HomeMy WebLinkAboutCC - Calc Package Stamped ailey Engineering,Inc.
CIVIL ENGINEERINGIPLANNINGICADD
PRESSURE IRRIGATION PUMP STATION
REPORT FOR:
Centerville Subdivision
S�ONAL F7
co,
�G\STE,y �i,�,F PROJECT NO: C2023-002
F �
04/19/20230
17882 DATE: 4-18-2023
9�F O FG�C�'`
/N S. C�P DEVELOPER :
Trilogy Development, Inc.
9839 W. Cable Car St, Suite 100
Boise, ID 83709
1119 E. State Street, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013
www.baileyengineers.com
Summary
Pump Station Design Point: 180 gpm @ 160 TDH
Pump Station Average Demand: 129 gpm
Pump Station Peak Calculated Demand: 149.2 gpm*
Total Available Water Rights: 136.4 gpm
*Pump Station peak demand is for required pump capacity and includes demand required for cleaning Clemons
Clearwater screen.Raw peak demand is 129.2,less than the available water right.This means that an equalization system
is not required in this system.
Water Supply
The property has access to 28.94 acres of water from New York Irrigation District.
-4111 Amity has 17.94 acres of a water right. (#327-003-00)
-4085 Amity has 11.0 acres of a water right. (#327-002-00)
The typical water allowance on a Boise Project Board of Control project is 3.75 acre-ft/acre.
28.94 acres x 3.75 acre-ft/acre= 108.53 acre-ft
108.53 acre-ft x 43,560 sq ft/acre=4,727,349 cu ft
The average water right is based on a constant delivery of water over the course of an irrigation
season (approx 180 days).
4,727,349 cu ft x
average irrigation season x 1 day x 1 hour x 1 min
180 days 24 hours 60 min 60 seconds
=0.3040 cfs= 136.42 gpm
Water Demand
The irrigation demand for Centerville Subdivision was determined first by analyzing the total irrigable
area within the pump station's service area.The preliminary plat was used to estimate total irrigable
area for each lot.
The peak project water requirement was determined using the standard Boise Project Board of
Control Equation, applying 0.33 inches of water per day over the sum of the building lot area, applied
within a 12-hour period.The same demand flow rate of 0.33 inches of water per day was used to
calculated the 'average demand flow' over all irrigable acreage and utilizing the entire available
irrigation time of 24 hours per day.A demand of 20 gpm has been added to both the average and
peak demands to account for the Clemons screen for pump sizing calculations, although water used
to clean the screen will not leave the system.The peak pump demand of 149.2 gpm serves as the
governing factor in sizing the pump station.The raw peak demand of 129 gpm is less than the
available water right meaning that equalization will not be required.
Delivery to Pumping Plant
Irrigation water is delivered to the site from a headgate on the Cunningham Lateral in the SW corner
of the development site. Water will be measured in a Cipoletti weir,just downstream of the
headgate.A 6"wide weir is proposed to measure the site's water right of 0.30 cfs The Cipoletti weir
calculation is shown below to show the gage reading at the development's water right:
Q = 3.367Lh3/2
Q= Discharge (cfs)
L=Weir Length (ft)
H= Head (ft)
As discharge is already known,the equation can be rearranged to solve for head over the weir crest:
h = ( Q )2/3
3.367L
0.30 2/3 _
h — (3.367(0.5)) 0.32
The downstream check boards are set 0.5' lower than the weir crest. If the pump station is not
utilizing all provided water, it will spill over the check boards in the screen box and continue to its
historic outfall location in the NE corner of the development site.
Screen Box
The concrete screen box contains a Clemons CW-600 screen.The screen requires 20 gpm to operate;
this demand has been added to that of the pump station.The screen is a not a consumptive use of
the water; it can be recycled back into the screen box.The screen is located in the screen box and
feeds directly to the pump station.
Wet Well
The concrete wet well will have a diameter of 48".The depth will be 14.5 feet from top of wet well
to top of floor(to be verified by pump supplier). Manhole steps will be provided for maintenance
inside the wet well.
Pumps
A pump capacity of 180 gpm at 160 TDH must be provided. Plans show one (1) submersible
turbine pumps but a vertical turbine is acceptable if desired by developer. A jockey pump will
be provided if determined to be necessary by the pump supplier.
Hydraulic Analysis
A hydraulic analysis was performed for the Centerville 1 pressure irrigation network using
WaterCAD software. The analysis was performed for only the buildout condition, however it
should be noted that there is a hydraulic bottleneck in Ph 1 from the single-point connection to
the pump system. The initial phase of construction encompasses approximately 37% of the
total Centerville development; prorating the peak demand on the pump station at a
conservative 50%, the initial phase would require a peak demand of approximately 75 gpm
(0.17 cfs). Using Q=VA through the single-point 4" delivery to the initial phase of development,
the 4" line would be subject to maximum flow rates of approximately 1.95 ft/s [5 ft/s being the
typical design criteria for velocity].
A pressure irrigation demand equal to the peak calculated demand of 150 gpm was placed at
nodes throughout the development site (w/20 gpm demand at the screen location). Demands
were spread throughout the system with an attempt to put them at hydraulically remote
locations (within the site's interior, higher elevations, and far from the pressure irrigation pump
station).
The system utilizes pipes with a minimum diameter of 4" and a maximum diameter of 6".
Junction elevations were provided using the existing site topography and the program's Trex
functionality. Throughout the system, no large sources of head loss are seen, with no velocities
exceeding 5 ft/s and no junctions with low pressure. Reports are attached for the pipes,
junctions and the pump definition in Appendix C.
Watering Schedule
Boise Project Board of Control Standards state that 0.33 in/day is the daily watering requirement
over irrigable area during the peak periods of summer.The watering schedule has been designed
accordingly,with schedule distribution determined by approximate irrigable area per lot. Because
this pump station will be privately owned,water is scheduled to be available 24 hours/day. Common
lots and attached/multi-family/commercial lots will be maintained by landscapers,who have control
over all common lot area; rather than breaking watering windows out by lot,the entirety of these
areas will be able to water for a certain time window daily.A constant use of 135 gpm has been used
to calculate how long the multi-family and common areas need daily for irrigation.
Irrigable HOA Controlled Area (sf) * 0.33in * 12 in 1ft
0.0022cfs day
135 gpm * _
1 gpm (hours to irrigate) * 60 * 60
HOA-Controlled Area =411,952 sf
Minimum Hours Required to Irrigate all Common Lots= 10.59 hours-> 11 hours per day to be
allotted to water common areas [to allow flexibility and room for error in the schedule]
Individual watering windows have not been scheduled for each common lot or attached unit;
landscapers will be able to set this schedule based on sprinkler zoning and use of these areas.The
watering schedule for building lots is based on the number of minutes provided every other day to
provide estimated irrigable area with 0.33 in/day average delivery at a minimum.The number of
minutes provided to each lot is greater than or equal to the time required to provide the delivery
using a 15 gpm standard-usage flow rate.
In addition to the need to provide sufficient irrigation water to lots,a second objective of an
irrigation watering schedule is to provide'desirable'watering windows to homeowners.Throughout
the night and morning are deemed to be the most desirable times as that's when homeowners are
less likely to be spending time in their yards.Single-family building lots are scheduled to water 13
hours per day,from gpm to 10am,with common lots scheduled from 10am to 9pm.The times of the
schedule can be modified as the HOA sees fit and so long as the watering windows are not
shortened from the specified durations.Watering windows for both common lots and building lots
are based on the entirety of the water being available to provide 0.33 in/day on average over
irrigable area.
