HomeMy WebLinkAbout2023-05-17 ACHD Development Services Department
ACHD
connecting you to more
Project/File: Compass Pointe Subdivision / MPP23-0008 / H-2023-0004
This is a rezone, a private road, and a preliminary plat application to allow for the
development of 21 single-family lots on 7.69 acres. The site is located in the southwest
corner of Locust Grove Road and Victory Road.
Lead Agency: City of Meridian"'!' '
Site address: 3245 & 3247 S Locust Grove Road53
Staff Approval: May XX, 2023
Applicant: Steve Arnold w .I-
A Team Land Consultants " „�
tn
1785 Whisper Cove Avenue �,��, a �+� 16
Boise ID 83709 r, d ML s'�`'��
] IZ, eMAW
i� �al
Jr �.
Staff Contact: Brandon Atchley, Asst. Traffic Engineer tip +sr, ,
Phone: (208) 387-6294
E-mail: batchley(a-achdidaho.org
A. Findinqs of Fact
1. Description of Application: The applicant is requesting approval of a rezone from RUT (Rural-
Urban Transition) to R-8 (Medium Density Residential), a private road, and a preliminary plat to
allow for the development of 21 single-family lots and 7 common lots on 7.69 acres.
The City of Meridian's Future Land Use Map designates this area as Medium Density Residential.
2. Description of Adjacent Surrounding Area:
Direction I Land Use Zoning
North Medium-Low Density Residential R-4
South Medium Density Residential R-8
East Medium-Low Density Residential, Medium Density Residential, R-4 / R-8 / RUT
and Rural Urban Transition Ada Count Ada Count
West Medium Density Residential R-8
3. Site History: ACHD Staff/Commission previously reviewed this site as Compass Pointe
Subdivision / MPP20-0027 in November 2020. The requirements of this staff report are consistent
with those of the prior action.
4. Adjacent Development: The following developments are pending or underway in the vicinity of
the site:
• Cache Creek Subdivision, a 13.99-AC subdivision with 41 residential lots and 4 common lots,
located directly north of the site, which was approved by ACHD staff on November 12, 2020.
5. Transit: Transit services are not available to serve this site.
1 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
6. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use
paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared
use path.
AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection
Treatments: The opening of a shared use path at the roadway should be at least the same width
as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the
path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the
full width of the ramp.
FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related
concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average
width of the trail to improve safety for users who will be traveling at various speeds. In addition, the
overall width of the trail should be increased, so the curb ramp can be slightly offset to the side.
The increased width reduces conflict at the intersection by providing more space for users at the
bottom of the ramp.
7. New Center Lane Miles: The proposed development includes 0 centerline miles of new public road.
8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building
permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time. The impact fee assessment will not be released until the civil plans are approved by ACHD.
9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
• Victory Road is scheduled in the IFYWP to be widened to 3-lanes from Meridian Road to
Locust Grove Road; design is scheduled for 2025 with no construction year available.
• Victory Road is scheduled in the IFYWP to be widened to 3-lanes from Locust Grove Road to
Eagle Road; design is scheduled for 2025 with no construction year available.
• Locust Grove Road is listed in the IFYWP to be widened to 3-lanes from Victory Road to Amity
Road; design is scheduled for 2026 with no construction year available.
• The intersection of Victory Road and Locust Grove road is to be widened as a multilane
roundabout and is currently under construction.
• Bridge#2116 over Ten Mile Creek on Victory Road is scheduled in the IFYWP to be replaced/
widened in 2023.
• Bridge #1207 over Ten Mile Creek on Locust Grove Road is scheduled in the IFYWP to be
designed in 2023 and replaced/widened in 2026.
10. Roadways to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was
adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to
implement the Planned Bicycle Network to support bicycling as a viable transportation option for
Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of
good repair in order to ensure they are consistently available for use, promote awareness of existing
bicycle routes and features and support encouragement programs and to facilitate coordination and
cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan
recommendations.
The BMP identifies Victory Road and Locust Grove Road as Level 3 facilities that will be constructed
as part future ACHD projects.
2 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 198 additional vehicle trips per day;
20 additional vehicle trips per hour in the PM peak hour, based on the Institute of Transportation
Engineers Trip Generation Manual, 111" edition.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour(VPH)
Roadway Frontage Functional PM Peak Hour PM Peak Hour
Classification Traffic Count Level of Service
Victory Road 615-feet Minor Arterial 459 Better than "D"
Locust Grove Road 1,070-feet Minor Arterial 678 "F"
*Acceptable level of service for a two-lane minor arterial is "E" (575 VPH).
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD's most current traffic counts.
