Loading...
HomeMy WebLinkAboutSkybreak Sub. - Entry Gate, Shack, Monument (ENG Calcs) - 072822 V1kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder I an, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE: 09/26/22 FILE NUMBER: a2021D162 Structural Calculations For Skybreak Subdivision E. Bingley Dr. Meridian, Idaho For 2022-13382 L &STER "y onlY c S� �on _N� 220 s TE of �oP �wN REED% Expiration] 712712023 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 1 of 69 IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 FILE NUMDER:^-zszz-sisz riteria Governing Code: 2018 IBC Snow Criteria Roof Snow Load (Pf) 25 psf Ground Load (P9) 17 psf Exposure Factor (C j 1.0 Partially Thermal Factor (Ct) 1.0 Typical Importance (Is) 1.0 Seismic Criteria Site Class D Stiff Soil Ss 0.29 Fa 1.57 S1 0.10 Fv 2.39 SpS 0.30 Spt 0.16 Risk Category II Other Seismic Importance (IE) 1.0 Seismic Design C Category (SDC) Live Loads Typ Residential 40 sf Garage (P.V.) 40 psf Studs 2.0 Siding 25.0 Insulation 0.5 Gyp. Board 2.5 Sheating 1.5 Misc 3.0 TOTAL 34 psf Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Wind Criteria Wind Speed M) 115 mph Wind Exposure C Open Terrain Wind Importance (IW) 1.0 Building Category II Seismic Wall Design Response Material Base Coefficient Shear R OSB .05Wp 6.5 Conc. .20Wp 1.5 e-Inf. CMU .15Wp 2 Soil Bearing Typical 1500 psf Frost Depth 24 in Concrete Cap Weight ,. >. 3" thick 42.0 5" thick - 62.5 0.0 Typ @ Ext Typ @ Int (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 2 of 69 C��(E IDIAN> kybreak Subdivision 13382 I an,Idaho PERFORMANCE APPROVED ENGINEERS DATEDATE: 09/26/22 : 9/26/22 PSB Seismic Loading Analysis SS = 0.289 S1 = 0.100 Fa = 1.6 Fv = 2.4 R = 6.5 IE = 1.0 SMS = FaS, = 0.4534 SM1 = F S1 = 0.2390 SIDS = 2/3 SMS = 0.3023 SD1 = 2/3 SM1 = 0.1593 Cs = SDS/(R/IE) = 0.0465 Ta = CA3/4 = 0.1356 Cs < SD1/[(R/IE)T] = 0.1808 CS > 0.044SDSIE = 0.0133 CS > 0.5S1/(R/IE) = 0.0077 V = CSW = 0.0465 W 0.7*V = 0.0326 W CT = 0.020 h„ = 12.83 ft Seismic Design Category B C Controls Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 3 of 69 CUE IDR IAN, kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder I an, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 DATE. - LE 0 /26/2zz�162PSB Seismic Component Loading wp = 1 psf weight of element Portion of seismic shear load at the level of the diaphragm, required to be transferred to the components of the vertical seismic -force -resisting system beacause of the offsets or changes in the stiffness of the vertical Vpx = 0 plf components above of below the diaphragm. wW = 34 psf weight of wall Lb = 8 ft length of the building NOTE: Use 1 for unit weight to achieve an answer per element unit weight Connections Fp = 0.133 SIDS Wp = 0.04 psf or Fp = 0.05 wp = 0.05 psf Controls Diaphragm Fp = 0.2 IE SoS wp + Vpx = 0.06 psf Fp,max = 0.4 IE SpS wp + Vpx = 0.12 psf Bearing Walls & Shear Walls Out of Plane Forces Fp = 0.40 IE SpS WW = 4.17 psf Controls 12.11.1 Fp = 0.10 WW = 3.45 psf 12.11.1 Anchorage Fp = 0.40 IE SpS wW ka = 4.5 psf 12.11-1 Fp = 0.2 IE ka WW = 7.4477 psf Controls ka = 1.0 + Lb / 100 = 1.0800 12.11-2 Note: 12.11.2.2.2 The strength design forces for steel elements of the structural wall anchorage system, with exception of anchor bolts and reinforcing steel, shall be increased by 1.4 times the forces otherwise noted above. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 4 of 69 kybreak Subdivision 13382 ian,ldaho PERFORMANCE APPROVED ENGINEERS DATEDATE: 09/26/22 : 9/2ER:6/22 onc. Seismic Loading Analysis SS = 0.289 S1 = 0.100 Fa = 1.6 Fv = 2.4 R = 1.5 IE = 1.0 SMs = FaS, = 0.4534 SM1 = F S1 = 0.2390 SIDS = 2/3 SMS = 0.3023 SD1 = 2/3 SM1 = 0.1593 CS = 1.2*SDs/(R/IE) = 0.2018 Ta = CA3/4 = 0.1356 Cs < SD1/[(R/IE)T] = 0.7835 CS > 0.044SDSIE = 0.0133 CS > 0.5S1/(R/IE) = 0.0333 V = CSW = 0.2018 W 0.7*V = 0.1411 W CT = 0.020 h„ = 12.83 ft Seismic Design Category B C Controls Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 5 of 69 kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE: 09/26/22 DATE 9/2ER:6/22 onc. Seismic Component Loading wP = 1 psf weight of element Portion of seismic shear load at the level of the diaphragm, required to be transferred to the components of the vertical seismic -force -resisting system beacause of the offsets or changes in the stiffness of the vertical VPX = 0 plf components above of below the diaphragm. wW = 34 psf weight of wall Lb = 8 ft length of the building NOTE: Use 1 for unit weight to achieve an answer per element unit weight Connections FP = 0.133 SIDS WP = 0.04 psf or FP = 0.05 wP = 0.05 psf Diaphragm FP = 0.2 IE SIDS WP + VPX = 0.06 psf Bearing Walls & Shear Walls Out of Plane Forces FP = 0.40 IE SIDS WW = 4.17 psf Controls 12.11.1 FP = 0.10 WW = 3.45 psf 12.11.1 Anchorage FP = 0.40 IE SIDS wW ka = 4.5 psf 12.11-1 FP = 0.2 IE ka WW = 7.4477 psf Controls ka = 1.0 + Lb l 100 = 1.0800 12.11-2 Note: 12.11.2.2.2 The strength design forces for steel elements of the structural wall anchorage system, with exception of anchor bolts and reinforcing steel, shall be increased by 1.4 times the forces otherwise noted above. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 6 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 FILE NUMBER: ^ D210162 WIND LOADING ANALYSIS - Main Wind -Force Resisting System Per ASCE 7-16 Code for Enclosed or Partially Enclosed Buildings Using Method 2: Analvtical Procedure (Section 27 & 28) for Low -Rise Buildings Input Data: Wind Speed, V = 115 mph (Wind Map, Figure 26.5-1A-C) Bldg. Classification = II (Table 1.5-1 Risk Category) Wind Exposure Category = C (Sect. 26.7) Ridge Height, hr = 12.83 ft. (hr >= he) Eave Height, he = 9.00 ft. (he <= hr) Building Width = 10.00 ft. (Normal to Building Ridge) Building Length = 8.00 ft. (Parallel to Building Ridge) Roof Type = Gable (Gable or Monoslope) Topo. Factor, Kzt = 1.00 (Sect. 26.8 & Figure 26.8-1) Direct. Factor, Kd = 0.85 (Table 26.6) Enclosed? (Y/N) Y (Sect. 26.2 & Table 26.11-1) Hurricane Region? N IT Resulting Parameters and Coefficients: Roof Angle, 0 = 37.45 deg. Mean Roof Ht., h = 10.92 ft. (h = (hr+he)/2, for angle >10 deg./ Check Criteria for a Low -Rise Building: 1. Is h - 60' ? Yes, O.K. 2. Is h - Lesser of L or B? External Pressure Coefrs., GCpf (Fig. 28.4-1): (For values, see following wind load tabulations.) Positive & Negative Internal Pressure Coefficients, GCpi (Table 26.11-1): +GCpi Coef. = 0.18 (positive internal pressure) -GCpi Coef. _ -0.18 (negative internal pressure) h < 15 then: Kh = 2.01*(15/zg)A(2/a) (Table 28.3-1) h >= 15 then: Kh = 2.01*(z/zg)^(2/a) (Table 28.3-1) a = 9.50 (Table 26.9-1) zg = 900 (Table 26.9-1) Kh = 0.85 (Kh = Kz evaluated at z = h) rian Elevation No, Violation! Velocity Pressure: qz = 0.00256*Kz*Kzt*Kd *VA 2 (Sect. 28.3.2, Eq. 28.3-1) qh = 24.43 psf qh = 0.00256*Kh*Kzt*Kd *VA 2 (qz evaluated at z = h) Design Net External Wind Pressures (Sect. 28.4.1): p = qh*[(GCpf) - (+/-GCpi)] (psf, Eq. 28.4-1) Wall and Roof End Zone Widths 'a' and '2*a' (Fig. 28.4-1): a = 3.00 ft. 2*a = 6.00 ft. B The (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 7 of 69 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: A-2o22-oi e2 ;kybreak Subdivision 13382 an, Idaho Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 MWFRS Wind Load for Load Case A MWFRS Wind Load for Load Case B rface GCpf p = Net Pressures (psf) Surface *GCpf p = Net Pressures (psf (w/ +GCpi) (w/ -GCpi) (w/ +GCpi) (w/ -GC[ Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 0.56 0.21 -0.43 -0.37 --- 9.28 0.73 -14.90 -13.44 --- _ 18.08 9.53 -6.11 -4.64 --- Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 --- --- --- Zone 1 E Zone 2E Zone 3E Zone 4E Zone 5E Zone 6E 0.69 12.46 21.25 Zone 1 E Zone 2E Zone 3E Zone 4E Zone 5E Zone 6E 0.27 2.20 10.99 -0.53 -17.34 1 -8.55 -0.48 -16.12 -7.33 --- --- --- --- --- --- 0.40 -0.69 -0.37 -0.29 -0.45 -0.45 5.37 -21.25 -13.44 -11.48 14.17 -12.46 -4.64 -2.69 -6.60 -6.60 -15.39 -15.39 0.61 -1.07 -0.53 -0.43 0.61 -0.43 10.50 19.30 -21.74 -8.55 -6.11 19.30 -6.11 -30.54 -17.34 -14.90 10.50 -14.90 'Note: Use roof angle 0 = 0 degrees for Longitudinal Direction. For Case A when GCpf is neg. in Zones 2/2E: For Case B when GCpf is neg. in Zones 2/2E: Zones 2/2E dist. = N.A. ft. Zones 2/2E dist. =1 4.00 Ift. Remainder of roof Zones 2/2E extending to ridge line shall use roof Zones 3/3E pressure coefficients. MWFRS Wind Load for Load Case A, Torsional Case MWFRS Wind Load for Case B, Torsional Case Surface GCpf p = Net Pressure (psf) Surface GCpf p = Net Pressure (psf) (w/ +GCpi) (w/ -GCpi) (w/ +GCpi) (w/ -GCpi) Zone 1T Zone 2T --- --- 2.32 0.18 -3.73 -3.36 4.52 2.38 -1.53 -1.16 I --- Zone 1T Zone 2T Zone 3T Zone 4T Zone 5T Zone 6T --- --- 1.34 -5.31 _ 3.54 _ -3.11 _ -1.16 _ -0.67 _ -1.65 -1.65 Zone 3T --- --- --- -3.36 Zone 4T Zone 5T Zone 6T --- --- --- -2.87 --- --- -3.85 -3.85 --- --- --- Notes: 1. For Load Case A (Transverse), Load Case B (Longitudinal), and Torsional Cases: Zone 1 is windward wall for interior zone. Zone 1 E is windward wall for end zone. Zone 2 is windward roof for interior zone. Zone 2E is windward roof for end zone. Zone 3 is leeward roof for interior zone. Zone 3E is leeward roof for end zone. Zone 4 is leeward wall for interior zone. Zone 4E is leeward wall for end zone. Zones 5 and 6 are sidewalls. Zone 5E & 6E is sidewalls for end zone. Zone 1T is windward wall for torsional case Zone 2T is windward roof for torsional case. Zone 3T is leeward roof for torsional case Zone 4T is leeward wall for torsional case. Zones 5T and 6T are sidewalls for torsional case. 2. (+) and (-) signs signify wind pressures acting toward & away from respective surfaces. 