Attachments
Appendix A-Centerville Subdivision Irrigation Demand Calculations
Appendix B-Centerville Subdivision Watering Schedule
Appendix C—Centerville Pump Station Hydraulic Analysis
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 1 Lot 1 29378 29378
Block 1 Lot 2 2038 2038
Block 1 Lot 3 3875 1937
Block 1 Lot 4 3601 1801
Block 1 Lot 5 3600 1800
Block 1 Lot 6 3600 1800
Block 1 Lot 7 3600 1800
Block 1 Lot 8 3600 1800
Block 1 Lot 9 3600 1800
Block 1 Lot 10 3600 1800
Block 1 Lot 11 3629 1815
Block 1 Lot 12 3011 3011
Block 1 Lot 13 7581 2274
Block 1 Lot 14 7921 2376
Block 1 Lot 15 7968 2390
Block 1 Lot 16 9186 2756
Block 1 Lot 17 15075 4523
Block 1 Lot 18 13469 0 Private Drive Lane
Block 1 Lot 19 1395 1395
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 1 Lot 20 3154 946
Block 1 Lot 21 2713 814
Block 1 Lot 22 3486 1046
Block 1 Lot 23 3348 1004
Block 1 Lot 24 2457 737
Block 1 Lot 25 3320 996
Block 1 Lot 26 3312 994
Block 1 Lot 27 2441 732
Block 1 Lot 28 3863 1159
Block 1 Lot 29 3375 1013
Block 1 Lot 30 2423 727
Block 1 Lot 31 3339 1002
Block 1 Lot 32 3267 980
Block 1 Lot 33 2407 722
Block 1 Lot 34 3003 901
Block 1 Lot 35 1899 1899
Block 1 Lot 36 13289 0 Private Drive Lane
Block 1 Lot 37 3149 3149
Block 1 Lot 38 2807 842
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 1 Lot 39 2304 691
Block 1 Lot 40 3120 936
Block 1 Lot 41 3024 907
Block 1 Lot 42 2304 691
Block 1 Lot 43 3360 1008
Block 1 Lot 44 3264 979
Block 1 Lot 45 2304 691
Block 1 Lot 46 3120 936
Block 1 Lot 47 3120 936
Block 1 Lot 48 2304 691
Block 1 Lot 49 3120 936
Block 1 Lot 50 3120 936
Block 1 Lot 51 2304 691
Block 1 Lot 52 2592 778
Block 1 Lot 53 960 960
Block 1 Lot 54 19717 19717
Block 1 Lot 55 18094 0 Private Drive Lane
Block 1 Lot 56 2394 2394
Block 1 Lot 57 5509 5509
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 1 Lot 58 18159 5448
Block 1 Lot 59 16663 4999
Block 1 Lot 60 22149 6645
Block 1 Lot 61 7169 7169
Block 2 Lot 1 12336 12336
Block 2 Lot 2 2040 2040
Block 2 Lot 3 7874 3937
Block 2 Lot 4 7500 3750
Block 2 Lot 5 9169 4584
Block 2 Lot 6 13523 6762
Block 2 Lot 7 10143 5071
Block 2 Lot 8 9357 4679
Block 2 Lot 9 9149 4575
Block 2 Lot 10 9191 4596
Block 2 Lot 11 9233 4617
Block 2 Lot 12 9393 4696
Block 2 Lot 13 9436 4718
Block 2 Lot 14 9479 4739
Block 2 Lot 15 9522 4761
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 2 Lot 16 9660 4830
Block 2 Lot 17 1509 1509
Block 3 Lot 1 3216 3216
Block 3 Lot 2 3596 1798
Block 3 Lot 3 3420 1710
Block 3 Lot 4 3420 1710
Block 3 Lot 5 3420 1710
Block 3 Lot 6 3420 1710
Block 3 Lot 7 3420 1710
Block 3 Lot 8 3420 1710
Block 3 Lot 9 3420 1710
Block 3 Lot 10 3420 1710
Block 3 Lot 11 12217 12217
Block 3 Lot 12 6080 3040
Block 3 Lot 13 6080 3040
Block 3 Lot 14 6080 3040
Block 3 Lot 15 3417 3417
Block 3 Lot 16 7130 3565
Block 3 Lot 17 8050 4025
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 3 Lot 18 8050 4025
Block 3 Lot 19 8050 4025
Block 3 Lot 20 7389 3695
Block 3 Lot 21 2357 2357
Block 3 Lot 22 3416 1708
Block 3 Lot 23 3420 1710
Block 3 Lot 24 3420 1710
Block 3 Lot 25 3420 1710
Block 3 Lot 26 3420 1710
Block 3 Lot 27 3403 1701
Block 3 Lot 28 2394 2394
Block 3 Lot 29 4306 2153
Block 3 Lot 30 3420 1710
Block 3 Lot 31 3705 1853
Block 3 Lot 32 3420 1710
Block 3 Lot 33 3420 1710
Block 3 Lot 34 3420 1710
Block 3 Lot 35 3420 1710
Block 3 Lot 36 3420 1710
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 3 Lot 37 3420 1710
Block 3 Lot 38 3420 1710
Block 3 Lot 39 3420 1710
Block 3 Lot 40 3943 1971
Block 4 Lot 1 83900 75510 90%of Area considered
irrigable...clubhouse, courts, etc.