• The average daily traffic count for Victory Road east of Meridian Road/SH-69 was 10,967 on
October 7, 2021.
• The average daily traffic count for Locust Grove Road south of Victory Road was 12,216 on
June 30, 2021.
C. Findings for Consideration
1. South Meridian Transportation Plan
The South Meridian Transportation Plan (SMTP) is a long-range planning tool used to identify future
roadway, intersection, and corridor needs in the South Meridian Area. Providing a framework for
future roadway improvements based on the land use designations. The plan was created in
collaboration with the City of Meridian and was adopted by the ACHD Commission in September
of 2009.
The SMTP recommends that both Victory Road and Locust Grove Road be constructed as 3-lane
residential arterials abutting the site.
2. Planning Level of Service Thresholds
a. Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such
as roadway widening and intersection improvements are infeasible as determined by ACHD,
the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall
demonstrate that impacts from the project will be offset.
• If the impacted roadway segments and/or intersections are programmed as funded in the
Integrated Five-Year Work Plan (IFYWP) or the Capital Improvements Plan (CIP); no
alternative mitigation is required.
• If the impacted roadway segments and/or intersections are not programmed in either the
IFYWP or the CIP; the applicant may (i) analyze the shoulder hour and (ii) provide a safety
analysis to determine alternative mitigation requirements.
o If the impacted roadway segments and intersections meet the minimum acceptable
level of service planning thresholds in the shoulder hour the applicant may suggest
feasible alternative mitigation such as: sidewalks, bike facilities, connectivity, safety
improvements, etc. within 1.5 miles of the proposed development.
3 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
o If the shoulder hour planning thresholds are exceeded the applicant may request to
enter into a Development Agreement and pay into the Priority Corridor Fund an
amount determined by the ACHD to offset impacts from the project.
• Alternative Mitigation may also include:
o Revision to the Phasing Plan to coincide with the District's future Capital Projects.
o Reducing the scope and/or scale of the project.
Level of Service Planning Thresholds: District Policy 7206.4.1 states that, Level of Service
Planning Thresholds have been established for principal arterials and minor arterials within
ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise
required to provide a Traffic Impact Study under section 7106, a proposed development with
site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic
shall not be required to provide mitigation for a roadway or intersection that currently exceeds
the minimum acceptable level of service planning threshold or V/C ratio.
b. Staff Comments/Recommendations: The roadway segment of Locust Grove Road south of
Victory Road currently exceeds ACHD's Acceptable Level of Service Thresholds for a 2-lane
minor arterial roadway. However, the following roadway segments and intersections are listed
as projects in either ACHD's IFYWP or CIP:
• Locust Grove Road between Victory Road and Amity Road — IFYWP
• Victory Road between Meridian Road and Locust Grove Road — IFYWP
• Locust Grove Road /Victory Road intersection —currently under construction
Therefore, consistent with District policy 7106.7.3 Alternative Mitigation Measures,which states,
if an impacted roadway segment or intersection are programmed as funded in the IFYWP, or
the CIP; no mitigation is required; no improvements are required at the intersections and
roadway segments listed above.
3. Locust Grove Road/Victory Road Intersection
a. Policy:
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, arterial street requirements, roundabout requirement,
and specific roadway features required through development. A new roundabout was identified
on the MSM. A dual-lane roundabout is planned at the Locust Grove Road/Victory Road
intersection.
b. Staff Comments/Recommendations: This intersection is currently under construction
consistent with the CIP and IFYWP, therefore no right-of-way dedication is required.
4. Locust Grove Road
a. Existing Conditions: Locust Grove Road is improved with 2-travel lanes (3 lanes at the Victory
Road intersection) and no curb, gutter or sidewalk abutting the site. There is 50 to 145-feet of
right-of-way for Locust Grove Road (25 to 68-feet from centerline).
b. Policy:
Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for
improving all street frontages adjacent to the site regardless of whether or not access is taken
to all of the adjacent streets.
Master Street Map and Typology Policy: District Policy 7205.5 states that the design of
improvements for arterials shall be in accordance with District standards, including the Master
Street Map and Livable Streets Design Guide. The developer or engineer should contact the
District before starting any design.
4 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states
that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70
feet of right-of-way. This width typically accommodates a single travel lane in each direction, a
continuous center left-turn lane, and bike lanes.
Right-of-Way Dedication: District Policy 7205.2 states that The District will provide
compensation for additional right-of-way dedicated beyond the existing right-of-way along
arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available
impact fee revenue in the Impact Fee Service Area.
No compensation will be provided for right-of-way on an arterial that is not listed as impact fee
eligible in the Capital Improvements Plan.
