MEMO TO CITY COUNCIL
Request to Include Topic on the City Council Agenda
From: Keith Watts, Procurement Meeting Date: January 17, 2023
Presenter: Consent Estimated Time: Consent
Topic: Approval of PO #23-0188 to ACHD for the Interagency Cooperative Development
Agreement for the Lake Hazel Roadway- Locust Grove to Eagle Improvement
project for the Not-To-Exceed amount of$540,673.51
Recommended Council Action:
Approval of PO #23-0188.
Background:
The Interagency Cooperative Development Agreement was approved by Council 8/10/2021.
Mayor Robert E. Simison
E IDIAN ��� City Council Members
�► Treg Bemt
Joe Borton
Public Works I D A H O Luke Cavener
Brad Hoaglun
Department Jessica Perreault
�LizSlrader
TO: Mayor Robert E. Simison
Members of the City Council
FROM: Brent A. Blake—Engineering Project Manager
DATE: February 8, 2023
SUBJECT: CONSTRUCTION COSTS OF SEWERIWATER IMPROVEMENTS, FIBER
OPTIC CONDUIT,AND MULTI-USE PATHWAYS WITHIN THE LAKE
HAZEL,LOCUST GROVE TO EAGLE ROAD WIDENING PROJECT.
REQUESTED COUNCIL DATE: February 14, 2023
I. RECOMMENDED ACTION
A. Move to:
1. Approve the City of Meridians "Reimbursable Project Costs" amounts as indicated
in section IV, below.
II. DEPARTMENT CONTACT PERSONS
Brent Blake—Engineering Project Manager 208-489-0340
Kyle Radek—Assistant City Engineer 208-489-0343
Warren Stewart, City Engineer 208-489-0350
Laurelei McVey, Public Works Director 208-985-1259
111. DESCRIPTION
A. Background
On August 18, 2021 the City entered into a cooperative development agreement with
Brighton Development and the Ada County Highway District (ACHD). The agreement
depicts Brighton as the party to design, bid, and construct the project described below.
The City and ACHD agreed to reimburse Brighton for specific items listed in the
agreement(see attached).
B. Proposed Project
Brighton Development plans to reconstruct and widen Lake Hazel Road from
approximately one quarter mile east of Locust Grove Road to approximately one-quarter
mile west of Eagle Road to five lanes, with 10-foot wide concrete multi-use pathways on
Page 1 of 2
I
both sides of the road, new and relocated City water line along Lake Hazel Road, street
lighting on that portion abutting City Fire Parcel and City Park Parcel, and two-inch(2")
conduit for future City fiber optics. Brighton Development also plans to construct
Recreation Avenue from its intersection with Lake Hazel to the southern boundary of City
Fire Parcel, with 10-foot wide concrete multi-use pathway on the west side of the road,
street lighting, City water main, City sewer main, and two-inch (2") conduit for future
City fiber optics.
IV. IMPACT
A. Strategic Impact:
This project is aligned with the Public Works objective of being opportunistic in planning
for growth and infrastructure needs.
B. Fiscal Impact
The City of Meridian "Reimbursable Project Costs" is $540,673.51 and will be funded
from the accounts shown below.
Project Funding
---------------------------.------------------------------------------------------ ._....._ .
Fiscal Year 2023 Account Code/Codes
Water Main Extensions
60-3490-96140 $52,05144
---- ----- -------
.
_FiberConduitforI T _____ _____ 01-1519-94600 __-__ _$32,97249.
Fire Department 55-2217-11266 $252,744.75
_ --------------------- ----
Park Dept Items. - - - .$54,812.94
Park Dept._Admin Fee $148,091.89
--------------------------------
Total Funding $540,673.51
V. TIME CONSTRAINTS
Brighton Development plans to start construction on this project in February 2023. City
Council approval of this construction cost is required in order to attain a Purchase Order from
the City's Finance Department.
VI. LIST OF ATTACHMENT
A. Interagency Cooperative Development Agreement between Ada County Highway
District, The City of Meridian, and Brighton Development, Inc.
