Loading...
HomeMy WebLinkAboutElevations 2023-01-20_IMH_Ten Mile_CCTLEVEL 01 100' -0" CCT-2CCT-1 A5.00/06A5.00/09 3' - 4" 8" 4' - 0" 8" 4' - 8" 8" 4' - 3 7/8" MODULAR BRICK RUNNING BOND METAL COPING CMU TO MATCH EXISTING METAL COPING MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSEA5.00/07T.O. COPING14' - 4"8' - 0"A5.00/08T.O. COPING18' - 4"EXISTING TRANSFORMER MODULAR BRICK WEAVE BOND COURSE LEVEL 01 100' -0" CCT-B CCT-A A5.00/054' - 0"1' - 0"4' - 8" 8" 4' - 0" 8" 3' - 4" BRICK SOLDIER COURSE METAL COPING LOCKING SLIDING WINDOWS BRICK SOLDIER COURSE BRICK SOLDIER COURSE METAL COPING 4' - 0"6' - 4" 8' - 0" BRICK WEAVE BOND COURSE LEVEL 01 100' -0" CCT-2 CCT-1A5.00/06A5.00/07 4' - 3 7/8"8" 4' - 8" 8" 4' - 0" 8" 3' - 4" 14' - 4"18' - 4"MODULAR BRICK RUNNING BOND METAL COPING MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSE MODULAR BRICK WEAVE BOND COURSE LEVEL 01 100' -0" CCT-B CCT-A A5.00/054' - 3 7/8"8"9' - 4" 8" 3' - 4" 18' - 4"MODULAR BRICK RUNNING BOND METAL COPING MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSE MODULAR BRICK SOLDIER COURSE A5.00/10MODULAR BRICK WEAVE BOND COURSE LEVEL 01 100' -0"14' - 11 3/4"15' - 4"14' - 0"A5.00/0618' - 0"A5.00/07TRUSS BEARING9' - 1 1/8"12' - 0"8' - 8 5/8"3"TRUSS BEARING12' - 4 1/2"3"1 1/2" BOTTOM PLATE1 1/2" 104 5/8" STUDS 3" DOUBLE TOP PLATE 1 1/2"1 1/2" BOTTOM PLATE 144" STUDS 3" DOUBLE TOP PLATE A5.00/08HEADER SPACE1' - 5 1/2"10 1/8"DOOR HEIGHT11' - 2"0" 35' - 6 1/2" /A7.00 11 LEVEL 01 100' -0" CCT-A 4"5' - 4" 8" 8' - 0" CMU (MIN 3 HR RATED) 3" MINERAL WOOL INSULATION STANDARD BRICK BRICK SOLDIER COURSE METAL COPING STRUCTURAL FOUNDATION 2" XPS INSULATION 6" GRAVEL COURSE CONCRETE SLAB ON GRADE R-20 BATT INSULATION IN 2X6 WOOD STUDS @ 16" OC PLYWOOD SHEATHING 2X TREATED WOOD BOTTOM PLATE METAL FLASHING TOP OF MASONRY14' - 0"SINGLE PLY ROOFING SYSTEM STUDS8' - 8 5/8"CEILING AS SCHEDULED OPEN WEB JOISTS W/ INTEGRAL PARAPET FRAMING LEVEL 01 100' -0"A5.00/05TRUSS BEARING12' - 4 1/2"TRUSS IS BOTTOM BEARING W/ INTEGRAL PARAPET (BOTTOM CHORD IS FLAT W/ SLOPED TOP CHORD) 1/4" / 12"TOP OF MASONRY18' - 0"LEVEL 01 100' -0"A5.00/056' - 0"8' - 0" 6' - 0"4' - 0" 4' - 0" 1/4" / 12"TOP OF MASONRY14' - 0"TRUSS BEARING9' - 1 1/8"LEVEL 01 100' -0" CCT-A 3" MINERAL WOOL INSULATION STANDARD BRICK BRICK SOLDIER COURSE METAL COPING STRUCTURAL FOUNDATION 2" XPS INSULATION 6" GRAVEL COURSE CONCRETE SLAB ON GRADE R-20 BATT INSULATION IN 2X6 WOOD STUDS @ 