Block 4 Lot 2 3420 1710
Block 4 Lot 3 3420 1710
Block 4 Lot 4 3420 1710
Block 4 Lot 5 3420 1710
Block 4 Lot 6 3420 1710
Block 4 Lot 7 3420 1710
Block 4 Lot 8 3705 1853
Block 4 Lot 9 718 718
Block 4 Lot 10 3554 1777
Block 4 Lot 11 3420 1710
Block 4 Lot 12 3420 1710
Block 4 Lot 13 3420 1710
Block 4 Lot 14 3420 1710
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 4 Lot 15 3420 1710
Block 4 Lot 16 3420 1710
Block 4 Lot 17 3420 1710
Block 4 Lot 18 3420 1710
Block 4 Lot 19 3420 1710
Block 4 Lot 20 3386 1693
Block 4 Lot 21 981 981
Block 4 Lot 22 3420 1710
Block 4 Lot 23 3420 1710
Block 4 Lot 24 3420 1710
Block 4 Lot 25 3420 1710
Block 4 Lot 26 3420 1710
Block 4 Lot 27 3422 1711
Block 4 Lot 28 3537 1769
Block 5 Lot 1 1059 1059
Block 5 Lot 2 3416 1708
Block 5 Lot 3 3420 1710
Block 5 Lot 4 3420 1710
Block 5 Lot 5 3420 1710
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 5 Lot 6 3420 1710
Block 5 Lot 7 3580 1790
Block 5 Lot 8 3606 1803
Block 5 Lot 9 3606 1803
Block 5 Lot 10 4166 2083
Block 5 Lot 11 3159 3159
Block 5 Lot 12 3716 1858
Block 5 Lot 13 3420 1710
Block 5 Lot 14 3420 1710
Block 5 Lot 15 3420 1710
Block 5 Lot 16 3420 1710
Block 5 Lot 17 3420 1710
Block 5 Lot 18 3420 1710
Block 5 Lot 19 3420 1710
Block 5 Lot 20 3816 1908
Block 5 Lot 21 2954 2954
Block 5 Lot 22 7918 3959
Block 5 Lot 23 8250 4125
Block 5 Lot 24 8250 4125
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 5 Lot 25 8250 4125
Block 5 Lot 26 8250 4125
Block 5 Lot 27 8770 4385
Block 5 Lot 28 8954 4477
Block 5 Lot 29 9784 4892
Block 5 Lot 30 8434 8434
Block 5 Lot 31 15543 7772
Block 5 Lot 32 12051 6025
Block 5 Lot 33 8090 4045
Block 5 Lot 34 7360 3680
Block 5 Lot 35 7360 3680
Block 5 Lot 36 7360 3680
Block 5 Lot 37 7360 3680
Block 5 Lot 38 2904 2904
Block 6 Lot 1 12450 12450
Block 6 Lot 2 2394 2394
Block 6 Lot 3 11962 0 Private Drive Lane
Block 6 Lot 4 5646 5646
Block 6 Lot 5 3585 1075
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est.Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 6 Lot 6 2590 777
Block 6 Lot 7 3511 1053
Block 6 Lot 8 3604 1081
Block 6 Lot 9 2617 785
Block 6 Lot 10 3808 1142
Block 6 Lot 11 3808 1142
Block 6 Lot 12 2617 785
Block 6 Lot 13 3813 1144
Block 6 Lot 14 4386 1316
Block 6 Lot 15 2646 794
Block 6 Lot 16 3272 982
Block 6 Lot 17 1460 1460
Block 6 Lot 18 40099 40099
Block 6 Lot 19 2499 2499
Block 6 Lot 20 3264 979
Block 6 Lot 21 2448 734
Block 6 Lot 22 3308 993
Block 6 Lot 23 3297 989
Block 6 Lot 24 2431 729
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 6 Lot 25 3490 1047
Block 6 Lot 26 3545 1064
Block 6 Lot 27 2512 754
Block 6 Lot 28 3324 997
Block 6 Lot 29 3250 975
Block 6 Lot 30 2400 720
Block 6 Lot 31 2400 720
Block 6 Lot 32 3117 935
Block 6 Lot 33 3458 3458
Block 6 Lot 34 3240 972
Block 6 Lot 35 2880 864
Block 6 Lot 36 3900 1170
Block 6 Lot 37 3906 1172
Block 6 Lot 38 2927 878
Block 6 Lot 39 4171 1251
Block 6 Lot 40 4387 1316
Block 6 Lot 41 3327 998
Block 6 Lot 42 4654 1396
Block 6 Lot 43 4734 1420
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 6 Lot 44 2666 800
Block 6 Lot 45 2578 773
Block 6 Lot 46 3474 1042
Block 6 Lot 47 25017 25017
Block 6 Lot 48 14650 0 Private Drive Lane
Block 6 Lot 49 2948 885
Block 6 Lot 50 2417 725
Block 6 Lot 51 2415 724
Block 6 Lot 52 3353 1006
Block 6 Lot 53 3348 1004
Block 6 Lot 54 2405 721
Block 6 Lot 55 2402 721
Block 6 Lot 56 3336 1001
Block 6 Lot 57 3331 999
Block 6 Lot 58 2382 715
Block 6 Lot 59 2765 829
Block 6 Lot 60 2175 2175
Block 6 Lot 61 10451 5226
Block 6 Lot 62 9812 4906
Centerville Subdivision
Pressure Irrigation Demand Calculations
4/17/2023 Assumed % Irrigable [Unless
otherwise noted]
Est. Approx Impervious Area per Single-Family Buildable Lot [driveway, garage, home footprint, misc.
impervious features] (sf): 50%
Attached/Multi-Family/Commercial Building Lot- Managed by HOA..significantly less irrigable area than 30%
single-family building lots
Common Lot/green open space 100%of common lots are assumed to be irrigable, less any large non-
irrigation surfaces 100%
Lot/Block numbers are from Centerville Preliminary Plat
Lot Block Lot Area (sf) Approx Irrigable Notes
Area sf
Block 6 Lot 63 9789 4894
Block 6 Lot 64 9765 4882
Block 6 Lot 65 9741 4870
Block 6 Lot 66 9717 4859
Block 6 Lot 67 10865 5433
Block 6 Lot 68 13394 6697
Total Lot Area(sf) Approx Irrigable Approx Irrigable Area(acres)
Area s
Sum All Buildable: 1,032,813 446,452 10.249
Sum All Common: 386,874 307,021 7.048
Sum HOA Controlled 736,645 411,952 9.457
Total: 1,419,688 753,473 17.297
Flow Clemons CW600
Demand Screen Demand Pump Demand Pump Demand(cfs)
(gpm) (gpm) (gpm)
Peak Demand: 129.2 20 149.2 0.328
Avg Demand: 109.0 20 129.0 0.284
——————————————————
I IIi -- ----- II - TENMLLECANAL TTTTTrTi o
Lr-
I I ------E.GRAYSON DR. II 1 1 - �I 111 1 1 1 I 0
U J Q N
pSED SNE�BU E. GRAYSON DR. 11 o O -i J O
PROP pZH S\3BD — — �\ NORTH a SECTION 33, 11 1 �� n 0 00
SO �� L- �� w N 000
II 1 \ T. 3N, R. 1 E, BM
G3�4 G3M4 I1I1 IIII G3M4 I�I' p�OpO�CD G,3�� I I II� G°3�M9 JL �_ ---- EdF- _zo zg
O
= - _ _ � � 3 L
r T T - - -�E. AMITY ROAD - --- w o- 3a O >� T w w O>
I
_ //\ T - - W
o , � ' T� Q
LLJ
-TT Lu Q
LLJ
CL
. Ld
-----------------------
• —
------------------- EP� �� \'
29 28 EP EP 28 1/4—EP / —/� --- --- -- �--- -- --- ------------ - -------- �` \1-� � 1wliJ 0
w
------------�- Q L �IJ�__
- - EP EP EP ---- - ------- TTT J r—
S89'1444'E 1330.22' EP E \ I1o�
32 33 E. AMITY ROAD N89°15'18"W ZONING LlM/TS - - - -E. AMITY ROAD - - - - - _ - E 1/16 EP EP EP EP 27 F
�I
2660.59' 33 S89'14'44"E 180.01 ' 0'19'12"W ��'-- Ep S89'14'44"E 1130.19' - - E AMITY ROA° -
---------- _ —� E w. AMrrY - - Tyr fifit �_� �!>I -
-----_------T-----_---_ EP EP EP EP i E EFS8-- EP - 33 34 J of _
EP
EP
1330.
