Loading...
HomeMy WebLinkAbout2023-06-09 Boise Project Board of ControlDONALD BARKSDALE CHAIRMAN OF THE BOARD FRED BUTLER VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER BOISE PROJECT BOARD OF CONTROL City of Meridian City Clerk's Office 33 E. Broadway Avenue, Meridian, Idaho 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465 OVERLAND ROAD BOISE, IDAHO 83705-3155 06 June 2023 RE: Biltmore Estates Subdivision No. 4 S. of W. Victory Rd. & S Kentucky Way New York Irrigation District Boise -Kona Irrigation District Sundell Lateral 49+70 Sec. 25, T3N, Rl W, B.M. Sonya Allen, Planner: OPERATING AGENCY FOR 167.000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT RECEIVED J U N 0 9 2023 ctrY o►= CITY CLERKS OFFICE MFP-2023-0001 NY-109-001-01 BK-88 TEL: (208) 344-1141 FAX: (208) 344-1437 The United States' Sundell Lateral lies within the boundary of the above -mentioned location. The easement for this lateral is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391, 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert this federal easement 21 feet Northeast and 15 feet Southwest of the lateral's centerline. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. Boise Project reserves the right to have changes made if our easements are affected in any way even during the construction phase of this project. The Boise Project does not approve landscaping other than gravel within its easements, as this will certainly increase our cost of maintenance. All easements must remain a flat drivable surface. Any fencing, gates and pathways, as may be required, must be constructed off of any Boise Project Easements. Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Project facility easements must be located outside of these easements. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case no work shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Storm Drainage and/or Street Runoff must be retained on site. Per Idaho State Statutes, title 42, all local irrigation drainage ditches that cross this property, in order to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the land owner, developer and contractors. and operate any Hump station that is associated with this phase. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull- size hard copy of the irrigation and drainage plans. If you have any further questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. 'Irhomas Ritthaler Assistant Project Manager, B.P.M. cc: Clint McCormick Terri Hasson Alicia Flavel File Watermaster, Div; 2 BPBC Secretary -Treasurer, NYID Secretary — Treasurer, BKID DECEIVED JUN 0 9 2023 CI I Y Vr V"w rzu CITY CLERKS OFFICE