Loading...
HomeMy WebLinkAboutZ - Approved Order BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: JUNE 20, 2023 ORDER APPROVAL DATE: JUNE 27, 2023 IN THE MATTER OF THE ) REQUEST FOR A 1-YEAR TIME ) EXTENSION ON THE ) CASE NO. TECC-2023-0001 PRELIMINARY PLAT FOR ) POLLARD SUBDIVISION IN ) ORDER OF CONDITIONAL ORDER TO OBTAIN THE CITY ) APPROVAL OF TIME EXTENSION ENGINEER'S SIGNATURE ON ) THE FINAL PLAT,LOCATED IN ) THE SW 1/4 SECTION 21, TAN., ) R.1W.,MERIDIAN, IDAHO ) BY: BRIGHTON DEVELOPMENT, ) INC. ) APPLICANT This matter coming on regularly before the City Council on June 20, 2023,upon the Applicant's submittal of a preliminary plat time extension application for a 1-year extension within which to obtain the City Engineer's signature on a final plat for Pollard Subdivision, which preliminary plat was originally approved on June 4, 2019, as provided in Unified Development Code § 11-6B-7C, and good cause shown. An administrative time extension (TED- 2021-0003) for two (2) years was previously approved for this subdivision by the Planning Director on April 26, 2021 and would have otherwise expired on June 4, 2023. IT IS HEREBY ORDERED THAT: The above-named Applicant is granted an additional one (1) year extended period of ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR POLLARD SUBDIVISION TECC-2023-0001 Page 1 of 2 time, until June 4, 2024,within which to obtain the City Engineer's signature on the final plat, subject to the conditions of approval as shown in the attached Staff Report for the hearing date of June 20, 2023 incorporated by reference. Attached: Staff Report for the hearing date of June 20, 2023 By the action of the City Council at its regular meeting on the 27th day of June , 2023. DATED this 27th day of June 92023 Mayor Robert E. Simison Attest: Chris Johnson, City Clerk Copy served upon the Applicant,Planning Division,Public Works Department,and City Attorney. BY: Dated: 6-27-2023 ORDER OF CONDITIONAL APPROVAL OF TIME EXTENSION FOR POLLARD SUBDIVISION TECC-2023-0001 Page 2 of 2 EXHIBIT A STAFF REPORT E IDIAN -- COMMUNITY DEVELOPMENT DEPARTMENT I D A H O HEARING 6/20/2023 Legend DATE: Project Location TO: Mayor&City Council FROM: Sonya Allen,Associate Planner 208-884-5533 SUBJECT: Pollard Subdivision-TECC TECC-2023-0001 4 -- - LOCATION: Near the northeast corner of SH-16 and W. Chinden Blvd., in the SW 1/4 of Section 21,TAN., R.1W. I. PROJECT DESCRIPTION Request for a one-year time extension on the preliminary plat in order to obtain the City Engineer's signature on the final plat. II. SUMMARY OF REPORT A. Project Summary Description Details Acreage 71.3-acres Existing/Proposed Zoning R-8(medium-density residential)&C-G(general retail&service commercial) Future Land Use Designation Mixed Use—Interchange(MU-I),Mixed Use—Community(MU-C)and Medium Density Residential(MDR) Existing Land Use(s) Agricultural Proposed Land Use(s) Phase 1 will include a 95K square foot(s.f)medical office,a 12K s.f. convenience store(retail),a 48K s.f office,a multi-tenant retail/office building,a health club,and a 36K s.f. flex office and is slated to open mid/late 2020;Phase 2 will include a 1 OK s.f emergency room,50 bed hospital,50K s.f medical office building,(23)48K s.f offices and a 36K s.f flex office and is slated to open mid/late 2022;and Phase 3 will include 74 conventional single-family residential units and independent living units for 55 and older and an 88-bed assisted living facility—date yet to be determined. Neighborhood meeting date;#of 3/23/2023 attendees: History(previous approvals) H-2019-0021,DA Inst. #2019-060655);FP-2022-0023 Page 1 III. APPLICANT INFORMATION A. Applicant: Josh Beach,Brighton Development,Inc.