Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Photometric Plan 2023-01-20_IMH_Ten Mile_CCT
0.3 0.4 0.5 0.6 0.6 0.4 0.4 1.1 2.0 3.1 3.6 3.6 3.5 2.9 1.9 0.9 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.7 1.1 1.5 1.5 1.0 0.4 1.2 2.8 5.7 8.8 9.4 8.5 5.2 2.5 1.0 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.0 1.7 2.8 3.5 2.4 0.3 0.8 2.2 5.0 10.5 12.6 9.6 4.5 2.0 0.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 1.3 2.3 4.6 7.5 5.4 0.0 0.0 0.0 0.0 0.8 1.6 2.8 5.9 11.7 11.5 0.0 0.0 0.0 0.0 1.0 1.9 3.3 7.0 13.4 13.7 0.0 0.0 0.0 0.0 1.1 2.1 3.9 8.2 13.7 10.3 0.0 0.0 0.0 0.0 1.1 2.1 3.8 8.1 13.9 10.8 0.0 0.0 0.0 0.0 0.9 1.8 3.3 7.0 13.3 14.1 0.0 0.0 0.0 0.0 0.8 1.6 2.7 5.9 11.4 10.7 0.0 0.0 0.0 0.0 0.8 1.3 2.3 4.4 6.8 4.7 0.0 0.0 0.0 0.0 0.6 1.0 1.6 2.6 3.1 2.1 0.3 1.0 2.6 6.1 13.0 17.2 20.3 17.4 13.2 6.4 2.7 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.4 0.7 1.0 1.3 1.3 0.9 0.5 1.3 3.0 6.1 9.9 12.7 14.7 12.9 10.2 6.3 3.1 1.3 0.5 0.2 0.1 0.0 0.0 0.0 0.0 0.3 0.4 0.5 0.6 0.5 0.4 0.5 1.1 2.1 3.5 4.7 5.5 5.9 5.5 4.7 3.6 2.2 1.2 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.8 1.4 2.0 2.5 2.8 2.9 2.8 2.5 2.0 1.4 0.9 0.4 0.2 0.1 0.1 0.0 0.0 0.0 Luminaire Schedule Tag Qty Description LLF Luminaire Lumens Luminaire Watts Total Watts BUG Rating EOC-32 5 XWM-FT-LED 06L-40 0.765 6666 47 235 B2-U0-G2 Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min CCT BLDG MOUNTED Illuminance Fc 2.66 20.3 0.0 N.A. N.A. (EOC-32) (EOC-32) (EOC-32) ARCHITECT REVISION HKS PROJECT NUMBER DATE SHEET TITLE SHEET NO.PRINT DATE: ISSUE © HKS, INC.TEMPLATE VERSION: KEY PLAN MODEL: PROJECT ADDRESS: TITLE BLOCK VERSION: CIVIL GREAT BASIN ENGINEERING, INC 5746 S 1475 E #200 SOUTH OGDEN, UT 84403 LANDSCAPE SOUTH BECK & BAIRD 2002 S VISTA AVENUE BOISE, ID 83705 STRUCTURAL REAVELEY ENGINEERS 515 EAST 100 SOUTH, SUITE 1200 SALT LAKE CITY, UT 84102 MECHANICAL & PLUMBING VAN BOERUM & FRANK ASSOCIATES, INC 181 EAST 5600 SOUTH, SUITE 200 MURRAY, UT 84107 ELECTRICAL SPECTRUM ENGINEERS 324 STATE ST, SUITE 400 SALT LAKE CITY, UT 84111 1/4/2023 3:05:15 PM Autodesk Docs://25275.000_Intermountain Saltzer Ten Mile Abulatory Building 2_2022/220241 ELEC CENTRAL.rvt ES103 CCT SITE PHOTOMETRIC PLAN 01/04/23 25275 50% CONSTRUCTION DOCUMENTS21.0.0.20200831 875 S VANGUARD WAYMERIDIAN, ID 83642HKS, INC. DENVER PLACE 999 18TH STREET, SUITE 2255N DENVER, CO 80202 INTERMOUNTAINTEN MILE CCT, CATHLAB & CV CLINICSEAL & SIGNATURE .00020210830NO. DESCRIPTION DATE SCALE: 1/8" = 1'-0"1 CCT SITE PHOTOMETRIC PLAN SCALE: 1/4" = 1'-0"2 CCT SITE CALCULATION SUMMARIES 02/21/23 A-2023-0001