ROAD
I
11L��11J
,
cn
I
UI
1 ----- -
61 T PARK ----- NI
YMCA
B i l-1 ------------ _
LOC 1 � ,-T- - ------ 1 1 I I I _ �\ \ I -� �_
17 16 15 14 BLOCK 2 I T------ \ \ F-( �- ----- 1
\^ \\� �_ F1'TTTT1 \
W = B z z 6 3 _ 13 11 10 9 8 7 6 5 4 3 5 1 \ >\ ALL--- _
0
\ � 12 2 2 3 4 i i i i � �-� � ,��,\\;\ �� 1�1 �__ ��, �---- v
1 6 I e / \\I L lam, / � � TT - y �� \/ \\� // { - TT�1 �� Z cfl
Q I Q°� 1 J - r TTT� T�TT I- O Cp
/ WA1' - -r � � �1 11����J LLL ��I T-�
1 / V -� �TTT� G� - y ,� �' / / ` } -� �rtfirt � ��1 w oo �
PRIVATE LANE E. WOODMURRA LANE 18 1 - / / - L L w I
- - ----- ------------- J �- -� / -� ��
---------- ------------� 53 19 - E. WOODMURRA ST. - - - F-� �` Y - -� / /'�, 1 g o 0
52 20 HI WOODMURRA COURT Z i v I � � Ld
w p 00
51 36 Q r� o - o
55 54 I 21 7 � ------ ------ ----- � I P v
I LAITY MA w
2 3 4 5 6 7 8 9 10 • 12 13 14 15 '� T � � , - w
i I I � � 1 ' - 600' � z
4 •
LBLOC
z50 22 --------I A PORTION OF THE NW 1/4 NE 1/4 OF SECTION 33, TOWNSHIP 3 NORTH, RANGE 1 EAST, B.M., ADA COUNTY, IDAHO Wz �' o cI ., r — aK 1 49 LOC 3 > o \
Z w 23 1 Q I = I I GENERAL NOTES Q
61 -
z
=. 8
o '.
ti 48 24 40 39 38 37 36 35 34 33 32 11 31 30 29 16 w '
-------___�_------_---_� �I 1. SANITARY SEWER SERVICE TO BE PROVIDED BY EXTENSION OF MERIDIAN CITY SEWER SYSTEM.
L 47 Z
PRIVATE DRIVE (CANTON 54 0 25 _------- ----- ------- 2 DOMESTIC WATER TO BE PROVIDED BY EXTENSION OF MERIDIAN CITY WATER SYSTEM
w > P OP( SED 1 T 1
LANE) ¢ Z N \ \
---------------- < 46 N N - m 1 1
ilk E R 1 17 9 3. NO PORTION OF THE SUBJECT PROPERTY FALLS WITHIN FEMA 100 YEAR FLOOD HAZARD ZONE.
.� 26 \
d vi vi
57 > 45 �i 27 :.•...• . ......• FW2ED \ \\ o
� I I
NE C- J - S. KALINGA ST. - 28S DRNE I I \ 4. ALL LOTS ARE HEREBY DESIGNATED AS HAVING A PERMANENT EASEMENT FOR PUBLIC UTILITIES, IRRIGATION, AND LOT o
59 44 Q ------ >
I 0 28 --
® ¢ J 27 ------ ----- � - IS EASEMENT
.:....... ...
� � � / DRAINAGE OVER THE TEN E 10o FEET ADJACENT TO ANY PUBLICSTREET UNLESS OTHERWISE DELINEATED TH � c�
\ ' SHALL NOT PRECLUDE TH CONSTRUCTION OF HARD-SURFACED RFACED DRIVEWAYS AND WALKWAYS TO EACH LOT cn 01 00
I I � �
® 10 18 I corn
� 43 29 ' 2 3 4 5 6 26 0 10 kV. OALRYMPLE COURT � U Y � 00 00 �
1 7 8 PR P ED 5. UNLESS OTHERWISE SHOWN AND DIMENSIONED, ALL LOTS ARE HEREBY DESIGNATED AS HAVING A PERMANENT EASEMENT U n 0o
57 42t�! 36 cn
30, 11 25 m _ --- -- ------T _ -- T- FOR PUBLIC UTILITIES, IRRIGATION AND LOT DRAINAGE OVER THE FIVE 5 FEET ADJACENT TO ANY INTERIOR SIDE LOT z o �' rn
-----------
BLOCK 1 41 31 cn 8 _ __ 1 LINE, AND OVER THE TEN (10) FEET ADJACENT TO ANY REAR LOT LINE OR SUBDIVISION BOUNDARY. z Z N z 0 0
12 � 19 �r �\ J O Y o g�•
58 24 �' � _j 0^0 11 -�' 6. DIRECT LOT OR PARCEL ACCESS TO E. AMITY ROAD AND S. HILLSDALE AVENUE IS PROHIBITED. EXCEPT ONE ( W � c x
i l -
40 RIGHT- RIGHT-OUT APPROACH FOR THE COMMERCIAL AREA ON HILLSDALE AVENUE
:... ...
cV �°PR 32 = 13 z z 1 N/ m a
I c� I I � v Z � o a
N °' 39 33 23 zo zo I 1 o
54 N N 20 1 1 7. THIS SUBDIVISION FALLS WITHIN THE BOISE PROJECT BOARD OF CONTROL, NEW YORK IRRIGATION DISTRICT, AND ALL
rn 55 38 F- 14 - -------- -------
cV 57 34. _ 22 Y 1 ---- - -------T------ LOTS SHALL BE SUBJECT TO THE ASSESSMENTS OF SAID DISTRICT. PRIVATE PRESSURIZED IRRIGATION WILL BE
56 36 12 PROVIDED BY DEVELOPER AND MAINTAINED BY SUBDIVISION HOMEOWNERS ASSOCIATION OR ITS ASSIGNS
37 ---- 1
r r w
"' . 2 moQ = �
.. U
Z3 to
rn
I
E. HILL PARK STREET o 00ODD w I I 8. BUILDING SETBACKS AND DIMENSIONAL STANDARDS IN THIS SUBDIVISION SHALL BE IN COMPLIANCE WITH THE o o w
E. HILL PARK STREET W - - - - o BLOCK 4 15 > E� HILL PARK STREET 1 APPLICABLE ZONING REGULATIONS OF THE CITY OF MERIDIAN. Z Z o
cV Q I � omo � o
:. ° G3�4 16 '_ 1` 38 13 9 LOTS 9 & LOCK E DESIGNATED AS COMMERCIAL LOTS
----------------- ---------- 1 5 6 B ARE rn 2: .. .., .,:. . .. G3
4.: 0000000, z o z z
°
3 4 ���-, 2 I N -------L------- ------- ------ -
7 0 1
Z 1 33 I� 32 5 - 17 N 37 o 1 10. LOT 58, BLOCK 1 IS A DAYCARE LOT. o J o o
LL 18 PROPOSED 3 I C W, YILLASONG COURT � w o Q z
i34 31 6 ZONE R-15 I -------- -------T-- -------- 11. LOT 1, BLOCK 4 IS A POOL FACILITY/AMENITY LOT, TO BE OWNED AND MAINTAINED BY THE SUBDIVISION HOMEOWNERS �� J z
r 35 30 BLOCK 6 7 00 18 4 14 ASSOCIATION OR ITS ASSIGNS. v> `� 00
o z g
--------- o 0 o Z Z z w w
Q 19 36 \ ' 2 12 19 35 37 53 54 56 57 & 61 BLOCK 1 LOT 1 2 & 17 BLOCK 2 LOTS 1 11 15 & 21
36 29 p� 27 26 25 24 23 22 5 12. LOTS 1, o z m m
s 28 I BLOCK 3; LOTS 1, 9 & 21, BLOCK 4; LOTS 1 & 21, 30 & 38, BLOCK 5; LOTS 1, 2, 4, 17, 18, 19, 33 & 60, w z o 0
20 BLOCK 6; ARE COMMON LOTS TO BE OWNED AND MAINTAINED BY THE SUBDIVISION HOMEOWNERS ASSOCIATION OR ITS z
37 28t 9 6 �' 35 ¢ 15 ASSIGNS.