3. Building must be designed for all wind directions using the 8 load cases shown below. The load cases are applied to each building corner in turn as the reference corner. 4. Wind loads for torsional cases are 25% of respective transverse or longitudinal zone load values. Torsional loading shall apply to all 8 basic load cases applied at each reference corner. Exception: One-story buildings with "h" <= 30', buildings <= 2 stories framed with light frame construction, and buildings <=2 stories designed with flexible diaphragms need not be designed for torsional load cases. 5. Per Code Section 28.4.4, the minimum wind load for MWFRS shall not be less than 16 psf. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 8 of 69 APPROVED DATE: 09/26/22 FKE NWKR: —,- ;kybreak Subdivision 13382 an, Idaho RF()RMANC Load Case A Load Case B Basic Load Cases Case B Torsi 0 om - Transverse Direction Longitudinal Direction Torsional Load Cases Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 j2081)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 9 of 69 Mian, ybreak Subdivision Engineering: Eduado Pelallo 3382 Checker: Shawn Reeder , Idaho PERFORMANCE 07/28/2022 ENGINEERS WIND LOADING ANALYSIS - Wall Components and Cladding Per ASCE 7-16 Code for Buildings of Any Height Using Part 1 & 3: Analytical Procedure (Section 30.4 & 30.6) Input Data: Wind Speed, V = Bldg. Classification = Exposure Category = Ridge Height, hr = Eave Height, he = Building Width = Building Length = Roof Type = Topo. Factor, Kzt = Direct. Factor, Kd = Enclosed? (Y/N) Hurricane Region? Component Name = Effective Area, Ae = 115 mph (Wind Map, Figure 26.5-1A-C) (Table 1.5-1 Risk Category) (Sect. 26.7) ft. (hr >= he) ft. (he - hr) ft. (Normal to Building Ridge) ft. (Parallel to Building Ridge) (Gable or Monoslope) (Sect. 26.8 & Figure 26.8-1) (Table 26.6) (Sect. 28.6-1 & Figure 26.11-1) (Girt, Siding, Wall, or Fastener) ft.^2 (Area Tributary to C&C) II C 12.83 9 10 8 Gable 1 0.85 Y N Wall 27 Resulting Parameters and Coefficients: Plan eo hr h he L Elevation Roof Angle, 0 = 37.45 deg. Mean Roof Ht., h = 10.92 ft. (h = (hr+he)/2, for roof angle >10 deg.) Wall External Pressure Coefficients, GCp: GCp Zone 4 Pos. = 0.92 (Fig. 30.4-1) GCp Zone 5 Pos. = 0.92 (Fig. 30.4-1) GCp Zone 4 Neg. = -1.02 (Fig. 30.4-1) GCp Zone 5 Neg. = -1.25 (Fig. 30.4-1) Positive & Negative Internal Pressure Coefficients, GCpi (Figure 26.11-1): +GCpi Coef. = 0.18 (positive internal pressure) -GCpi Coef. = 0.18 (negative internal pressure) If z <= 15 then: Kz = 2.01*(15/zg)A(2/(x) , If z > 15 then: Kz = 2.01*(z/zg)^(2/a) (Table 30.3-1) a = 9.50 (Table 26.9-1) zg = 900 (Table 26.9-1) Kh = 0.85 (Kh = Kz evaluated at z = h) Velocity Pressure: qz = 0.00256*Kz*Kzt*Kd *VA 2 (Sect. 30.3.2, Eq. 30.3-1) qh = 24.43 psf qh = 0.00256*Kh*Kzt*Kd*V^2 (qz evaluated at z = h) Design Net External Wind Pressures (Sect. 30.4 & 30.6): For h <= 60 ft.: p = qh*((GCp) - (+/-GCpi)) (psf) For h > 60 ft.: p = q*(GCp) - qi*(+/-GCpi) (psf) where: q = qz for windward walls, q = qh for leeward walls and side walls qi = qh for all walls (conservatively assumed per Sect. 30.6) (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 10 of 69 (E IDI� I.A\ - kybreak Subdivision J 13382 I an, Idaho PERFORMANCE APPROVED ENGINEERS DATE 09/26/22 FllE NUMBER! A-2 Wind Load Tabulation for Wall Components & Cladding Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 ° 0162 mponent z (ft.) Kh qh (psf) p = Net Design Pressures (psf) Zone 4 (+) Zone 4 (-) Zone 5 (+) Zone 5 (-) Wall 0 0.85 24.43 26.97 -29.41 26.97 -34.88 For z = hr: 12.83 0.85 24.43 26.97 -29.41 26.97 -34.88 For z = he: 9.00 0.85 24.43 26.97 -29.41 26.97 -34.88 For z = h: 1 10.92 1 0.85 1 24.43 1 26.97 -29.41 26.97 -34.88 Notes: 1. (+) and (-) signs signify wind pressures acting toward & away from respective surfaces. 2. Width of Zone 5 (end zones), 'a' = 1 3.00 ft. 3. Per Code Section 30.2.2, the minimum wind load for C&C shall not be less than 16 psf. 4. References : a. ASCE 7-10, "Minimum Design Loads for Buildings and Other Structures". b. "Guide to the Use of the Wind Load Provisions of ASCE 7-02" by: Kishor C. Mehta and James M. Delahay (2004). (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 11 of 69 (E IDI� I.A\ - J kybreak Subdivision 13382 ian, Idaho APPROVED DATL 09/26/22 f IlE NUMBER! A-2D22-0162 Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Wall Components and Cladding: Wall Zones for Buildings with h <= 60 ft. `a' WALL ELEVATION Wall Zones for Buildings with h > 60 ft. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 12 of 69 1 CUEIDR IAN kybreak Subdivision J 13382 an, Idaho PERFORMANCE APPROVED ENGINEERS DATE 09/26/22 Force Calculations FILE NUMBER: ^zozz-oisz I z Wind Loading Analysis': Skybreak Monuments Lateral LOAD CASE 'A' a = 3.00 feet 2a = 6.00 feet Z1 = 9.28 psf Z1 E = 12.46 psf Z2 = 0.73 psf Z2E = 2.20 psf Z3 = -14.90 psf Z3E = -17.34 psf Z4 = -13.44 psf Z4E = -16.12 psf 'A' FACTORED LOADS 0.6*Wr = (Z2 + Z3) * 0.6 = 9.4 psf 0.6*WrE = (Z2E + Z3E) * 0.6 = 11.7 psf 0.6*Ww = (Z1 + Z4) * 0.6 = 13.6 psf 0.6*WwE = (Z1E + Z4E) * 0.6 = 17.1 psf 'B' FACTORED LOADS 0.6*Wr = (Z2 + Z3) * 0.6 = 4.7 psf 0.6*WrE = (Z2E + Z3E) * 0.6 = 7.9 psf 0.6*Ww = (Z1 + Z4) * 0.6 = 10.1 psf 0.6*WwE = (Z1E + Z4E) * 0.6 = 15.2 psf Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 LOAD CASE 'B' a = 3.00 psf 2a = 6.00 feet Z1 = 5.37 psf Z1 E = 10.50 psf Z2 = -21.25 psf Z2E = -30.54 psf Z3 = -13.44 psf Z3E = -17.34 psf Z4 = -11.48 psf Z4E = -14.90 psf ffiffl Ul® Ww, WwE W r, Wind Upr. Flr wall Wind We Shear, Wind Wall Force Wall Wall ht line Force Wall ht truss wall line Upper Force Line(psf) ht ft ft dist. ft +(psf) ft trib ft dist ft + # = (kips) X1-1 17.85 10 0 5.00 + 12.19 0 0.50 5 + 0.00 = 0.24 X2-1 17.85 10 0 5.00 + 12.19 0 0.50 5 + 0.00 = 0.24 X3-1 17.85 10 0 5.00 + 12.19 0 0.50 5 + 0.00 = 0.24 X4-1 17.85 10 0 5.00 + 12.19 0 0.50 5 + 0.00 = 0.24 Y1-1 14.95 10 0 16.00 + 10.26 0 0.50 16 + 0.00 = 0.64 Y2-1 14.95 10 0 16.00 + 10.26 0 0.50 16 + 0.00 = 0.64 Y3-1 17.15 10 0 6.00 + 11.73 0 0.50 6 + 0.00 = 0.27 Y4-1 Y5-1 17.15 15.55 10 10 0 0 6.00 + 11.00 + 11.73 10.66 0 0 0.50 0.50 6 11 + 0.00 = + 0.00 = 0.27 0.46 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 13 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE: 09/26/22 t N U I N t t K J FILE NUMBER:^-2o210162 ear Force Calculations ommmmmmmmA Seismic Loading Analysis: Skybreak Monuments Lateral Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 H J 0 > (0 J (9 p > J Q- — — > Q N 53 (>a p p >>N < >>0 _� >>N p p) N C N Lj L Q Y t O cO O Q Q + LL Q Q + > > > 2 0- x + Eq � II En LL J U X1-1 17 5 16 + 18 0 0 + OSB 35.0 10 5.00 .03Wp + 0 =EO.O Wind X2-1 17 5 16 + 18 0 0 + OSB 35.0 10 5.00 .03Wp + 0 =Wind X3-1 17 5 6 + 18 0 0 + OSB 35.0 10 5.00 .03Wp + 0 =Wind [Wind X4-1 17 5 6 + 18 0 0 + OSB 35.0 10 5.00 .03Wp + 0 = Y1-1 17 16 5 + 18 0 0 + OSB 35.0 10 16.00 .03Wp + 0 =T Wind Y2-1 17 16 5 + 18 0 0 + OSB 35.0 10 16.00 .03Wp + 0 = Wind Y3-1 17 6 5 + 18 0 0 + OSB 35.0 10 6.00 .03Wp + 0 = Wind Y4-1 17 6 5 + 18 0 0 + OSB 35.0 10 6.00 .03Wp + 0 = Wind (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 14 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: X1-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 28.00 ft L = 28.00 ft Lw 22.00 tt H = 10.00 tt H' = 7.00 ft Vf = 238 Ibs WDL self— 350 Pit V'DL above— 168.75 Pit 7/16 in 1/2 in y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 0.786 '°Oh - H'/H = 0.700 SCAF = 0.81 abase = VI/Lw = 11 Plf ureq = abase/tiUAI- 13 Pit OTM = 2,946 lb ft Shear wall adjustment factor RM - 203,350 lb ft r= 0.8397 moo= 0.8092 9 If 13.39 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Resisting moment of total length of wall Blocking Unit Shear Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a, 72 " O.C. T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1% 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" (2) Minimum Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 16.00 6 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 15 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: X2-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 28.00 ft L = 28.00 ft Lw 22.00 tt H = 10.00 tt H' = 7.00 ft Vf = 238 Ibs WDL self— 350 Pit V'DL above— 168.75 Pit 7/16 in 1/2 in Y y/n Y y/n y/n Unit Base Shear 70fh - Lwd L - 0.786 '°Oh - H'/H = 0.700 SCAF = 0.81 abase = VI/Lw = 11 Plf ureq = abase/tiUAI- 13 Pit OTM = 2,946 lb ft Shear wall adjustment factor RM - 203,350 lb ft r= 0.8397 moo= 0.8092 9 If 13.39 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Resisting moment of total length of wall Blocking Unit Shear Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a, 72 " O.C. T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1% 16 Gage Staples @ 3" O.C. Blockinq / Nailinq Framing Attachment "No Blockinq Required" "Tvp. Gable / Draq Truss or Rim Nailinq" (2) Minimum Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 16.00 6 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 16 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: X3-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 11.00 ft L = 11.00 ft Lw - 11.00 tt H = 10.00 tt H' = 0.00 ft Vf = 238 Ibs WDLself- 350 Pit V'DL above— 113.40 Pit 7/16 in 1/2 in Y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 22 Pit ureq = abase/tiUAI- 22 Pit OTM = 2,384 lb ft Shear wall adjustment factor RIM - 28,036 lb ft r= 1.0000 moo= 1.0000 22 If 21.67 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Resisting moment of total length of wall Blocking Unit Shear Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a, 72 " O.C. T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1% 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" (2) Minimum Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 11.00 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 