—2929 W.Navigator Dr., Ste. 400,Meridian,ID 83642 B. Owner: Michael Hall, SCS Investments, LLC—855 W. Broad Street, Ste. 300, Boise, ID 83702 C. Representative: Same as Applicant IV. NOTICING City Council Posting Date Notification published in newspaper 5/28/2023 Notification mailed to property owners within 300 feet 5/25/2023 Applicant posted public hearing notice on site 6/9/2023 Nextdoor posting 5/25/2023 V. UNIFIED DEVELOPMENT CODE ANALYSIS (U !g Per UDC 11-6B-7C, "Upon written request and filing by the applicant prior to the termination of the period in accord with subsections A and B of this section, the director may authorize a single extension of time to obtain the city engineer's signature on the final plat not to exceed two (2)years. Additional time extensions up to two (2)years as determined and approved by the City Council may be granted. With all extensions, the director or city council may require the preliminary plat, combined preliminary and final plat or short plat to comply with the current provisions of this title." VI. STAFF ANALYSIS The preliminary plat(H-2019-0021) for this project was approved by City Council on 6/4/19 and was valid until 6/4/21. The plat consists of 75 building lots, seven(7) common lots and four(4) other lots on 71.3 acres of land in the R-8 and C-G zoning districts and is proposed to develop in three(3)phases per the approved phasing plan in Section VIII.A. The Director approved a two (2) year time extension on 4/23/21 for the Applicant to obtain the City Engineer's signature on the final plat, which expired on 6/4/23. The request for a subsequent time extension was received prior to the expiration date. The Applicant requests approval of a one(1)year time extension in order to obtain the City Engineer's signature on the first phase final plat. The final plat for Phase 1 was approved by City Council on 9/27/22; the Applicant is currently working to get the plat signed but will not be able to do so prior to the expiration date (see Section VIII.Q. Note: The Phase 1 final plat includes all of the commercial areas noted as Phases 1 and 2 on the phasing plan approved with the preliminary plat; the residential portion remains to be included in a future final plat as Phase 2. Page 2 Approval of the subject time extension will allow the Applicant to obtain the City Engineer's signature on a final plat and proceed with development of the property. If City Council does not approve the requested time extension,a new preliminary plat application will be required. With all extensions,the Director may require the final plat to comply with the current UDC provisions per UDC 11-6B-7C. Since the approval of the preliminary plat in 2019,the following UDC standards have changed: • Street buffer landscaping includes more specifications for such and enhanced landscaping is required in buffers along designated entryway corridors such as W. Chinden Blvd./SH 2O-26. See UDC 11-3B-7C for more information. • The off-street parking standards for 2-bedroom single-family residential units now require fewer spaces(i.e. two(2) spaces instead of four(4)with at least one(1) space in an enclosed garage).See UDC Table 11-3C-6for more information. • The amount of qualified open space for the R-8 zoning district has increased from 10%to 15%and some of the standards for such have been modified. See UDC 11-3G-3 for more information.A total of 2.19-acres (or 12.19%) was proposed for the 17.97-acre area. Based on the current standard, a minimum of 2.7 acres would be required, which requires an additional 0.51-acre of qualified open space. • The number of site amenities for residential developments have changed from one amenity for each 20 acres of development area to a point system requiring one (1)point of site amenity for