Loading...
HomeMy WebLinkAboutCC - L1.5_Landscape Details W O LANDSCAPE NOTES: Q W ooa00000000 1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR Al PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING W WORK. T L7 o0 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND z Z Z o 0 CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. Q or {o 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. W W U Bc 'o 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START-UP. a t� U H oC �o 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. U z a U moo 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND Q p" ti HEALTHY CONDITION. Z v0000a o0 0o p0000 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND CALL OUT SYMBOL NUMBERS. 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3"DEPTH OF CASCADE COMPOST (2"MINUS). SUBMIT SAMPLE FOR APPROVAL.PRE-EMERGENT HERBICIDE RODNEY EVANS + PARTNERS + + + + SHALL BE APPLIED PRIOR TO MULCH INSTALLATION. reandpartners.com+208-514-3300+ 1014 S.La Pointe,Boise,Idaho 83706 9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND •� REMOVE ANY PLASTIC, BURLAP, NAILS,OR OTHER DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT 10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. • !/ ROOT GROWTH �. 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. `� • �• CONSTRUCT 2"EARTH BERM TO FORM A WATER z w > w 12. FERTILIZE ALL TREES AND SHRUBS WITH'AGRIFORM'PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. ' 'r RETENTION BASIN, FILL BERM WITH MULCH,AS 2.o}o w o =z ✓T /<• 5�0ww��o 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18"DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12"DEPTH OF TOPSOIL. SPREAD,COMPACT,AND FINE GRADE �, • r, SPECIFIED CC) �w W_W°°o z TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3"BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2"BELOW ADJACENT SURFACES OF TURF SOD AREAS,AND 1" ! �% - o- 0 o o�w _ w BELOW ADJACENT SURFACES OF TURF SEED AREAS. MULCH, PER PLANS,3"DEPTH OVER ENTIRE BED. DO ", a W z o 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF NOT COVER CROWNS OF PLANTS M ¢w=af Z,w 3 0 TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL TEST/ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, _ _ _ /jam// /�//� - _ �A� A � o z i o i ii o T Lm \ - - PROVIDE COMMERCIAL FERTILIZER TABLETS AND a � FRIABLE,SANDY LOAM,CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS,WEED SEEDS, ROCKS,GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO /\// // j� ¢ w, w o 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS,CONTRACTOR IS RESPONSIBLE TO EITHER: -III / /AA/A BIOSTIMULANT,AS SPECIFIED, FOR EACH SHRUB �1)t o 2 it 0 0 0 A)PROVIDE APPROVED IMPORTED TOPSOIL,OR - �V//VA// //// - �= �j w �x z w B)IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. _ ///x ///\ _ BACKFILL WITH APPROVED TOPSOIL AND SOIL A LENGTH,AS SPECIFIED LO uzi z w u o w 15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM,SURFACE SOIL, REASONABLY FREE OF SUBSOIL,CLAY -III j/ //\\//\ �i AMENDMENTS,AS SPECIFIED. BACKFILL IN 6"LIFTS, m OR PER PLANT SCHEDULE A LUMPS, BRUSH,WEEDS AND OTHER LITTER,AND FREE OF ROOTS,STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION,AND OTHER EXTRANEOUS OR TOXIC - WATER EACH LAYER, DO NOT TAMP OR OVER y. Q - s:C � r> ¢w a w a - - - COMPACT. B=85%OF'A' Q U) O M z o o~Z~MATTER HARMFUL TO PLANT GROWTH. - 3 = oo ¢0¢Z 0 w A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY - Q o No Lj w>-<o�m 12' WIDTH OF 12 CONSTRUCT 6"MOUND OF TOPSOIL + FF 0 - -_= 0 ¢ FROM NATURALLY,WELL-DRAINED SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. w o>0 z W o ° B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY,TOXICITY,AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY MIN. ROOTBALL MIN. mo cn p w w`_0 a}o o U) AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO ti No m a o �o a a a o TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION.ACIDITY/ALKALINITY RANGE-PH.5.5 TO 7.6. NOTES: PLAN VIEW FINISH GRADE PER PLANS 16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 17. TREES SHALL NOT BE PLANTED WITHIN 5-0"FROM THE BACK OF SIDEWALK. 