12" OC PLYWOOD SHEATHING STANDARD BRICK BRICK SOLDIER COURSE BRICK SOLDIER COURSE4"4' - 0" 8" 4' - 8" 8" 4' - 0" 8" 3' - 4" OPEN WEB JOISTS W/ INTEGRAL PARAPET FRAMING 2X TREATED WOOD BOTTOM PLATETOP OF MASONRY18' - 0"STUDS12' - 0"LEVEL 01 100' -0" CCT-2 3" MINERAL WOOL INSULATION STANDARD BRICK BRICK SOLDIER COURSE METAL COPING STRUCTURAL FOUNDATION 2" XPS INSULATION 6" GRAVEL COURSE CONCRETE SLAB ON GRADE 2X6 WOOD STUDS @ 12" OC PLYWOOD SHEATHING BOTH SIDES STANDARD BRICK BRICK SOLDIER COURSE BRICK SOLDIER COURSE4"4' - 0" 8" 4' - 8" 8" 4' - 0" 8" 3' - 4" OPEN WEB JOISTS W/ INTEGRAL PARAPET FRAMING 2X TREATED WOOD BOTTOM PLATETOP OF MASONRY18' - 0"STUDS12' - 0"GYP BOARD I N T E R I M R E V I E W O N L Y Architect: Arch. Reg. No.: permit, or construction purposes. are not intended for regulatory approval, are released for interim review only and These documents are incomplete, and Date: ARCHITECT REVISION HKS PROJECT NUMBER DATE SHEET TITLE SHEET NO.PRINT DATE: ISSUE © 2022 HKS, INC.TEMPLATE VERSION: KEY PLAN XXXXXX XXXX XX/XX/XXXX MODEL: PROJECT ADDRESS: TITLE BLOCK VERSION: 25275.000 CIVIL LANDSCAPE STRUCTURAL MECHANICAL & PLUMBING ELECTRICAL GREAT BASIN ENGINEERING, INC 5746 S 1475 E #200 SOUTH OGDEN, UT 84403 SOUTH BECK & BAIRD 2002 S VISTA AVENUE BOISE, ID 83705 VAN BOERUM & FRANK ASSOCIATES, INC. 181 EAST 5600 SOUTH, SUITE 200 MURRAY, UT 84107 REAVELEY ENGINEERS 515 EAST 100 SOUTH, SUITE 1200 SALT LAKE CITY, UT 84102 SPECTRUM ENGINEERS 324 STATE ST, SUITE 400 SALT LAKE CITY, UT 84111 DENVER PLACE 999 18TH STREET, SUITE 2255N DENVER, CO 80202 HKS, INC. SEAL & SIGNATUREINTERMOUNTAIN HEALTHCARETEN MILE CCT, CATH LAB & CV CLINIC875 S VANGUARD WAYMERIDIAN, ID 8364204-Jan-23 13:47:53 Autodesk Docs://25275.000_Intermountain Saltzer Ten Mile Abulatory Building 2_2022/A_10MILE_MOB1_2022.rvt A5.00 CCT BULIDING EXTERIOR ELEVATIONS AND SECTIONS 12/20/2022 50% CONSTRUCTION DOCUMENTS21.0.0.20200831 INTERMOUNTAIN HEALTHCARETEN MILE CCT, CATH LAB & CVCLINICSEAL & SIGNATURE20210830 1/8" = 1'-0"01 CCT NORTH ELEVATION 1/8" = 1'-0"02 CCT EAST ELEVATION 1/8" = 1'-0" 03CCT SOUTH ELEVATION 1/8" = 1'-0"04CCT BUILDING WEST ELEVATION 1/8" = 1'-0"05 CCT BULDING LONGITUDINAL SECTION 1/4" = 1'-0"09WALL SECTION AT CMU 1/8" = 1'-0" 06CCT BUILDING SECTION AT GARAGE 1/8" = 1'-0"07 CCT BUILDING SECTION AT RESIDENCE 1/4" = 1'-0"08WALL SECTION AT BRICK NO. DESCRIPTION DATE 1/4" = 1'-0"10 WALL SECTION AT WEST 02/21/23 A-2023-0001