each 5-acres of land.See UDC 11-3G-4 for more information. One(1) amenity, a children's play structure, was proposed with the preliminary plat. Based on the current standard, a minimum of 4 points of site amenity would be required; a tot lot qualifies as one (1)point—additional amenities totaling at least three(3)points are required to comply with the current standard. Staff recommends future development comply with current UDC standards for development noted above as a provision of the requested time extension on the preliminary plat. Staff further recommends the landscape plan for the first phase final plat approved by City Council but not yet recorded,be amended through an administrative landscape plan modification application to reflect compliance with the updated landscape standards for street buffers.Note:If a hospital develops in the commercial portion of the development as originally anticipated, a conditional use permit will be required for approval of the use.As a condition of approval, compliance with the traffic noise abatement standards listed in UDC I I-3H-4 will be required; or, alternative compliance may be requested where the Applicant has a substitute noise abatement proposal in accord with ITD standards and prepared by a qualified sound engineer. VII. DECISION A. Staff: Staff recommends approval of the proposed time extension for a time period of 1-year as requested,to expire on 6/4/24 with the conditions in Section IX. B. The Meridian City Council heard this item on June 20,2023. At the public hearing,the Council moved to approve the subject TEC request. 1. Summary of the City Council public hearing: a. In favor: Mike Wardle,Brighton Development b. In opposition:None c. Commenting: None Page 3 d. Written testimony: Mike Wardle,Brighton Development e. Staff presenting application: Sonya Allen f. Other Staff commenting on application:None 2. Key issue(s)of public testimony: a. The Applicant requested condition#IX.3 pertaining to compliance with the updated landscape standards for street buffers,including those for entryavay corridors.to be deleted. 3. Key issue(s)of discussion by City Council: a. Discussion of the Applicant's request for removal of condition#IX.3. 4. City Council change(s)to Commission recommendation. a. Council deleted condition#IX.3 at the Applicant's request. Page 4 VIII. EXHIBITS A. Preliminary Plat(date: 1/10/2019) &Phasing Plan POLLARD SUBDIVISION PRELIMINARY PLAT A PARCEL OF LAND SITUATED IN A PORTION OF THE SOUTHEAST 1/4 OF THE SOUTHW EST V4 AND THE SOUTHWEST 1/4 OF THE SOUTHEAST 1/4 OF N SECTION 21,TOWNSHIP 4 NORTH,RANGE WEST,BOISE MERIDIAN,ADA COUNTY,IDAHO y i Rem moo. 8 rwreouxoyry LEGEND axs MUM- D— RUT f ®p®ppp0®®O ®®®®B®®B®e ®®®®®®®®®®®®p ® PIS a' ® S RUT - ,•0000000000 BSI °'®®®®®®®p pp_� ®p®®pp 0 000000 0 1 ® ����� 6f SURVEYm ---------------- m.-- _w.rcxa°w O �••�,..». vreuuiaa,. O O O O O O O O ```` � sx¢rxo. a� omm m� u�avv 5 RB WMM ON=ARens( wU O O O O u.o vx ��in ux ® O O O ® OO ai.a wwvvc.�.. mraRwR LorARMCGO xwU o,aace�� m mfPOLLARD SUBDIVISION E�N�UURSHEET 110 11 a.ve �eid�mu ------------ �PP1.0 v PHASING MAP _R!lA3E 3 •T Hkr �`��,I{III€NW ' '� y PH c O efl 3T1 = aR� I,{ tr .x -_ - _ = DR - CHINDEN BLVD BRIGATON CENTRAL VALLEY PLAZA C-r FATM Pollard Subdivision 1.IOtit9 Page 5 B. Approved Landscape Plan(dated: 1/10/2019) POLLARD SUBDIVISION 3 G 9 r �g @ o o a " 1 0 �//--''�� ° it®a�iutnem. �� vw.es wavr wmii w OPEN SPALE fALCl11AT10N5I1111EE/80GOSF) uvn.rwm�v Brea. m�..�wwwwwwmw eww�nm.�m....rmvu�w s� may`/ " .rarwrw..0 xu.r .r:.a dni . a .x'wW1, or w. m. u wrvwE wrs avu aw nm.rem.® /.�O n xnrt:.vvs w.o rxr r .-s_ aa�. mru u e um.im..�.