Loading...
HomeMy WebLinkAboutPZ - Finished Floor Plan ...... ......... ......... ......... ......... ......... ......... ......... ......... ......... C j SAVORY MANAGEMENT UNISEX RESTROOM EF-1 EB-1 - - - - - - I ,�O � STORAGE Q 3 I II 102 ........ ........ q EF-1 9 I I I 3 L` I 4 > c� I . J C'0 m 00 I' p zo I. S-1 W — I S-2 r - - - - - r z Q c r — — — - 0 I 2 = 0 N _ — KITCHEN I S2 U 100 3 �.0000 j W i i EF-1 3 7-1b (D 5 7 I I EB-1 13' -5 1/2" 5-8" l000r I I T-0" 3 3'-4" 2' - 6 3 3 � � CORE STATES 8 � 8 . ........... . ........... .... M=Wm MAP.���� GROUP 135 WATER STREET SUITE 201 NAPERVILLE,IL 60540 630.413.1110 www.core-states.com SEAL NORTH FINISH FLOOR PLAN �. 1/2"= 1'-0" ISSUE DATE DESCRIPTION FINISH FLOOR PLAN GENERAL NOTES INTERIOR FINISH SCHEDULE FLOOR FINISH SCHEDULE � KEYNOTES A. FLOOR FINISHES ARE CONTINUOUS. ALL FLOORING IS TO CONTINUE MARK MATERIAL DESCRIPTION MARK MATERIAL DESCRIPTION lO MOP SINK; COORDINATE WITH PLUMBING DRAWINGS BENEATH'ALL ELEMENTS IN CONTACT WITH THE FLOOR. WHITE;SMOOTH; 10' HIGH SHEETS SEE DETAIL. . CONTRACTOR TO COORDINATE OPENINGS AND PROVIDE FRP-1 FRP (WHITE) 1/A501 EF-1 EPDXY FLOOR EPDXY FLOOR; SEE SPEC ON SHEET A151 O2 2"x 4" HOLE IN COUNTER FLOORING WITHIN OPENINGS NOT SPECIFICALLY IDENTIFIED.. PAINT PROJECT INFORMATION B. ALL PRODUCTS ARE TO BE PROVIDED AND INSTALLED PER P-1 (WHITE) HIGH PERFORMANCE EPDXY 3 FLOOR DRAIN/ FLOOR TROUGH/ FLOOR SINK; COORDINATE WITH MANUFACTURERS PUBLISHED REQUIREMENTS AND FASTENED AND. " O PLUMBING I 1/Al l l PROJECT NO: " SW-06SAL C. - W 2 O ION OF SODA LINE COORDINATE WITH ADHERED ACCORDING TO APPROVED METHODS FULL HEIGHT STAINLESS STEEL U CHANNEL WITH " DATE- 12/23/2021 ALL EXPOSED SURFACES ARE TO BE PREPARED TO RECEIVE NEW S-1 SS U-CHANNEL WING SIZE; 18 GAUGE; #4 SATIN FINISH; 90° 4 APPROXIMATE LOCATION S; C SCALE: AS NOTED FINISHES. ANGLES. . PLUMBING DRAWN BY: M.SCHNEIDER D. ALL WIRE FRAMES, CONDUIT, ACCESS PANELS, GILLES, FIRE FULL HEIGHT'STAIN STAINLESS STEEL CORNER GUARD 0 MILLWORK AND STAINLESS STEEL COUNTER W/ 6" BACKSPLASH; BASE CHECKED BY. M.PELINI EXTINGUISHER CABINETS, ELECTRICAL PANELS AND MECHANICAL SS CORNERL BASE FINISH SCHEDULE 5 . S-2 WITH 2" WING SIZE; 18 GAUGE; #4 SATIN FINISH; 90° CABINETS SHALL BE WHITE MELAMINE OPEN SHELVING; COORDINATE SUBDIVISION: TBD DEVICES SHALL.BE.FI.NISHED TO MATCH THE ADJACENT SURFACE ........... GUARD MARK MATERIAL DESCRIPTION WITH OWNER UNLESS NOTED OTHERWISE. ANGLE LOT, BLOCK: BLOCK A, LOT 15 E. CONTRACTOR TO REPORT ANY DISCREPANCIES IN PRODUCT 6 CUTOUTS IN COUNTERTOP FOR DROP-IN SINKS. SEE EQUIPMENT TOWN PROJECT NO: TBD QUALITY TO ARCHITECT FOR REVIEW AND APPROVAL. EB-1 EPDXY BASE 6" HIGH BASE MATCH FLOOR,SEE SPEC. SCHEDULE FOR DROP-IN SINK CUTOUT DIMENSIONS F. COMMENCEMENT OF WORK ON ANY SURFACE BY THE SEE DETAIL; b/A631 SHEET TITLE CONTRACTOR MEANS ACCEPTANCE OF THOSE SURFACES. O7 COVED EPDXY BASE FINISH AT BASE CABINET TOE KICK G. FLOOR TRANSITION HEIGHTS NOT TO EXCEED 1/4"MAXIMUM. PROVIDE APPROPRIATE TRANSITION AT EACH LOCATION WHERE ® 2" HOLE IN COUNTER FOR POS FLOOR MATERIAL CHANGES. H. RUN FLOORING UP TO MILLWORK AND UNDER OPEN COUNTERTOPS.. O9 APPROXIMATE LOCATION OF FLOOR CLEANOUT;.CO.ORQINATE WITH FI N ISH TLOOR PLAN I. COORDINATE COUNTERTOP FINISHES WITH OWNER PLUMBING J. THE PAINT COATING SYSTEM SHALL INCLUDE A PRIMER THAT SHALL CONTRAST.WITH THE WHITE OR SPECIAL COLOR SELECTED FOR THE INTERMEDIATE AND FINISH COATS TO ALLOW OWNER AND CONTRACTOR TO VERIFY EACH COAT OF PAINT HAS BEEN INSTALLED SHEET NUMBER 04 K. GC TO VERIFY THAT ALL FLOOR AND GROUND SURFACES ARE 60. STABLE, FIRM,AND SLIP RESISTANT. LAl 13 C) ......... ......... ......... . THE SURFACE SLOPE OF ALL FLOORING SHALL NOT EXCEED 2% IN co ANY DIRECTION. ......... .................. ......... ......... ......... ......... ......... N O N N