17 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: X4-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 11.00 ft L = 11.00 ft Lw - 11.00 tt H = 10.00 tt H' = 0.00 ft Vf = 238 Ibs WDLself- 350 Pit V'DL above— 113.40 Pit 7/16 in 1/2 in Y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 22 Pit ureq = abase/tiUAI- 22 Pit OTM = 2,384 lb ft Shear wall adjustment factor RIM - 28,036 lb ft r= 1.0000 moo= 1.0000 22 If 21.67 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Resisting moment of total length of wall Blocking Unit Shear Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a, 72 " O.C. T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1% 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" (2) Minimum Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 11.00 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 18 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y1-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft L,h, - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 639 Ibs WDL self— 350 Pit V'DL above— 187.50 Pit 7/16 in 1/2 in y y/n y y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 128 Pit ureq = abase/tiUAI- 128 Pit OTM = 6,391 lbft Shear wall adjustment factor RIM - 6,719 lbft Resisting moment of total length of wall r= 1.0000 �D= 1.0000 128 If Blocking Unit Shear 127.81 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum Holdown Ta T = 472 ]bs Intersecting wall 500 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5.00 Type Misc Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 19 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y2-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft Lw - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 639 Ibs WDLself- 350 Pit V'DL above— 187.50 Pit 7/16 in 1/2 in y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 128 Pit ureq = abase/tiUAI- 128 Pit OTM = 6,391 lbft Shear wall adjustment factor RIM - 6,719 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 128 If Blocking Unit Shear 127.81 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum Holdown Ta T = 472 ]bs Intersecting wall 500 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5.00 Type Misc Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 20 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERA-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y3-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft L,A, - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 275 Ibs WDL self— 350 Pit wDL above— 187.50 Pit 7/16 in 1/2 in Y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 55 Pit ureq = abase/tiUAI- 55 Pit OTM = 2,748 lb ft Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Shear wall adjustment factor RIM - 6,719 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 55 If Blocking Unit Shear 54.96 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5.00 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 21 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERA-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y4-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft L,A, - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 275 Ibs WDL self— 350 Pit wDL above— 187.50 Pit 7/16 in 1/2 in Y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 55 Pit ureq = abase/tiUAI- 55 Pit OTM = 2,748 lb ft Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Shear wall adjustment factor RIM - 6,719 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 55 If Blocking Unit Shear 54.96 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5.00 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 22 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y5-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft Lw - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 457 Ibs WDLself- 350 Pit wDL above— 28125 pit 7/16 in 1/2 in Y y/n Y y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 91 Plf ureq = abase/tiUAI- 91 Plf OTM = 4,569 lbft Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Shear wall adjustment factor RM - 7,891 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 91 If Blocking Unit Shear 91.39 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum T = Not Req'd ]bs OSB Wall Sheathinq attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 23 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: Y6-1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 5.00 ft L = 5.00 ft L,h, - 5.00 tt H = 10.00 tt H' = 0.00 ft Vf = 457 Ibs WDL self— 350 Pit wDL above— 28125 pit 7/16 in 1/2 in Y y/n Y y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 91 Plf ureq = abase/tiUAI- 91 Plf OTM = 4,569 lbft Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Shear wall adjustment factor RM - 7,891 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 91 If Blocking Unit Shear 91.39 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 60 " O.C. (2) Minimum T = Not Req'd ]bs OSB Wall Sheathinq attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 5 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 24 of 69 CUEIDR IAN kybreak Subdivision J 13382 an, Idaho PERFORMANCE APPROVED ENGINEERS DATE 09/26/22 Force Calculations FILE NUMBER:^-D210is2 Wind Loading Analysis': FGaurd Shack Lateral LOAD CASE 'A' a = 3.00 feet 2a = 6.00 feet Z1 = 9.28 psf Z1 E = 12.46 psf Z2 = 0.73 psf Z2E = 2.20 psf Z3 = -14.90 psf Z3E = -17.34 psf Z4 = -13.44 psf Z4E = -16.12 psf 'A' FACTORED LOADS 0.6*Wr = (Z2 + Z3) * 0.6 = 9.4 psf 0.6*WrE = (Z2E + Z3E) * 0.6 = 11.7 psf 0.6*Ww = (Z1 + Z4) * 0.6 = 13.6 psf 0.6*WwE = (Z1E + Z4E) * 0.6 = 17.1 psf 'B' FACTORED LOADS 0.6*Wr = (Z2 + Z3) * 0.6 = 4.7 psf 0.6*WrE = (Z2E + Z3E) * 0.6 = 7.9 psf 0.6*Ww = (Z1 + Z4) * 0.6 = 10.1 psf 0.6*WwE = (Z1E + Z4E) * 0.6 = 15.2 psf Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 LOAD CASE 'B' a = 3.00 psf 2a = 6.00 feet Z1 = 5.37 psf Z1 E = 10.50 psf Z2 = -21.25 psf Z2E = -30.54 psf Z3 = -13.44 psf Z3E = -17.34 psf Z4 = -11.48 psf Z4E = -14.90 psf mMm Ww, WwE W r, Wind Upr. Flr wall Wind We Shear, Wind Wall Force Wall Wall ht line Force Wall ht truss wall line Upper Force Line(psf) ht ft ft dist. ft +(psf) ft trib ft dist ft + # = (kips) 3 15.74 9 0 10.00 + 10.79 0 3.83 10 + 0.00 = 0.56 4 15.74 6.5 0 10.00 + 10.79 0 3.83 10 + 0.00 = 1 0.46 1 16.27 9 0 8.00 + 11.14 0 3.83 8 + 0.00 = 0.46 2 16.27 9 0 8.00 + 11.14 0 3.83 8 + 0.00 = 0.46 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 25 of 69 kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 t N U I N t t K J EiEENUMBER: ^2022--2 ear Force Calculations ommmmmmummt Seismic Loading Analysis: Gaurd Shack Lateral Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 C: v a Cn J > > J > > J Q- p (0 (B p (0 (9 — — — _� Q p) N N to d i Q r rr c>a p p >N c>0 >N p N C Lj L Q Y t O Y c0 O � Q Q + LL Q Q + > > > 2 d + U II N LL .. J U 3 17 10 8 + 18 0 0 + OSB 12.0 9 10.00 .03Wp + 0 = 0.06 Wind 4 17 10 8 + 18 0 0 + OSB 12.0 6.5 10.00 .03Wp + 0 = 0.05 Wind X3-1 17 20 20 + 18 0 0 + OSB 12.0 9 20.00 .03Wp + 0 = 0.18 Wind 1 X4-1 17 20 20 + 18 0 0 + OSB 12.0 9 20.00 .03Wp + 0 = 0.18 Wind 1 17 8 10 + 18 0 0 + OSB 12.0 9 8.00 .03Wp + 0 =T01 Wind 2 17 8 10 + 18 0 0 + OSB 12.0 9 8.00 .03Wp + 0 = Wind Y3-1 17 20 20 + 18 0 0 + OSB 12.0 9 20.00 .03Wp + 0 = Wind Y4-1 17 20 20 + 18 0 0 + OSB 12.0 9 20.00 .03Wp + 0 = Wind (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 26 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: 3 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 8.00 ft L = 8.00 ft Lw 8.00 tt H = 9.00 tt H' = 0.00 ft V, = 561 Ibs WDLself— 108 Pit wDL above - 40 80 Pit 7/16 in 1/2 in y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 70 Pit ureq = abase/tiUAI- 70 Pit OTM = 5,047 lb ft Shear wall adjustment factor RIM = 4,762 lbft Resisting moment of total length of wall r= 1.0000 �D= 1.0000 70 If Blocking Unit Shear 70.10 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 72 " O.C. (2) Minimum Holdown Ta T = 274 ]bs Intersecting wall 500 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.57 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 8.00 Type Misc Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 27 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERA-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: 4 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 8.00 ft L = 8.00 ft Lw 8.00 tt H = 6.50 tt H' = 0.00 ft Vf = 462 Ibs WDL self— 78 Pit wDL above— 40.80 Pit 7/16 in 1/2 in y y/n N y/n y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 58 Pit ureq = abase/SLAT 58 Pit OTM = 3,006 lb ft Shear wall adjustment factor RIM - 3,802 lbft Resisting moment of total length of wall r= 1.0000 moo= 1.0000 58 If Blocking Unit Shear 57.80 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 72 " O.C. (2) Minimum Holdown Ta T = 91 lbs Intersecting wall 500 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailinq Framing Attachment "Tvp. Gable / Draq Truss or Rim Nailinq" Min Shear Wall Segment: 1.86 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 8.00 Type Misc Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 28 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -oisz ;kybreak Subdivision 13382 an, Idaho Description: 1 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 10.00 ft L = 10.00 ft 7.34 tt H = g.00 tt H' = 6.67 ft Vf = 464 Ibs WDL self— 108 Pit wDL above— 40.80 Pit 7/16 in 1/2 in y y/n y y/n N y/n Unit Base Shear 0fh - Dw+D - 0.734 !ooh - H'/H = 0.741 SCAF = 0.75 abase = VI/Lw = 63 Pit ureq = abase/tiUAI- 84 Pit OTM = 5,529 lb ft Shear wall adjustment factor RIM - 7,440 lbft Resisting moment of total length of wall r= 0.7883 �D= 0.7545 46 If Blocking Unit Shear 83.70 Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a), 