21
38 27 10 0 :.''_I I-z---- --- ------- - fi fi
7 -- ------ ------- ------- 13. - LOCK 3 LOT 28, BLOCK 3 AND LOT 11 BLOCK 5 WILL BE SHARED DRIVEWAYS FOR THE BENEFIT OF LOTS 29 31, B a
39 26' O E. HILLSONG ST. - m ^, J o 0)
°'" Y T H OWNED MAINTAINEDY THSUBDIVISION I AND LOTS 8- LOCK 5. SHARED DRIVEWAY LOT SHALL BE 0 ED AND B E
3 "�". . . ....:.. ..............:...,,.....,,.._..: .. HOMEOWNERS ASSOCIATION OR ITSASSIGNS.A o
o
ro 11 g 34 �� 16 I i i i i I li 00
rn 40 25 ® 12 r 20 19 18 17 16 15 14 13 12 l l o m 14. LOT 47, BLOCK 6 IS AN OPEN LOT WITH A BLANKET EASEMENT FOR THE CUNNINGHAM LATERAL DEDICATED TO THE ~
00
41 24 6, { 1 9 `�' I 1 BOISE PROJECT BOARD OF CONTROL AND SHALL BE OWNED AND MAINTAINED BY THE SUBDIVISION HOMEOWNERS cn n o
13 O °° N
1 42 23 18 (R-15) N 33 17 ASSOCIATION OR ITS ASSIGNS. '-'
10 - -ter-�- L�--------L-------�---- -- �- -- Q
ZONING LIMITS ..::::::. .. --- 4 U-
R vl 15. LOTS 18, 36 & 55, BLOCK 1; LOTS 3 & 48, BLOCK 6; ARE PRIVATE DRIVE/ALLEY/LANES TO OWNED AND MAINTAINED =
o W. MACUMBO ST. a
43 22E 14 N ZONING LIMITS W. MACUMBO ST. BY THE SUBDIVISION HOMEOWNERS ASSOCIATION OR ITS ASSIGNS. O o 00
B L C K 5 :: ...',. o
21 (R-8) ------ --------- _o
�Q� 15 `" 22 23 24 25 26 27 2g 30 \1 r - --- -- --- SITE DATA cai� Q I
1 00
��P V 45 20, � 16 29 ' I I � o
21
�y --_- _ I 46 3 I LEGEND SITE AREA 38.95 ACRES O w 00
�O�P �o 47 19 17 ROPO ED _ _ SINGLE-FAMILY LOT AREA 15.80 ACRES 40.56% z � o
IV — Lo
Q BOUNDARY LINETOWNHOME LOT AREAS 5.63 ACRES 14.45% 0',
48 PRIVATE LANE (W. RINCON LANE) 48 48 Z N E 31 --- o
W. RINCON SECTION LINE FOUR-PLEX LOT AREAS 0.75 ACRES 1.93% o
5� ... 0o v DAYCARE LOT AREA 0.42 ACRES 1.08%
\ . . . . . . . . :.:, - . . ..... LINE E LOTS
J I RIGHT OF WAY
m COMM ERCIAL/FLEX-SPAC 1.24 ACRES 3.18%
� LOT LINE
I Q
49 50 51 . 52 53 : 54 55 • 56 57 58 59 601 �> RIGHT-OF-WAY
RIGHT OF WAY 6.09 ACRES 15 64%
I - - - 0 LOT LINE PRIVATE DRIVE/ALLEY LOTS 1.64 ACRES 4.21
J
BL CK 6 W �61 62 63 64 65 66 67 68 0 32 I EXISTING LOT/PARCEL LINE SHARED DRIVEWAY 0.13 ACRES 0.33%
EG EG EG EG. _ - CENTERLINE PARKING LOT 0.06 ACRES 0.16% L J
- ;' r N NATURAL PATHWAY.... gE GG EG EG EG z 46%
CN 1/16 EG EGG EGEGG� BL CK 6 1 ---- - EASEMENT LINE SINGLE-FAMILY RESIDENTIAL LOTS 124 6 W
=i it Nr� m — — — — — COMMON AREA 7 19 ACRES 18
F. EXISTING ZONING LINE (5 .62%) = r,
-__ ZONING LIMITS_____ �� \ \\ > > 1 vi ZONING LIM NE 1/16 36't WIDTH LOTS 79 63.71% W m
N89 27 31 'W 1309.05 1 PROPOSED ZONING LINE ( ) ^ °'
c� Q Q E. ROCKHAMPTON ST. �\ F�` `\ `\ _ _ _ / 64 -80 + WIDTH LOTS 45 (36.29%) a w o
w \ \ EXIST. CUNNINGHAM 'r 7 ____ _ __ _ __ _ _ TOWNHOME LOTS 79 �36.07%� _J------------- LATERAL EASE. FOUR Ld
-PLEX LOTS (16 UNITS) 4 7.31% v
y i ` \ I W. ROCKHAMPTON ST. DAYCARE LOT 1 ILL. o
J, \\ \ �\ \\\ °°o o w�4F \\��\ �\\\ 1 Q ,' POOL FACILITY/AMENITY LOT 1 CD
/ \ - '- r------T------T ---r- Z
\ COMMERCIAL/FLEX SPACE LOTS 3 a
I \
\ \ �_----- _ L--- = PRIVATE ALLEY/DRIVE/LANE LOTS 4 g � z
G _ _ Ilti COMMON LOTS 33 W Ld
z o
ROCKHAMPTON ST. i Q 1 /' 1 1 � U
\ \ \ // w 0
�. TOTAL RESIDENTIAL BUILDABLE LOTS 207 = z Q__ I I I I I
>' A ` / m --- --- /' =
\ --_---------� L - - I TOTAL COMMERCIAL BUILDABLE LOTS 4 Q
\ \ I
\\ 1 1 1 ------ 4 = <
TOTAL LOTS 249 r, z o =
II w � �
{ i i i i i i � o 0
--- GROSS DENSITY (36.45 ACRES) J F-
-- (TOTAL COMBINED DWELLING UNITS = 219) W
---�
--� o (COMBINED = 16 FP + 124 SF + 79 TH UNITS) 6.01 DU/ACRE
o --
-i-------L------- ----- -L �--------- GROSS DENSITY (R-15) (23.40 ACRES)
- -----T---- \\ --/ �y \\ W. LACHLAN STREET (COMBINED = 16 FP + 79 SF + 79 TH UNITS) 7.44 DU/ACRE
P T GROSS DENSITY (R-8) (13.05 ACRES)
(45 SINGLE-FAMILY LOTS) 3.45 DU/ACRE SCALE 1 =100
GROSS DENSITY (C-C (2.50 ACRES)
\ \ , y \ / \ / / / Q
-_ `\\ `\ ,' S" j Gc�� �/ `��\ / �' - (4 COMMERCIAL/FLEX LOTS N/A DWG.DATE 06/25/21 rls
NET DENSITY
PROJ. No. 190304
- -- -- -- -- \\v'/ /' /// \\ S� \ \ \\� /' \
SHARED (NG DRIVES, DAYCARE & COMMON) / SHEET 1 OF 3
\ , `\ / \ / / -----------� PRIVATE 9.87 DU ACRE
---------- +--------f--------�--
100 50 0 100 200 300 AVERAGE LOT SIZE SINGLE-FAMILY) 5,550 SF
AVERAGE LOT SIZE (TOWNHOME) 3,104 SF
EXISTING ZONE RUT
PRE- 1
SCALE IN FEET PROPOSED ZONES R-8, R-15 & C-C
/190304-PRE.DWG
