Loading...
HomeMy WebLinkAbout2023-03-16 Ada County Dev Services for Commercial Bldg Ale AEC HUD Alexis Pickering, President Jim D. Hansen,Vice-President Kent Goldthorpe,Commissioner Dave McKinney,Commissioner Miranda Gold,Commissioner March 16, 2023 To: Brandon Sheltrown 2997 E Deerhill Drive Meridian, ID 83642 Subject: MER23-0025/A-2023-0052 Parcel # R1815110060 Modern Craftsman Commercial Building The Ada County Highway District(ACHD) has reviewed the submitted application for the application referenced above and has determined that there are no improvements required to the adjacent street(s). The applicant shall be required to: 1. Pay a traffic impact fee. If applicable, a traffic impact fee may be assessed by ACHD and will be due prior to the issuance of a building permit by the lead agency. This is a separate review process and it is the applicant's responsibility to submit plans directly to ACHD. • Payment can be accepted over the phone by calling (208) 387-6170 or can be sent/delivered to the following address: Ada County Highway District Attn: Development Services 1301 N Orchard St, Suite 200 Boise, ID 83706 • Reference the file number above when making the payment. • Please note: o Fees are subject to change if not paid prior to October 1 st o All card payments are subject to a 3% processing fee o All e-check payments are subject to a $1.50 processing fee • For any questions regarding the traffic impact fee please contact ACHD's Impact Fee Administrator at impactfees(a)achdidaho.org. 2. Comply with all ACHD Policies and ACHD Standard Conditions of Approval for any improvements or work in the right-of-way. 3. Obtain a permit for any work in the right-of-way prior to the construction, repair, or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.). Ada County Highway District•3775 Adams Street•Garden City, ID•83714• PH 2O8-387-6100• FX 345-7650•www.achdidaho.org Traffic Information Condition of Area Roadways: Traffic Count is based on Vehicles per hour VPH Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Black Cat Road 0-feet Collector 66 Better than "D" * Acceptable level of service for a two-lane collector is "D" (425 VPH). Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD's most current traffic counts • The average daily traffic count for Black Cat Road north of Chinden Boulevard was 1,697 on October 19, 2021. If you have any questions, please feel free to contact me at (208) 387-6329. Sincerely, ptl. ul Carbella Loise Medina Planning Review Intern Development Services cc: City of Meridian — Stacy Hersh Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 2O8-387-6100•FX 345-7650•www.achdidaho.org Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right- of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.6,the applicant may be required to update any existing non-compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387- 6280 (with file number)for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 2O8-387-6100•FX 345-7650•www.achdidaho.org