS5Naturalized LandscapeScale: NTS6Basalt BouldersScale: NTS7Brown/Tan Rock MulchScale: NTS84' Tall Split Rail FenceScale: NTS93-FT High CMU Wall with 3-FT High Tube Steel FencingScale: NTS10Chain Link FenceScale: NTS1110' Wide Multi-Use PathwayScale: NTS12Tree-Lined StreetsScale: NTS13Dry Land Seed MixScale: NTS10-FT Height6-FT Height Powder Coated 3-FT High CMU Wall with 3-FT High Tube Steel Fencing on Top of Wall.