B. Table of Reimbursable Project Costs based on actual bids.
Approved for Council Agenda:
Page 2 of 2
E. Lake Hazel Rd. and S.Recreation Ave. CDA Reimbursable Costs
Project Number: 0109-02-7000
Budget ACHD Meridian
IMPROVEMENTS:
22-00105-01 Engineering, Staking & Other Consulting 235,018 235,018 -
24-00400-01 Government Fees/Permits/Entitlement - - -
24-02076-01 Trash Clean Up/Demo/Dirt Remov. 12,794 12,794 -
24-00420-01 Erosion Control (SWPPP) 22,350 20,339 2,012
24-02500-01 Excavation/Grading/Paving 1,470,286 1,438,352 31,934
24-02604-01 Sanitary Sewer 33,889 - 33,889
24-02675-01 Municipal Water System 148,101 - 148,101
24-02608-01 Storm Drain 244,106 244,106 -
24-02813-01 Gravity Irrigation 792,894 792,894 -
24-02058-01 Power 31,500 31,500 -
24-02521-01 Concrete Curb/Gutter/Sidewalk/Flatwork 543,341 479,256 64,085
24-00454-01 Landscaping&Fencing 345,639 345,639 -
24-10552-01 Mail &Paper Boxes 1,000 1,000 -
24-16582-01 Street Lighting/Lamp Posts 739,525 645,670 93,855
24-01950-01 ACHD & City Bonding - - -
24-00999-01 Contingency 12% 315,953 297,260 18,694
SUBTOTAL: IMPROVEMENTS 4,936,396 4,543,827 392,569
CM Fee 3% (100%Paid by City of Meridian) 3% - 148,092
GRAND TOTAL 5,084,488 4,543,827 540,661
This pricing includes the following subcontractor proposal's:
KM Engineering, ATLAS, Precision Engineering, CMT Engineering Laboratories, David Kordiyak, Syman Erosion&
Sediment Control, Boise Skid Steer, Element Fencing,Nampa Paving&Asphalt Co., Brown Construction Inc.,
Randell Concrete, Hastriter,Northwest Hardscape Specialties, Secured Earth Systems, Alloway Electric Co.
Clarifications:
Unless noted otherwise, the pricing for this job does not include the following: pricing for utilities (to be done at
the cost of the utilities provider) such as relocation of existing telephone pedestal, power lines, power poles;
landscaping on the south side of E. Lake Hazel Rd or any on Recreation Avenue (done by others); 1-Fire Hydrant
Assembly located on the east side of S. Recreation Ave. (to be removed in future plan set); 1-2" Blow-Off Assembly
for Future Water Main Extension(to be done as a stand alone project at a later date); 1-8" Gate Valve at 8" Blow-Off
Assembly Main; 1-12" Gate Valve tying into Blow-Off Assembly; any pressure irrigation scope of work(none shown
on plans); Government Fees, Permits and Entitlement; Amenities &Monument Structures; ACHD & City Bonding.
CDA.LH&Rec.Final.Estimate.Revision2.2023-01-04 1/4/2023
Page 1 of 2 10:02 AM
E. Lake Hazel Rd. and S.Recreation Ave. CDA Estimate
Project Number: 0109-02-7000
Exceptions & additions beyond plan set that our pricing does include is as follows: Asphalt paving SPC 64-28 oil
based on current oil prices on the ITD Index published in June; additional concrete removal at the SE corner of S.