The District may acquire additional right-of-way beyond the site-related needs to preserve a
corridor for future capacity improvements, as provided in Section 7300.
Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to
be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between
the back-of-curb and street edge of the sidewalk is required to provide increased safety and
protection of pedestrians. Consult the District's planter width policy if trees are to be placed
within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of
7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen
the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder
adjacent to the entire site. Curb, gutter and additional pavement widening may be required
(See Section 7205.5.5).
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway
features required through development. This segment of Locust Grove Road is designated in
the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section
within 74-feet of right-of-way.
c. Applicant Proposal: South of the area of influence of the roundabout currently under
construction, the applicant is proposing to construct 5-foot wide detached concrete sidewalk on
Locust Grove Road and to dedicate 25-feet of right-of-way from centerline for the roadway
frontage south of the roundabout.
d. Staff Comments/Recommendations: As part of ACHD's intersection project, curb, gutter, and
a 10-foot wide concrete multi-use pathway will be constructed on Locust Grove Road within the
influence area of the intersection. Therefore, no improvements or right-of-way dedication are
required within this area and a road trust deposit is not required since this project is already
under construction.
The applicant's proposal to construct a 5-foot wide detached sidewalk on Locust Grove Road
outside the influence area of the intersection meets ACHD policy; however, the City of Meridian
has indicated a desire for the 10-foot wide multi-use pathway to continue along the site frontage.
ACHD is supportive of this, as Locust Grove Road south of the site is being improved with the
construction of 10-foot wide concrete pathways. If required by the City of Meridian, then the
5 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
applicant should be required to construct a 10-foot wide multi-use pathway on Locust Grove
Road abutting the site consistent with the improvements constructed as part of ACHD's
intersection project.
The applicant should be required to dedicate additional right-of-way to total 39-feet from
centerline of Locust Grove Road abutting the site. Compensation for the right-of-way dedication
will be provided since this segment of Locust Grove Road is scheduled for improvements in the
IFYWP.
5. Victory Road
a. Existing Conditions: Victory Road is improved with 2 travel lanes (3 lanes at the Locust Grove
Road intersection) and no curb, gutter, or sidewalk abutting the site. There is 72 to 93-feet of
right-of-way for Victory Road (35 to 42-feet from centerline).
b. Policy:
Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for
improving all street frontages adjacent to the site regardless of whether or not access is taken
to all of the adjacent streets.
Master Street Map and Typology Policy: District Policy 7205.5 states that the design of
improvements for arterials shall be in accordance with District standards, including the Master
Street Map and Livable Streets Design Guide. The developer or engineer should contact the
District before starting any design.
Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states
that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70
feet of right-of-way. This width typically accommodates a single travel lane in each direction, a
continuous center left-turn lane, and bike lanes.
Right-of-Way Dedication: District Policy 7205.2 states that The District will provide
compensation for additional right-of-way dedicated beyond the existing right-of-way along
arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available
impact fee revenue in the Impact Fee Service Area.
No compensation will be provided for right-of-way on an arterial that is not listed as impact fee
eligible in the Capital Improvements Plan.
The District may acquire additional right-of-way beyond the site-related needs to preserve a
corridor for future capacity improvements, as provided in Section 7300.
Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to
be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between
the back-of-curb and street edge of the sidewalk is required to provide increased safety and
protection of pedestrians. Consult the District's planter width policy if trees are to be placed
within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of
7-feet wide.
Detached sidewalks are encouraged and should be parallel to the adjacent roadway.
Meandering sidewalks are discouraged.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen
the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder
6 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
adjacent to the entire site. Curb, gutter and additional pavement widening may be required
(See Section 7205.5.5).
ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map
(MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway
features required through development. This segment of Locust Grove Road is designated in
the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section
within 74-feet of right-of-way.
c. Applicant Proposal: West of the area of influence of the roundabout currently under
construction, the applicant is proposing to dedicate approximately 37-feet of right-of-way from
centerline of Victory Road abutting the site.
The applicant is proposing to construct a 20-foot wide gated emergency access only driveway
onto Victory Road located approximately 262-feet east of the west property line.
d. Staff Comments/Recommendations: As part of ACHD's intersection project, curb, gutter, and
a 10-foot wide concrete multi-use pathway will be constructed on Victory Road within the
influence area of the intersection. Therefore, no improvements or right-of-way dedication are
required within this area and a road trust deposit is not required since this project is already
under construction. .
The applicant should be required to dedicate additional right-of-way to total 39-feet from
centerline of Victory Road abutting the site outside the influence area of the intersection.