72 " O.C. (2) Minimum Holdown Ta T = 145 lbs Intersecting wall 500 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1'/2 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" Min Shear Wall Segment: 2.57 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 3.67 3.67 Type Misc Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 29 of 69 �j(E IDS IAN,— APPROVED DATE 09/26/22 FILE NUMBERn-zo -0162 ;kybreak Subdivision 13382 an, Idaho Description: 2 Shear Wall Perforated Shear Wall Calculation Sheet: This spreadsheet is made in conformance to the IBC Chapters 2305-2308 and AFPA's "SDPWS: Lateral Force Resisting Systems". Shear Watt Forces 10.00 ft L = 10.00 ft Lw - 10.00 tt H = 9.00 tt H' = 0.00 ft V, = 464 Ibs WDLself- 108 Pit `/"DL above - 40 80 Pit 7/16 in 1/2 in y y/n y/n N y/n Unit Base Shear 70fh - Lwd L - 1.000 '°Oh - H'/H = 0.000 SCAF = 1.00 abase = VI/Lw = 46 Pit ureq = abase/tiUAI- 46 Pit OTM = 4,172 lb ft Shear wall adjustment factor RIM = 7,440 lb ft r= 1.0000 �D= 1.0000 46 If 46.35 Total length of wall Total length of shear wall Total length of full height segments height of shear wall Maximum opening height Total Wind force at top of wall Self weight Applied dead load Prefered OSB thickness Prefered Gyp thickness Wall Connected to Concrete Wall Connected to Truss or Joist Wall Connected to Gable / Drag Truss or Rim Percent of full height segments Percent of maximum opening height Shear capacity adjustment factors (NDS SDPWS Table ) Unit base shear Effective unit base shear Overturning moment of total length of wall Resisting moment of total length of wall Blocking Unit Shear Force Calculated Shear Transfer to Concrete: 1/2 Anchor Bolts (a, 72 " O.C. T = Not Req'd ]bs OSB Wall Sheathing attachment Provide: 7/16" OSB W/ 8d Nails @ 6" O.C. OR: 7/16" OSB W/ 1% 16 Gage Staples @ 3" O.C. Blockinq / Nailing Framing Attachment "No Blockinq Required" (2) Minimum Min Shear Wall Segment: 2.57 ft Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 SHEARWAL L SEGMENTS 10.00 Va= 336 W1 Va= 434 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 30 of 69 kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 a r Wall uild:20.22.6.12 riff NUM9ERA2o22-o, ez Gaurd shack column Code References Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 Calculations per TMS 402-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Wall Material MASONRY Total Wall Height Base Wall Length R: Resp. Mod Factor le: Seismic Import. Factor Wall Data fm 1.50 ksi Block Class 3.333 ft Fy - Rebar 60.0 ksi Concrete Density 150.0 pcf 2.0 ft Fy - HJR 70.0 ksi Min. Bending As % 0.00180 Ern 3,120.0 ksi 1.0 Phi - Shear 0.80 Phi : Axial & Flexure 0.90 Bottom Analysis Height 0.00 ft Wall Offset ( datum ) ft Wall Length 2.0 ft Effective Length 'd' 16.0 in Nominal Block Thickness 8 in Solid Grout? Solid Grouted Reinforcing in Field of Wall Vertical Bar Size # 5 Vertical Bar Spacing 24 in Horiz. joint reinf. area (HJR) 0.55 in HJR Spacing 24 in Bond beam reinf. area 0.4 in Spacing of bond beams 48 in In each chord cell: Vertical rebar size # 4 # Chord Cells @ Each End 2 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 31 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE 09/26/22 a r Wall FILE NUM[�ER:^zszz-oisz uild:20.22.6.12 Gaurd shack column Wall Sketch Applied Distributed Vertical Loads Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 Load Location (ft) Load Magnitude (kips) Start Location End Location Height of Application Dead Load Roof Live Load Live Load Snow Load Earth Load 0.0 2.0 3.333 0.0950 0.0 0.0 0.0 0.0 Applied Concentrated Lateral Loads Load Magnitude (kips) Load "Y" Location (ft) Dead Load Roof Live Load Floor Live Load Wind Load Seismic Load Earth Load 3.330 0.0 0.0 0.0 0.60 0.0 0.0 SHEAR ANALYSIS Bottom Level Special Boundary Elements Req'd? Not Req'd Vu : Story Shear 0.60 k for Load Combination +1.20D+W Controlling Mu/(Vud) 1.00 Vn Masonry 16.162 k Vn Steel 20.20 k Vn Masonry + Vn Steel 36.362 k Vn Max 28.257 k Phi Vn 22.606 k Ratio: Vu/PhiVn (controlling) 0.02654 Vertical As — Av/3 OK Vertical Bar Spacing — 96" OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 32 of 69 IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 a r Wall I11[NUMBERA-2D22- sz uild:20.22.6.12 Gaurd shack column AXIAL ANALYSIS Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 Bottom Level H / d Ratio 2.50 Pu 1.069 k for Load Combination +1.401D Phi Pn +1.401D k Ratio: Pu/PhiPn (controlling) 0.004411 BENDING ANALYSIS Bottom Level "a" : Flexural compression 2.62 in Length of defined chord zone Is - the ..a., almenslon or the OK masonry (the compression zone) "T : Eff depth to tension reinf 16.0 As -flex < As -max ? 400 <= 1.081 Mu 1.998 k for Load Combination +1.20D+W Phi Mn 26.439 k Ratio: Mu/PhiMn (controlling) 0.07557 Force Summary Load Combination Values for Wall section Wall Level Vu (k) Mu (k) +1.40D Wall Level: 1 +1.20D Wall Level: 1 +1.20D+0.50W Wall Level: 1 0.300 0.999 +1.20D+W Wall Level: 1 0.600 1.998 +1.20D+E Wall Level: 1 +0.90D+W Wall Level: 1 0.600 1.998 +0.90D+E Wall Level: 1 Resultant Overturning Uplift (k) Pu (k) Ecc (ft) Ratio Left Right 1.069 0.916 0.916 1.091 0.802 0.490 0.490 0.916 2.181 0.401 1.240 1.240 0.916 0.687 2.909 0.373 1.197 1.197 0.687 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 33 of 69 IDIAN> kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE: 09/26/22 ar Wall Project File: 05 beams 2022-13486 Blackrock Homes - Impressive Ri.EC6 IiiErlut�fBER ^�����,sz uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 CMU WALL Gate Column Lateral Code References Calculations per TMS 402-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Wall Material MASONRY fm Total Wall Height 6.0 ft Fy - Rebar Base Wall Length 3.0 ft Fy - HJR R: Resp. Mod Factor Ern le: Seismic Import. Factor 1.0 Phi - Shear Wall Data Bottom Analysis Height 0.00 ft Wall Offset ( datum ) ft Wall Length 3.0 ft Effective Length 'd' 28.0 in Nominal Block Thickness 8 in Solid Grout? Partial Groute Reinforcing in Field of Wall Vertical Bar Size # 5 Vertical Bar Spacing 16 in Horiz. joint reinf. area (HJR) 0.55 in HJR Spacing 48 in Bond beam reinf. area 0.4 in Spacing of bond beams 48 in In each chord cell: Vertical rebar size # 5 # Chord Cells @ Each End 2 1.50 ksi Block Class 60.0 ksi Concrete Density 150.0 pcf 70.0 ksi Min. Bending As % 0.00180 3,120.0 ksi 0.80 Phi : Axial & Flexure 0.90 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 34 of 69 �E IDIAN> APPROVED DATE: 09/26/22 i 11[ NUMBER! ^-zo2-162 Wall Sketch *ybreak Subdivision 13382 an, Idaho Wall Rrnpmr CMU WALL Gate Column Lateral SHEAR ANALYSIS Bottom Level Special Boundary Elements Req'd? Not Req'd Vu : Story Shear 0.1820 k for Load Combination +1.401D Controlling Mu/(Vud) 1.00 Vn Masonry 23.740 k Vn Steel 18.750 k Vn Masonry + Vn Steel 42.490 k Vn Max 30.953 k Phi Vn 24.762 k Ratio: Vu/PhiVn (controlling) 0.007350 Vertical As — Av/3 OK Vertical Bar Spacing — 96" OK AXIAL ANALYSIS Bottom Level H / d Ratio 2.57 Pu 2.103 k for Load Combination +1.401D Phi Pn +1.401D k Ratio: Pu/PhiPn (controlling) 0.006362 Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13486 Blackrock Homes - Impressive Ri.EC6 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 35 of 69 IDIAN> kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE: 09/26/22 ar Wall Project File: 05 beams 2022-13486 Blackrock Homes - Impressive Ri.EC6 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 liiENUM(4fR ^������s� CMU WALL Gate Column Lateral BENDING ANALYSIS "a" : Flexural compression Length of defined chord zone Is - me ..a., almenslon or me masonry (the compression zone) "T : Eff depth to tension reinf As -flex < As -max ? Mu for Load Combination Phi Mn Ratio: Mu/PhiMn (controlling) Force Summary Load Combination Wall Level Bottom Level 4.07 in OK 28.0 620 <= 1.892 1.092 k +1.40D 72.449 k 0.01507 Values for Wall section Vu (k) Mu (k) +1.40D Wall Level: 1 0.182 1.092 +1.20D Wall Level: 1 0.156 0.936 +1.20D+0.50S Wall Level: 1 0.156 0.917 +1.20D+1.60S Wall Level: 1 0.156 0.876 +1.20D+0.70S+E Wall Level: 1 0.156 0.910 +0.90D Wall Level: 1 0.117 0.702 +0.90D+E Wall Level: 1 0.117 0.702 Pu (k) 2.103 1.802 1.815 1.842 1.820 1.352 1.352 Resultant Overturning Uplift (k) Ecc (ft) Ratio Left Right 0.519 2.063 0.519 2.407 0.505 2.447 0.475 2.535 0.500 2.463 0.519 3.209 0.519 3.209 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 36 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE o9i26i22 M a zszz-oi sz EIIE NUMBEA: - uild:20.22.6.12 Skybreak monument CODE REFERENCES Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties fc = 2.50 ksi Phi Values Flexure : 0.90 fr = fc �2 ' 7.50 = 375.0 psi Shear: 0.750 W Density = 145.0 pcf R 1 = 0.850 k LtWt Factor = 1.0 Elastic Modulus = 3,122.0 ksi Fy - Stirrups 40.0 ksi fy - Main Rebar = 60.0 ksi E - Stirrups = 29,000.0 ksi E -Main Rebar = 29,000.0 ksi Stirrup Bar Size # 3 Number of Resisting Legs Per Stirrup = 2 (0.12_E 5.0 ft 24"wx5" h Cross Section & Reinforcing Details Rectanqular Section, Width = 24.0 in, Heiqht = 5.0 in Span #1 Reinforcinq.... 244 at 2.0 in from Bottom, from 0.0 to 5.0 ft in this span Beam self weight calculated and added to loads Load for Span Number 1 Uniform Load : S = 0.0250 ksf, Tributary Width = 5.