Loading...
HomeMy WebLinkAbout2023-06-29 Boise Project Board of ControlDONALD BARKSDALE CHAIRMAN OF THE BOARD FRED BUTLER VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER BOISE PROJECT BOARD OF CONTROL City of Meridian City Clerk's Office 33 E. Broadway Avenue, Meridian, Idaho 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 27 June 2023 RE: Stapleton Apartments /Jim Conger 4435 S. Meridian Rd. Boise- Kuna Irrigation District Tumbler Lateral 21+10 Sec. 25, T3N, Rl W, B.M. OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT 81G BEND DISTRICT TEL:(208)344-1141 FAX:(208)344-1437 RECEIVED JUN 2 9 2023 CITY OFGKi CITY CLERKS OFFICE CUP H-2023-0033 City Clerk's office: The United States' Tumbler Lateral lies within the boundary of the above -mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert this federal easement 20 feet East and 20 feet West of the lateral's centerline and 20 feet in all Erections from any concrete irrigation Structures. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. The Boise Project does not approve any landscaping other than gravel within its easements, as this will certainly increase our cost of maintenance. All easements Ili remain a flat drivable surface. Any fencing, gates and pathways, as may be required, must be constructed off of any Boise Project Easements. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be located outside of these easements. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Street Runoff must be retained on site. Per Idaho Statutes, Title 42, Local irrigation/drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the developer, landowner and contractors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a full- size hard copy of the irrigation and drainage plans. If you have any further questions contact me at (208) 344-1141. Thomas Ritthaler Assistant Project Manager, BPBC for/tr cc: Clint McCormick Alicia Flavel File or comments regarding this matter, please do not hesitate to Watermaster, Div; 2 BPBC Secretary -Treasurer, BKID