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. GROUNDCOVER PLANTING PER PLANTING PLAN O �W NO LO 00 18. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0"CLEAR ZONE OF ALL STORM DRAIN PIPE,STRUCTURES,OR FACILITIES. 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. uJ 1 00 O 19. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION 3. THIN BRANCHES AND FOLIAGE BY%3. MULCH, PER PLANS, 3"DEPTH OVER ENTIRE BED. 000 A m SYSTEM. 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. DO NOT COVER CROWNS OF PLANTS O_ 20. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 5. FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED 0 M VERTICAL CUTS. A. TILL SOIL TO A DEPTH OF 12", BACKFILL WITH < - 00 �? TOPSOIL NOTES ad, °9 '_ -;°- S I APPROVED TOPSOIL AND SOIL AMENDMENTS,AS Q w p SPECIFIED. O N SHRUB PLANTING -;; �..r o -- 1. TOPSOIL REQUIREMENTS: ASTM 15268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, -III- \/\\/\\ /\\/\\ /\\/\ m X AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. NOT TO SCALE III \\/\\/\\/\\/\\/\\/\�/\\/\\/\\/\\/\\/ SUBGRADE Q iv - //\//\//\//\//\//\//\//\//\//\//\// // O LL 2 REEASONABLY FREE OF PSOIL SOURCE: SUBSOILIP I,C�AYOLUMIPS BRUSHL FROM ,WEEDS A AREAS OND OTHER F THE E ITOTER,BE DAND UFREEDOF ROOTS,STUMPS,ORGANIC MAT. TOPSOIL SHALL BE FERTILE, TER LARGER THLE, NATURAL ORN 2 INCHES N AAM,SURFACE OIY, h\/AA/AA/AA/A�/AA/AA/AA/AA/AA/AA/AA/AA/ N �A�/�A////�A//�A�/�A////�A��V// /�A//�A// / • DIMENSION,AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. 1 =III III III III III III III IIII11.0 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF 3"DEPTH OF MULCH AT PLANTER - - - - - - I I-III- I I i�' IF ' � � THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL BE BEDS -i � AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO i� 8 -1 1=i '- M TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. SECTION cIt 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE,AS REQUIRED. J4111LAA Jill 00 5. COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: - - O _ W -II III- NOTES: [�] A. LAWN AREAS:9 INCHES MINIMUM OR AS NECESSARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. B. PLANTER BEDS: 18 INCHES MINIMUM _ - _ - 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS,AS REQUIRED TO MEET FINISH - _ III APPROVED TOPSOIL AND SOIL 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2"BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND 1"FOR SEED. AMENDMENTS AS SPECIFIED BEDS. 7. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. FINISH GRADE, PER PLANS 8. ALL GRAVEL,SUBBASE,AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH PLANTER BED CUT EDGE GROUNDCOVER / PERENNIAL ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. 2 (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE PLANTING NOT TO SCALE WEED ABATEMENT NOTES. 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDING. 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH"ROUND-UP"(CONTACT HERBICIDE)OR APPROVED EQUAL. 3. DO NOT WATER FOR AT LEAST SEVEN(7)DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. ► 1� 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN(14)DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE r WATERING FOR THREE TO FIVE(3-5)DAYS. 5. APPLY SECOND APPLICATION OF"ROUND-UP"TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN(7)DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO(2)APPLICATIONS,CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDROSEEDING,ALL PLANTING AREAS SHALL BE WEED Fi r� I� TURF AREA PREPARATION NOTES: ROOT FLARE TO BE AT SOIL LINE ROOT FLARE TO BE AT SOIL LINE. PREVAILING WIND DIRECTION PREVAILING WIND DIRECTION 1. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. 