Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PZ - Updated Elevations
2 A301 4 A301 1 A301 3 A301 W35' - 0"1 5 12 13 13 X-8 X-3 X-3 X-2 X-7 X-2 X-2 T.O. LOW PARAPET 113' -6" T.O. HIGH PARAPET 116' -0" X-4 X-1 7 7 X-3 1 A302 2 A302 W6 2 4 1 11 12 13 13 X-3X-2 X-2 X-4 X-7 5' - 0"X-1 X-8 5 KEYNOTES1 1 2 3 BUILDING SIGNAGE BY OWNER PREFINISHED METAL DOWNSPOUT MENU BOARD AND FOOTINGS BY SEPARATE SIGN PERMIT 4 5 6 CONTROL JOINT7 8 DARK BRONZE LIGHT FIXTURE; COORDINATE WITH ELECTRICAL CO2 ENCLOSURE - SEE EQUIPMENT PLAN ELECTRICAL PANEL OR EQUIPMENT; COORDINATE WITH ELECTRICAL 9 POWDER COATED STEEL TUBE FRAME, TYP. STEEL CAP AT TOP OF POSTS 10 24" X 36" OPENING 11 EXTERIOR CANOPY MANUFACTURER - ARCHITECTURAL CANOPIES; EXTRUDECK 12 ROOF PROFILE 13 RTU BEYOND 14 TRASH ENCLOSURE 1 A302 100 BEYOND 4 6 10 11 12 X-1 X-8 X-3 X-4 X-7 X-2 T.O. LOW PARAPET 113' -6" T.O. HIGH PARAPET 116' -0" 2 A301 1 A301 3 A301 W3 EQ4 A301 5' - 0"X-3X-8 X-2 X-5 X-7 X-2 2 4 11 12 13 13 6(BEYOND) W5W4W2 T.O. LOW PARAPET 113' -6" T.O. HIGH PARAPET 116' -0" X-4 X-1 9' - 4" SECTION CONCRETE FOOTING2"4"2' - 11"4"2"2' - 6"2' - 6"2"3' - 7"2"10"6"3' - 11"6"11" ELEVATION 6' - 8"3' - 0"6' - 5"6' - 5"9 X-7 3 8.X-7 3 8 X-79 4 4 EXTERIOR FINISH SCHEDULE MARK MATERIAL DESCRIPTION X-2 CORNICE (BLACK) X-1 THIN BRICK (WAINSCOT) X-3 SIMULATED WOOD SIDING EXTERIOR GRADE - SW# 6993 "BLACK OF NIGHT" FIBER CEMENT PANELS BASE BID: NICHIHA; VINTAGE WOOD; BARK; 17-7/8" x 5/8" THICK; HORIZONTAL INSTALL BID ALTERNATE:JAMES HARDIE; SIERRA 8; TIMBER BARK; 5/16" THICK; HORIZONTAL INSTALL X-5 STOREFRONT DARK BRONZE X-6 'SHER-COLOR' CUSTOM MATCH, EXTERIOR ULTRADEEP SATIN. COLOR CAST FORMULA: W1 WHITE >>> COLORANT 0Z= 2 COLORANT 32 =2 R4 NEW RED >>> COLORANT 0Z = 8, COLORANT 32 = 61 COLORANT 64 = 1 THIN BRICK GLEN-GERY; CEDAR LAKE GROUT GLEN GERY; G-601 SWIG RED X-7 EXTERIOR GRADE - SW# 7019 "GAUNTLET GRAY" (POWDER COAT STEEL IF POSSIBLE) PAINT (LIGHT GRAY) X-4 STONE SILL CHISELED STONE SILL - LIGHT GRAY CORONADO STONE X-8 STUCCO NAVAJO WHITE LA HABRA 3/8" = 1'-0"3 EAST ELEVATION 3/8" = 1'-0"4 SOUTH ELEVATION 3/8" = 1'-0"5 NORTH ELEVATION 3/8" = 1'-0"2 WEST ELEVATION PROJECT INFORMATION CHECKED BY: DRAWN BY: SCALE: DATE: PROJECT NO: SHEET NUMBER SHEET TITLE AS NOTED SEAL 201 SOUTH MAPLE AVENUE SUITE 300 AMBLER, PA 19002 215.809.2125 www.core-states.com SUBDIVISION: LOT, BLOCK: TOWN PROJECT NO:TBD BLOCK A, LOT 15 TBD CORESTATES INC. KENNETH MACKENZIE IDAHO LICENSE #: AR-986307 EXP: 07/27/2023 4/18/2023 9:20:52 AMA201SWIG (WOOD FRAME)MERIDIAN, ID12/23/2021 M.SCHNEIDER A.NICASIO EXTERIOR ELEVATIONSW. CHINDEN BLVDMERIDIAN, ID 83646SAV.36507.SWG 1/2" = 1'-0"1 DRIVE UP MENU BOARD - BY OWNER FACADE MATERIAL PERCENTAGES - STUCCO _EAST_ _WEST_ _NORTH_ _SOUTH_ X-1 - THIN BRICK WAINSCOT 15 % 17 % 19 % 19 % 38 SF 46.75 SF 128 SF 128 SF X-2 - CORNICE 9 % 10 % 10 % 10 % 36 SF 25.5 SF 69 SF 69 SF X-3 - SIMULATED WOOD 32 % 30 % 20 % 20 % 82.5 SF 82.5 SF 138 SF 138 SF X-4 - STONE SILL 1 % 1 % 1 % 1 % 2.5 SF 3 SF 8.5 SF 8.5 SF X-5 - STOREFRONT 2 % 6 % 6 % 1 % 5 SF 15 SF 40 SF 6 SF X-8 - STUCCO 34 % 33 % 44 % 49 % 89 SF 89.5 SF 298 332 SF EXTERIOR CANOPY 3 % 3 % 1 % 0 % 7 LF 7 LF 7 LF 0 LF ISSUE DATE DESCRIPTION