Loading...
HomeMy WebLinkAboutSutherland Farm Subdivision No. 5 FP-05-011 BEFORE THE l\1ERIDIAN CITY COUNCIL C/C March 8, 2005 IN THE MATTER OF THE ) APPLICATION OF GREAT SKY, ) INC. FOR FINAL PLAT APPROV AL ) OF 57 SINGLE-FAMILY ) RESIDENTIAL BUILDING LOTS ) AND 9 COMMON LOTS ON 27.73 ) ACRES IN AN R-4 ZONE ) LOCATED EAST OF SOUTH ) EAGLE ROAD AND NORTH OF ) EAST VICTORY ROAD IN A ) PORTION OF THE NORTH lh OF ) THE SW % AND NORTH lh OF THE ) SE t;.j OF T. 3N., R. IE., SECTION 21 ) CASE NO. FP-05-011 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT " ~- F This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code ~ 12-3-7 on March 8, 2005, and the Council finding that the Administrative Review is complete from Sonya Allen, Assistant City Planner for the Planning and Zoning Department, and Bruce Freckleton, Development Services Manager for the Public Works Department, dated: Hearing Date: March 8, 2005, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of "PLAT SHOWING SUTHERLAND FARM SUBDIVISION NO.5 LOCATED IN A POR nON OF THE NORTH Y2 OF THE SW ]14 AND NORTH Y2 OF THE SE ~ OF T, 3N., R. IE., SECTION 21, BOISE MERIDIAN, MERIDIAN, ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUTHERLAND FARM SUBDIVISION NO.5 / CPP-05-0J I) Page ] of 5 ADA COUNTY, IDAHO 2005, HANDWRITTEN DATE: 01106/05, SHEET 1 OF3, J-U-B ENGINEERS, INC.", BOISE, IDAHO, GREAT SKY, INC., MERIDIAN, IDAHO, Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Sonya Allen, Assistant City Planner for the Planning and Zoning Department and Bruce Freckleton, Development Services Manager for the Public Works Department, dated: Hearing Date: March 8, 2005, listing 21 SITE SPECIFIC REQUIREMENTS/FINAL PLAT and 13 GENERAL REQUIREMENTS, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of 5 pages, and by this reference incorporated herein, and the additional requirements from the action of the Council taken at their March 8, 2005 meeting as follows, to- wit: 1,1 Adopt the action of the City Council taken at their March 8, 2005 meeting, and specifically pertaining to the Staff Report, under Conditions of Approval, number 4, such that they now read as follows: Conditions of Approval 4. A permanent public pedestrian easement shall be created for the pathway within Lot 2, Block 20 and Lot 11, Block 21 and recorded prior to signature of the City Engineer on the final plat or the lots shall be dedicated to the city for ownership and maintenance by the Parks DelJartment. If an easement is created, the easement shall be sufficient width to cover the lO-foot wide pathway shown. The lO-foot wide hard surfaced pathway shall be ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUTHERLAND FARM SUBDIVISION NO.5 / CFP-05-011) Page 2 of 5 constructed and fully improved prior to the issuance of the first Certificate of Occupancy for any building within this phase of the subdivision. 1.2 Adopt the Recommendation of the Central District Health Department as follows: The Central District Health requires after written approval from the appropriate entities are submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Welfare, Division of Environmental Quality for central sewage and central water; that run-off is not to create a mosquito breeding problem; and it is suggested that the stormwater be pretreated through a grassy swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should obtain current best management practices for stormwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals for guidance: 1. State of Idaho Catalog of Stormwater Best Management Practices for Idaho Cities and Counties. Prepared by the Idaho Division of Environmental Quality, July 1997. 2. Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, May 2000. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 1. The Plat dimensions are approved by the City Engineer; and ORDER OF CONDITIONAL APPRO V AL OF FINAL PLAT FOR SUTHERLAND FARM SUBDIVISION NO. 5/ (FP-05-01 1) Page 3 of 5 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code S 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty-eight (28) days after the date of this decision and order, seek a judicial review as provided by Chapter 52, Title 67? Idaho Code. By action of the City Council at its regular meeting held on the S*J day of U}'Yl oJ~ctv ,2005. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUTHERLAND FARM SUBDIVISION NO.5 / (FP-05-01l) Page 4 of 5 , \.1111111//// \\\\ JI, ....\\ n'f' I" ", ..t _ " ...' "'..... "~ "A' ~A ..... Attest: g V ,rrrJl"'T ......1If'jJ';::; -:;. ~ ~ :0 ~ J#-- ft ~ ~ ? SEAL ) William G. Berg, Jr., City erk \. ".lL~r 1$"'\' "#.R j ~4> ~ Cb" ~ 'f)'iif' ~~ Copy served upon Applicant, the Planning/ft'tW.~MmgDyp.'i'ttment, Public Works Department, and COt Att """III,n\\\\ 1 y orney. By: S h M mgYV!A.'JI~ Dated: /0-/3-OtS ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUTHERLAND FARM SUBDIVISION NO.5 / (FP.05-01l) Page 5 of 5 f MAYOR Tammy de Weerd cU'e;;dla:n-~ IDAHO . <, ~ c{, '" ,,' V '/ iV 5' l>Ul~LIC WORKS IWILDlNG DEPARTMENT (208) 898.5500 . Fax (208)898.9551 PLANNING AND ZONING DEPARTMENT (208) 884-5533. FAX 888-6854 CITY COUNCIL MEMBERS Keith Bird Christine Donnell Shaull Wardle Charles M. Rountree smCf 1903 STAFF REPORT: Hearing Date: March 8, 2005 To: Mayor, City Council and Planning & Zoning Commission Sonya Allen, Assistant City Plannerc)1l ~ Bruce Freckleton, Senior Engineering Tech. ~ Prom: Re: Sutherland Farm Subdivision No.5 Request for Final Plat Approval of 57 Single-family Residential Building Lots and 9 Common Lots on 27.73 Acres in an R-4 Zone for Sutherland Farm Subdivision No.5, by Great Sky, Inc. (File No. FP-05-011) We have reviewed the above-referenced submittal and offer the following comments~ as conditions of approval. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION The applicant, Sutherland Farm, Inc., has requested approval for the fifth phase of Sutherland Farm Subdivision. This phase consists of 57 single-family residential building lots and 9 common area lots on 27.73 acres in an RA zone. The gross density of Phase No. 5 is approximately 2.06 dwelling units/acre, The net density is approximately 4.21 dwelling units/acre. Sutherland Farm Subdivision No.5 is located approximately Y2 mile east of S. Eagle Road and 1/2 mile north ofE. Victory Rd., in the SW 1A of Section 21, T.3N., R.lE. A Conditional Use Permit was approved for this subdivision that allowed for a reduction to the minimum requirements for lot size from 8,000 s.f. to 6,500 s.f. for detached homes. Although reduced frontages were approved for townhomes/attached single-family dwellings, reduced frontages were not specifically approved for the detached single-family dwelling lots. However, the preliminary plat was approved with a few lots in this phase below the required 80-ft. frontage and the applicant appears to have noted these lots in their public hearings. Staff did not identify or note that the lots needed to be modified to meet the 80-foot minimum frontage. Because the frontages shown on the final plat conform to the approved preliminary plat frontages, staff is recommending approval of the final pLat. FP-05-0 11 Exhibit "A" Sutherland Farm Sub5 FP.doc Mayor & City Council Hearing Date: March 8,2005 Page 2 The final plat that was submitted substantially complies with the approved preliminary plat. Staff recommends approval of the fifth phase of Sutherland Farm Subdivision with the comments and conditions stated in this report. SITE SPECIFIC REQUIREMENTSIFINAL PLAT 1. Applicant shall meet aU terms of the approved Rezone (AZ-02-004), Preliminary Plat (PP-02-004), Planned Development (CUP-02-00S), and Development Agreement (Inst. #102143307). 2. The pressurized irrigation system within this development is to be owned and maintained by the Nampa & Meridian Irrigation District. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water, If a creek or well source is not available, a single-point cOlmection to the culinary water system shall be required. If a single-point connection is utilized, the developer shall be responsible for the payment of assessments for the common areas prior to signature on the final plat by the Meridian City Engineer. 3. Fencing located on the rear lot lines of all building lots along the pathway adjacent to the Ridenbaugh Canal and fencing around the private park shall be restricted to 3-ft. in height if solid material is used or 4-ft. in height if non-sight obscuring is used per Conditional Use Permit Finding #3, page 4. Please reflect this on the landscape plan. 4. A permanent public pedestrian easement shall be created for the pathway within Lot 2, Block 20 and Lot 11, Block 21 and recorded prior to signature of the City Engineer on the final plat. The easement shall be sufficient width to cover the lO-foot wide pathway shown. The lO-foot wide hm'd surfaced pathway shall be constructed and fully improved prior to the issuance of the first Certificate of Occupancy for any building within this phase of the subdivision. Applicant shall work with the City Parks Dept. to acquire the necessary approvals through the City's Master Pathway Agreement with the Nampa Meridian Irrigation District (NMID). Applicant shall conform to the Park's Dept. standards for construction of the pathway. The Homeowner's Association is responsible for maintenance of all landscaping adjacent to the pathway. 5. Sanitary sewer service to this site shall be via mainline extension from main lines installed in previous phases. Applicant will be responsible to construct the sewer mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. 6. Municipal water service to this site shall be via main line extensions from main lines in previous phases. Applicant will be responsible to construct the water mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. FP-05-011 Exhibit "A" Sutherland Farm Sub5 FP.doc Mayor & City Council Hearing Date: March 8, 2005 Page 3 7. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat per Resolution 02-374. 8, Please submit a copy of the Ada County Street Name Committee's "Final" letter for the street names and lot & block numbering. Make all corrections necessary to comply. 9. Lots 12, 13, & 19, Block 4 and Lot 1, Block 16 shall be restricted to a building peak height of 25-ft. or less per Preliminary Plat Finding #21, pg. 6. 