HomeMy WebLinkAboutPZ - Applicant's Response to Staff Report and Requested Modification 5-18
Charlene Way
From:Amber Van Ocker <amber@lkvarchitects.com>
Sent:Wednesday, May 17, 2023 10:28 AM
To:Clerks Comment
Subject:Cole Valley Christian School AZ CUP H-2023
Attachments:Requested Mod_Staff Report.pdf
To
help
prot
ect
your
priva
cy, …
External Sender - Please use caution with links or attachments.
To
help
prot
ect
your
priva
Public Hearing Drawings.pdf
cy, …
Please accept the attached letter in response to the staff report and the presentation documents.
Sonya,
I have included the revised rendered site plan that shows the correct number of parking stalls (650) , the future
classroom additions, and the potential future relocatable classroom buildings.
I have also included a brief letter that outlines the requested modifications to the Staff Report conditions. They focus on
the timeline of completion for the work along McMillan and the extension of the Owyhee Storm and Ersatz to the north
property line. Hopefully we can discuss this during the hearing.
Thanks again for your hard work.
Amber Van Ocker
--
To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.
Amber Van Ocker, A.I.A , NCARB
LKV Architects
2400 Riverwalk Dr.
Boise, Idaho 83706
208-336-3443 Extension 101
amber@lkvarchitects.com
Idaho - Oregon
1
K LKY
K:,60mml
A R C H I T E C T S
May 16, 2023
Cole Valley Christian Schools
Annexation / Rezone/ Conditional Use
H-2023-0011
Staff Report/ Hearing Date: 5/18/2023
Requested Revisions to the Conditions of Approval:
Please accept the following suggested revisions to the Staff Report. Our revisions focus on the
required timing of the improvements to be completed with the initial phase of construction and
we respectfully request that they be completed when the entire parcel is fully developed.
Page 25 —
1.1.c (Original Requirement)
Owyhee Storm Ave and Ersatz Rd shall be constructed the full length of the subject property with
the first phase of development and the width/street section required by the Ada County Highway
District.
Revised:
Owyhee Storm Ave and Ersatz Rd shall be constructed to the north side of the proposed
development construction limits (48.88 acres) with the first phase of development at the width
/ street section required by the Ada County Highway District
1.1.d (Original Requirement)
All detached sidewalks and multi-use pathways along public streets (i.e. McMillan Rd., Owyhee
Storm Ave and Ersatz Rd) shall be constructed in the first phase of development.
Revised:
Detached sidewalks and multi-use pathways along Owyhee Storm Ave. and Ersatz Rd. shall be
constructed in the first phase of development. Sidewalks and multi-use pathways along
www.lkvarchitects.com
208.336.3443
2400 E. Riverwalk Dr.
Boise, Idaho 83706 Page 1 of 2
IL! YJ
A R C H I T E C T S
McMillan Road shall be constructed in a later phase when the 5 acre portion of the site adjacent
to McMillan Road is developed.
2.3 (Original Requirement)
a. Depict a minimum 25-foot wide street buffer along W. McMillan Rd and a minimum 20-foot
wide street buffer along Owyhee Storm Ave. measured from back of curb.
Revised:
Depict a minimum of 20-foot wide street buffer along Owyhee Storm Ave. measured from back
of curb. Provide a 25-foot wide street buffer along McMillan Road that shall be constructed in
a later phase when the 5 acre portion of the site adjacent to McMillan Road is developed.
Thank-you in advance for your consideration of these applications and suggested modifications.
The Cole Valley Christian School community is extremely excited to be a part of the City of
Meridian and see their vision continue to grow.
Respectfully,
Amber Van Ocker
LKV Architects
www.lkvarchitects.com
208.336.3443
2400 E. Riverwalk Dr.
Boise, Idaho 83706 Page 2 of 2