HomeMy WebLinkAbout20230404163903025N T RAL DISTRICT HEALTH DEPA
Environmental H—ealth Diyision
MENT . Return to:
Cl Boise,
C3 Eagle
0 /U V El Garden City
Rezone # 4eridian
Conditional Use # El Kuna
Preliminary / Final / Short Plat 0 ACZ
El Star
M
We have No Objections to this Proposal.
ClIrY OF ME RIDIAN-1
Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal.
We will require more data concerning soil conditions on this Proposal before we can comment.
EJ 5. Before we can comment concerning individual sewage disposal, we will require more data concerning the depth of:
CJ high seasonal ground water El waste flow characteristics
El or bedrock from original grade E) other
EJ 6. This office will require a study to assess the impact of nutrients and pathogens to receiving ground waters and/or
surface waters.
07. This project shall be reviewed by the Idaho Department of Water Resources concerning well construction and
water availability.
8. After written approval from appropriate entities are submitted, we can approve this proposal for:
• central sewage 0 community sewage system El community water well
• interim sewage C3 central water
El individual sewage Q individual water
9. The following plan(s) must be submitted to and approved by the Idaho Department of Health & Welfare,
Division of Environmental Quality:
0 central sewage C3 community sewage system C] community water
El sewage dry lines El central water
Ell 10. Run-off is not to create a mosquito breeding problem.
11. This Department would recommend deferral until high seasonal ground water can be determined if other
considerations indicate approval.
12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State
Sewage Regulations.
013. We will require plans be submitted for a plan review for any:
El food establishment El swimming pools or spas
0 beverage establishment Q grocery store
No
C3 child care center
Reviewed By:
Date: _1L_1LJE1.LZ
Review Sh
CMD&W1kc