Loading...
HomeMy WebLinkAboutCC - Private Street Section 2.5"THICKNESS OF ASPHALT PLANT MIX PAVEMENT z"SUPERPAVE SP-3 MIX DESIGN W/PG-58-28 O O O O 4"THICKNESS OF%"MINUS CRUSHED AGGREGATE BASE �oO�0o0oO�0o0oO�0o0oO�� COMPACTED TO 95%MAX DRY DENSITY PER ASTM D1557 14"THICKNESS OF 6"MINUS UNCRUSHED AGGREGATE BASE COMPACTED TO 95%MAX DRY DENSITY PER ASTM D1557 GRANULAR STRUCTURAL FILL AS REQUIRED BY SITE CONDITIONS 6"MINUS UNCRUSHED AGGREGATE BASE COMPACTED TO 95%MAX DRY DENSITY PER ASTM D1557 SUBGRADE SHALL BE PREPARED AND PROOF COMPACTED PER THE SITE PREPARATION SECTION OF THE GEOTECHNICAL REPORT AND BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO PLACEMENT OF OF ANY SUBBASE AGGREGATE OR GRANULAR STRUCTURAL FILL ASPHALT PAVEMENT SECTION 25.00'MIN.-(VARIES SEE PLAN) 12.50'MIN.-(VARIES SEE PLAN) 12.50'MIN.-(VARIES SEE PLAN) 1.00' 9.50, 4.00' 5.50' 5.00' TOP OF CURB SLOPES DOWNWARD AT 1.5% VARIES VARIES 1.0%MIN ° 1.5% TOWARDS STREET 1.0/°MIN. 6"THICK CONCRETE —y SIDEWALK PER ACHD 12"WIDE CONCRETE RIBBON SUPPLEMENTAL CURB-(SEE 4/GD.3) a a o a o a a a a DRAWING SD-709 /ice/ice ASPHALT PAVEMENT PER 3/GD.3 CONCRETE VALLEY GUTTER ASPHALT PAVEMENT PER 3/GD.3 PER ACHD SUPPLEMENTAL DRAWING SD-708 (SEE 3/RD.4) PRIVATE STREET TYPICAL SECTION NOTES 1. ALL ASPHALT PAVEMENTS AND BASE MATERIALS,AND SUB-GRADE PREPARATIONS SHALL BE PROVIDED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. 2. AGGREGATE BASE MATERIALS(3/4"MINUS CRUSHED AGGREGATE&6"MINUS UNCRUSHED AGGREGATE)MATERIALS SHALL COMPLY WITH DIVISION 800 OF THE ISPWC. 3. ALL SUBGRADES,STRUCTURAL FILL,AND BASE MATERIAL PREPARATIONS SHALL BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO COVERING UP THE WORK OR PLACING SUBSEQUENT LIFTS. 4. ASPHALT PAVEMENT SHALL BE COMPACTED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. DENSITY TESTING SHALL BE PERFORMED RANDOMLY ACROSS THE SITE AT A FREQUENCY TO BE DETERMINED BY THE OWNER'S GEOTECHNICAL REPRESENTATIVE. PRIVATE STREET SECTION 3 GD.3