Loading...
HomeMy WebLinkAboutHampton Inn Subdivision P/FP-01-010 BEFORE THE CITY COUNCIL OF THE CITY OF MERIDIAN IN THE MATTER OF THE REQUEST FOR PRELIMINARY/FINAL PLAT FOR HAMPTON INN SUBDIVISION, LOCATED AT THE SOUTHWEST CORNER OF ALLEN STREET AND GENTRY WAY, MERIDIAN, IDAHO BY: MERIDIAN HAMPTON CENTER, LLC". APPLICANT ) ) ) ) ) ) ) ) ) ) ) ) ) C/C 03/26/02 Case No. P/FP-OlwOIO FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT The above entitled matter coming on regularly for public hearing before the City Council on March 5, 2002 and continued until March 26, 2002, and Shari Stiles, Planning and Zoning Administrator, and Wes Steele, appeared and testified at the hearing, and the City Council having received a report from Shari Stiles, the Planning and Zoning Administrator, and the City Council having received as part of the record of this matter the recommendation to City Council of the Planning and Zoning Coml?1ission and the applicant having submitted the Plat Drawing described as follows, "PRELIMINARY PLAT FOR HAMPTON INN SUBDIVISION, A PORTION OF LOT 15 OF AMENDED MAGIC VIEW SUBDIVISION BOOK 52, FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT - HAMPTON INN SUBDIVISION / BY MERIDIAN HAMPTON CENTER, LLC - (PFP-OI-OIO) - I PAGE 4445 OF PLATS AND LOCATED IN THE El/2 OF SECTION 17, TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN, CITY OF MERIDIAN, ADA COUNTY, IDAHO 2001 2002, PINNACLE ENGINEERS, INC.", submitted for preliminary/final plat approval and which preliminmy/final plat application is herein received and adjudged by the City Council pursuant to Meridian City Code, Section 12-3. Therefore the City Council makes the following findings: FINDINGS OF FACT 1, That the proposed development is in conformance with the Comprehensive Plan by reason of the fact that it lies within the existing Urban Area as defined in the Meridian Comprehensive Plan Generalized Land Use Map, Infrastructure Planning Analysis Comprehensive Plan and Map, adopted December 21, 1993, and the property is presently zoned C-G General Retail and Service Commercial District, and requires connection to the Municipal Water and Sewer System. [see Meridian City Code, Section 11-7-2 K] 2. The preliminary plat is in conformance with the Comprehensive Plan City of Meridian adopted December 21, 1993, Ordinance No. 629. 3, It is determined that Urban Services can be made available to ~ccommodate the proposed development if the plat complies with the requirem,ents and conditions hereinafter set forth as conditions of preliminalY plat approvaL FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT - HAMPTON INN SUBDIVISION / BY MERIDIAN HAMPTON CENTER, LLC - (PFP-OI-OIO) - 2 4. The proposed development is a continuity of the proposed development within the City's Capital Improvement Program and if the conditions which are requested by the Planning and Zoning Administrator and the Engineering Technician III are met there will be public financial capability of supporting services for the proposed development. 5. The development, if built in accordance with the conditions and as proposed, will not create health, safety or environmental problems and there have been no specifics of any such concerns brought to the Council's attention. 6, It is found that the Recommendation to City Council of the Planning and Zoning Commission is reasonable and appropriate for the conditions of approval of the preliminary plat as hereinafter set forth. DECISION ANn ORDER Pursuant to the City Council's authority as provided in Meridian City Code, Section 12~3-S and based upon the above and foregoing Findings of Fact which are herein adopted: IT IS HEREBY ORDERED AND THIS DOES ORDER The Preliminary/Final Plat of the applicant as evidenced by "PRELIMINARY PLAT FOR HAMPTON INN SUBDIVISION, A PORTION OF LOT 15 OF AMENDED MAGIC VIEW SUBDIVISION BOOK 52, PACE 4445 OF PLATS AND LOCATED FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT - HAMPTON INN SUBDIVISION / BY MERIDIAN HAMPTON CENTER, LLC - (PFP-O 1-0 1 0) - 3 IN THE El/2 OF SECTION 17, TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN, CITY OF MERIDIAN, ADA COUNTY, IDAHO 2001 2002, PINNACLE