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day 1 Day 2
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:00 AM-9:00 9:00 PM - 10:00 PM - 11:00 PM- 12:00 AM- 1:00 AM- 2:00 AM - 3:00 AM - 4:00 AM- 5:00 AM- 6:00 AM - 9:00 PM - 10:30 PM- 12:30 AM- 2:30 AM - 5:00 AM- 7:30 AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 1 Lot 1 Landscapers
Block 1 Lot 2 Landscapers
Block 1 Lot 3 15
Block 1 Lot 4 15
Block 1 Lot 5 15
Block 1 Lot 6 15
Block 1 Lot 7 15
Block 1 Lot 8 15
Block 1 Lot 9 15
Block 1 Lot 10 15
Block 1 Lot 11 15
Block 1 Lot 12 Landscapers
Block 1 Lot 13 Landscapers
Block 1 Lot 14 Landscapers
Block 1 Lot 15 Landscapers
Block 1 Lot 16 Landscapers
Block 1 Lot 17 Landscapers
Block 1 Lot 18 Landscapers
Block 1 Lot 19 Landscapers
Block 1 Lot 20 Landscapers
Block 1 Lot 21 Landscapers
Block 1 Lot 22 Landscapers
Block 1 Lot 23 Landscapers
Block 1 Lot 24 Landscapers
Block 1 Lot 25 Landscapers
Block 1 Lot 26 Landscapers
Block 1 Lot 27 Landscapers
Block 1 Lot 28 Landscapers
Block 1 Lot 29 Landscapers
Block 1 Lot 30 Landscapers
Block 1 Lot 31 Landscapers
Block 1 Lot 32 Landscapers
Block 1 Lot 33 Landscapers
Block 1 Lot 34 Landscapers
Block 1 Lot 35 Landscapers
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:00AM-9:00 9:00PM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 1 Lot 36 Landscapers
Block 1 Lot 37 Landscapers
Block 1 Lot 38 Landscapers
Block 1 Lot 39 Landscapers
Block 1 Lot 40 Landscapers
Block 1 Lot 41 Landscapers
Block 1 Lot 42 Landscapers
Block 1 Lot 43 Landscapers
Block 1 Lot 44 Landscapers
Block 1 Lot 45 Landscapers
Block 1 Lot 46 Landscapers
Block 1 Lot 47 Landscapers
Block 1 Lot 48 Landscapers
Block 1 Lot 49 Landscapers
Block 1 Lot 50 Landscapers
Block 1 Lot 51 Landscapers
Block 1 Lot 52 Landscapers
Block 1 Lot 53 Landscapers
Block 1 Lot 54 Landscapers
Block 1 Lot 55 Landscapers
Block 1 Lot 56 Landscapers
Block 1 Lot 57 Landscapers
Block 1 Lot 58 Landscapers
Block 1 Lot 59 Landscapers
Block 1 Lot 60 Landscapers
Block 1 Lot 61 Landscapers
Block 2 Lot 1 Landscapers
Block 2 Lot 2 Landscapers
Block 2 Lot 3 15
Block 2 Lot 4 15
Block 2 Lot 5 1 1 15
Block 2 Lot 6 15
Block 2 Lot 7 15
Block 2 Lot 8 15
Block 2 Lot 9 15
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:OOAM-9:00 9:OOPM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 2 Lot 10 15
Block 2 Lot 11 15
Block 2 Lot 12 15
Block 2 Lot 13 15
Block 2 Lot 14 15
Block 2 Lot 15 15
Block 2 Lot 16 15
Block 2 Lot 17 Landscapers
Block 3 Lot 1 Landscapers
Block 3 Lot 2 15
Block 3 Lot 3 15
Block 3 Lot 4 15
Block 3 Lot 5 15
Block 3 Lot 6 15
Block 3 Lot 7 15
Block 3 Lot 8 1 15
Block 3 Lot 9 15
Block 3 Lot 10 15
Block 3 Lot 11 Landscapers
Block 3 Lot 12 15
Block 3 Lot 13 15
Block 3 Lot 14 1 1 15
Block 3 Lot 15 Landscapers
Block 3 Lot 16 15
Block 3 Lot 17 15
Block 3 Lot 18 15
Block 3 Lot 19 15
Block 3 Lot 20 1 15
Block 3 Lot 21 Landscapers
Block 3 Lot 22 15
Block 3 Lot 23 15
Block 3 Lot 24 15
Block 3 Lot 25 15
Block 3 Lot 26 15
Block 3 Lot 27 15
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:OOAM-9:00 9:OOPM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 3 Lot 28 Landscapers
Block 3 Lot 29 15
Block 3 Lot 30 15
Block 3 Lot 31 15
Block 3 Lot 32 15
Block 3 Lot 33 15
Block 3 Lot 34 15
Block 3 Lot 35 15
Block 3 Lot 36 15
Block 3 Lot 37 15
Block 3 Lot 38 15
Block 3 Lot 39 15
Block 3 Lot 40 15
Block 4 Lot 1 Landscapers
Block 4 Lot 2 15
Block 4 Lot 3 1 15
Block 4 Lot 4 15
Block 4 Lot 5 15
Block 4 Lot 6 15
Block 4 Lot 7 15
Block 4 Lot 8 15
Block 4 Lot 9 Landscapers
Block 4 Lot 10 15
Block 4 Lot 11 15
Block 4 Lot 12 15
Block 4 Lot 13 15
Block 4 Lot 14 15
Block 4 Lot 15 1 1 15
Block 4 Lot 16 15
Block 4 Lot 17 15
Block 4 Lot 18 15
Block 4 Lot 19 15
Block 4 Lot 20 15
Block 4 Lot 21 Landscapers
Block 4 Lot 22 1 15
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:OOAM-9:00 9:OOPM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 4 Lot 23 15
Block 4 Lot 24 15
Block 4 Lot 25 15
Block 4 Lot 26 15
Block 4 Lot 27 15
Block 4 Lot 28 15
Block 5 Lot 1 Landscapers
Block 5 Lot 2 15
Block 5 Lot 3 15
Block 5 Lot 4 15
Block 5 Lot 5 15
Block 5 Lot 6 15
Block 5 Lot 7 15
Block 5 Lot 8 15
Block 5 Lot 9 15
Block 5 Lot 10 15
Block 5 Lot 11 Landscapers