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = Section used for this span Mu : Applied MnPhi: Allowable Location of maximum on span Span # where maximum occurs Maximum Deflection Max Downward Transient Deflection Max Upward Transient Deflection Max Downward Total Deflection Max Upward Total Deflection 0.217 : 1 Typical Section 1.078 k-ft 4.976 k-ft 2.495 ft Span # 1 0.002 in Ratio = 26649 > 360.0 0.000 in Ratio = 0 <360.0 0.004 in Ratio = 13550 > 180.0 0.000 in Ratio = 0 <180.0 S Only S Only Span: 1:+D+S Span: 1:+D+S Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum 0.615 0.615 Overall MlNimum 0.181 0.181 D Only 0.302 0.302 �n�(Z n a1G n air, +Q.)A,789)040 0.5361102 NDPJMKLIN BLVD, NAMPA, ID 83687 Page 37 of 69 +0.60D 0.181 0.181 S Only 0.313 0.312 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 M Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILENUMBER: Az�z2-2 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 Skybreak monument Detailed Shear Information Span Distance 'd' Vu (k) Mu d*Vu/Mu Phi*Vc Comment Phi*Vs Phi*Vn Spacing (in) Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) (k) Req'(Suggest +1.20D+1.60S 1 0.00 3.00 0.86 0.86 0.00 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 0.05 3.00 0.84 0.84 0.05 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 0.11 3.00 0.82 0.82 0.09 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 0.16 3.00 0.81 0.81 0.14 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 0.22 3.00 0.79 0.79 0.18 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 0.27 3.00 0.77 0.77 0.22 0.86 5.78 Vu < PhiVc/2 A Reqd 9.E 5.8 0.0 0.0 +1.20D+1.60S 1 0.33 3.00 0.75 0.75 0.26 0.71 5.66 Vu < PhiVc/2 A Reqd 9.E 5.7 0.0 0.0 +1.20D+1.60S 1 0.38 3.00 0.73 0.73 0.30 0.60 5.58 Vu < PhiVc/2 A Reqd 9.E 5.6 0.0 0.0 +1.20D+1.60S 1 0.44 3.00 0.71 0.71 0.34 0.52 5.52 Vu < PhiVc/2 A Reqd 9.E 5.5 0.0 0.0 +1.20D+1.60S 1 0.49 3.00 0.69 0.69 0.38 0.45 5.47 Vu < PhiVc/2 A Reqd 9.E 5.5 0.0 0.0 +1.20D+1.60S 1 0.55 3.00 0.67 0.67 0.42 0.40 5.43 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 0.60 3.00 0.66 0.66 0.46 0.36 5.40 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 0.66 3.00 0.64 0.64 0.49 0.32 5.37 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 0.71 3.00 0.62 0.62 0.53 0.29 5.35 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 0.77 3.00 0.60 0.60 0.56 0.27 5.33 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 0.82 3.00 0.58 0.58 0.59 0.25 5.31 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 0.87 3.00 0.56 0.56 0.62 0.23 5.30 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 0.93 3.00 0.54 0.54 0.65 0.21 5.29 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 0.98 3.00 0.52 0.52 0.68 0.19 5.27 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 1.04 3.00 0.50 0.50 0.71 0.18 5.26 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 1.09 3.00 0.49 0.49 0.74 0.16 5.25 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 1.15 3.00 0.47 0.47 0.76 0.15 5.24 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.20 3.00 0.45 0.45 0.79 0.14 5.24 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.26 3.00 0.43 0.43 0.81 0.13 5.23 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.31 3.00 0.41 0.41 0.83 0.12 5.22 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.37 3.00 0.39 0.39 0.86 0.11 5.22 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.42 3.00 0.37 0.37 0.88 0.11 5.21 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.48 3.00 0.35 0.35 0.90 0.10 5.20 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.53 3.00 0.33 0.33 0.92 0.09 5.20 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.58 3.00 0.32 0.32 0.93 0.08 5.19 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.64 3.00 0.30 0.30 0.95 0.08 5.19 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.69 3.00 0.28 0.28 0.97 0.07 5.18 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.75 3.00 0.26 0.26 0.98 0.07 5.18 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.80 3.00 0.24 0.24 0.99 0.06 5.18 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.86 3.00 0.22 0.22 1.01 0.05 5.17 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.91 3.00 0.20 0.20 1.02 0.05 5.17 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 1.97 3.00 0.18 0.18 1.03 0.04 5.16 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 2.02 3.00 0.16 0.16 1.04 0.04 5.16 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 2.08 3.00 0.15 0.15 1.05 0.03 5.16 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 2.13 3.00 0.13 0.13 1.05 0.03 5.15 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 2.19 3.00 0.11 0.11 1.06 0.03 5.15 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.24 3.00 0.09 0.09 1.07 0.02 5.15 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.30 3.00 0.07 0.07 1.07 0.02 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.35 3.00 0.05 0.05 1.07 0.01 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.40 3.00 0.03 0.03 1.08 0.01 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.46 3.00 0.01 0.01 1.08 0.00 5.13 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.51 3.00 -0.00 0.00 1.08 0.00 5.13 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.57 3.00 -0.02 0.02 1.08 0.01 5.13 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.62 3.00 -0.04 0.04 1.08 0.01 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.68 3.00 -0.06 0.06 1.07 0.01 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.73 3.00 -0.08 0.08 1.07 0.02 5.14 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.79 3.00 -0.10 0.10 1.06 0.02 5.15 Vu < PhiVc/2 A Reqd 9.E 5.1 0.0 0.0 +1.20D+1.60S 1 2.84 3.00 -0.12 0.12 1.06 0.03 5.15 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S �1 Onn�l ane 1 I 2.90 or 3.00 Q nn -0.14 n iF 0.14 n 1a 1.05 I nn 0.03 n nn 5.15 G iF Vu < PhiVc/2 A Reqd 9.E + o., 1 o F 5.2 G 0.0 n n 0.0 n n +1(20ED)1T%0840 1 3.01 3.001102-N.FRANIOLIN BLVD,*AMPA,OD 836U-16 Vu < PhiVc/2 A Reqd gl�age 8? .2of 690.0 0.0 +1.20D+1.60S 1 3.06 3.00 -0.19 0.19 1.02 0.05 5.17 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.11 3.00 -0.21 0.21 1.01 0.05 5.17 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE 09/26/22 M FIEENUM[.ER:^-����-Diaz uild:20.22.6.12 Skybreak monument Detailed Shear Information Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Span Distance 'd' Vu (k) Mu d*Vu/Mu Phi*Vc Comment Phi*Vs Phi*Vn Spacing (in) Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) (k) Req'(Suggest +1.20D+1.60S 1 3.17 3.00 -0.23 0.23 1.00 0.06 5.17 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.22 3.00 -0.25 0.25 0.99 0.06 5.18 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.28 3.00 -0.27 0.27 0.97 0.07 5.18 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.33 3.00 -0.29 0.29 0.96 0.07 5.19 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.39 3.00 -0.31 0.31 0.94 0.08 5.19 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.44 3.00 -0.33 0.33 0.92 0.09 5.20 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.50 3.00 -0.34 0.34 0.91 0.09 5.20 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.55 3.00 -0.36 0.36 0.89 0.10 5.21 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.61 3.00 -0.38 0.38 0.87 0.11 5.21 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.66 3.00 -0.40 0.40 0.85 0.12 5.22 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.72 3.00 -0.42 0.42 0.82 0.13 5.23 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.77 3.00 -0.44 0.44 0.80 0.14 5.23 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.83 3.00 -0.46 0.46 0.78 0.15 5.24 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.88 3.00 -0.48 0.48 0.75 0.16 5.25 Vu < PhiVc/2 A Reqd 9.E 5.2 0.0 0.0 +1.20D+1.60S 1 3.93 3.00 -0.49 0.49 0.72 0.17 5.26 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 3.99 3.00 -0.51 0.51 0.70 0.18 5.27 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.04 3.00 -0.53 0.53 0.67 0.20 5.28 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.10 3.00 -0.55 0.55 0.64 0.22 5.29 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.15 3.00 -0.57 0.57 0.61 0.23 5.31 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.21 3.00 -0.59 0.59 0.58 0.26 5.32 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.26 3.00 -0.61 0.61 0.54 0.28 5.34 Vu < PhiVc/2 A Reqd 9.E 5.3 0.0 0.0 +1.20D+1.60S 1 4.32 3.00 -0.63 0.63 0.51 0.31 5.36 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 4.37 3.00 -0.65 0.65 0.47 0.34 5.39 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 4.43 3.00 -0.66 0.66 0.44 0.38 5.41 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 4.48 3.00 -0.68 0.68 0.40 0.43 5.45 Vu < PhiVc/2 A Reqd 9.E 5.4 0.0 0.0 +1.20D+1.60S 1 4.54 3.00 -0.70 0.70 0.36 0.48 5.49 Vu < PhiVc/2 A Reqd 9.E 5.5 0.0 0.0 +1.20D+1.60S 1 4.59 3.00 -0.72 0.72 0.32 0.56 5.55 Vu < PhiVc/2 A Reqd 9.E 5.5 0.0 0.0 +1.20D+1.60S 1 4.64 3.00 -0.74 0.74 0.28 0.65 5.62 Vu < PhiVc/2 A Reqd 9.E 5.6 0.0 0.0 +1.20D+1.60S 1 4.70 3.00 -0.76 0.76 0.24 0.78 5.71 Vu < PhiVc/2 A Reqd 9.E 5.7 0.0 0.0 +1.20D+1.60S 1 4.75 3.00 -0.78 0.78 0.20 0.96 5.85 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 4.81 3.00 -0.80 0.80 0.16 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 4.86 3.00 -0.82 0.82 0.11 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 4.92 3.00 -0.83 0.83 0.07 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 +1.20D+1.60S 1 4.97 3.00 -0.85 0.85 0.02 1.00 5.88 Vu < PhiVc/2 A Reqd 9.E 5.9 0.0 0.0 Maximum Forces & Stresses for Load Combinations Load Combination Segment Location (ft) Span # along Beam Bending Stress Results ( k-ft ) Mu: Max Phi*Mnx Stress Ratio MAXimum BENDING Envelope Span # 1 1 5.000 1.08 4.98 0.22 +1.40D Span # 1 1 5.000 0.53 4.98 0.11 +1.20D Span # 1 1 5.000 0.45 4.98 0.09 +1.20D+0.50S Span # 1 1 5.000 0.65 4.98 0.13 +1.20D+1.60S Span # 1 1 5.000 1.08 4.98 0.22 +1.20D+0.70S Span # 1 1 5.000 0.73 4.98 0.15 +0.90D Span # 1 1 5.000 0.34 4.98 0.07 Overall Maximum Deflections Load Combination Span Max. "" DO (in) -ocation in Span (ft Load Combination Max. "+" Defl (in)ocation in Span (ft +D+S 1 0.0044 2.500 0.0000 0.000 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 39 of 69 CUEIDR IAN APPROVED EA1E 09/26/22 FILE NUMBER: A-2o22--2 ;kybreak Subdivision 13382 an, Idaho Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 m Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 u (c) ENERCALC INC 1983-2022 Concrete Cap max. 2' Span CODE REFERENCES Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties fc = 2.50 ksi Phi Values Flexure : 0.90 fr = fc �2 '7.50 = 375.0 psi Shear: 0.750 y, Density = 145.0 pcf R 1 = 0.850 a LtWt Factor = 1.0 Elastic Modulus = 3,122.0 ksi Fy - Stirrups 40.0 ksi fy - Main Rebar = 60.0 ksi E - Stirrups = 29,000.0 ksi E -Main Rebar = 29,000.0 ksi Stirrup Bar Size # 3 Number of Resisting Legs Per Stirrup = 2 75) 2.0 Cross Section & Reinforcing Details Rectanqular Section, Width = 24.0 in, Heiqht = 3.50 in Span #1 Reinforcinq.... 