ENGINEERS, INC.", has been submitted for preliminaly/final plat. 1. The conditions of Staff pertaining to the Preliminary/Final Plat comments are as set forth in the Memorandum to the Mayor and City Council from David McKinnon, Planner II for Planning and Zoning, and Bruce Freckleton, Engineering Technician III, dated ]anumy 9, 2002, listing 6 PreliminalY Plat Site Specific Comments and 6 Preliminary/Final Plat General Requirements and 10 General Requirements, a true and correct copy of which is attached hereto and marked Exhibit uN', and consisting of eight pages, and by this reference incorporated herein, "vith the additional requirements from the City Council from their meeting of March 26, 2002, and the requirements are as follows, to-wit: 1.1, That number A.S. of page 2 of the Planning and Zoning Recommendations shall be amended to read as follows: A.5. The applicant shall provide a recorded cross"access easement among the parcels for the shared parking and driveway access to the public streets prior to final plat signature by the City. "I.2 The signage package shall meet the Meridian City Code, <llld shall also specifically address where the sign is intended to be located to the freeway, and shall clarify the placement of the monument signs that are proposed. 1.3 Retain or mitigate the 7 trees presently on the property, as all the FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT - HAMPTON INN SUBDIVISION / BY MERIDIAN HAMPTON CENTER, LLC - (PFP-O 1-010) - 4 remaining trees are dead or in velY poor condition, The 7 trees are the 3 Honey Locust, 2 Spruce, 1 Chenyand 1 Scotch Pine. The Site Plan shall be modified to retain 2 Honey Locust trees and I Spruce tree. Additionally, little or no construction shall be done within the drip line of the trees to be retained. The remaining trees shall be mitigated by increasing caliper trees at planting and/or planting additional trees. Submit an accurate caliper size for the trees to be removed for mitigation on the final landscape plans, 1.4 All laterals and waste ways shall be protected and all municipal surface drainage shall be retained on site. If any surface drainage leaves the site, the Nampa & Meridian Irrigation District shall review drainage plans. The developer shall comply with Idaho Code 831-3805. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: a. The Plat dimensions are approved by the City Engineer; b. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements; and By action of the City Council at its regular meeting held on the (6 II:::. day of JJr~ ,2002. By:~ffl. ~~ ROBERT D, CORRIE Mayo,r, City of Meridian FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARy/FINAL PLAT - HAMPTON INN SUBDIVISION / BY MERIDIAN HAMPTON CENTER, LLC - (PFP-OI-OlO) . 5 Copy served upon Applicant, the Planning and Zoning Department, Public Works Department and City Attorney, ByJl~~~SL City Clerk Dated: .\ I-Il-IJ 2- jl ;>, it. , ""1,-; J ~~~ Z:\Work\M\Meridian\Meridian 15360M\I-1ampton Inn CUPO [-044 PPPO 1-0 10\PreLimPlatFinalPlatFfClsfU FINDINGS OF FACT AND CONCLUSIONS OF LAW AND ORDER OF CONDITIONAL APPROVAL OF PRELIMINARY/FINAL PLAT - HAMPTON INN SUBDIVISION I BY MERIDIAN HAMPTON CENTER, LLC - (PFP-OI-OIO) - 6 MAYOR Robert D, Come HUB OF TRE4SURE VALLEY A Good Place to Live LEGAL DEPARTMENT (208) 288-2499 . Fax 288-2501 CITY COUNCIL h-IE!vlBERS Ron Anderson Keith Bird Tammy deWeerd Cherie McCandless CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, IDAHO 83642 (208) 888-4433 . FAX (208) 83748B City Clerk Office Falt:(203) 8884218 PUBLIC WORKS BUILDING DEP ARTr,.lENT (208) 887-2211' Fax 887-1297 PLANNING AND ZONING DEP ARTlvlENT (203) 884.5533 ' FA..