HomeMy WebLinkAboutCC - Percolation test SITE CONSULTING, LLC Mr. Jake Miller May 17, 2017 Ronald Van Auker, Inc. Page 1 of 2 3084 East Lanark Street Report 17025-A Meridian, Idaho 83642 Re: Percolation Testing Swindell Subdivision Locust Grove & Overland Roads Meridian, Idaho Jake: As per your request, this engineer visited the referenced project on April 21, April 27, and May 2, 2017 to assist with percolation testing of the planned infiltration trenches. During the first visit it was learned that the excavation for the southern bed had been extended by the contractor to deeper than the design depth in search of free draining materials. It was recommended that a new test pit be excavated and tested at the design depth. It was also learned that ACHD requested an additional test pit and perc test at the end of the previously constructed northern bed. Excavation was completed prior to the second visit. Perc testing was scheduled with ACHD present during the third site visit. Filling with water began when SITE arrived. Measurement points were established and depths to water and time recorded. All field measurements were witnessed by and shared with the ACHD inspector. All recorded data is in the attached Perc Test Log. Calculated results were 1.2 in / hr in the south bed and 2.6 in/hr in the north bed. WH Pacific, the project civil engineer, was contacted and indicated that they can modify the design and drain time to make these result acceptable. ACHD requested that this report is to be forwarded to the project plan reviewer with bed modifications. We appreciate this opportunity to be of service. Should you have any questions or require additional information, please contact our office at your convenience. Respectfully submitted. Bob J. Arnold, PE SITE Consulting 55� 4ALFj� QQok� �+STE-Yp ��® , 0t' C �x% 208-440-6276 * info@siteconsultingllc.com * Post Office Box 190537 * Boise, Idaho 83719 SITE CONSULTING, LLC PERC TEST LOG Swindell Subdivision Construction Time Perc Testing w/ACHD Present B.Arnold 5/2/17 South Bed TIME PERIOD DEPTH DROP PERC DESIGN 8:51 14.53 8 9:18 0:27 14.59 0.06 9:51 0:33 14.63 0.04 TOTAL 1:00 0.10 1.2 FAIL North Bed TIME PERIOD DEPTH DROP PERC DESIGN 9:36 1.50 8 10:36 1.28 TOTAL 1:00 0.22 2.6 FAIL 208-440-6276 * bjarnoldpe@msn.com 2 Post Office Box 190537 * Boise, Idaho 83719