Loading...
HomeMy WebLinkAboutC8.04 ACHD Roadway -Signal Materials V120213 3 1 0 0 B R I S T O L S T R E E T , S U I T E 4 0 0 C O S T A M E S A , C A 9 2 6 2 6 W W W . N G G P A R T N E R S . C O M T 9 4 9 . 7 5 6 . 0 8 1 8 F 9 4 9 . 7 5 6 . 0 1 4 5 A R C H I T E C T U R E ● P L A N N I N G ● I N T E R I O R S REV DESCRIPTION DATE 2700 E. Overland Rd. Meridian, ID 83642 SEASONS AT MERIDIAN NEWMAN GARRISON + PARTNERS, INC COPY RIGHT 2019 NEWMAN GARRISON + PARTNERS MORGAN HOLDINGS & STONE HILL 38 Glen Gary Dr., Ste. 200 Aspen, CO 81611 7301 Peak Dr., Ste. 200 Las Vegas, NV 89128 TLG PN: 120124 A DELTA A 07/22/2022 C8.04 ACHD Roadway - Signal Materials Sheet Notes: 1. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 2. REFER TO ACHD STANDARD TRAFFIC DETAILS (TS SERIES) FOR CONSTRUCTION DETAILS AND INSTALLATION REQUIREMENTS. 3. THE LOCATIONS OF SIGNAL POLES, JUNCTION BOXES AND PEDESTRIAN POLES SHALL BE STAKED IN THE FIELD FOR APPROVAL BY ACHD PRIOR TO INSTALLATION. REQUEST ACHD APPROVAL AT LEAST TWO (2) WORKING DAYS PRIOR TO INSTALLATION. 4. CONDUIT LAYOUT SHOWN IS SCHEMATIC. THE CONTRACTOR SHALL MAINTAIN APPROPRIATE CLEARANCE BETWEEN ADJACENT UTILITIES. 5. GROUND THE SIGNAL AND ILLUMINATION SYSTEM IN ACCORDANCE WITH THE CURRENT EDITION OF THE N.E.C. AND THE ACHD TRAFFIC SUPPLEMENTAL PROVISIONS. 6. LOCATIONS OF EXISTING UNDERGROUND STRUCTURES AND UTILITIES SUCH AS PIPELINES, CONDUITS, CABLES, ETC. SHOWN ON THE TRAFFIC SIGNAL PLANS ARE APPROXIMATE ONLY. IT IS NOT THE INTENT OF THESE PLANS SHOWN THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURES. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES WITH THE RESPECTIVE OWNERS. EXISTING UTILITIES DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 7. ALL VIDEO DETECTION ZONES WILL BE SET BY ACHD STAFF. CONTRACTOR SHALL CONTACT ACHD TRAFFIC DEPARTMENT AT LEAST TWO (2) WORKING DAYS PRIOR TO VIDEO DETECTION PROGRAMMING. 8. NEW SIGNAL AND SERVICE CABINETS AND ALL ASSOCIATED EQUIPMENT TO BE SUPPLIED BY ACHD AT CONTRACTOR/DEVELOPER EXPENSE. CONTRACTOR SHALL CONTACT ACHD TRAFFIC DEPARTMENT TO COORDINATE THE SALVAGING, DISPOSAL, AND/OR TRANSFER OF ANY SIGNAL OR INTERCONNECT EQUIPMENT. 9. TOP OF FOUNDATION ELEVATIONS FOR ALL POLES SHALL BE FIELD VERIFIED BY THE CONTRACTOR BASED ON THE CONSTRUCTED FINISHED GROUND ELEVATIONS. 10. CONTRACTOR SHALL COORDINATE WITH IDAHO POWER AND SITE ELECTRICAL PLANS FOR SIGNAL POWER. POLE POLE TYPE SIGNAL MAST ARM LUMINAIRE SIGNAL MOUNT LOCATION SIGNAL MOUNTING BRACKETS MAST ARM SIGNS