\: 838-6854 MEMORANDUM: January 9, 2002 From: Mayor & City Council Bruce Freckleton. Assistant to fitf fnginee~ David McKinnon, Planner II J.)V\ To: ,RECEIVED r:,] 0 4 2002 Meridian Hampton Center CITY OF MERIDIAN CITY C{ ERJ< OFF" o Request for the approval of a Preliminary and Final Plat for Three (3) BUilding LdGE on 4.10-Acres in a C-G Zone by Pinnacle Engineering (File No. PFP-OI-OIO). Re: o Request for 'a Conditional Use Permit for a Planned Commercial Development Containing a 92-Room Hotel, a 7,500 Square Foot Single Story Office Building, and 17,836 Square Foot 2-Story Office Building by the Meridian Hampton Center LLC (File No. CUP-OI-044). We have reviewed these submittals and offer the following comments, as conditions of the applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY The applicants, Pinnacle Engineering and the Meridian Hampton Center LLC, have requested approval of a preliminary plat/final plat for three building lots on 4.10 acres of land located at 875 S. Allen Street, on the north side of Freeway Drive, and the approval of a conditional use permit for a 92-room hotel and two office buildings within the proposed subdivision. The hotel will be a 3-story, 50,204 square foot Hampton Inn. The southernmost office building will be a 2-story office building (one of the stories will be a day-lit basement) with between of 17,800- 23,500 square feet. The third building is a single story office building containing 7,500 sq~e feet. The annexation of the property was approved in October of 1999 and a Development.Agreement (DA) controlling the development ofthe subject property was signed by the City in July (jf2000, The DA limited the development of the property to a single 60,000 square foot medical office building (Section 4.2). The DA will have to be amended to allow the proposed hotel and office uses. LOCATION The property is located on northwest comer of the Allen and Freeway Drive intersection; approximately 1/5 of a mile west of Eagle Road, just north of the Freeway. The subject property is designated as "MixedIPlanned Use Development" in the Comprehensive Plan Generalized land Use Map. PFP-O 1-0] O;CUP-O]-044 Ex- h ; b ~ + I'I~ I [ I 0 f 8 Hampton Inn. PFP.CUP ,,,,.",r"" /2:-'-" dipfbland Council ,<('vdiiuary 9, 2002 ,.<,; Page 2 ".",,:,,',- '/:',>:< /:?~'-; " SURROUNDING PROPERTIES North - Mid-valley Business Park, zoned C-G. South - 1-84 East - Holiday Inn Express Hotel, zoned C-G. West - Low density rural-residential, zoned RUT (County). CURRENT OWNERS OF RECORD Ada County lists John and Alberta Sonntag as the property owner of the 4.10 acres, and they have submitted their consent for the applications. PRELIMINARYIFINAL PLAT FINDINGS AND REQUIREMENTS Sections 12-3-3 J.2. and 12-3-5 D read as follows: "In determining the acceptance of a proposed subdivision' the Commission/Council shall consider the objectives of tbis title and at least the following: a. The conformance of the subdivision with the Comprehensive Development Plan; Staff find's ,the subdivision is designated as "MixedJPlanned Use Development" on the Generalized Land Use Map and that the requested C-G Zoning is in compliance with the adopted Comprehensive Plan. A list of the policies and goals that apply to this development are listed below under the heading "Comprehensive Plan Analysis". b. The availability of public services to accommodate the proposed development; Staff fmds that public services are readily available to two (2) lots within the proposed subdivision. Lot 3 of the proposed subdivision will not be able to utilize existing gravity sewer lines due to the site topography. The building on Lot 3 will need to be serviced by a private lift station, to be installed at the Applicant's expense. c. Tbe continuity ofthe proposed development with tbe capital improvement program; Stafffmds that the subdivision will not negatively impac( the capital improvement program. d. The public financial capability of supporting services for the proposed development; Stafffin.ds that the development will not require major expenditures for supporting services. e. The other health, safety or environmental problems that may be brought to the Commission's attention. Staff fmds that there will not be any other health, safety or environmental problems associated with this subdivision that should be brought to the Council or Commission's attention. PFP-l}!-OIO; CUP-O!-044 Hampton [nn,PFP.CUP Ex h: b i~+ if A If d-. 0+ ~ / /l~yor and Council / January 9,2002 / Page 3 :J... 1S. Ii PRELIMINARY PLAT SITE SPECIFIC COMMENTS I. Sanitary sewer and water service to this site shall be via existing and new mains and service lines from the existing mains adjacent to the property. The applicant will be responsible to construct lateral sewer mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. 