Loading...
HomeMy WebLinkAboutPZ - Building Elevations Know all before lyou dig. DUTCH BROS. COFFEE - ID0802 - MERIDIAN, ID w. 3 Dial 811 00 c rn L U1 O C O 0 v 0 rn c 0 U (n T.O. T.O. PRE-FINISHED PARAPET i O PARAPETS PARAPETS CAP FLASHING, PRE-FINISHED PARAPET O _ +25'-6" +25'-6" SIDING PRE-FINISHED PARAPET C COLOR TO MATCH CAP FLASHING, CAP FLASHING, O 1A SIDING SYSTEM SIDING SYSTEM COLOR TO MATCH SYSTEM SIDING SYSTEM O PRE-FINISHED PARAPET COLOR TO MATCH 2B 1A 2A CAP FLASHING, 2A 1A iC Q O T.O.PARAPET 2 T O.PARAPET 2 cn i COLOR TO MATCH h (D + +23'-6" PRE FINISHED PARAPET LIGHTED SIGN, PRE FINISHED PARAPET FRAMED CANOPY; SIDING 1A +23' MECHANICAL UNIT BEYOND; P RE FINISHED PARAPET PRE-FINISHED PARAPET 0) L CAP FLASHING, INSTALLED BY SIGN CONTRACTOR, CAP FLASHING, DOWNSPOUTS TO STORM DRAIN - SCREENED BY PARAPET LASHING, - - - CAP FLASHING, 0 N COLOR TO MATCH COORD.W/ELECTRICAL J-BOX COLOR TO MATCH OR TRENCH DRAIN&DAYLIGHT SYSTEM R TO MATCH COLOR TO MATCH E_ 2B AND BLOCKING REQUIREMENTS 1A TO DRIVE AISLE 2A LIGHTED SIGN, 1A T.O.PARAPET 1 INSTALLED RSIGN hT.O.PARAPET 1 a ■. CONTRACTOR, X � +21�_p�� +21�_p 3 COOOD.W/ELECTRICAL SIDING SYSTEM ■ SIDING SYSTEM M J-BOX AND BLOCKING SIDING SYSTEM 1 B �a iB D O REQUIREMENTS 1B �/J O o \` � a U O CORNICE TO MATCH SIDING SYSTEM CORNICE TO MATCH ;� 1A 9 1B iq U N Z Q T.O.CORNICE T.O.CORNICE _0 CORNICE TO MATCH O � BAND CORNICE TO MATCH - - - - - - - - - - 1A W 0 CD BAND O -0 L B.O.FIN. c CANOPY FRAMED PRE-FAB. 0 METALAWNINGS, CANOPY FASCIA BY OTHERS V C -- dl 7 +- - c -O B.O.AWNING STOREFRONT _ Z PRE-FAB. SYST EM METALAWNINGS, +10_0^ 0 O PRE-FAB. - BY OTHERS PRE-FAB LIGHT FIXTURE O L METALAWNINGS, METALAWNINGS, 8'-0"B.O.FIXTURE O T BY OTHERS r CANOPY SOFFIT BY OTHERS L4 aL+ d /// �� SIDING SYSTEM / ■ 0 L ll1 eF ,.r LED MENU BOARD FINISH 1 B O iI 5 IS � �� +3-2 SITION +3'-2" O d WINDOW SILL I. TRAN STONE VENEER � O 44 N SERVICE SERVICE - 0 O U WINDOW SILL+2'-10" — WINDOW SILL+2--101, N N STONE VENEER - - N STONE VENEER - - O STONE VENEER - N • 0 �' 6"STEEL PIPE BOLLARD {T.O.SLAB _ T.O.SLAB W/PLASTIC SLEEVES +0-01, +0,-0" O L STONE VENEER STAINLESS STEEL STONE VENEER O U DRIVE AISLE GAS METERS DRIVE AISLE SERVICE TRAY c O O Q�z + O � 0) p � 015 a 4 SOUTH ELEVATION OO 3 NORTH ELEVATIONN a SCALE: 3/16" = V-0" SCALE: 3/16" = 1'-0" o �i � Q O PRE-FINISHED PARAPET > uj CAP FLASHING, Ci COLOR TO MATCH c : L 2A SIDING SYSTEM .N U T.O. SIDING SYSTEM i B N 0 PARAPET3 2A OI L6 0 +25'-6" PRE-FINISHED PARAPET PRE-FINISHED PARAPET CL SIDING SYSTEM CAP FLASHING, CAP FLASHING, CL U 1A CORNICE TO MATCH SIDING SYSTEM COLOR TO MATCH COLOR TO MATCH Q c i 1A O 1A 1A N �; EXTERIOR FINISH SCHEDULE ITQPARAPET2 L +23' PRE-FINISHED