Loading...
HomeMy WebLinkAboutCC - MPWD Centerline Elevations Stamped ailey Engineering,Inc. CIVIL ENGINEERINGIPLANNINGICADD July 19, 2021 Meridian Public Works Department 33 E Broadway Street Meridian, Idaho 83642 RE: Foxcroft Subdivision No. 1 To Whom it May Concern: This letter is to provide certification for Foxcroft Subdivision No. 1 that all street finished centerline elevations are set a minimum of three(3)feet above the highest established groundwater elevations. This information is based on a geotechnical report [including groundwater monitoring] from Site Consulting, LLC dated March 10, 2021. Sincerely, SS S�L �NG/�� F <0 Q� 07/19/2021 17882 Kevin S. Craig, P.E. 11 F p F 'D N S. C cc: BEI Project No. C2019-013 1119 E State St, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013 www.baileyengineers.com