10. Please submit all updated groundwater/soils monitoring data to the Public Works Department for review. Any drainage areas (detention/retention basins) must be designed to ensure that water is retained only during lOG-year storm events, and for a period of time not to exceed 24 hours. Side slopes within drainage areas shall not exceed 3:1. Any portion of a drainage area not improved with sod/grass seed (or other approved landscaping) shall not count towards the required open space area, The project engineer should pay close attention to the results of field studies determining the groundwater, soil type & and characteristics during the design and construction phases. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established normal groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least I-foot above. 11. Developer shall coordinate mailbox locations with the Meridian Post Office. 12. The applicant shall install aerators in the pond on Lot 3, Block 20 and maintain the ponds in a manner that shall prevent the water from becoming stagnant or a public nuisance (a mosquito breeding ground). 13. Relocate the note for adjacent platted subdivision "Ranchos Los Altos" to the east and correct spelling of "Book." 14. Complete the Ceiiificate of Owners and its accompanying Acknowledgement. 15. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 16. Graphically depict and call out the 30-foot wide City of Meridian Sanitary Sewer Easement across the northerly portion of Lot 3, Block 20. 17. Graphically depict an 8-foot wide public utilities, drainage and inigation easement along the north side of Lot 1, Block 19, and the north side of Lot 3, Block 17, and a IS-foot wide public utilities, drainage and iiTigation easement along the east side of Lots 9 & 10, Block 4. 18. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. FP-05-011 Exhibit "A" Sutherland Farm Sub5 FP.doc Mayor & City Council Hearing Date: March 8,2005 Page 4 19. Please revise the Landscape Plan dated 1/26/05, prepared by South Landscape Architecture as follows: a. Reflect any changes necessary to comply with Site Specific Requirement #3 above. 20, Please add or revise the following plat notes: (1.) Revise as follows: "Building setbacks and dimensional standards in this subdivision shall be in compliance with the applicable zoning regulations of the City of Meridian, Idaho. Title 11 and Title 12 of the Meridian City Code unless otherwise modified by Conditional Use Permit (CUP-02-005)." (3.) ., .public right-of-way, rear lot lines, and the exterior boundary... (9.) Revise note as follows: "A portion of Lots 10 & 11 of Block H 1, Lot 1 of ..." (11.) Complete recording information. (12.) Add a sentence, "Lot 2, Block 20 and Lot 11, Block 21 are also common lots and are subiect to the public pedestrian agreement recorded as instrument # " (13.) Strike note 16. Staff's failure to cite specific ordinance provisions or terms of the approved Annexation, Preliminary Plat, Conditional Use Permit or Development Agreement does not relieve Applicant of responsibility for compliance, GENERAL REQDIREl\1ENTS 1. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association, with written confirmation of said approval submitted to the Public Works Department. 2. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape iITigation. 3. Street signs are to be in place, water system shall be approved and activated, fencing installed, drainage lots constructed, road base approved by the Ada County Highway District and the Pinal Plat for this subdivision shall be recorded, prior to applying for building permits. 4. All development improvements, including sewer, fencing, micro-paths, pressurized inigation and landscaping shall be installed and approved prior to obtaining celtificates of occupancy, 5. A letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, amenities, pressurized inigation, sanitary sewer, water, etc., prior to Fp.OS-Oll Exhibit "An Sutherland Farm SubS FP.doc Mayor & City Council Hearing Date: March 8, 2005 Page 5 signature on the final plat. 6, Two-Hundred-fifty watt (250w) and One-Hundred watt (100w), high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typical locations are at street intersections and/or fire hydrants. Final design locations and quantity are determined after power designs are completed by Idaho Power Company. Street light contractor to obtain design and permit from the Public Works Department prior commencing installations. 7. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 8. Submit "Final" letter from the Ada County Street Name Committee, approving the subdivision and street names. Make any cOITections necessary to conform. 9, Applicant's engineer will be required to submit a signed, stamped statement certifying that all street finish centerline elevations are set a minimum of three feet above the highest established normal groundwater elevation. 10. Coordinate fire hydrant placement with the City of Meridian's Water Deputy Fire Chief and the Public Works Department. 11. Provide five-foot-wide sidewalks in accordance with City Ordinance Section 12-5-2.K. Sidewalks are to provide a clear five-foot-wide walkway pathway without encroachment of mailbox structures. 12. All development shall comply with the Americans with Disabilities Act and the Fair Housing Act. 13. No building permits shall be issued within the development until a final plat has been recorded for this subdivision. RECOMMENDATION Staff recommends approval of the final plat for Sutherland Farm Subdivision No.5 with the above stated comments and conditions. FP-05-011 Exhibit "A" Sutherland Farm Sub5 FP.doc