HomeMy WebLinkAboutCC - MPWD Centerline Elevations Stamped ailey Engineering,Inc.
CIVIL ENGINEERINGIPLANNINGICADD
July 19, 2021
Meridian Public Works Department
33 E Broadway Street
Meridian, Idaho 83642
RE: Foxcroft Subdivision No. 1
To Whom it May Concern:
This letter is to provide certification for Foxcroft Subdivision No. 1 that all street finished
centerline elevations are set a minimum of three(3)feet above the highest established groundwater
elevations. This information is based on a geotechnical report [including groundwater monitoring]
from Site Consulting, LLC dated March 10, 2021.
Sincerely, SS S�L �NG/��
F <0
Q� 07/19/2021
17882
Kevin S. Craig, P.E. 11 F p F 'D
N S. C
cc: BEI Project No. C2019-013
1119 E State St, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013
www.baileyengineers.com