2. Sanitary sewer service to Lot 3 shall be provided via a private sewer lift station. Consideration should be given in the design for the eventual conversion to a gravity system when it's available :from the south. 3. Please add or revise the following plat note(s): (10.) The bottom elevation of structural footings shall be set a minimwn of 12 inches above the highest established normal ground water elevation. 4. Applicant has indicated. that the pressurized irrigation system within this development is to remain private. The applicant shall be required to provide a backup source to the pressurized irrigation system. The Public Works Department as part of the development plan-review process shall review plans and specifications for the irrigation system. A draft copy of the pressurized irrigation system O&M manual must be submitted prior to plan approval. 5. The 'a~Iic~t sh~ll ~OVicl~C~ anQ. the ~ity CI~k ~opy lil..f a re~rdeQ a G{o~ ac~ss a~"em t ameng ~~e p~ce for t~e s~. ~ par"\.ing an'ci. dri~Way. 11 c~es~ tc..t~pu~c 's.tree~ pnor'tp fi I plat..Slgillttur3.-PY City. As per C / 11 ~() u.. VLQ;l 15 f I yuf.. l OS .t:rom. The applicant shall be required to provide a water main loop through the proposed project to allow for fire hydrant connections at locations as determined by the Meridian Fire Department. 3/~ !) 6. PRELIMINARY /FINAL PLAT GENERAL REQUIREMENTS 1. Submit letter from the Ada County Street Name Connnittee, approving the subdivision and street names. Make any corrections necessary to conform. Coordinate fire hydrant placement with the City of Meridian Public Works pepartment. Assessment fees for water and sewer service are determined during the building plan review process. Two-hundred-fifty- and 100-watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdividds expense. Typical locations are at street intersections and/or fire hydrants. l~, I Underground, year-round pressurized irrigation must be provided to all landscape areas on site. Please submit hook-up and design details based on the proposed landscaping. Due to the size PFP-o 1-0 10; C UP-O 1-044 Hamplon Inn,PFP,CUP E~h,iJ/<f Ifill ~ of fl #fayor and Council January 9,2002 Page 4 y of landscaped area, primary water supply connection to the City's mains will not be allowed. Applicant shall be required to utilize any existing surface or well water for the primary source. If City water is proposed as a secondary source, developer shall be responsible to pay water assessments for the entire common open area. 11F. Show all existing and proposed easements for irrigation/drainage facilities located within the boundaries of this proposed development. STANDARDS FOR CONDITIONAL USES The Commission and Council shall review the particular facts and circumstances of each proposed conditional use in terms of the following and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish (11-17-3): A. That the site is large enough to accommodate the proposed use and all yards, open spaces, parking landscaping ~nd other features as may be required by this ordinance; Staff finds that the subject property is large enough to accommodate the requested use and all other required features. . Staff finds that the height of the Hampton Inn Hotel, if measured from adjacent grade to the top ofthe building is slightly taller (approximately 45'6") than the maximum 40' height allowed in the CMG Zone (MCC 11-9-1). Notwithstanding, the City defines building height of mansard roof structures, like the hote~ as the vertical distance measured from the grade of the front of the building to the deck line ofa mansard roof(MCC 11-2-2 "Building, Height"). The deck line ofthe hotel roofis 39'and is thereby in conformance with the City Code.. B. That the proposed use and development plan will be harmonious with the Meridian Comprehensive Plan and in accordance with the requirements ofthis Ordinance; The current Comprehensive Plan Land Use Map designates the property as "Mixed/Planned Use Development". Stafffinds the 'development plan to be in compliance with the