HomeMy WebLinkAbout2023-06-29 Boise Project Board of ControlDONALD BARKSDALE
CHAIRMAN OF THE BOARD
FRED BUTLER
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
BOISE PROJECT BOARD OF CONTROL
City of Meridian
City Clerk's Office
33 E. Broadway Avenue,
Meridian, Idaho 83642
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465 OVERLAND ROAD
BOISE, IDAHO 83705-3155
27 June 2023
RE: Stapleton Apartments /Jim Conger
4435 S. Meridian Rd.
Boise- Kuna Irrigation District
Tumbler Lateral 21+10
Sec. 25, T3N, Rl W, B.M.
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
81G BEND DISTRICT
TEL:(208)344-1141
FAX:(208)344-1437
RECEIVED
JUN 2 9 2023
CITY OFGKi
CITY CLERKS OFFICE
CUP H-2023-0033
City Clerk's office:
The United States' Tumbler Lateral lies within the boundary of the above -mentioned location. The
easement for this lateral is held in the name of the United States through the Bureau of Reclamation
under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert
this federal easement 20 feet East and 20 feet West of the lateral's centerline and 20 feet in all
Erections from any concrete irrigation Structures. Whereas this area is for the operation and
maintenance of our facility, no activity should hinder our ability to do so.
The Boise Project does not approve any landscaping other than gravel within its easements, as this
will certainly increase our cost of maintenance. All easements Ili remain a flat drivable surface.
Any fencing, gates and pathways, as may be required, must be constructed off of any Boise Project
Easements.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project
facility easements must be located outside of these easements.
Utilities planning to cross any project facility must do so in accordance with the master policies
now held between the Bureau of Reclamation and most of the utilities. In any case no work shall
take place within the easement before proper crossing agreements have been secured through both
the Bureau of Reclamation and the Boise Project Board of Control.
Storm Drainage and/or Street Runoff must be retained on site.
Per Idaho Statutes, Title 42, Local irrigation/drainage ditches that cross this property, in order to
serve neighboring properties, must remain unobstructed and protected by an appropriate easement
by the developer, landowner and contractors.
This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a full-
size hard copy of the irrigation and drainage plans.
If you have any further questions
contact me at (208) 344-1141.
Thomas Ritthaler
Assistant Project Manager, BPBC
for/tr
cc: Clint McCormick
Alicia Flavel
File
or comments regarding this matter, please do not hesitate to
Watermaster, Div; 2 BPBC
Secretary -Treasurer, BKID