2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INCHES. REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH,AND OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. SOIL LINE REMOVE DEAD/DAMAGED BRANCHES AND ' 3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE SOIL LINE PRUNE TO INTERNATIONAL SOCIETY OF REMOVE DEAD/DAMAGED BRANCHES AND r 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THICKNESS OF SOD. � \ /j ARBORICULTURE STANDARDS; IMPROPERLY � w 5. UNCHANGED SUBGRAD PRUNE TO INTERNATIONAL SOCIETY OFES: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXCAVATING,GRADING, OR SURFACE-SOIL STRIPPING OPERATIONS, PRUNED TREES(AS DETERMINED BY THE ARBORICULTURE STANDARDS; IMPROPERLY PREPARE SURFACE SOIL AS FOLLOWS: � LANDSCAPE ARCHITECT)SHALL BE REMOVED A. REMOVE EXISTING GRASS,VEGETATION,AND TURF. DO NOT MIX INTO SURFACE SOIL. \ PRUNED TREES(AS DETERMINED BY THE AND REPLACED. DO NOT REMOVE MAIN 0 B. LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. APPLY SOIL AMENDMENTS AND FERTILIZERS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX LANDSCAPE ARCHITECT SHALL BE REMOVED\ `� G / AND REPLACED. DO NOT REMOVE MAIN as LEADER!! THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE.6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. LEADER!! b' ° RUBBER CINCH TIE A. REMOVE STONES LARGER THAN 1 INCH IN ANY DIMENSION AND STICKS, ROOTS,TRASH,AND OTHER EXTRANEOUS MATTER. - RUBBER CINCH TIE B. LEGALLY DISPOSE OF WASTE MATERIAL, INCLUDING GRASS,VEGETATION,AND TURF,OFF OWNER'S PROPERTY. •� o ', 2"x 2"WOOD STAKE(LENGTH AS 7. FINISH GRADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INCH �'� 2"x 2' WOOD STAKE(LENGTH AS • REQUIRED)-DO NOT PENETRATE ROOTBALL. OF FINISH ELEVATION. ROLL AND RAKE, REMOVE RIDGES,AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT CAN BE PLANTED IN THE _- i - REQUIRED)-DO NOT PENETRATE ROOTBALL. d (,`� SEE NOTE 1. SET STAKES PARALLEL TO IMMEDIATE FUTURE. ' 00 SEE NOTE 1. SET STAKES PARALLEL TO a ° PREVAILING WIND. 8. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFACE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. 9. BEFORE PLANTING,OBTAIN LANDSCAPE ARCHITECT'S ACCEPTANCE OF FINISH GRADING; RESTORE PLANTING AREAS IF ERODED OR OTHERWISE DISTURBED AFTER FINISH PREVAILING WIND. w' GRADING. Z REMOVE TREE WRAP TRUNK PROTECTION, o AFTER INSTALLATION CONSTRUCT 2"EARTH BERM AT EDGE OF Q D ROOTBALL, FILL TREE RING W/MULCH,AS J U CONSTRUCT 2" 4O EARTH BERM AT EDGE OF v ROOTBALL, FILL TREE RING W/MULCH,AS ° °o SPECIFIED. � bi SPECIFIED. '� ° 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY 0 m o o FROM TRUNK. CONSTRUCTION 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY o FROM TRUNK. DOCUMENTS � o = FINISH GRADE N dill o_ p FINISH GRADE w Cw \//A//A// / // / �� / / // // ///�/ COMMERCIAL SLOW RELEASE FERTILIZER o w \ \ \ \ \ o VA/VA/VA/ /VA/ / V /V/ / V Q v //jam/jam/j jam/V //V// //�/jam/j TABLETS _j Q v o w v v v vv vv/ vv/vv v v v w / COMMERCIAL SLOW RELEASE FERTILIZER \ - SIDES OF HOLE ROUGH&UNEVEN o A//A / in -III = / - o / / TABLETS PROJECT DATE N BACKFILL WITH APPROVED TOPSOIL AND _III 20019.0 04-30-20 _ SIDES OF HOLE ROUGH&UNEVEN SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6"LIFTS,WATER EACH LAYER, DRAWN CHECKED II � BACKFILL WITH APPROVED TOPSOIL AND TAMP LIGHTLY AS REQUIRED BACKFILL P RE WIDTH WIDTH III WIDTH WIDTH WIDTH WIDTH WIDTH WIDTH WIDT WIDTH SOIL AMENDMENTS AS SPECIFIED. L OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/TOP OF ROOTBALL, DO NOT OVER COMPACT!! OF BALL OF BALL OF BALL OF BALL OF BALL BACKFILL IN 6"LIFTS,WATER EACH LAYER, 5' MIN. DIA. 5' MIN. DIA. TAMP LIGHTLY AS REQUIRED, BACKFILL REVISED TREE RING SOIL EVEN W/TOP OF ROOTBALL, SET ROOTBALL ON NATIVE, UNDISTURBED TREE RING SOIL DO NOT OVER COMPACT!! NOTES: SET ROOTBALL ON NATIVE, UNDISTURBED SOIL 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP 3/3 OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY NOTES: BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP%OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM SHEET TITLE 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. LANDSCAPE AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE WARRANTY PERIOD. THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE DETAILS ARCHITECT BEFORE PROCEEDING. WARRANTY PERIOD. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE MATERIAL. ARCHITECT BEFORE PROCEEDING. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. MATERIAL. SHEET 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER(DEEPROOT 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. Ll m5 DECIDUOUS TREE PLANTING CONIFEROUS TREE PLANTING NOT TO SCALE 5 NOT TO SCALE ORIGINAL SHEET SIZE 3 " " 24 x 36