HomeMy WebLinkAbout2023-03-31 Meridian Pathways (AWENDIAN�---
Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Cole Valley Christian School AZ, CUP
File No: H-2022-0011 AZ,CUP Date: 3.31.2023
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Final Approval,the applicant shall submit a public access easement for a detached 10'
wide multi-use pathway (concrete sidewalk)from McMillan Rd along the full length of Owyhee
Storm Ave to be constructed this project phase. Multi-use pathway is also indicated along the
east side of Ersatz Place Road, but since the full roadway section will not be constructed this
phase,future pathway will be constructed by the entity/developer who completes the roadway
section. Pathway easement shall be a minimum of 14' wide (10' pathway + 2' shoulder each
side). Dedicated easements are not required for any pathway that lies within the public right-of-
way.
Use standard City template for public access easement. Submit all easement documents online
through Citizen's Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final
approval the applicant's engineer shall provide written documentation that the pathway
segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
6. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
not(nor are they intended to)override those of the irrigation district having jurisdiction over the
project area.
Rev.02.11.22
O i
i
y �
i
d �
i
m i
III
i
I
II 'I
i
i
Id
pull
n n � k
1
O
sass ■ � �■ o I.= � ' �I
MIN
i 111
y Ilel
MOMILIMI xu s
�-t $
a � M
's a
9
8
n m. Cole Valley Christian Schools a §
a N Site Development Plan 's m 1yT 1
0 a AA®> aRM
Meridian,Idaho < i • —