344 at 1.50 in from Bottom, from 0.0 to 2.0 ft in this span Beam self weight calculated and added to loads Point Load : S = 0.750 k @ 1.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = 0.146 : 1 Section used for this span Typical Section Mu: Applied 0.6497 k-ft Mn * Phi: Allowable 4.447 k-ft Location of maximum on span 1.002 ft Span # where maximum occurs Span # 1 Maximum Deflection Max Downward Transient Deflection 0.000 in Ratio = 0 <360.0 S Only Max Upward Transient Deflection 0.000 in Ratio = 0 <360.0 S Only Max Downward Total Deflection 0.000 in Ratio = 0 <180.0 Span: 1 : +D+S Max Upward Total Deflection 0.000 in Ratio = 0 <180.0 Span: 1 : +D+S Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum 0.460 0.460 Overall MINimum 0.051 0.051 D Only 0.085 0.085 +D+S 7cnc 0.460 0.460 n occ n occ +Q7 075-0040 0.0511102 NOEMNKLIN BLVD, NAMPA, ID 83687 Page 40 of 69 S Only 0.375 0.375 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS osizsizz DATE M Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILENUMBER: A-2Diaz Concrete Cap max. 2' Span (c) ENERCALC INC 1983-2022 6= -F Detailed Shear Information Span Distance 'd' Vu (k) Mu d"Vu/Mu Phi'Vc Comment Phi"Vs Phi'Vn Spacing (in) Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) (k) Req'Suggest +1.20D+1.60S 1 0.00 2.00 0.70 0.70 0.00 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.02 2.00 0.70 0.70 0.02 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.04 2.00 0.70 0.70 0.03 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.07 2.00 0.69 0.69 0.05 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.09 2.00 0.69 0.69 0.06 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.11 2.00 0.69 0.69 0.08 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.13 2.00 0.69 0.69 0.09 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.15 2.00 0.69 0.69 0.11 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.17 2.00 0.68 0.68 0.12 0.94 4.48 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 0.20 2.00 0.68 0.68 0.14 0.83 4.36 Vu < PhiVc/2 A Reqd 9.E 4.4 0.0 0.0 +1.20D+1.60S 1 0.22 2.00 0.68 0.68 0.15 0.75 4.26 Vu < PhiVc/2 A Reqd 9.E 4.3 0.0 0.0 +1.20D+1.60S 1 0.24 2.00 0.68 0.68 0.17 0.68 4.19 Vu < PhiVc/2 A Reqd 9.E 4.2 0.0 0.0 +1.20D+1.60S 1 0.26 2.00 0.67 0.67 0.18 0.62 4.12 Vu < PhiVc/2 A Reqd 9.E 4.1 0.0 0.0 +1.20D+1.60S 1 0.28 2.00 0.67 0.67 0.20 0.57 4.07 Vu < PhiVc/2 A Reqd 9.E 4.1 0.0 0.0 +1.20D+1.60S 1 0.31 2.00 0.67 0.67 0.21 0.53 4.02 Vu < PhiVc/2 A Reqd 9.E 4.0 0.0 0.0 +1.20D+1.60S 1 0.33 2.00 0.67 0.67 0.22 0.50 3.98 Vu < PhiVc/2 A Reqd 9.E 4.0 0.0 0.0 +1.20D+1.60S 1 0.35 2.00 0.67 0.67 0.24 0.46 3.94 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 0.37 2.00 0.66 0.66 0.25 0.44 3.91 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 0.39 2.00 0.66 0.66 0.27 0.41 3.88 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 0.42 2.00 0.66 0.66 0.28 0.39 3.86 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 0.44 2.00 0.66 0.66 0.30 0.37 3.83 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 0.46 2.00 0.65 0.65 0.31 0.35 3.81 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 0.48 2.00 0.65 0.65 0.33 0.33 3.80 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 0.50 2.00 0.65 0.65 0.34 0.32 3.78 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 0.52 2.00 0.65 0.65 0.35 0.31 3.76 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 0.55 2.00 0.65 0.65 0.37 0.29 3.75 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.57 2.00 0.64 0.64 0.38 0.28 3.74 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.59 2.00 0.64 0.64 0.40 0.27 3.72 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.61 2.00 0.64 0.64 0.41 0.26 3.71 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.63 2.00 0.64 0.64 0.42 0.25 3.70 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.66 2.00 0.63 0.63 0.44 0.24 3.69 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.68 2.00 0.63 0.63 0.45 0.23 3.68 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.70 2.00 0.63 0.63 0.47 0.23 3.67 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.72 2.00 0.63 0.63 0.48 0.22 3.67 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.74 2.00 0.63 0.63 0.49 0.21 3.66 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.77 2.00 0.62 0.62 0.51 0.21 3.65 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 0.79 2.00 0.62 0.62 0.52 0.20 3.64 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.81 2.00 0.62 0.62 0.53 0.19 3.64 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.83 2.00 0.62 0.62 0.55 0.19 3.63 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.85 2.00 0.61 0.61 0.56 0.18 3.63 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.87 2.00 0.61 0.61 0.57 0.18 3.62 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.90 2.00 0.61 0.61 0.59 0.17 3.61 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.92 2.00 0.61 0.61 0.60 0.17 3.61 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.94 2.00 0.61 0.61 0.61 0.16 3.60 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.96 2.00 0.60 0.60 0.63 0.16 3.60 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 0.98 2.00 0.60 0.60 0.64 0.16 3.60 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.01 2.00 -0.60 0.60 0.65 0.15 3.59 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.03 2.00 -0.60 0.60 0.63 0.16 3.60 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.05 2.00 -0.60 0.60 0.62 0.16 3.60 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.07 2.00 -0.61 0.61 0.61 0.17 3.61 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.09 2.00 -0.61 0.61 0.59 0.17 3.61 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.11 2.00 -0.61 0.61 0.58 0.18 3.62 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.14 2.00 -0.61 0.61 0.57 0.18 3.62 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 +1.20D+1.60S 1 1.16 2.00 -0.62 0.62 0.55 0.19 3.63 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 I BLV�, 4MP�, Q 8368 tof 690.0 1 1.20 2.001102_�l.§FANFbL 64 Vu < PhiVc/2 A Reqd 9Page 0.0 +1.20D+1.60S 1 1.22 2.00 -0.62 0.62 0.51 0.20 3.65 Vu < PhiVc/2 A Reqd 9.E 3.6 0.0 0.0 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILE NUMBER: Az�z2- 2 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 shack access door header (max. 3') CODE REFERENCES Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16 Load Combination Set: IBC 2018 Material Properties Analysis Method : Allowable Stress Design Fb + 900.0 psi E : Modulus of Elasticity Load Combination: IBC 2018 Fb - 900.0 psi Ebend- xx 1,600.Oksi Fc - Prll 1,350.0 psi Eminbend - xx 580.Oksi Wood Species DouglasFir-Larch Fc - Perp 625.0 psi Wood Grade No.2 Fv 180.0 psi Ft 575.0 psi Density 31.210pcf Beam Bracing Beam is Fully Braced against lateral -torsional buckling 2-2x8 Span = 3.0 ft pplied Loads Service loads entered. Load Factors will be applied for calculations. Beam self weight NOT internally calculated and added Uniform Load : D = 0.0170, S = 0.0250 ksf, Tributary Width = 5.330 ft, (Roof) DESIGN SUMMARY Maximum Bending Stress Ratio = 0.093 1 Maximum Shear Stress Ratio = 0.067 : 1 Section used for this span 2.2x8 Section used for this span 2-2x8 fb: Actual = 114.99 psi fv: Actual = 13.86 psi Fb: Allowable = 1,242.00psi Fv: Allowable = 207.00 psi Load Combination +D+S Load Combination +D+S Location of maximum on span = 1.500ft Location of maximum on span = 0.000ft Span # where maximum occurs = Span # 1 Span # where maximum occurs = Span # 1 Maximum Deflection Max Downward Transient Deflection 0.002 in Ratio = 22465 > 360 Span: 1 : S Only Max Upward Transient Deflection 0 in Ratio = 0 <360 n/a Max Downward Total Deflection 0.003 in Ratio = 13372 > 180 Span: 1 : +D+S Max Upward Total Deflection 0 in Ratio = 0 <180 n/a Maximum Forces & Stresses for Load Combinations Load Combination Ivlax btress E<atlos moment values bnear vaiues Segment Length Span # M V Cd CFN Ci Cr Cm C t CL M fb F'b V fv F'v D Only 0.00 0.00 0.00 0.00 Length = 3.0 ft 1 0.048 0.035 0.90 1.200 1.00 1.00 1.00 1.00 1.00 0.10 46.54 972.00 0.08 5.61 162.00 +D+S 1.200 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 3.0 ft 1 0.093 0.067 1.15 1.200 1.00 1.00 1.00 1.00 1.00 0.25 114.99 1242.00 0.20 13.86 207.00 +D+0.750S 1.200 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 3.0 ft 1 0.079 0.057 1.15 1.200 1.00 1.00 1.00 1.00 1.00 0.21 97.88 1242.00 0.17 11.80 207.00 +0.60D 1.200 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 3.0 ft 1 0.016 0.012 1.60 1.200 1.00 1.00 1.00 1.00 1.00 0.06 27.93 1728.00 0.05 3.37 288.00 Overall Maximum Deflections Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span +D+S 1 0.0027 1.511 0.0000 0.000 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 42 of 69 �E IDIAN> APPROVED DATE: 09/26/22 111E NUM9MA-222-0 2 *ybreak Subdivision 13382 an, Idaho RF()RMANC Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 ild:20.22.6.12 SHAWN REEDER shack access door header (max. T) Vertical Reactions Support notation : Far left is #1 Load Combination Support 1 Support 2 Overall MAXimum 0.336 