Bloomerang Way and E. Lake Hazel to allow for seepage bed#1 Sand&Grease Trap install as well as removal of
existing gravity irrigation lines near GI Box#1; tree removal at the properties of existing home owners along the south
side of E. Lake Hazel to account for road widening requirements; additional fill brought in at a 4:1 slope where the
install of 235 LF of Keystone landscape wall will be placed per KN#8 on sheet C2.1 to allow proper depth above the
existing seepage bed on the NE corner of S. Bloomerang and E. Lake Hazel Rd.; reseed with grass mixture will be
installed in lieu of landscaping at all areas north of the sidewalk on E. Lake Hazel Rd.; due to heavy fill requirements
starting at station 59+00, our budget accounts for landscape replacement of the property line north of E. Lake Hazel
Rd. that will extend to station 73+30; reseed with grass mixture is budgeted for north of the sidewalk that runs south of
E. Lake Hazel Rd. starting at station 60+30 and extending out to station 73+30; removal and replacement of existing
fencing at property owners along the south of E. Lake Hazel Rd. due to road widening requirements; three asphalt
aprons at the driveway approaches located on the south side of E. Lake Hazel Rd. at station 66+00, 67+25, and 68+40;
750 SF of retaining wall due to heavy fill requirements to prevent damage to Impressive East Ridge Subdivision
property owners fence line that runs north of E. Lake Hazel Rd. starting roughly at station 69+20 and extends out to
station 71+31; 30 LF of 24" Steel Sleeve installed at 12" water main that crosses 12" and 18" Gravity Irrigation Lines
at Recreation to allow for proper potable/non-potable spacing; removal of existing 3x3 GI Box#1 and replacement
with new 4x4 precast box due to connection requirements of new pipe; our budget reflects the cost for 12" C900 in lieu
of 12" ADS HP in order to meet potable/non-potable crossing rules per Note 2, sheet C1.1, but if separation meets
IDAPA requirements, HDP will be used at a lower cost; Power Dips For Recreation&Bloomerang Signal;
Engineering Fees for Utilities; 12,500sf of cold patching to maintain access at Discovery Park included with a unit
price of$2.20/sf.
Final Budget Approval:
Michael Alexander
Brent Blake
Jon Wardle
CDA.LH&Rec.Final.Estimate.Revision2.2023-01-04 1/4/2023
Page 2 of 2 10:02 AM
Item No. Item Description Estimated Unit Unit Item
Quantity Price Total Parks Fire Public Works I.T.
General SWPPP % 0.09 $22,350.00 $2,012.00 $503.00 $503.00 $503.00 $503.00
Import Granular Material for Deep Fill Sections in Winter Months(from BOC to BOS) 2,578 LCY $10.06 $25,934.68 $25,934.68
Asphalt Paving SPC 64-28 Oil(Based on 2022 oil prices)@ Asphalt Approach 10 TON $83.00 $830.00 $830.00
Uncrushed Aggregate Base @ Asphalt Approach 48 LCY $17.16 $823.68 $823.68
Crushed Aggregate Base Under Sidewalk,Curb/Gutter,and Flatwork 143 LCY $30.39 $4,345.77 $4,345.77
8"PVC Sanitary Sewer Main 285 LF $68.00 $19,380.00 $19,380.00
Sewer Manhole 48" 1 EA $5,199.00 $5,199.00 $5,199.00
Connect to existing @ SS MH#4 1 EA $3,800.00 $3,800.00 $3,800.00
Connect to existing @ Existing clean-out#2 1 EA $3,800.00 $3,800.00 $3,800.00
CCTV Inspection 285 LF $6.00 $1,710.00 $1,710.00
Water Tees,Angles&Misc. 18 EA $515.61 $9,280.98 $9,280.98
Water Main Valve Box-8" 1 EA $1,785.00 $1,785.00 $1,785.00
Relocate/Extend Water Main Leak Detection Metering Station 1 EA $2,275.00 $2,275.00 $2,275.00
12"Water Main 616 LF $84.75 $52,206.00 $52,206.00
8"Water Main 120 LF $58.00 $6,960.00 $3,770.00 $3,190.00