Compensation for the right-of-way dedication will be provided since this segment of Victory
Road is scheduled for improvements in the IFYWP.
The applicant's proposal to construct a 20-foot wide gated emergency access only onto Victory
Road is approved, as proposed. The driveway should be restricted with either a gate or bollards
located outside of the right-of-way, as determined by the Meridian Fire Department.
6. Private Roads
a. Existing Conditions: There is an existing 12-foot wide unimproved driveway from the site onto
Locust Grove Road located 223-feet south of Victory Road (measured centerline-to-centerline).
b. Policy:
Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada
County establish the requirements for private streets. The District retains authority and will
review the proposed intersection of a private and public street for compliance with District
intersection policies and standards. The private road should have the following requirements:
• Designed to discourage through traffic between two public streets,
• Graded to drain away from the public street intersection, and
• If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of
50-feet from the near edge of the intersection and a turnaround shall be provided.
Driveway Location Policy: District policy 7205.4.5 requires driveways located on minor
arterial roadways from a signalized intersection with a single left turn lane shall be located a
minimum of 330-feet from the nearest intersection for a right-in/right-out only driveway and a
minimum of 660-feet from the intersection for a full-movement driveway.
District policy 7205.4.5 requires driveways located on minor arterial roadways from a signalized
intersection with a dual left turn lane shall be located a minimum of 330-feet from the nearest
intersection for a right-in/right-out only driveway and a minimum of 710-feet from the intersection
for a full-movement driveway.
7 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
Successive Driveways: District policy 7205.4.6 Table 1 a, requires driveways located on minor
arterial roadways with a speed limit of 50 MPH to align or offset a minimum of 425-feet from
any existing or proposed driveway.
Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or
more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a
maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-
volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be
required for low-volume driveways with less than 100 VTD.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7205.4.8, the applicant should be required to pave the driveway its full width and at least 30-
feet into the site beyond the edge of pavement of the roadway and install pavement tapers in
accordance with Table 2 under District Policy 7205.4.8.
Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross
access utilizes a single vehicular connection that serves two or more adjoining lots or parcels
so that the driver does not need to re-enter the public street system.
c. Applicant Proposal: The applicant is proposing to close the existing driveway from the site
onto Locust Grove Road with landscaping.
The applicant is proposing to construct a 24-foot wide private road from the site onto Locust
Grove Road located 770-feet south of Victory Road and in alignment with Coastline Street on
the east side of Locust Grove Road across from the site.
The applicant is proposing to construct a gated entry on the private road access located 80-feet
beyond the proposed crosswalk.
d. Staff Comments/Recommendations: The location of the proposed private road meets District
policy and should be approved, as proposed. If the City of Meridian approves the private road,
the applicant shall be required to pave the private roadway a minimum of 20 to 24-feet wide and
at least 30-feet into the site beyond the edge of pavement of all public streets and install
pavement tapers with 15-foot curb radii abutting the existing roadway edge. If private roads are
not approved by the City of Meridian, the applicant will be required to revise and resubmit the
preliminary plat to provide public standard local streets in these locations.
Street name and stop signs are required for the private road. The signs may be ordered through
the District. Verification of the correct, approved name of the road is required.
ACHD does not make any assurances that the private road, which is a part of this application,
will be accepted as a public road if such a request is made in the future. Substantial redesign
and reconstruction costs may be necessary in order to qualify this road for public ownership
and maintenance.
The following requirements must be met if the applicant wishes to dedicate the roadway to
ACHD:
• Dedicate a minimum of 50-feet of right-of-way for the road.
• Construct the roadway to the minimum ACHD requirements.
• Construct a stub street to the surrounding parcels.
The applicant's proposal to gate the private road meets District policy ,as it is proposed to be located
in excess of 50-feet from edge of Locust Grove Road. A turnaround should be provided for the
gated private road.
8 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
7. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
8. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
9. Other Access
Locust Grove Road and Victory Road are classified as minor arterials roadways. Other than the
access specifically approved with this application, direct lot access is prohibited to these roadways
and should be noted on the final plat.
D. Site Specific Conditions of Approval
1. Outside the influence area of the Locust Grove Road/Victory Road intersection project dedicate
additional right-of-way on Victory Road to total 39-feet from centerline. Compensation will be
provided for this right-of-way dedication.
2. Outside the influence area of the Locust Grove Road/Victory Road intersection project dedicate
additional right-of-way on Locust Grove Road so to total 39-feet from centerline. Compensation will
be provided for this right-of-way dedication.