0.336 Overall MINimum 0.200 0.200 D Only 0.136 0.136 +D+S 0.336 0.336 +D+0.750S 0.286 0.286 +0.60D 0.082 0.082 S Only 0.200 0.200 (c) ENERCALC INC 1983-2022 Values in KIPS (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 43 of 69 kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder I an, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE: 09/26/22 FILE NUMBER: a- 021D162 STEEL GATE MOMENT CALCULATION WEIGHT OF GATE = 400 LBS GATE LENGTH = 11 FT. GATE MOMENT ARM = 5.5 FT. MOMENT @ GATE = (11 FT. = 2) * 400LBS = 2200 LBS-FT (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 44 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder J ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 o9/26/22 DATE FILE NUMBFN:^ o,sz uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 gate column Code References Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Steel Section Name : HSS6x6x1/4 Overall Column Height 6 ft Analysis Method : Allowable Strength Top & Bottom Fixity Top Pinned, Bottom Fixed Steel Stress Grade Brace condition for deflection (buckling) along columns Fy : Steel Yield 36.0 ksi X-X (width) axis: E : Elastic Bending Modulus 29,000.0 ksi Unbraced Length for buckling ABOUT Y-Y Axis = 6 ft, K = 2.1 Y-Y (depth) axis: Unbraced Length for buckling ABOUT X-X Axis = 6 ft, K = 2.1 Applied Loads Service loads entered. Load Factors will be applied for calculations. Column self weight included : 113.918 Ibs ` Dead Load Factor BENDING LOADS ... Moment acting about X-X axis at 6.0 ft, D = 2.20 k-ft DESIGN SUMMARY Bending & Shear Check Results PASS Max. Axial+Bending Stress Ratio = 0.1089 : 1 Maximum Load Reactions . . Load Combination D Only Top along X-X 0.0 k Location of max.above base 5.960 ft Bottom along X-X 0.0 k At maximum location values are ... Top along Y-Y 0.550 k Pa: Axial 0.1139 k Bottom along Y-Y 0.550 k Pn / Omega: Allowabl( 90.669 k Ma-x : Applied 2.178 k-ft Maximum Load Deflections ... Mn-x / Omega: Allowable 20.120 k-ft Along Y-Y 0.006111 in at 4.027ft above base for load combination : D Only Ma-y :Applied 0.0 k-ft Mn-y / Omega: Allowable 20.120 k-ft Along X-X 0.0 in at 0.0ft above base for load combination PASS Maximum Shear Stress Ratic 0.01721 : 1 Load Combination D Only Location of max.above base 0.0 ft At maximum location values are ... Va : Applied 0.550 k Vn / Omega: Allowable 31.951 k Load Combination Results Maximum Axial + Bending Stress Ratios Maximum Shear Ratios Load Combination Stress Ratio Status Location Cbx Cby KxLx/Ry KyLy/Rx Stress Ratio Status Location D Only 0.109 PASS 5.96 ft 2.15 1.00 64.62 64.62 0.017 PASS 0.00 ft +0.60D 0.065 PASS 5.96 ft 2.15 1.00 64.62 64.62 0.010 PASS 0.00 ft Maximum Reactions Note: Only non -zero reactions are listed. Axial Reaction X-X Axis Reaction k Y-Y Axis Reaction Mx - End Moments k-ft My - End Moments Load Combination @ Base @ Base @ Top @ Base @ Top @ Base @ Top @ Base @ Top D Only 0.114 0.550 -0.550 -1.100 +0.60D 0.068 0.330 -0.330 -0.660 Extreme Reactions Axial Reaction X-X Axis Reaction k Y-Y Axis Reaction Mx - End Moments k-ft My - End Moments Item Extreme Value @ Base @ Base @ Top @ Base @ Top @ Base @ Top @ Base @ Top Axial @ Base Maximum 0.114 0.550 -0.550 -1.100 " Minimum 0.068 0.330 -0.330 -0.660 Reaction, X-X Axis Base Maximum 0.114 0.550 -0.550 -1.100 1. Minimum 0.114 0.550 -0.550 -1.100 Reaction, Y-Y Axis Base Maximum 0.114 0.550 -0.550 -1.100 1. Minimum 0.068 0.330 -0.330 -0.660 Reaction, X-X Axis Top Maximum 0.114 0.550 -0.550 -1.100 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 45 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE: 09/26/22 FILE NUMBER: zszz-oisz - uild:20.22.6.12 a gate column Extreme Reactions Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Axial Reaction X-X Axis Reaction k Y-Y Axis Reaction Mx - End Moments k-ft My - End Moments Item Extreme Value @ Base @ Base @ Top @ Base @ Top @ Base @ Top @ Base @ Top " Minimum 0.114 0.550 -0.550 -1.100 Reaction, Y-Y Axis Top Maximum 0.068 0.330 -0.330 -0.660 " Minimum 0.114 0.550 -0.550 -1.100 Moment, X-X Axis Base Maximum 0.068 -0.660 0.330 -0.330 -0.660 " Minimum 0.114 -1.100 0.550 -0.550 -1.100 Moment, Y-Y Axis Base Maximum 0.114 0.550 -0.550 -1.100 " Minimum 0.114 0.550 -0.550 -1.100 Moment, X-X Axis Top Maximum 0.114 0.550 -0.550 -1.100 " Minimum 0.114 0.550 -0.550 -1.100 Moment, Y-Y Axis Top Maximum 0.114 0.550 -0.550 -1.100 " Minimum 0.114 0.550 -0.550 -1.100 Maximum Deflections for Load Combinations Load Combination Max. X-X Deflection Distance Max. Y-Y Deflection Distance D Only 0.0000 in 0.000 ft 0.006 in 4.027 ft +0.60D 0.0000 in 0.000 ft 0.004 in 4.027 ft Steel Section Properties : HSS6x6xl/4 Depth = 6.000 in I xx = 28.60 in14 J = 45.600 in^4 Design Thick = 0.233 in S xx = 9.54 inA3 Width = 6.000 in R xx = 2.340 in Wall Thick = 0.250 in Zx = 11.200 inA3 Area = 5.240 inA2 1 yy = 28.600 inA4 C = 15.400 inA3 Weight = 18.986 plf S yy = 9.540 inA3 R yy = 2.340 in Ycg 0 0.000 in +Y 6.00in +X 2 20kX (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 46 of 69 L Q fE IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 Footing Design f I! E NUMBER: A-zDzz-oi ez wont. Footing Design E N G I N E E R S Description: Monumnet min. footing Inputs are in ITALICS and outputs are in BOLDFACE. Soil Bearing Pressure: 1500psf Roof Roof Dead (63psf ) Snow Live (25psf) Misc Wall Load: (34psf) Conc Stem: ( 145pcf) Misc Load: (.Oft) ( 8.Oft ) ( 8.Oft) (10.Oft ) (2 x .5ft) (.Oft) (.Oft) Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 = 500plf = 200plf = 345plf = 145plf = plf 1190pif Use Footing WiLth/L 12 x 8 in (2) #4 Cont. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 47 of 69 CUEIDR IAN kybreak Subdivision J 3382 n, Idaho APPROVED lanrp DATE: 09/26/22 Build 11.20.03.31EILENUMHER:^-zozz-o, sz FnninPPrc Retained Height = Wall height above soil = Slope Behind Wall = Height of Soil over Toe = Water height over heel = Load Factors Building Code Dead Load Live Load Earth, H Wind, W Seismic, E Soil Data and Lateral Earth Pressure E N G I N E E R S Cantilevered Retaining Wall Gaurd Shack Retaining Wall 3.83 ft 0.67 ft 0.00 22.00 in 0.0 ft IBC 2015,ACI 1.200 1.600 1.600 1.000 1.000 Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Code: IBC 2015,AC1 318-14,AC1 530-13 Allow Soil Bearing = 2,500.0 psf Soil Density, Heel = 120.00 Pcf Equivalent Fluid Pressure Method Soil Density, Toe = 0.00 pcf Active Heel Pressure = 40.0 psf/ft FootingllSoil Friction = 0.400 Soil height to ignore = for passive pressure = 12.00 in Passive Pressure = 422.0 psf/ft Surcharge Loads Surcharge Over Heel = 40.0 psf Surcharge Over Toe = 0.0 Used To Resist Sliding & Overturning Used for Sliding & Overturning Axial Load Applied to Stem Axial Dead Load Axial Live Load Lateral Load Applied to Stem 330.0 Ibs 0.0 Ibs Axial Load Eccentricity = 0.0 in Lateral Load = 0.0 #/ft ...Height to Top = 0.00 ft ...Height to Bottom = 0.00 ft Load Type = Wind (W) (Service Level) Wind on Exposed Stem Wind on Exposed Stem = 0.0 psf (Service Level) Adjacent Footing Load Adjacent Footing Load = 0.0 Ibs Footing Type Line Load Footing Width = 0.00 ft Base Above/Below Soil � tVM'040 = q.%2ih FRANKLIN BLVD, NAMPA, IetftWof Wall = Page 48 ®f.693t Wall to Ftg CL Dist = 0.00 ft Poisson's Ratio = 0.300 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: ^-2o22-oi e2 ;kybreak Subdivision 13382 an, Idaho mmary ineers Cantilevered Retaining Wall Gaurd Shack Retaining Wall Stability Ratios Overturning = 1.51 OK Sliding = 3.64 OK Soil Bearing Total Bearing Load = 1,297 Ibs ...resultant ecc. = 4.43 in Soil Pressure @ Toe = 1,934 psf OK Soil Pressure @ Heel = 0 psf OK Allowable = 2,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 2,707 psf ACI Factored @ Heel = 0 psf Footing Shear @ Toe = 0.2 psi OK Footing Shear @ Heel = 6.9 psi OK Allowable = 75.0 psi Sliding Resisting Forces Sliding Forces Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Code: IBC 2015,AC1 318-14,AC1 530-13 Vertical Forces Force Lateral Forces Force Soil Over Heel (above water table, if any) 229.8 Ibs Heel Active Pressure (above water table, if any) 434.9 Ibs Soil Over Heel (below water table, if any) 0.0 Heel Active Pressure (below water table, if any) 0.0 Water Over Heel 0.0 Hydrostatic Force 0.0 Buoyant Force 0.0 Heel Active Pressure 434.9 Sloped Soil Over Heel 0.0 Surcharge over Heel 62.2 Surcharge Over Heel 20.0 Adjacent Footing 0.0 Adjacent Footing Load 0.0 Surcharge Over Toe 0.0 Axial Dead Load on Stem 330.0 Load @ Stem Above Soil 0.0 Axial Live Load on Stem Omit Added Lateral Load 0.0 Soil Over Toe 0.0 Seismic Load 0.0 Surcharge Over Toe 0.0 Seismic -Self -weight 0.0 Stem Weight(s) 337.5 Lateral on Key 0.0 Earth @ Stem Transitions 0.0 Totals = 497.1 Ibs Footing Weight 187.5 Key Weight 0.0 *Includes water table effect Vert. Component ** 192.2 Total Vertical Loads 1,297.0 Ibs * Axial live load NOT included in total displayed , or used for overturning or sliding resistance, but is included for soil pressure calculations. Sliding Calcs Lateral Sliding Force = 497.1 Ibs less 100% Passive Force = 1,289.4 Ibs less 100% Friction Force = - 518.8 Ibs Added Force Req'd = 0.0 Ibs Olk ....for 1.5 Stability = 0.0 Ibs Olk (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 49 of 69 Vertical component of active lateral soil pressure IS considered in the calculation of soil bearing pressures. CUEIDR IAN kybreak Subdivision J lanrp 3382 n, Idaho APPROVED DATE: D9/26/22 Build 11.20.03.31 FILE NUMBER:^-����-Diaz FnninPPrc Resisting Moments E N G I N E E R S Cantilevered Retaining Wall Gaurd Shack Retaining Wall Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Code: IBC 2015,AC1 318-14,AC1 530-13 Resisting Moments Force Distance Moment Soil Over Heel (above water table, if any) 229.8 Ibs 1.25 ft 