Meridian Zoning Ordinance and the Comprehensive Plan. C. That the design, construction, operation, and maintenance will be compatible with other uses in the general neighborbood and witb the existing or intended character oftbe general vicinity and that such use will not adversely change the essential character of the same area; Staff finds that the proposed development will not change the essential character of the general vicinity and will be harmonious with the intended character of the same area D. That the proposed use, if it complies with all conditions ofthe approval imposed, will not adversely affect other property in the vicinity; PFP-Ol..olO; CUP-OI..Q44 Hampton Inn,PFP.CUP ;;- Mfb/f iA II 2/ of ~ Mayor and Council January 9, 2002 Page 5 Staff finds that the proposed use would not adversely affect other properties in the general vicinity. E. That the proposed use will be served adequately by essential public facilities and services such as highways, street, police, and fire protection, draioage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such services; Staff finds that the proposed development will be adequately served by the essential public facilities and services listed above. F. That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare ofthe community; Staff finds that the proposed use would not be detrimental to the economic welfare ofthe community, nor would it create the need for any new facilities or services to be paid for by the public. G. That the proposed use will oot involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reason of excessive production oftraffic, noise, smoke, fumes, glare or odors; Staff finds that no excessive traffic, noise, smoke, fumes, glare or odors will result from the proposed use. H. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; Staff fmds that the proposed use will not create significant interference with any traffic on the slUTounding public streets as long as ACHD requirements are met and all approaches and traffic control measures are installed. I. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. Staff does not fmd that any natural or scenic feature will be Iost, damaged or destroyed by issuance of this conditional use. CUPIPD SITE SPECIFIC REQUIREMENTS (File CUP-Ol-002) 1. Traffic and Circulation comments: The applicant shall provide ACHD with a copy of a recorded cross access easement for the use ofthe common driveways and parking lots. PFP-Ol-O I 0; cUP-{) \.{)44 Hampton Inn,PFP.CUP E0L/h/f III 'f 5 of l? Mayor and Council January 9, 2002 Page 6 2. Signage: Although signage locations are noted on the plan and size ofthe signs are mentioned in the applicant's cover letter, no details of proposed signage were included with the application. The applicant shall be responsible for obtaining a separate sign permit for each sign. 3. All conditions placed on this application shall run with the land and shall not lapse or be waived as the result of any change in tenancy or ownership of any or all of the lands governed by tlus CUP application. All such conditions shall he deemed the requirements for the issuance of a Certificate of Occupancy for any use or structure as per City Ordinance. 4. Initiation of work on the planned development must take place within eighteen months, as set forth in section 11-17-4. all phases of the planned development shall be completed within 5 years of the date of approval; approval of any un-initiated phases will lapse after that time unless a time extension is granted by the Council (MCC12-6-8). 5. All trees over 4" in caliper that are removed from the site shall be replaced with an equal number of caliper inches of trees, in conformance with the Landscape Ordinance. A new landscape plan with the additional trees shall be submitted at least ten days prior to the City Council ~earing. 6. Temporary fencing shall be installed around the project during construction to prevent conStruction debris from blowing onto adjacent properties and roadways. 7. Section 4.2 of the original Development Agreement (Resolution No. 329) shall be modified to include hotel and office uses as uses permitted by the Development Agreement. GENERAL REQUIREMENTS (All Applications) 1. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4~8. Wells may be used for non-domestic purposes such as landscape irrigation. 2. Compaction test results must be submitted tothe Meridian Building Department for all lots receiving engineered backfill. . 3. Off-street parking shall be provided in accordance with City of, Meridian Zoning and Development Ordinance and/or as detailed in site-specific requirements. 4. Paving and striping shall be in accordance with the standards set forth inthe City of Meridian Zoning and Development Ordinance and in accordance with Americans with Disabilities Act (ADA) requirements. 5. A drainage plan designed by a State ofIdaho licensed architect or engineer is required and shall be submitted to the City Engineer for all off-street parking areas. All site drainage shall be PFI'-O 1-010; CUP-O 1-044 Hampton Inn.PFP.CUP ixh/6/i Jflr! !& of 2 Mayor and Council January 9,2002 Page 7 contained and disposed of on-site. An operation and maintenance agreement for joint drainage facilities shall be developed for inclusion in the CC&R's of the subdivision. 6. Outside lighting shall be designed and placed so as not to direct illumination on any nearby residential areas and in accordance with City Ordinance. 7. All signage shall be in accordance with the standards set forth in the City of Meridian Zoning and Development Ordinance. No temporary signage, flags, banners or flashing signs will be permitted. 8. Provide five-foot-wide sidewalks throughout development in accordance with City Ordinance. 9. All construction shall conform to the requirements of the Americans with Disabilities Act. 10. Landscaping shall be installed as submitted (Sheet L1.0). ADDITIONAL CONSIDERA TIONS The applicant has proposed that they provide only half of the required landscape buffer between land uses (20') on the western side of the subdivision. The Landscape Ordinance requires the higher intensity land use, m. this case the hotel and office use, to provide the entire landscape buffer on their property. As justification for their reduced setbacks, the applicants point to the proposed comprehensive plan that depicts the property to the west as commercial use in the future. If the property does indeed become commercial in the future, there would be no need for the fu1120' buffer between land uses to be provided on the applicant's property. Staff supports the proposed reduced landscape buffer; however, should the Commission or Council determine that the buffer should be located entirely on the applicant's property, an additional condition of approval should be added requiring a redesign ofthe site and landscape plans prior to final approval. COMPREHENSIVE PLAN ANALYSIS The 1993 Comprehensive Plan contains a variety of goals and policies relevant to this application. The following sections most directly apply to the proposed project and are repeated here for the Council and Commission's consideration during the hearing process. Goal 3 is ''to encourage the kind of economic growth and development which supplies employment and economic self-sufficiency for existing and future residents, reduces the present reliance on Boise and strengthens -the City's ability to finance and implement public improvements, serVices, and its open space character." Goal 5 is ''to preserve and improve the character and quality of Meridian's man-made environment while maintaining its identity as a self-sufficient community." Goal 8 is ''to establish compatible and efficient use of land through the use of innovative and functional site design." PFP-OI-OIO; CUP-OI-044 Hampton Inn,PFP.CUP 2JLhtb/1 fl1lf 7 of ~ Mayor and Council January 9, 2002 Page 8 Economic Development 1.1, 1.2, 1.3, 1.5, 2.2U Land Use 1.5U, 1.6U, 1.1OU, 1.11U, 4.8U, 5.6,5.10,5.12,5.13, 5.14U, 5.15U Public Services, Utilities and Energy Resources 5.2,5.4,5.5 Transportation l.4U, 1.5U, 1.1OU Community Design 1.4, 2.1U, 2.3U, 2.5U, 4.4U, 5.2 RECOMMENDATION Staff recommends approval of the preliminary/final plat, and conditional use permit, with the requirements and comments as noted above. PFP-{II~10; CUP~l~44 Ezh/b/t jqlf g ()f~ Hampton Inn,PFP.CUP