PARAPET PRE-FINISHED PARAPET Q_ L. CAP FLASHING, CAP FLASHING, ADDRESS NUMBERS, L SIDING SYSTEM SIDING SYSTEM O O U COLOR TO MATCH COLOR TO MATCH PROVIDED BY SIGN m D 1A iB 1A 1C XXXX 7 VENDOR.COORD.W/AHJ w ID TAG MATERIAL MANUFACTURER MODEL REMARKS TO.PARAPET 1 REQUIREMENTS.PROVIDE II HIGH CONTRAST W/ u � ZONE 1 (BODY) BACKGROUNDcz) cn > 1A STUCCO COLOR:DB DARK GRAY INSTALLED BY SIGN CONTRACTOR, DD D ® � � � � � - - -I - i 3-COAT SYSTEM W/ACRYLIC MEDIUMLIGHTED HTED x _a a SAND FINISH;REVEALS AS SHOWN COOOD.W/ELECTRICAL J-Box x AND BLOCKING REQUIREMENTS MECHANICAL UNIT 3-COAT SYSTEM W/ACRYLIC MEDIUM COLOR:REFLECTION, N 1B STUCCO BEYOND;SCREENED N SAND FINISH;REVEALS AS SHOWN SW7661 FRAMED 0 T.O.CORNICE CANOPY _ _ - BY PARAPET 3-COAT SYSTEM W/ACRYLIC MEDIUM COLOR:MARCH WIND, BAND FASCIA O j 1C STUCCO SAND FINISH;REVEALS AS SHOWN SW7668 +14'-0^ ® T 0 0 j ZONE 2(TOWER) B.O.FIN. N N CANOPY -.. .. -. - - / 04 0 Q 2A FIBER CEMENT NICHIHA ILLUMINATION,AWP 1818&3030 w/ COLOR:DB BLUE +12'-0^ CORNICE TO MATCH > SIDING MATCHING PANEL CORNERS 1A BOTH SIDES -0 N FIBER CEMENT VINTAGEWOOD,AWP 1818 w/ T T T T T T T STONE VENEER �I c o 2B SIDING NICHIHA MATCHING PANEL CORNERS COLOR:ASH - 3 IIk O 3 0 p ZONE 3(BASE) STOREFRONT j SYSTEM CANOPY 0 STONE +10'-0" SOFFIT U VENEER ELDORADO STONE CLIFFSTONE,BANFF SPRINGS COLOR:PER MFR. O / L4 LIGHT FIXTURE, 3 // c /� 8'-0"B.O.FIXTURES •21 t J / STONE SILL ELDORADO STONE SNAPPED EDGE WAINSCOT SILL COLOR:PEWTER N Q 6"STEEL PIPE BOLLARD %� %� %� / %� �� �� �� �- _ / %� A�x (n ZONE 4(BUMP OUT SOFFIT) W/PLASTIC SLEEVE // Q O SIDING SYSTEM Q 3 SIDES; COLOR:OLD WINDOW SILL C c 4 FASCIA FLAT METAL FASCIA TOWN GRAY(DB GRAY AS +3'-2^ %/ // / (D in AVAILABLE) {SERVICE D_ -p WINDOW SILL+2'-10" N U NATURAL NORTHWESTERN 1x8,T&G,1/8"REVEAL, m / STOREFRONT SYSTEM& O 5 SOFFIT HEWN ELEMENTS 0 LAI DOOR PER PLAN SPRUCE SEALED ROOF OVERFLOW DOWNSPOUT LL_ 0 NOTE:PROVIDE 3"x2"SMOOTH DOWNSPOUTS&ALL NECESSARY ADAPTORS AT AWNING LOCATIONS;COLOR DB DARK GRAY I T.O.SLAB / //_ "0 m +0' Ln O DRIVE AISLE STONE VENEER STAINLESS STEEL SIDING SYSTEM STOREFRONT SYSTEM& STONE VENEER STOREFRONT SYSTEM& —I _0 0'-6" 0 SERVICE TRAY 1 B DOOR PER PLAN 3O DOOR PER PLAN X T 7 0 N V N 2 EAST ELEVATION Ix _ > 04 °� o 0 L SCALE: 3/16" = 1'-0" E 044 � II =I O 3a c L 0 N p N 0 T.O. 0 3 PARAPET 3 PRE-FINISHED PARAPET O +25'-6" PRE-FINISHED PARAPET PRE-FINISHED PARAPET CAP FLASHING, p SIDING SYSTEM CAP FLASHING, SIDING SYSTEM CAP FLASHING, PRE-FINISHED PARAPET COLOR TO MATCH O U COLOR TO MATCH CORNICE TO MATCH SIDING SYSTEM COLOR TO MATCH 2A 0 L i g 1 1 C 1 B CAP FLASHING, + 0 OA 1A O 1A COLOR TO MATCH SIDING SYSTEM � T.O.PARAPET 2 O E P RE FINISHED PARAPET 2B 2A V U +23'-6" - C SIDING SYSTEM MECHANICAL UNIT BEYOND,R TO MATCH 2B SCREENED BY PARAPET .. C N fiT.O.P1_0ARAPET 1 LIGHTED SIGN, vI 0 - - INSTALLED BY SIGN L N CONTRACTOR, /^��' O L 4 4 D D 0ELEC RI AD. /L J BOX W O U AND BLOCKING O S 0 CORNICE TO MATCH REQUIREMENTS •� � N �> T.O.CORNICE FRAMED � BAND CANOPY FASCIA ■� B.O.FIN. CANOPY +12'-0" c rn -0OwlN m -0 < c B.O.AWNING L TT CANOPY SOFFIT U O Ln 4-+ f V M o 0 N 0 c Lrn ® LIGHT FIXTURE iW V 00 L4 LIGHT FIXTURE, 6-0"B.O.FIXTURE _c 8'-0"B.C.FIXTURES v a U STONE VENEER �� ROPOSED r �1 i �A/ O 0 O TRA H O PROPOSED PROPOSED - � O FINIS _ PROPOSED NSITION METER METER METER METER _ L +3'- " SOCKET SOCKET SOCKET / SOCKET 0 {SERVICE = LOCATION LOCATION = LOCATION _ LOCATION N U to WINDOW SILL+2'-10" - —� �� — 6"STEEL PIPE BOLLARD U C c LLI 0 O SIDING SYSTEM \ W/PLASTIC SLEEVES +� 1B 0 (n D T.O.Sch LAB O- m j +0 0 PRE-FAB.METALAWNINGS EXTERIOR DOOR, STONE VENEER PRE-FAB.METALAWNINGS EXTERIOR DOOR, SIDING SYSTEM STONE VENEER EXTERIOR DOOR, SIDING SYSTEM EXTERIOR DOOR, PRE-FAB.METALAWNINGS EXTERIOR DOOR, DRIVE AISLE GAS METERS N _ p,6„ &DOWNSPOUT,BY OTHERS PAINTED PER PLAN O3 &DOWNSPOUT,BY OTHERS PAINTED PER PLAN 1 C 0 PAINTED PER PLAN 1 B PAINTED PER PLAN &DOWNSPOUT,BY OTHERS PAINTED PER PLAN O N U c m N mm cn U O U WEST ELEVATION Z O EPRELIMINARY NOT FOR CONSTRUCTION SCALE: 3/16" = 1'-0" ' N N 0I rn t's 0 Know Call be ore you DUTCH BROS. COFFEE - ID0802 - MERIDIAN ID C111 before you dig. 3 �VA� Dial 811 7 a c L U O L O -p Q L 0 U U7 T.O. T.O. vi PARAPET 3 PRE-FINISHED PARAPET PARAPET 3 L 0 CAP FLASHING, PRE-FINISHED PARAPET p - +25'-6" +25'-6" SIDING PRE-FINISHED PARAPET COLOR TO MATCH CAP FLASHING,O CAP FLASHING, PRE 0 1A SIDING SYSTEM SIDING SYSTEM COLOR TO MATCH 'FINISHED SYSTEM SIDING SYSTEM 26 1A 2A - SFLASHING,HED PARAPET ® COLOR TO MATCH 1 C CAP c/j T.O.PARAPET 2 COLOR TO MATCH T.O.PARAPET 2 N * +23'-6" PRE FINISHED PARAPET LIGHTED SIGN, PRE FINISHED PARAPET FRAMED CANOPY; 1A +23' MECHANICAL UNIT BEYOND; PRE FINISHED PARAPET PRE-FINISHED PARAPET O L CAP FLASHING, INSTALLED BY SIGN CONTRACTOR, CAP FLASHING, DOWNSPOUTS TO STORM DRAIN SIDING 0 SCREENED BY PARAPET CAP FLASHING, CAP FLASHING, 2BLOR TO MATCH AND BLOCKING W/ELECTRICAL NOTS 1 OLOR TO MATCH R DRIVE TRENCH DRAIN&DAYLIGHT SY 2TLE AEM LIGHTED SIGN, 1 OLOR TO MATCH COLOR TO MATCH J Q T.O.PARAPET 1 INSTALLED RSIGN TO.PARAPET 1 Q w CONTRACTOR, x p +21'-0" +21'-0" N COLOD.W/ELECTRICAL SIDING SYSTEM • in z SIDING SYSTEM ���/� J-BOX AND BLOCKING SIDING SYSTEM 1 B co 0 (a:) D REQUIREMENTS 1 g �/J O \L Lti���� a o�0 U U 0 � .2 CORNICE TO MATCH �9 SIDING SYSTEM CORNICE TO MATiA 4_ 1B Q T.O.CORNICE T.O.CORNICE ORNICE TO MATCH O BAND CORNICE TO MATCH BAND - - - - - - -11 A 0 L _J 41+141-011 LU B.O.FIN. O -0 L RE-FHB. c CANOPY FRAMED 0 CANOPY FASCIA1;j=,-tB� ETALAWNINGS, C +12'-0" Y OTHERS V U 7 EQ B.O.AWNING CD STOREFRONT mn m ���� PRE-FAB. SYST EM V�r11L•711/� METALAWNINGS, +10'-01, 0 O PRE-FAB. BYOTHERS PRE-FAB. LIGHT FIXTURE L METALAWNINGS, METALAWNINGS, 8'-0"B.O.FIXTURE O > BY OTHERS CANOPY SOFFIT BY OTHERS L4 0 M -1 / -- - - � O u1� '_ ��1_ SIDINGSYSTEB 0 L 111 __ LED MENU BOARD FINISH • O Q WINDOW SILL _ / / ' ' -_ _ _ r_ Q2 TRANSITION tl +3'-2" �� - +3'-2" STONE VENEER O N SERVICE - - _ SERVICE 3� O � U WINDOW SILL+2'-10" WINDOW SILL+2'-10" N STONEVENEER N STONE VENEER STONEVENEER N 0 6"STEEL STEEL PIPE BOLLARD %� %� % ON le - T.O.SLAB W/PLASTIC SLEEVES T.O.SLAB O L STONE VENEER STAINLESS STEEL STONE VENEER 0 O DRIVE AISLE GAS METERS DRIVE AISLE +� -0'-6„ CD SERVICE TRAY -0'-6" 0 Q!2 O c N O P� p °D 4 SOUTH ELEVATION O 3 NORTH ELEVATION N 0 ESCALE: 3/16"= 1'-0" SCALE: 3/16" = 1'-T �I 3 � Q N p PRE-FINISHED PARAPET > N Uj CAP FLASHING, Of p O COLOR TO MATCH c Lp 2A SIDING SYSTEM 0' O PARAPET 3 SIDING SYSTEM 16 c 0 2A 0 +25'-6" PRE-FINISHED PARAPET PRE-FINISHED PARAPET Q +L SIDING SYSTEM CAP FLASHING, CAP FLASHING, Q CORNICE TO MATCH SIDING SYSTEM COLOR TO MATCH COLOR TO MATCH Q T.O.PARAPET2 1A 1A 16 1A 1A R O PRE-FINISHED PARAPET LLASHING, INISHED PARAPET \\\\� vi E EXTERIOR FINISH SCHEDULE +23 CAP FLASHING, ADDRESS NUMBERS,O O COLOR TO MATCH SIDING SYSTEMR TO MATCH SIDING SYSTEM PROVIDED BY SIGNp m 1A 1C XXXX VENDOR;COOOD.W/AHJ ID TAG MATERIAL MANUFACTURER MODEL REMARKS REQUIREMENTS.PROVIDE o hT.O.PARAPET 1 HIGH CONTRAST W/ u � +U -1-' ZONE 1 (BODY) +21'-0° BACKGROUND c LIGHTED SIGN, 1A STUCCO COLOR:DB DARK GRAY INSTALLED BY SIGN CONTRACTOR, DD D O 4RIR 4RRu 4 - -- -I - -L 3-COAT SYSTEM W/ACRYLIC MEDIUM Q SAND FINISH;REVEALS AS SHOWN COORD.W/ELECTRICAL J-BOX x AND BLOCKING REQUIREMENTS MECHANICAL UNIT O 3-COAT SYSTEM W/ACRYLIC MEDIUM COLOR:REFLECTION, N 1 B STUCCO BEYOND;SCREENED N SAND FINISH;REVEALS AS SHOWN SW7661 FRAMED 0 -0 T.O.CORNICE CANOPY BY PARAPET N 3-COAT SYSTEM W/ACRYLIC MEDIUM COLOR:MARCH WIND, BAND FASCIA — O > _0 1 C STUCCO SAND FINISH;REVEALS AS SHOWN SW7668 +14'-0', ® o0 p � o v ZONE 2(TOWER) B.O.FIN. O O CANOPY N Q 2A FIBER CEMENT NICHIHA ILLUMINATION,AWP 1818&3030 w/ COLOR:DB BLUE 0712'-0" COR BOTHOSIDESCH SIDING MATCHING PANEL CORNERS FIBER CEMENT VINTAGEWOOD,AWP 1818 w/ a 2B NICHIHA COLOR:ASH SOTONEVENEER I c p SIDING MATCHING PANEL CORNERS g 3 p ZONE 3(BASE) STOREFRONT C C SYSTEM CANOPY \:i11�►f�� %� %� %� %� %� %� %� A� � 'N 0 STONE +10'-0" SOFFIT U VENEER ELDORADO STONE CLIFFSTONE,BANFF SPRINGS COLOR:PER MFR. / / / / / / / L4 LIGHT FIXTURE, c 3 �� �� �� 8'-0"B.O.FIXTURES .21 J STONE SILL ELDORADO STONE SNAPPED EDGE WAINSCOT SILL COLOR:PEWTER N N Q 6"STEEL PIPE BOLLARD /� /� /� / /� Ate., '. Ai /� /� ;;� \ ,�% (n ZONE 4(BUMP OUT SOFFIT) W/PLASTIC SLEEVE /� Q SIDING SYSTEM Q 3 SIDES; COLOR:OLD WINDOW SILL Op 4 FASCIA FLAT METAL FASCIA TOWN GRAY(DB GRAY AS +3'-2" p AVAILABLE) SERVICE a a WINDOWSILL+2'-10" \ \ \ a1 U NATURAL NORTHWESTERN 1x8,T&G,1/8"REVEAL, STOREFRONT SYSTEM& `o 0 � 5 SOFFIT HEWN ELEMENTS /A , /A /A / v- 0 0 SPRUCE SEALED ROOF OVERFLOW DOWNSPOUT /� /iA /� ji/ /� // DOOR PER PLAN a LL Ai Ai Ai Ai Ai i�/ 0 NOTE:PROVIDE 3"x2"SMOOTH DOWNSPOUTS&ALL NECESSARY ADAPTORS AT AWNING LOCATIONS;COLOR DB DARK GRAY T.O.SLAB -0 m +0'''" 0" DRIVE AISLE STONE VENEER STAINLESS STEEL SIDING SYSTEM STOREFRONT SYSTEM& STONEVENEER STOREFRONT SYSTEM& -p 0 7Z 3O SERVICE TRAY 1 B DOOR PER PLAN 3O DOOR PER PLAN xI 7 8 2 EAST ELEVATION N c > NI _ p = O 0 — co O O L SCALE: 3/16" = 1'-0" 0 � N � 0 0 a L o v � N o -0 N T.O. c Y 0 3 PARAPET 3 PRE-FINISHED PARAPET 0 ! U a p +25'-6" PRE-FINISHED PARAPET PRE-FINISHED PARAPET CAP FLASHING, < p CAP FLASHING, CAP FLASHING, COLOR TO MATCH SIDING SYSTEM SIDING SYSTEM PRE-FINISHED PARAPET O O COLOR TO MATCH CORNICE TO MATCH SIDING SYSTEM COLOR TO MATCH 2A 0 1C CAP FLASHING, � p 0 1A 1A 1B 1A COLOR TO MATCH SIDING SYSTEM • T.O.PARAPET 2 O E ^ Tt 64 PRE-FINISHED PARAPET 2B ® V U L :p CAP FLASHING, O p COLOR TO MATCH SIDING SYSTEM MECHANICAL UNIT BEYOND; ?i .L 1A 2B SCREENED BY PARAPET • w C O LIGHTED SIGN, O T.O.PARAPET 1 INSTALLED BY SIGN L j +21'-0" J N � ICI�v I CONTRACTOR, O N vmamvT- _ 7mwu D D O ELEC ELECD.TRICAL J-BOX W 2 U AND BLOCKING t v > CORNICE TO MATCH ao9 REQUIREMENTS .� T.O.CORNICEL — FRAMED 0 N BAND 4CANOPY FASCIA N +14'-0" CD M W N /�� > B.O.FIN. V/ > O N U CANOPY B.O.AWNING CV a p U +10'-0" vi fl- ROPY SOFFIT (��' 0 0 /�/� p O LIGHT FIXTURE W V � V J - L4 LIGHT FIXTURE, 8'-0"B.O.FIXTURE 8'-0"B.C.FIXTURES L6 �I 1 10 / N U a �_ �__ / �_ O STONE VENEER / 00 cn O FINISH 3 / PROPOSED PROPOSED PROPOSED / / PROPOSED / A / O 0 TRANSI / METER METER / METER / / METER / A - +3'-2" �� SOCKET SOCKET SOCKET SOCKET - 0 SERVICE LOCATION LOCATION LOCATION b LOCATION (j 0 Uj WINDOW SILL+2'-10" 6"STEEL PIPE BOLLARD U 0 O SIDING SYSTEMS \ \R \\ \ �/ \\ � C C W/PLASTIC SLEEVES W (n O T.O.SLAB \ D_ m +0� PRE-FAB.METALAWNINGS EXTERIOR DOOR, STCNEVENEER PRE-FAB.METALAWNINGS EXTERIOR DOOR, SIDING SYSTEM STONEVENEER EXTERIOR DOOR, SIDING SYSTEM EXTERIOR DOOR, PRE-FAB.METALAWNINGS EXTERIOR DOOR, DRIVE AISLE GAS METERS N 0 6„ &DOWNSPOUT,BY OTHERS PAINTED PER PLAN 0 &DOWNSPOUT,BY OTHERS PAINTED PER PLAN 1C 0 PAINTED PER PLAN 1B PAINTED PER PLAN &DOWNSPOUT,BY OTHERS PAINTED PER PLAN O N p C o N m WEST