HomeMy WebLinkAboutAda County Highway District Interagency Cost Share Agreement City Water and Sewer Improvements by Nampa Paving and Asphalt CO. C� fIEN DLAN HO MEMO TO CITY COUNCIL Request to Include Topic on the City Council Agenda From: Keith Watts, Procurement Meeting Date: December, 6 2022 Presenter: Consent Estimated Time: Consent Topic: Approval of PO #22-0106 to ACHD for the Interagency Agreement for the Locust Grove - Overland to Victory project for the Not-To-Exceed amount of$1,312,293.46 Recommended Council Action: Approval of PO #22-0106. Background: The Interagency Agreement was approved by Council 8/9/2022. The estimate at that time was $1,077,040.00. Bids came in at$1,312,293.46, $235,253.46 over the estimate. fE IDIANty Purchase Order 12/6/2022 23-0106 Attention: Tyson Glock CITY OF MERIDIAN Billing Attn: Finance 33 y Ave 33 EAST BROADWAY AVE. Meridian,Bro IDa 8 Address: 3642 MERIDIAN,ID 83642 (208) 888-4433 Shipping 33 E Broadway Ave. Vendor Address: Address: Ste. 200 Meridian, ID 83642 ADA COUNTY HIGHWAY DISTRICT 3775 ADAMS ST. GARDEN CITY, ID 83714-6447 Shipping Method: Contractor FOB: Destination Pre-Paid Description Unit I Quantity Unit Price Total 23-0106 ACHD Locust Grove-Victory to Overland 3490 Dollar 984220.00 1.00 984,220.00 23-0106 ACHD Locust Grove-Victory to Overland 3590 Dollar 328073.46 1.00 328,073.46 Purchase Order Total: $1,312,293.46 Purchasing Manager: = �� Special Instructions Bid results from Interagency Agreement approved by Council on 8/9/2022. Not-To-Exceed $1,312,293.46 Split $984,220.00 30-3490-96140-10976.c and $328,073.46 60-3590-93505-10976.c PO approved by Council 12/6/2022 Ticket#85070 Mayor Robert E. Simison E IDIAN ��� City Council Members �► Joe Borton Treg Bernt Public Works I D A H 0 Luke Cavener Brad Hoaglun De art Jessica Perreault Liz�Itrader�, TO: Mayor Robert E. Simison Members of the City Council FROM: Tyson Glock Staff Engineer II DATE: November 14, 2022 SUBJECT: IN ACCORDANCE WITH THE INTERAGENCY AGREEMENT AND COST SHARE AGREEMENT PREVIOUSLY APPROVED BY CITY COUNCIL,APPROVE THE NOT-TO-EXCEED AMOUNT OF $1,312,293.46 TO PAY ADA COUNTY HIGHWAY DISTRICT (ACHD) FOR CITY WATER AND SEWER IMPROVEMENTS CONSTRUCTED BY NAMPA PAVING & ASPHALT CO ALONG LOCUST GROVE FROM OVERLAND TO VICTORY AND THE INTERSECTION OF LOCUST GROVE AND VICTORY ROADS. ACHD PROJECT 319043/519034.001 AND CITY OF MERIDIAN PROJECT 10976 I. RECOMMENDED ACTION A. Move to: In accordance with the Interagency Agreement and Cost Share Agreement, approve the not-to-exceed amount of$1,312,293.46 to pay ACHD for City water and sewer improvements constructed along Locust Grove from Overland to Victory Road and the intersection of Locust Grove and Victory Road. ACHD Project 319043/519034.001 and City of Meridian Project 10976. II. DEPARTMENT CONTACT PERSONS Tyson Glock, Staff Engineer II 208-489-0358 Kyle Radek, Assistant City Engineer 208-489-0343 Warren Stewart, City Engineer 208-489-0350 Laurelei McVey, Director of Public Works 208-985-1259 III. DESCRIPTION A. Back rg ound Page I of 3 ACHD plans to widen and improve Locust Grove Road from Overland to Victory Road. They also will construct a roundabout at the intersection of Locust Grove and Victory Roads. ACHD has agreed, per the attached Interagency Agreement, to include City water and sewer improvements as part of their project. They incorporated these improvements in their plans and bid documents. B. Proposed Project This project includes the construction of water and sewer improvements. The water improvements will include approximately 3,000 ft of 8-inch, 12-inch, and 16-inch PVC pipe and 1,000 ft of 16-inch and 24-inch HDPE pipe, subsequent adjustments of water valves, stubbing water to an unserved area, and the installation of seven water service stubs. The sewer improvements include installing approximately 125 ft. of 8-inch gravity sewer main,repairing damaged gravity sewer at four locations and installing two sewer service stub and the subsequent adjustments to existing manholes within the road corridor. In addition to the water and sewer work, landscaping along the west side of Well 17,that will be removed as part of ACHD's project,will be replaced and some paving for Well 17 drainage will be completed. IV. IMPACT A. Strategic Impact: This project is aligned with the Public Works objective of being opportunistic in planning for growth and infrastructure needs. The construction impacts on the residents will be minimized by partnering with ACHD. B. Fiscal Impact: The costs of the City of Meridian infrastructure improvements are $1,312,293.46 and will be funded from two different accounts as shown below. Project Costs: Fiscal Year 2022 --------- ------ --------------------------------- Construction - ACHD Overhead Costs $57,946.98 ACHD Traffic Control $95,406.90 Mobilization, and Fla in -----------------------;-------- --------------------- --- -------------------- Total $1,312,293.46 Available Project Funding:. ------ ---------------- ---------------- Fiscal Year 2022 Account Code-------- /Codes __.__.... . ......._....._. ............_..__..._....__...._.........._......_......;....................__................_................ Water Main Extensions 60-3490-96140 $984,220.00 -------- ---------------- Sewer Main Extensions 60-3590-93505 $328,073.46 i Page2of3 ---------------------------- ------------------------------- -; ---------------- ----------.,..._.. -------------------------- Total Funding $1,312,293.46 V. TIME CONSTRAINTS ACHD plans to start construction on this project in November 2022. City approval of this agreement is required for ACHD to install sewer and water improvements as part of their project. VI. LIST OF ATTACHMENTS A. Construction Cost Breakdown B. Interagency Agreement Approved for Council Agenda: �✓ Page 3 of 3