�.mrmc.m mm V R a«mvE.cw .u._ «aye _'—i . SiHEETTNEE UI.CIlUR10N5(11REFJ35lF�� ••¢ w.i®i.w �a.nR>suuma,��,�ma��Am.nmo.m®�� � ® ,nr arur mm�m '""'w vm �w .ee _- _ - ��+� xxwus omwnwwnw waa um.:cram mei�.we.u�uexuz�mm 4- HPPOLLARD SUBDIVISION ,b M'RIGMIONREUUIREMENISm� =ry ERufFERip RESIDE Eu1 USES li TREE/a5�I a w •��,v aiu5 PPL1.0 Vu Page 6 C. Approved Final Plat for Phase I(FP-2022-0023) PLAT OF POLLARD SUBDIVISION No.1 A PARCEL OF LAND SITUATED IN A PORTION'IF THE SDVTNEW f 1A OFTME 50UIMWEST 114 AND THE SOUTHWEST 1140F THE SOUTHEAST lle OF SECTION 31,TOWNSHIP 3 NORTN,RAKE 1 EAST,B.M., CRY OF M ERIL LAN,ADA ODIINTx'.IDAHO �- _ air 1jle�malxm�xcnex v '• o-6111e IXfa�w YCImM�s�__ __�_ � No ov Ik I 569'23'59"E 2-I0' S69'2]'D6"E 8n9'2a'25'E I 55TS5'59"E 11.R1' 6Y•W' N45'39'31"E -g 4'p0'PS'E - 547'T"06'E 16.03' PI40'33'36'E 339'P]'30'E 2133 2E.]S' He[']a'SR'E lal9e,ote 569'2]'OR"E 61199' ISAS ,3-OS' 36Y2]'OS"E 5]815' SL9'M'ZE•E SeN'M'25'E 52{.56' I413" WR4agM Na9�� W.W—ftrI Dr. ! 2'6A6' 552'4n'22L I 61.n6' SOMS'39'E 1 p&3T' NCT50'33-% " 5eex5x6t I6ur I ReYboume xtam � 41 I Eu1BAENn Nat aolAd sa.M'4ree'.n'sere¢bet a1P.a' �I i' ^ W.W.6 .Or. asem Fier ar fiTrmet ias.,s I I 7I �+, loeltt 5 I I =m 122 L 'W r W.little Ravels. Iil z - $ $ { �________ -------------------- -_ �. W. R9vm M. g RlttAx L! `--- ----------r �-------- ---------- r------------------- Oa p I I I I � •oa,D�'awn.xv cn FNIT2]'l]'Y! HNT13'39�r ROD.BB' Fair 9F EEgNNIC N UESNrNI % 92-)] N0P2Y1]'W 31211' NR9'25'31'W 323 PS' ^'b I v ]5.5a' N66.25'31'W 581.Rn' E[![�F arpglEq SE[T:NSS�/Y __- 29 ]1[ � � x i/te omoe aEcmu xt fTe >�xT 1�66•bi�• ��w�nx[�i�� as ___ -__I _nbxa'Si1 tan.x5__ -__ ___ w.rnrleeRRnb. f 0� LEGEND $f� r�N�cx r�awo Nra® R 1w xoo SURVEY NARRATIVE e N!1 2�SIIEHYI 11nH F,A.'lIC lJP MNaaD Phn5�:1•�15w WT'�f MYA�ir[�n[r N��ry s�rtm�Mive mxe�usim FI Im" n 1E YR—1—a ,x.Px Pub M!Nv.N[nc w6wp xNaan iie Pu SHEEI INDEX �YC4biK�[:q*%a:9.EaF sF* E9E'q 9 •noYp+. sxm, mEm.[slmxsaN we.ia<vw xxP Ncwnur nuwe,rN[ km wuR�vwc�j rrcxiTc i�[firl�m ic�u� Y[tt x-mu ruT uv.ux¢uu ammc veus [,.x.5-PE..x Pur uxP,uxE xxa cumc,xaus �yc�Exra ® G9fAE.xTE9 PNIrt.NaRlrle fOIWY LR Rr• ix[R.-CRrirluiE Ox vukxa,Ime ' Ear xwRIN [max.6_a�a xnP�P6� 12459 ————— sE9c+sE.EPn+l9•m we '��v�q° im urz REFERENCES [.eR�` NaxtMr LP lTR R1 Mi Or IH19DUN[9.iWipx xq,.PCP[ ff%pg vrWis 7•i�•>'bI� 11P •T ENO IN E E II I N 6 ,wPP-+B'sls,nsaam a rxv.eRum,own1B DevaloE1eE i Ro n ron 6 xE .P,.as 1. Brighton xa ncrzP - ESPoa of NH Doan°:.w.c PxPR�� -- +oo Wdoa ONE b*E,q R>-xE�RP a,R.�xd Txxa.6Em1o9 Pa ram,nRN. Corporation MerldNn,Idaho Page 7 IX. CONDITIONS OF APPROVAL 1. Applicant shall comply with all terms of the annexation and associated development agreement provisions and the preliminary plat approved for this property(H-2019-0021,Inst. #2019- 060655;FP-2022-0023. 2. Comply with the off-street parking standards listed in UDC Table 11-3C-6 for single-family residential dwellings. 3. Prior-to submit4ai of the Pellar-d Subdivision No. 1 final pW(FP 2022 0023) for-City Efigiflee street btiff-er-s,inehiding these for-entfyway eeffider-s (i.e. W. Chifiden Blvd.SH 20 26). 4. The plans submitted with the final plat application for the residential portion of the development shall be revised to comply with the following: a. Comply with the qualified open space standards for the R-8 zoning district listed in UDC 11- 3G-3.A minimum of 2.7-acres of qualified open space is required. b. Comply with the qualified site amenity standards for the R-8 zoning district listed in UDC 11-3G-4.A minimum of four(4)points of site amenity is required. 5. The applicant shall obtain the City Engineer's signature on the first phase final plat by June 4, 2024 in accord with UDC 11-6B-7 in order for the preliminary plat to remain valid; or another time extension may be requested. Page 8