ELEVATION E O z q ° p ALE: 1 " = 1'- " a N77F7FLIMINARY SC 3/ 6 0 cm rnl 0 Know what's oreyoubelow. DUTCH BROS. COFFEE - ID0802 - MERIDIAN ID p Call before you dig. 3 �V � Dial 811 a A C .21 64'-6" L 66'-0" CANOPY, 6'-0 C w O r-+ � AB VE v p L 0 FRAMED O 0-, � CANOPY :_ ABV. C y O N O L O -E U � Q � I L o II III II II o, z � E II II L �J J 0 1 III X V) FRAMED 3 CANOPY ♦^ v ABV. o 0 0 0 0 RUNNER AREA 02 co 0 a II U Ij jl L❑J Q nn n W oE 0 it III PRODUCTION r� - - - D�L � O /� -/ /� QQ � _ z SUITE D(DUTCH BROS) O a c USABLE: 1,371 S.F. v O LEASABLE: 1,531 S.F. v � II W o �I III 0 L Cl _ � 0 z II II o II v v� — L it III STORAGE L o \'A � O ❑ III �� — UNISEX o U COOLER OFFICE/\ �L/ sa — J ,d / ESSIBLE PROPOSED v °' STORAGE _ — — / METER N 7_ PROPOSED Y — — ® MECH. I / GAR/ 5LOOCATION 6 LOCATION � SOCKET GAS METERS N o L T ROOM vI / N o � II —� {7 Q, O za — v _c L LJ o Po v, O O °O : TOTAL BUILDING SQUARE > FOOTAGE :GROSS = 5,910 SQ. FT. 3� a O � c? U) rn a� SUITE C Q v USABLE: 1,295 S.F. a v LEASABLE: 1,380 S.F. O L J 04 v c � CL m E N (V L N v C3-j 11 11 Q p 0) .Q a6 xI O AWNING O U ABV. N T N v Q AWNLG PRE-FAB.MET L (VI ABV.AWNING,ABO E O A2�2 f 1 A20 00 v J o +� CANT STRIP, ROOF DRAIN SINGLE PLY ROOFING MEMBRANE, PRE-FAB.METAL p N Q AS NECESSARY W/OVERFLOW, OVER DENSDECK BOARD, � AWNING,ABOVE PER PLAN, OVER 2 LAYERS OF INSULATION, - �-+ IN SUMP OVER SHEATHING,PER PLAN _ 0 E a > _ - of I c v v LL v F— � o -71- a� •O AWNING N J o ABV. •c L J N v PROPOSED p c: Q r METER • (n SOCKET �- p LOCATION Q C FILLER, O 0) (MIN.EXPANDING FOAM AWNING U OR SIMILAR) ABV. O _a v SUITE B Q L L MAIN ROOF DRAIN, OVERFLOW ROOF DRAIN, ro N VI PIPETS)STORM SYSTEM, PIPE TO LAMB'S TONGUE,18'A.EF., N USABLE: 1,359 S.F. 0 m OR TRENCH DRAIN, REFERENCE SHEET A6.0 N V) p PER PLAN FOR LOCATIONS LEASABLE: 1,445 S.F. ob J a X � Q O 7 J Q MET\L `W M"ING�BO E (1 O NI 0 3 TYPICAL 4" ROOF & OVERFLOW DRAIN DETAIL Vl SOCKET O LOCATION = 00 L O O L6. m v � SCALE: 1-1/2" = 1 -0" L v PRE-FAB.METAL = •� N AWNING,ABOVE 0 O Q C O C i v 3 O p BUILDING EXTERIOR WALL, y= AWNING 0 ^ PER PLAN ABV. PROPOSED .; E C0 SOCKET ETERV LOCATION O v .► BUILDING ROOF DRAIN U) d SIZE AND LOCATION, AWNING to PER PLAN 4) = o c'0 Im 0 TRENCH DRAIN, FLUSH W/ TOP OF SIDEWALK SUITE e- 0 DAYLIGHT TO FACE OF CURB USABLE: 1,378 S.F. •� > LEASABLE: 1,532 S.F. 4) 000ORD. SLAB THICKNESS AND L JI D, W M w > ° REINFORCEMENT W/ CIVIL 0 > 0 U) �_ 000N o c +, N ASPHALT, L PRE-FAB.METAL N C co Q PER CIVIL AWNING,AB VE U ILP .2 U) ++ L 0') -0 ————————-- ° d d ° ° ° ' r v o v --------- 16 N v - a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 PRE-FAB.METAL O /_/ AWNING,ABOVE o \,\\\\�\,\\\� ;�/,\SIDEWALK, PER PLAN \%\, \\,\ 