3. Outside the influence area of the Locust Grove Road/Victory Road intersection project on Locust
Grove Road, construct either a 5-foot wide detached concrete sidewalk or, if required by the City of
Meridian, construct a 10-foot wide multi-use pathway to match the improvements constructed as
part of ACHD's intersection project.
4. Construct a 20-foot wide emergency access only driveway onto Victory Road located 262-feet east
of the west property line. Restrict this driveway to emergency access only with a gate or bollards
located outside the right-of-way.
5. Close the driveway on Locust Grove Road located 223-feet south of Victory Road with landscaping,
as proposed.
6. Construct a 24-foot wide private road onto Locust Grove Road located 770-feet south of Victory
Road and in alignment with Coastline Street on the east side of Locust Grove Road across from
the site, as proposed.
7. Install street name and stop signs for the private road/drive aisles. The signs may be ordered
though the District. Verification of the correct, approved name of the road is required.
8. If the private road is gated, then locate the gate a minimum of 50-feet from the edge of Locust Grove
Road and provide a turnaround.
9. Beyond the private road approach on Locust Grove Road, direct lot access is prohibited to Locust
Grove Road and Victory Road and should be noted on the final plat.
9 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
10. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
11. Payment of impact fees is due prior to issuance of a building permit.
12. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities
Act (ADA) requirements. The applicant's engineer should provide documentation of ADA
compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number)for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled)are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
the planned use of the property which is the subject of this application, shall require the applicant
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
10 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Appeal Guidelines
11 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
VICINITY MAP
I,kl,nxok ' '
ti 4 r 11. .a
016
F IN
1 f�41
-1
�Fa11:II1 till. y % , * + '
- } hJ %P
;
•' ! L . JI'1 } S
'J
l_ Yl -ift
�fensa St " F Fathom 9t
i. :; s '
`Ta
MW ,.
Ard
oA
. t.y �w r ` , °� Imo`` w� , -
R '
x _� 1
k
on IP
r �} • i '4
41
kr [ � r
i r
12 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
SITE PLAN
-
V I I I
I I I �
�v L--J L- il L--J L
A II i
i
i
i I
\ i
V
0
yY
C
0 G
d
13 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway and
road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5)working days upon notification of required right of way improvements
by Highway entities, developers shall provide written notification to the affected utility owners and
the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to,
project limits, scope of roadway improvements/project, anticipated construction dates, and any
portions critical to the right of way improvements and coordination of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the utility
owners. Conference notification shall also be sent to the UCC. During the review meeting the
developer shall notify utilities of the status of right of way/easement acquisition necessary for their
project. At the plan review conference each company shall have the right to appeal, adjust and/or
negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter
of review indicating the costs and time required for relocation of its facilities. Said letter of review
is to be provided within thirty calendar days after the date of the plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the anticipated
date work will commence. This notification shall indicate that the work to be performed shall be
pursuant to final approved plans by the highway entity. The developer shall schedule a
preconstruction meeting prior to right of way improvements. Utility relocation activity shall be
completed within the times established during the preconstruction meeting, unless otherwise
agreed upon.
Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com
for e-mail notification information.
14 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
Development Process Checklist
Items Completed to Date:
®Submit a development application to a City or to Ada County
®The City or the County will transmit the development application to ACHD
®The ACHD Planning Review Section will receive the development application to review
®The Planning Review Section will do one of the following:
❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at
this time.
®Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
®Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
❑For ALL development applications, including those receiving a"No Review" letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non-Subdivisions)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to ACHD Construction (for approval by Development Services &Traffic
Services). There is a one week turnaround for this approval.
❑Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application"to ACHD Construction—Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you
are placing>600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment&Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion&Sediment Control Narrative&Plan,done
by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being
scheduled.
❑ Final Approval from Development Services is required prior to scheduling a Pre-Con.
15 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all of
the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily
and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
and Clerk of the District, which must be filed within ten (10) working days from the date of
the decision that is the subject of the appeal. The notice of appeal shall refer to the
decision being appealed, identify the appellant by name, address and telephone number
and state the grounds for the appeal. The grounds shall include a written summary of the
provisions of the policy relevant to the appeal and/or the facts and law relied upon and
shall include a written argument in support of the appeal. The Commission shall not
consider a notice of appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working days
from the date of the filing of the notice of appeal to reply to the notice of the appeal, and
may during such time meet with the appellant to discuss the matter, and may also consider
and/or modify the decision that is being appealed. A copy of the reply and any
modifications to the decision being appealed will be provided to the appellant prior to the
Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the Development Services
Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice
of appeal and the reply shall be delivered to the Commission at least one (1) week prior
to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
16 DRAFT Compass Pointe Subdivision /
MPP23-0008 / H-2023-0004