Block 5 Lot 12 15
Block 5 Lot 13 15
Block 5 Lot 14 15
Block 5 Lot 15 15
Block 5 Lot 16 15
Block 5 Lot 17 15
Block 5 Lot 18 15
Block 5 Lot 19 15
Block 5 Lot 20 15
Block 5 Lot 21 Landscapers
Block 5 Lot 22 15
Block 5 Lot 23 15
Block 5 Lot 24 15
Block 5 Lot 25 15
Block 5 Lot 26 15
Block 5 Lot 27 15
Block 5 Lot 28 15
Block 5 Lot 29 15
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day 1 Day 2
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:00 AM -9:00 9:00 PM - 10:00 PM - 11:00 PM- 12:00 AM- 1:00 AM- 2:00 AM - 3:00 AM - 4:00 AM- 5:00 AM- 6:00 AM - 9:00 PM - 10:30 PM- 12:30 AM- 2:30 AM - 5:00 AM- 7:30 AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 5 Lot 30 Landscapers
Block 5 Lot 31 15
Block 5 Lot 32 15
Block 5 Lot 33 15
Block 5 Lot 34 15
Block 5 Lot 35 15
Block 5 Lot 36 15
Block 5 Lot 37 15
Block 5 Lot 38 Landscapers
Block 6 Lot 1 Landscapers
Block 6 Lot 2 Landscapers
Block 6 Lot 3 Landscapers
Block 6 Lot 4 Landscapers
Block 6 Lot 5 Landscapers
Block 6 Lot 6 Landscapers
Block 6 Lot 7 Landscapers
Block 6 Lot 8 Landscapers
Block 6 Lot 9 Landscapers
Block 6 Lot 10 Landscapers
Block 6 Lot 11 Landscapers
Block 6 Lot 12 Landscapers
Block 6 Lot 13 Landscapers
Block 6 Lot 14 Landscapers
Block 6 Lot 15 Landscapers
Block 6 Lot 16 Landscapers
Block 6 Lot 17 Landscapers
Block 6 Lot 18 Landscapers
Block 6 Lot 19 Landscapers
Block 6 Lot 20 Landscapers
Block 6 Lot 21 Landscapers
Block 6 Lot 22 Landscapers
Block 6 Lot 23 Landscapers
Block 6 Lot 24 Landscapers
Block 6 Lot 25 Landscapers
Block 6 Lot 26 Landscapers
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:00AM-9:00 9:00PM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 6 Lot 27 Landscapers
Block 6 Lot 28 Landscapers
Block 6 Lot 29 Landscapers
Block 6 Lot 30 Landscapers
Block 6 Lot 31 Landscapers
Block 6 Lot 32 Landscapers
Block 6 Lot 33 Landscapers
Block 6 Lot 34 Landscapers
Block 6 Lot 35 Landscapers
Block 6 Lot 36 Landscapers
Block 6 Lot 37 Landscapers
Block 6 Lot 38 Landscapers
Block 6 Lot 39 Landscapers
Block 6 Lot 40 Landscapers
Block 6 Lot 41 Landscapers
Block 6 Lot 42 Landscapers
Block 6 Lot 43 Landscapers
Block 6 Lot 44 Landscapers
Block 6 Lot 45 Landscapers
Block 6 Lot 46 Landscapers
Block 6 Lot 47 Landscapers
Block 6 Lot 48 Landscapers
Block 6 Lot 49 Landscapers
Block 6 Lot 50 Landscapers
Block 6 Lot 51 Landscapers
Block 6 Lot 52 Landscapers
Block 6 Lot 53 Landscapers
Block 6 Lot 54 Landscapers
Block 6 Lot 55 Landscapers
Block 6 Lot 56 Landscapers
Block 6 Lot 57 Landscapers
Block 6 Lot 58 Landscapers
Block 6 Lot 59 Landscapers
Block 6 Lot 60 Landscapers
Block 6 Lot 61 15
Centerville Subdivision
Pressure Irrigation Schedule
4/18/2023
Lot/Block numbers are from Centerville Preliminary Plat
Single-Fa mily Builda ble
Multi-Family/Attached, Commercial
Common Lot
Daily Day Day
Duration: 11 1 1 1 1 1 1 1 1 1 4 1.5 2 2 2.5 2.5 2.5
Lot Block 10:OOAM-9:00 9:OOPM- 10:OOPM- 11:00PM- 12:OOAM- 1:OOAM- 2:00AM- 3:00AM - 4:00AM- 5:00AM- 6:00AM- 9:00PM- 10:30PM- 12:30AM- 2:30AM- 5:00AM- 7:30AM-
PM 10:00 PM 11:00 PM 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 10:00 AM 10:30 PM 12:30 AM 2:30 AM 5:00 AM 7:30 AM 10:00 AM
Block 6 Lot 62 15
Block 6 Lot 63 15
Block 6 Lot 64 15
Block 6 Lot 65 15
Block 6 Lot 66 15
Block 6 Lot 67 15
Block 6 Lot 68 15
C� Q M 1
o �
Q2 �
4" P—IRR PIPING co
6" P—IRR PIPING — '
w a�
■— Z �
� Z
•- a
N
LLI
P-36 J-15
Z
P-19 J-16 P-38 :;Mr+ W U)
Ww
w
■ w �
n � W � 00
co
a_ I ? ui u f
V � w
00
J-26 P-34
P-30 I
J-23
AL
J-24 �S�ON FNG
J-1 1 P-13 J-12 P-14 Q'� J-28 OF F l
J-13 D A.8 P�
CHECKED BY:
DAVID A. BAILEY P.E.
DRAWN BY:
O 00 KSC
M N
I I N
a- I
J-10
I
I a-
P-12 J-9 Z
0
F
n
O N
r
W
I
J-20 P-32 J-25
N o
P-31 J-22 J-8 P�1 J-14 Z
N I
I
J—19
Z
P-23 P-22 J-4 P-6 0
J-18 O Z
J-5 P-7 J-6
W
00 N e
U
N J-7
Q 0
o J
w
J-21 �'�
P-20 _ >
J 17 P-40 J-29 ZW
O W
� J �
J-3 Q
W W
P-27 0 J-2 � L
PMP-1�. AP-3 f
� J-1 j
P-1
R-1 P-41 N Z
P-2 (,0 W
W
0� U
CL
DATE:
4-18-2023
PROJECT:
C2023-002
80 0 40 80 160 SHEET
SCALE IN FEET
1"=80' rlHYD :m
Q C j N
Q O�
U6—
�O
°o
CD�
n CO m O O N O N N .--i .--i M O1 W
n n n CO W W W W W W rb W W W Il rl
N
7
N �
a
I� Lr) 110 O W 1.0 to O 01 O W W M O
-d 7 7 ,� O? � � � lO lO lO l0 Vr lO l0 Vr LQ � O1
. . . . . . . . . . . . . . . .