00 0 QF7D LL.............. j 0 F- v C 3 W v o // A� O In O p -' - PRE-AB.METAL J � �• � AWNING,ABOVE 1_D 64'_6" 1'-6 m — N O S N vi C N o 2 DOWNSPOUT DISCHARGE DETAIL, TYP. FLOOR PLAN 1 _O E � PRELIMINARY Z U) a o SCALE: 3/4" = 1'-0" SCALE: 3/16" = 1'-0" 0' 2' 4' 0 N �I NCN N O GENERAL NOTES: O 3-0" 56'-0" 5'-0" 1. THIS DRAWING IS FOR EQUIPMENT LAYOUT PURPOSES 12'-0" 39'-0" 5'-0" ONLY. PLEASE SEE FLOOR PLAN FOR FULLY A6.0 DIMENSIONED PARTITION LOCATIONS AND ASSEMBLIES. a V-0" 3'-6 1/2" N-0"x 6'-0"R.O. 3'-5 1/2" FRAMED CANOPY NOTES: o SILL AT2-1o"A.F.F. 4 FREEZE MACHINE RECEPTACLES ABOVE ABV. 2. NOTE: PLEASE SEE SHEET G1.0, COVER SHEET, FOR CODE n �1 U MACHINES AT CEILING AREA. ELECTRICALTO SUMMARY, BUILDING DATA AND EXIT ACCESS PROVIDE RECEPTACLES BELOW TABLES AS A d ALTERNATE LOCATION FOR THE FREEZE REQUIREMENTS. IT-9 EQ20 MACHINES ELECTRICAL (2)EQ21 @ TRANSOM 4 Q2, ELECTRICAL n LSATOFFOCEAONDRUNNERAREAsoNALL 3. G.C.TO VERIFY ALL DIMENSIONS IN THE FIELD BEFORE fA) sA-, COMMENCING CONSTRUCTION. �3 G.C.TO PROVIDE WALL GUARD AT SERVICE Q N WINDOWS W/SILL WRAP,REFER TO FINISH PLAN ON SHEETA2.o 4. ALL FIRE EXTINGUISHERS SHALL BE STATE OF IDAHO o Q17 3 qz.� ; O ❑4 ELECTRICAL TO PROVIDE QUAD RECEPTACLES CERTIFIED.ALL FIRE EXTINGUISHERS SHALL BE BE s1. T-9A n d ` °`°^A.F.F. PROPERLY MOUNTED AT THE HEIGHT REQUIREMENTS OF EQ3 o x NO HIGHER THAN 4'-6"A.F.F.TO THE TOP OF THE n EQ4 w 01 v U21 _ �5 ELECTRICAL TO PROVIDE 50A CIRCUIT FORGNICH o P-5 L "' EQ21 FUTURE RETROFIT TO ESPRESSO WORKSTATION EXTINGUISHER AND AT LEAST 6" FROM FLOOR TO THE 3 EQ10 �. BOTTOM OF EXTINGUISHER. (NFPA 10: 6.1.3.8) 4 �6 FUTURELECTRICAL IT PROVIDE QUAD RECEPTACLE AT ARCHITECTURE x FRAMED EQ1 7) -3 FUTURE MONITOR LOCATION CANOPY EQ12 Q17 �00 O • cone ¢ HPROVIDE TRENCH DRAIN OR FLOOR SINK W/FULL5. ALL PROPERLY MOUNTED FIRE EXTINGUISHERS SHALLT I I t16 RUNNER AREA "ANGERs Q N GRATE NOT EXCEED 76 OF TRAVEL DISTANCE APART. (NFPA 1: 6.1) S I U D I O EQ13 t o° Aav q jp Ta d M 9 x AN OREGON LIMITED LIABILITY COMPANY .3 P_8 F7 � TV MONITOR Nd 8 PROVIDE STOREFRONT DOOR AT MANAGER'S m EQS 1 EQ7 N °'' m ,n v v �"� VE BY EQ13 Agy (2)ROLLING J�J m OFFICE,COORD.W/DOOR SCHEDULE ON SHEET OWNER CABINETS 6. FIRE EXTINGUISHERS SHALL BE CONSPICUOUSLY p; O d wd O a d d O d T-7 A2.1 d w d w TRASH BINS E EQ2 w v w w � w PROVIDED Aav/� —/� LOCATED WHERE THEY ARE READILY ACCESSIBLE AND PRODUCTION _ 3 3 BY OWNER T 11 �9 PROVIDE FULL LITE DOOR,REFER TO DOOR 7 SCHEDULE ON SHEETA2.1 IMMEDIATELY AVAILABLE IN THE EVENT OF FIRE. (NFPA 10: N vai _ 1� ELECTRICAL NOTE:ALL OPEN SIGN RECEPTACLES 6.1.3) 1 EQ7 e2W. 5 EQ18 (6) B2yv P-5 NEEDS TO BE}HOT&SWITCHED _ P-s EQ,a (4)ABV EQ10 P q SUITE D(DUTCH BROS) N Q, Pq