Fire Hydrant Assembly-Relocation-Extend existing* 2 EA $6,446.00 $12,892.00 $12,892.00
Fire Hydrant Assemblies(6'bury hydrants required,new assembly)(Bosch way) 1 EA $5,780.00 $5,780.00 $5,780.00
Connect to Existing @ 12"B/O-Recreation 1 EA $2,425.00 $2,425.00 $2,425.00
Connect to Existing @ 8"B/O-Fire Station(incl.temp blow off assembly) 1 EA $4,495.00 $4,495.00 $4,495.00
Connect to Existing @ 12"Main(12x12 live tap-subject to approval)** 1 EA $15,054.00 $15,054.00 $15,054.00
Connect to Existing @ 12"Main(12x8 live tap,subject to approval)*** 1 EA $12,592.00 $12,592.00 $12,592.00
Connect to Existing-Relocate/Reuse Existing 12x8 Tee**** 1 EA $10,146.00 $10,146.00 $10,146.00
24"Sleeves 30 LF $407.00 $12,210.00 $12,210.00
Vertical Curb&Gutter 140 LF $16.00 $2,240.00 $2,240.00
Sidewalk 10' 788 LF $36.00 $28,368.00 $28,368.00
Ped Ramps(Double)&Truncated Domes 6 EA $1,200.00 $7,200.00 $7,200.00
4'Valley Gutter 110 LF $28.00 $3,080.00 $3,080.00
Small Fillets 4 EA $500.00 $2,000.00 $2,000.00
Driveway Approach 160 SF $5.50 $880.00 $880.00
Common Driveway/Flatwork(to Fire station) 1,700 SF $6.50 $11,050.00 $11,050.00
Irrigation Manhole Adjustment 2 EA $100.00 $200.00 $200.00
Irrigation Monitoring Well Adjustment 2 EA $100.00 $200.00 $200.00
Concrete Sleeves Extra Long 8 EA $100.00 $800.00 $800.00
Concrete Cold Weather Protection 0 % $53,778.00 $8,066.70 $8,066.70
Street Lighting(15'Mast Arm, Davit Arm Style,40'Pole Height) 4 EA $12,000.00 $48,000.00 $36,000.00 $12,000.00
Street Light Conduit(Trenched)w/Locate Wire,Size 2"(trench,conduit,wire,compaction) 1,245 LF $12.67 $15,774.15 $12,036.50 $3,737.65
Fiber Optic Conduit(Trenched)with Locate,Size 2"(trench,conduit,wire,compaction) 1,815 LF $12.67 $22,996.05 $22,996.05
Fiber Optic Conduit for Future Emergency Signal(Trenched)w/Locate Wire,Size 2" 55 LF $12.67 $696.85 $696.85
Street Light Junction Box,Type S40T/ADA 4 EA $400.00 $1,600.00 $1,200.00 $400.00
Fiber Optic Junction Box(Oldcastle Model H2436-24 H Series Heavy Duty Box or Equal) 6 EA $800.00 $4,800.00 $4,800.00
Contingency for City of Meridian SOW 0 % $373,875.33 $18,693.77 $4,673.44 $4,673.44 $4,673.44 $4,673.44
CM Fee(100%paid by City of Meridian) 0 % ############ $148,091.89 $148,091.89
$0.00
$0.00
$0.00
$0.00
$0.00
Total $540,673.51 $202,904.83 $252,744.75 $52,051.44 $32,972.49
Budget Total $540,673.51
$540,673.51
Cost Breakdown Final 1/17/2023
CjfE IDIANty
Purchase Order 1/24/2023 23-0188
Attention: Tyson Glock
CITY OF MERIDIAN Billing Attn: Finance
33 Ave
33 EAST BROADWAY AVE. Meridian,Bro IDa
Address: 83642
MERIDIAN,ID 83642
(208) 888-4433
Shipping 33 E Broadway Ave.
Vendor Address: Address: Ste. 200
Meridian, ID 83642
ADA COUNTY HIGHWAY DISTRICT
3775 ADAMS ST.
GARDEN CITY, ID 83714-6447 Shipping Method: Contractor
FOB: Destination Pre-Paid
Description Unit Quantity Unit Price Total
23-0188 ACHD Lake Hazel - Locust Gr. to Eagle 5210 Dollar 148091.89 1.00 148,091.89
23-0188 ACHD Lake Hazel - Locust Gr. to Eagle 5290 Dollar 54812.94 1.00 54,812.94
23-0188 ACHD Lake Hazel - Locust Gr. to Eagle 3490 Dollar 52051.44 1.00 52,051.44
23-0188 ACHD Lake Hazel - Locust Gr. to Eagle 2217 Dollar 252744.75 1.00 252,744.75
23-0188 ACHD Lake Hazel - Locust Gr. to Eagle 1510 Dollar 32972.49 1.00 32,972.49
Purchase Order Total: $540,673.51
Purchasing
Manager:
Special Instructions
Bid results from Interagency Agreement approved by Council on 8/9/2022. Not-To-Exceed $1,312,293.46 Split $984,220.00
30-3490-96140-10976.c and $328,073.46 60-3590-93505-10976.c PO approved by Council 1/24/2023 Ticket#85070