oc cl cl cl cl cl cl cl cl cl cl cl cl rb rb rb rb cl
U (N N N N N N N N N N N N N N N N N N
T
2
Cl)
O
O O O O O O O O O O O O O O O O O O N
N
rraa E U
E Q c
0
0� -:5co
o c0
_ C)o
O 10L)
0
� o
v O O O O O O O O O O O O O O O O o CO
C a
0 c c c c c c c c c c c c c c c c c c � 0 co
ra U 0 0 0 0 0 0 0Cu LO
0 0 0 0 0 0 0 0 0 0 0 �L�
U U U U U U U U U U U U U U U U U U f
U 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E
U W U W U W U W U W U W U W U W U W U W U W U W U W U W U W U W U W U W —
V - V - V - V - V - V - V - V - V - V - V - V - V - V - V - V - V - V - 0 U)
d�
N m
r T O
u
C
0
c
LZ a)0 n n n n n n n n n n n n n n n n n n m 0 a)
N N N N N N N N N N N N N N N N N N N N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
z z z z z z z z z z z z z z z z z z
v v v v v v v v v v v v v v v v v v
lO W W 01 N .--i M W N N W W W O
LQ M +--i 0� l0 M N N O N l0 M +--i V: l0 LQ 0� rb
rb rb r\ V- M O -4 0', rb r\ 0', lO lO rb r\ 7 1-1 7
O O O O O O O O � � � � � � � � � O O
N N N N N N N N N N N N N N N N N N
N
LU
9 d
0
O
00
n OP T ,N-i ,M-i ,�-i ,�-i ,1.0 ^-i
U_
M V- W O N Ln W 01 O l0 O M W
M M M Ln Ln Ln Ln lO lO lO l0 I� _
K
K
Q d
dco
O
a)N
C W
a)
Ut
Q C j N
Q O�
U L A N
�O
°o
�Oa
W 01 a) O O m O O N m
I� n W W W W W I�
N
7
L
N Q
a
N N Lr) O l0 N W l0 N M
-� Il l0 N Vf 7 7 Lfl V 7 Lq rl
Lp Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln
U N N N N N N N N N N N
T
2
c+�
O
O O O O O O O O O O O N
r U Q
E Q c
0
Ho� -:5co
o�
_ Co
O �L)
0
� o
C 0
c 0 O O O O O mCO
o co
u 0 0 0 0 0 0 0 LO
LO
o n n n n n n n n n n n =Q
Q U V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 LA N
0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E 0 E c a:
U W U W U W U W U W U W U W U W U W U W U W —
V - V - V - V - V - V - V - V - V - V - V
d�
N m
r T O
u CO
C
3
c v
LZ 0 n n n n n n n n n n n a)
N N N N N N N N N N N N m N
c c c c c c c c c c c
0 0 0 0 0 0 0 0 0 0 0
z z z z z z z z z z z
v v v v v v v v v v v
N N N l0 Lr) M 01 01 l0 N m
L.O O� O O I- O C� l0 +--i Vf O
7 M I" V- (71 O M O O Ln N
O O O O O al CD CD CD CD al
O
—ra N N N N N N N N N N N
N
LU
J d
0
O
0', O +--i N M 7 Ln 1.0 I" CO 2
O
ri ri ri ri ri ri ri ri ri ri ri �
as
N M W Ln O M l0 m 'p
N rl rl W W W W m m m m =
K
K
Q d
dco
O
a)N
C co
a)
Ut
Qoo
U6�
�bo
M �
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o
00
N
c
c p
(3)
J
M1•
L
J-�
N O
Ln � N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
� J VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI VI In
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
LL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LPL LL
2 O
N N . N . O O O O O O O O O O O O O O O O O O � O O O O O O O O O O O O O --�
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
Cl O O Cl O O O O O O O O O O O O O O O Cl Cl O O O O O O O O O O O O O O O O O O Cl Cl
O � ^ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
2 C7 V
O O M � 0', CO Ln O Ln V- O V- V- CO N Ln N O M N M -4 N O O m m O m n O n Noll M M 1.0 oll N -4 m
� l0 � O � M O M O _! _! � N M _! N M _! OR +--i I� N O M N � M Lr! Lr! _! M � N O � _! r�
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
O O O O O O O O O O O O O O O O O O O +--i O O +--i O O O O O O O O O O O O O O
O
N�
O O O M , r� 00 O 00 M O M -i r� m r� 0', N Ln 0', M V N M r� 00 N N O CO M O M l0 V- O
Ln Ln O Ln M . . . .--i N N .--� •--� •--� � •--� � M
O Q
LL l31
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
}, O O O O O O O O O O O O O O O Cl Cl O Cl Cl Cl O Cl O O O O O O O O O O O O Cl Cl O Cl Cl Cl
�O N ^ O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
J 'V u
U
U
A
�n
r`
�M
�o
Y �N
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N U +
u ] Fo Fo Fo Fo Fo VI VI VI VI VI Fo Fo Fo Fo Fo Fo Fo Fo Fo VI VI VI VI VI VI VI VI VI VI VI Fo Fo Fo Fo Fo Fo Fo Fo Fo VI In 0 Q
U
to ; LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL LL j
coco
0 o
Lo
C CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CDv
'a E CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln Ln o
r 0
� E
L
N �~
_ EN
ra
T�
�a
N 0
� C
Lp m O
N
U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U 0
n
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
N
7
0
N
0
O
Z
Q
O
U') a O —4 N M V_ M 1.0 m 1.0 N N moll O m —4 N V_ M N m 1.0 V_ N m m 1.0 � oll cx�
N N N
0_ ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri
N
O
ra
ra
++
+--i N V- N +--i Ln CO ON ON ,--i M Ln V- Ln O O l0 l0 r, M CO CO n
+--i N M T Lf T T T T
� 0_ ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri ri �
M rl rl rl O V_ 00 N M 01 M 01 01 110 V_ V_ Ln M rl Ln Ln Ln 01 O M N l0 O M l0 Lr) 00 Lr)
M O m m O1 M O1 O1 m m M V_ V_ V_ V_ O O1 00 V_ 00 O O1 M M M M M O V_ O V_ 01 l0 V_ 00 N m
M N N V_ rl M N Ln N N Ln N .--i
f6
U
a-+
O
C
N
J
J
a
O N M 'cr Lr) l0 rl 00 01 O N M 'cr Lr) l0 rl 00 m O N M 'cr Lr) l0 rl 00 m O .-I O
Lf l0 rl 00 01
m
LfI l0 I� O1 .� M l0 I� .--i N M LfI 00 01 .� N Ln l0 I� 0') O Ln l0 I� 0') O M l0 rl 00 0') .� N m N 00 O N -p
M M M M V_ V_ V_ V_ m m m m m m 110 110 l0 110 110 110 N N N N N N 00 00 00 00 00 00 m m O1 O1 O1 O1 O O O
K
K
0 d
N M
O
�N
C co
N 7
Uv
Pump Definition Detailed Report: Centerville Pump
Element Details
ID 103 Notes
Label Centerville
Pump
Pump Definition Type
Pump Definition Type Design Point Design Head 160.00 ft
(1 Point)
Shutoff Flow 0 gpm Maximum Operating Flow 0 gpm
Shutoff Head 0.00 ft Maximum Operating Head 0.00 ft
Design Flow 180 gpm
Pump Efficiency Type
Best Motor Efficiency 100.0%
Pump Efficiency Type Efficiency
Point
BEP Efficiency 75.0% Is Variable Speed Drive? True
BEP Flow 180 gpm
Speed-Efficiency Curve
Speed Efficiency
(%)
Transient(Physical)
Inertia(Pump and Motor) 0.000 Ib•ftz Specific Speed SI=25,
LIS=1280
Speed (Full) 0 rpm Reverse Spin Allowed? True
WaterCAD
Centerville PIRR Hydraulic Model.wtg Bentley Systems,Inc. Haestad Methods Solution Center [10.03.05.05]
4/18/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 1 of 2
Pump Definition Detailed Report: Centerville Pump
Graph
225.00 87.5
200.00
75.0
175.00
62.5
150.00
v
c
3
125.00 50.0 M
-a n'
Q
= 100.00 37.5 Q
75.00
25.0
50.00 I I I
' 12.5
25.00
0.00 0.0
0 50 100 150 200 250 300 350
Flow (gpm)
WaterCAD
Centerville PIRR Hydraulic Model.wtg Bentley Systems,Inc. Haestad Methods Solution Center [10.03.05.05]
4/18/2023 76 Watertown Road,Suite 2D Thomaston,CT 06787 USA +1-203-755-1666 Page 2 of 2