EQ6 EQ12 EQ6 EQ13 USABLE: 1,364 S.F. Ay,2 7. FIRE EXTINGUISHERS SHALL BE LOCATED ALONG NORMAL 1001 SE SANDY BLVD, SUITE 100 o d EQ7 II II Z'ACIA LEASABLE:1,531 S.F. N Q,3 Q,3 PATHS OF TRAVEL, INCLUDING EXITS FROM AREAS. (NFPA PORTLAND, OR 97214 w EQ18 ) II — — — 10: 6.1.3) V. 503.552.9079 w T, OI Q,7 0 ® �° 0 0,3 F. 503.241.7055 EQ2 L J "` a 8. FIRE EXTINGUISHERS SHALL NOT BE OBSTRUCTED OR WWW,GNICHARCH.COM — ..,,, o ' OBSCURED FROM VIEW. (NFPA 10: 6.1.3.3) EQ5 I N N n z EQ25 d L ¢� x g`W 7. TACTILE SIGNAGE SHALL BE PROVIDED AT ALL EXIT DOORS o F-Z EQ13 II�2)�ay. STORAGE SA-2Q E Q12 q,)II Q15 0o L / \\ 6— L — — TO MEET THE FOLLOWING CRITERIA: o w EQ,o // rn „ Q13 Q13 A. TACTILE SIGNAGE SHALL BE LOCATED AT EACH EXIT DOOR REQUIRING AN EXIT SIGN; z III °15 5°" z 2 / AWNING B. TACTILE SIGNAGE SHALL READ AS FOLLOWS: "EXIT"; � � P-5 Q13 \ / 9 / LUNISEX ABV. C. TACTILE SIGNAGE SHALL COMPLY WITH ICC/ANSI A117.1 EQ4 COOLER OFFICE/\ / 3d d N U EQ3 1 O J O / ESSIBLE PROPOSED o w IT-9A EQ15 STORAGE pi / METER a SOCKET 3 Q15 I / 6Q° LOCATION w .a w @TRANSOM z MECH. GAP 5'-0^ r-6° Q21 T III a ROOM \\II / J ID GM GM M PARTITION KEY IJ 0 {� B o TA-10 a a EQa �� BAC EQEQ8KFLOW 2a L P_2 NEW FULL HEIGHT DEMISING WALL O EQ28 Q13 O L J PREVENTION T3 EQ8B DEVICE NEW EXTERIOR WALL CONSTRUCTION U J v °J FULL HEIGHT DEMISING 00000000000000000 NEW EXTERIOR OVERBUILD WALL,EXTEND TO d DE K ABV., N REFER TO STRUCTURAL NEW EXTERIOR CLADDING N (V NEW FULL HEIGHT INTERIOR PARTITION TENA N T SPACE I SHELL SPACE TO BE N X 04 a INFILLED BY FUTURE L J M 8'-°„ N TENANT IMPROVEMENT M 0 O _ _ — J SUITE C 5, 9 1 O S.F. WATER RISER 0 A6.0 2 N (V AWNING USABLE: 1, 295 S.F. TOTAL BUILDING 05 m ABV. EQ31 ROOF ACCESS EQ30 LADDER& LEA SABLE: 1,376 S.F. S.F. AB Q29 HATCH ABV AWNING N N FULL HEIGHT DEMISING UTILITY WALL,EXTEND TO — — ROOM DECK ABV., - REFER TO STRUCTURAL v � a AWNING TENA N T SPA CE ABV MAIN DISCONNECT ^' PRO SHELL SPACE TO BE M TER SED N /O��\\ SOCKET W INFILLED BY FUTURE LOCATION TC C) AWNING (DlJ ABV. TENANT IMPROVEMENT C) m SUITE B °x - U os a O � L L o USABLE. 1,359 S.F. C 0 N Z 0 O -4 LEASABLE■ 1,438 S.F. S CKRTED 00 LOCATION • FULL HEIGHT DEMISING C WALL,EXTEND TO DECK ABV., REFER TO STRUCTURAL vLu N Z cn � AWNING ISSUED FOR OWNER N ABV TENA N T SPA CE OCKOTED LOCATION REVIEW: 12.05.2022 SHELL SPACE TO BE r AWNING o INFILLED BY FUTURE ABV. TENANT IMPROVEMENT ce REV: DATE: DESCRIPTION: SUITE A O cV x °] V L J M o - - USABLE: 1,378 S.F. LEASABLE: 1,511 S.F. 0 cV N cV 0 0 SHEET NAME: m D 3 SHELL FLOOR PLAN A6.0 AWNING 1'-6" 3-0" 2'-2" ABV. 810" 2-2" 4'-6" 36'_8" 7-6" V-6 64'-0" SHEET NUMBER: �ISHELL FLOOR PLAN /A 1 • O SCALE: 3/16" = 1'-0" 0' 2' 4' /`� I -_"" COPYRIGHT 2022