Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PZ - Elevations Bldg. 1
KEYNOTES Q1EE1 1. ARCHITECTURAL LAMINATED FIBERGLASS ROOF SHINGLES. RUBY 2. HORIZONTAL LAP SIDING: PAINTED, 7" EXPOSURE. ����p� 3. VERTICAL BOARD AND BATTEN STYLE SIDING: PAINTED, BOARD & BATTEN SIDING: PUYNAN 4' X 10' PANELS, 5/16" THICK, TEXTURED FINISH, 2-1/2" X 3/4" BATTENS AT 16" O.C. TA 4. HORIZONTAL TRIM BAND, PAINTED (PREFINISHED 'Z' FLASHING AT TOP). 5. CORNER TRIM: PAINTED CEMENT FIBER TRIM 3/4" X 3-1/2". w w 6. DOOR & WINDOW TRIM: PAINTED TRIM 1" X 3-1/2". 499 MAIN STREET (208) 3 4 3-2 9 3 1 BOISE, IDAHO 83702 T A O I D A H O.C O M 7. HARD BOARD FASCIA. AT EAVE PLACE PRE—FINISHED METAL GUTTER (WITH A B DOWNSPOUTS, SEE ROOF PLAN) OVER PAINTED CEMENT FIBER FASCIA. 8. DOOR AND WINDOW TRIM: STUCCO FINISH COAT OVER RIGID FOAM. SEE DOOR & WINDOW SCHEDULE AND DETAILS. 9. STAINED WOOD CORBEL/BRACKET. RE: 5 & 20/A10.2. 12 i 10. WOOD COLUMN AND BRACE. PAINT. 6. 11. FINISH GRADE, SLOPE AWAY FROM BUILDING AT 5% MIN. 19'-7 1 8" 12. VINYL FRAME WINDOW. TOP OF PLATE 13. ELECTRIC METERS — SEE ELECTRICAL DRAWINGS. 14. INSULATED METAL EXTERIOR DOOR PER SCHEDULE. 15. METAL ROOFING. 1 2 3 4 5 6 10'-6" 16. DOUBLE GLAZED, INSULATED PATIO DOOR UNIT. LIE2ND FLOOR 17. PRE—FINISHED METAL RAIN—GUTTER, AND DOWN—SPOUT. TIE INTO STORM DRAIN. T.O. SHTG. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION. TE El 18. LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. 19. OVERHEAD DOOR. PAINT. 1 12 12 12 12 12 20. MFD. STONE W/ STONE CAP TRIM. 6�-- 10 17 19'-7 1 8" T.O.SLAB TOP OF PLATE 5 12 mLl ir -111 TM T m mIfl PROJECT 3 152ND FLOOR pi_u I—]ji 11 1 1� 101- 7 RIGHT ELEVATION - BUILDING TYPE 1 9 T.O. SHTG. SCALE: 1/8" = 1'_0" STAPLETON ❑� � ]EA.- Lj 1 ❑� El- GENERAL e APARTMENTS =_—____ —___ NOTES �T.O.SLAB A. ALL KEYNOTES ARE TYPICAL AND APPLY TO ALL ELEVATIONS. 4 10 20 10 4 9 7 10 20 10 10 20 10 10 20 10 20 10 7 B. REFER TO CONSTRUCTION TYPE DETAILS (SHEETS A10.0 THROUGH A10.3) AND SPECIFICATIONS FOR ADDITIONAL EXTERIOR FINISH MATERIAL NOTES. C. ALL VISIBLE EXT. FLASHINGS TO BE PRE—FINISHED METAL TO MATCH ADJACENT COLOR U.O.N. ALL CONCEALED METAL FLASHING TO BE GALV. METAL. ALL EXPOSED CAULKING PAINTED TO FRONT ELEVATION — BUILDING TYPE 1 MATCH ADJACENT MATERIAL FIN. COLOR. D. VERIFY ALL FINISH MATERIAL SELECTION AND COLORS WITH OWNER PRIOR TO ORDERING AND 2SCALE: 1/8" = V-0" INSTALLATION. E. ALL SIDING AND TRIMS TO BE CAULKED, PRIMED (OR PRE—PRIMED) AND PAINTED. F. ALL UTILITIES TO BE SCREENED. COORDINATE WITH MECHANICAL DRAWINGS AS REQUIRED. G. ALL FINISH MATERIALS TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS, 2015 IBC REQUIREMENTS AND PER GENERALLY ACCEPTED CONSTRUCTION PRACTICES. H. FINISH COLORS, MATERIALS, REVEALS AND TRIMS SHOWN ALSO APPLY TO RETURN WALLS NOT SHOWN, AND TYPICALLY TERMINATE/TRANSITION AT INTERIOR CORNERS ONLY, TYPICAL. I. PROVIDE OVERSIZED SOLID j TRIM BACKING AT ALL VENTS, GRILLES, ELECTRICAL PANELS, FIRE ALARM BELLS, LINESETS, LIGHTS, ETC. (NOT SHOWN FOR CLARITY). COORDINATE WITH ALL g q TRADES. J. SIDING PATTERNS AND BATTENS ARE SHOWN FOR SIDING TYPE LOCATIONS ONLY. BATTENS AND SIDING TO BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS, CENTERED WITHIN EACH AREA. SEAL ' iV DAVID TOP OF PLATE �y RUBY A%AR-2 H11 El •. .•. 6 5 4 3 2 1 12 12 3� -1 4 OL 10'-6" 2ND FLOOR This document is the property of THE ARCHITECTS $—1 T.O. SHTG. OFFICE,PLLC and is not to be duplicated without STORAGE written authorization. ® ® T.O. PLATE © THE ARCHITECTS OFFICE,PLLC 12 FILE 6 , » DATE �19'-7 1/8" MAY 30, 2023 TOP OF PLATE FILE N0. 22-604 A5.0 DRAWN 1� i i i I i i FFT1 gk 2ND FLOOR DAVID RUBY, AIA T.O. SHTG. LEFT ELEVATION - BUILDING TYPE 1 REVISIONS LILSCALE: 1/8" = 1'-10" lift +0'-0" T.O.SLAB 14 19 1 19 14 194 14 19 14 19 14 REAR ELEVATION - BUILDING TYPE 1 SCALE: 1/8" = V-0" SHEET A5ml EXTERIOR ELEVATIONS BUILDING TYPE 1