287.3ft-# Soil Over Heel (below water table, if any) 0.0 Water Table 0.0 Soil Over Heel 229.8 1.25 287.3 Sloped Soil Over Heel 0.0 Surcharge Over Heel 20.0 1.25 25.0 Adjacent Footing Load 0.0 Axial Dead Load on Stem 330.0 0.75 247.5 Axial Live Load on Stem 0.0 Soil Over Toe 0.0 0.25 Surcharge Over Toe 0.0 Stem Weight(s) 337.5 0.75 253.1 Earth @ Stem Transitions 0.0 Footing Weight 187.5 0.75 140.6 Key Weight 0.0 1.92 Vert. Component 192.2 1.50 288.3 Total Vertical Loads 1,297.0 Ibs Resisting Moment 1,241.8 ft-# Eccentricity -5.1 in Axial live load NOT included in total displayed, or used for overturning or sliding resistance, but is included for soil pressure calculations. Overturning Overturning Moments Overturning Moments Force Distance Moment Heel Active Pressure (above water table, if any) 434.9 Ibs 1.55 ft 676.1 ft-# Heel Active Pressure (below water table, if any) 0.0 Hydrostatic Force 0.0 Buoyant Force 0.0 Surcharge over Heel 62.2 2.33 145.0 Adjacent Footing 0.0 Surcharge Over Toe 0.0 Load @ Stem Above Soil 0.0 Added Lateral Load 0.0 Seismic Load 0.0 Seismic -Self -weight 0.0 Totals = 497.1 Ibs Overturning Moment 821.1 ft-# (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 50 of 69 L Q fE IDIAN> kybreak Subdivision lurnmary 3382 n, Idaho APPROVED DATE: 09/26/22 Build 11.20.03.31 : J NUMBER: ^-2D22--2 ance Engineers nl_nn1AA►lf% E N G I N E E R S Gaurd Shack Retaining Wall Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Code: IBC 2015,AC1 318-14,AC1 530-13 Bottom Stem OK Design Height Above Ftg ft = 0.00 Wall Material Above "Ht" = Concrete Design Method = LRFD Thickness = 6.00 Rebar Size = # 5 Rebar Spacing = 18.00 Rebar Placed at = Edge Design Data fb/FB + fa/Fa = 0.206 Total Force @ Section Service Level Ibs = Strength Level Ibs = 551.1 Moment.... Actual Service Level ft-# _ Strength Leve ft-# = 755.7 Moment..... Allowable = 3,667.6 Shear..... Actual Service Level psi = Strength Leve psi = 11.0 Shear..... Allowable psi = 75.0 Anet in2 = Rebar Depth 'd' in = 4.19 Masonry Data fm psi = Fs psi = Solid Grouting = Modular Ratio'n' _ Wall Weight psf = 75.0 Short Term Factor = Equiv. Solid Thick. _ Masonry Block Type = Medium Weight Masonry Design Method = ASD Concrete Data fc psi = 2,500.0 Fy psi = 60,000.0 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 51 of 69 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: ^-2o22-oi e2 ;kybreak Subdivision 13382 an, Idaho E N G I N E E R S 11.20.03.31 Cantilevered Retaining Wall °n ineers Area Details Gaurd Shack Retaining Wall Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Code: IBC 2015,AC1 318-14,AC1 530-13 Bottom Stem Vertical Reinforcing Horizontal Reinforcing As (based on applied moment) : 0.0434 in2/ft (4/3) * As : 0.0579 in2/ft Min Stem T&S Reinf Area 0.648 in2 200bd/fy : 200(12)(4.1875)/60000 : 0.1675 in2/ft Min Stem T&S Reinf Area per ft of stem Height : 0.144 in2/ft 0.0018bh : 0.0018(12)(6) : 0.1296 in2/ft Horizontal Reinforcing Options : One layer of: Two layers of: Required Area : 0.1296 in2/ft #4@ 16.67 in #4@ 33.33 in Provided Area : 0.2067 in2/ft #5@ 25.83 in #5@ 51.67 in Maximum Area: 0.5673 in2/ft #6@ 36.67 in #6@ 73.33 in Footing Data Toe Width = 0.50 ft fc = 2,500 psi Heel Width = 1.00 Fy = 60,000 psi Total Footing Width = 1.50 ft Footing Concrete Density = 150.00 pcf Footing Thickness = 10.00 in Min. As % = 0.0018 Key Width = 12.00 in Rebar Cover @ Top = 2.00 in Key Depth = 0.00 in @ Bottom = 3.00 in Key Distance from Toe = 1.42 ft Footing Design Results Toe Heel Factored Pressure = 2,707 0 psf Mu': Upward = 3,469 1 ft-# Mu': Downward = 621 249 ft-# Mu: Design = 237 -121 ft-# Actual 1-Way Shear = 0.22 6.94 psi Allow 1-Way Shear = 40.00 40.00 psi Toe Reinforcing = None Spec'd Heel Reinforcing = None Spec'd Key Reinforcing = None Spec'd Other Acceptable Sizes & Spacings Toe: phiMn = phi'5'lambda'sgrt(fc)'Sm Heel: phiMn = phi'5'lambda'sgrt(fc)'Sm Key: No key defined Min footing T&S reinf Area 0.32 in2 Min footing T&S reinf Area per fo 0.22 in2 /ft If one layer of horizontal bars: If two layers of horizontal bars: #4@ 11.11 in #4@ 22.22 in #5@ 17.22 in #5@ 34.44 in #6@ 24.44 in #6@ 48.89 in Footing Torsion, Tu = 0.00 ft-Ibs Footing Allow. Torsion, phi Tu = 0.00 ft-Ibs If torsion exceeds allowable, provide supplemental design for footing torsion. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 52 of 69 J-, ybreak Subdivision Engineering: Eduado Pelallo 3382 Checker: Shawn Reeder n, Idaho PERFORMANCE 07i28i2022 ENGINEERS Build 11.20.03.31 Cantilevered Retaining Wall Code: IBC 2015,AC1 318-14,AC1 530-13 nce Engineers Gaurd Shack Retaining Wall Horizontal Deflection at Top of Wall due to settlement of soil (Deflection due to wall bending not considered) Soil Spring Reaction Modulus 250.0 pci Horizontal Defl @ Top of Wall (approximate only) 0.161 in The above calculation is not valid if the heel soil bearing pressure exceeds that of the toe, because the wall would then tend to rotate into the retained soil. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 53 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE 09/26/22 i n g zozz-oi sz FILE NUMBER: - uild:20.22.6.12 a Planter footing Code References Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Material Properties Soil Design Values fc : Concrete 28 day strength = 2.50 ksi Allowable Soil Bearing = 1.50 ksf fy : Rebar Yield = 60.0 ksi Soil Density = 110.0 pcf Ec : Concrete Elastic Modulus = 3,122.0 ksi Increase Bearing By Footing Weight = No Concrete Density = 145.0 pcf Soil Passive Resistance (for Sliding) = 100.0 pcf T Values Flexure = 0.90 Soil/Concrete Friction Coeff. = 0.30 Shear = 0.750 Increases based on footing Depth Analysis Settings Footing base depth below soil surface = ft Min Steel % Bending Reinf. = Allow press. increase per foot of depth = ksf Min Allow % Temp Reinf. = 0.00180 when footing base is below = ft Min. Overturning Safety Factor = 1.0 : 1 Min. Sliding Safety Factor = 1.0 : 1 Increases based on footing plan dimension Add Ftg Wt for Soil Pressure Yes Allowable pressure increase per foot of depth Use ftg wt for stability, moments & shears Yes = ksf Add Pedestal Wt for Soil Pressure Yes when max. length or width is greater than = ft Use Pedestal wt for stability, mom & shear No Dimensions Width parallel to X-X Axis = 2.670 ft Length parallel to Z-Z Axis = 2.670 ft Footing Thickness = 8.0 in Pedestal dimensions... px : parallel to X-X Axis = 24.0 in pz : parallel to Z-Z Axis 24.0 in Height 20.0 in Rebar Centerline to Edge of Concrete... at Bottom of footing = 3.0 in Reinforcing Bars parallel to X-X Axis Number of Bars - 3.0 Reinforcing Bar Size = # 4 Bars parallel to Z-Z Axis Number of Bars = 3.0 Reinforcing Bar Size = # 4 Bandwidth Distribution Check (ACI 15.4.4.2) Direction Requiring Closer Separation n/a M # Bars required within zone n/a # Bars required on each side of zone n/a plied Loads D Lr P : Column Load = OB : Overburden = M-xx = M-zz = V-x = V-z = 2.0 x 3-#4Bars X-X Section Looking to +Z L S (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Z 2'-0" 3 - 9-4 Bars 00 ih Z-Z Section Looking to +X W E H k ksf k-ft k-ft k k Page 54 of 69 CUEJ­2uild:20.22.6.12 kybreak Subdivision 13382 an, Idaho APPRO DATE 09/i n g RIENUMBER: Planter footing DESIGN SUMMARY Min. Ratio Item Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 =• Applied Capacity Governing Load Combination PASS 0.3419 Soil Bearing 0.5128 ksf 1.50 ksf D Only about Z-Z axis PASS n/a Overturning - X-X 0.0 k-ft 0.0 k-ft No Overturning PASS n/a Overturning - Z-Z 0.0 k-ft 0.0 k-ft No Overturning PASS n/a Sliding - X-X 0.0 k 0.0 k No Sliding PASS n/a Sliding - Z-Z 0.0 k 0.0 k No Sliding PASS n/a Uplift 0.0 k 0.0 k No Uplift PASS 0.006818 Z Flexure (+X) 0.03265 k-ft/ft 4.789 k-ft/ft +1.40D PASS 0.006818 Z Flexure (-X) 0.03265 k-ft/ft 4.789 k-ft/ft +1.40D PASS 0.006818 X Flexure (+Z) 0.03265 k-ft/ft 4.789 k-ft/ft +1.40D PASS 0.006818 X Flexure (-Z) 0.03265 k-ft/ft 4.789 k-ft/ft +1.40D PASS n/a 1-way Shear (+X) 0.0 psi 75.0 psi n/a PASS 0.0 1-way Shear (-X) 0.0 psi 0.0 psi n/a PASS n/a 1-way Shear (+Z) 0.0 psi 75.0 psi n/a PASS n/a 1-way Shear (-Z) 0.0 psi 75.0 psi n/a PASS n/a 2-way Punching 1.361 psi 75.0 psi +1.40D Detailed Results Soil Bearing Rotation Axis & Xecc Zecc Actual Soil Bearing Stress @ Location Actual / Allow Load Combination... Gross Allowable (in) Bottom, -Z Top, +Z Left, -X Right, +X Ratio X-X, D Only 1.50 n/a 0.0 0.5128 0.5128 n/a n/a 0.342 X-X, +0.60D 1.50 n/a 0.0 0.3077 0.3077 n/a n/a 0.205 Z-Z, D Only 1.50 0.0 n/a n/a n/a 0.5128 0.5128 0.342 Z-Z, +0.60D 1.50 0.0 n/a n/a n/a 0.3077 0.3077 0.205 Overturning Stability Rotation Axis & Load Combination... Overturning Moment Resisting Moment Stability Ratio Status Footing Has NO Overturning Sliding Stability All units k Force Application Axis Load Combination... Sliding Force Resisting Force Stability Ratio Status Footing Has NO Sliding Footing Flexure Flexure Axis & Load Combination Mu Side Tension As Req'd Gvrn. As Actual As Phi*Mn Status k-ft Surface inA2 inA2 inA2 k-ft X-X, +1.40D 0.03265 +Z Bottom 0.1728 AsMin 0.2247 4.789 OK X-X, +1.40D 0.03265 -Z Bottom 0.1728 AsMin 0.2247 4.789 OK X-X, +1.20D 0.02799 +Z Bottom 0.1728 AsMin 0.2247 4.789 OK X-X, +1.20D 0.02799 -Z Bottom 0.1728 AsMin 0.2247 4.789 OK X-X, +0.90D 0.02099 +Z Bottom 0.1728 AsMin 0.2247 4.789 OK X-X, +0.90D 0.02099 -Z Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +1.40D 0.03265 -X Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +1.40D 0.03265 +X Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +1.20D 0.02799 -X Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +1.20D 0.02799 +X Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +0.90D 0.02099 -X Bottom 0.1728 AsMin 0.2247 4.789 OK Z-Z, +0.90D 0.02099 +X Bottom 0.1728 AsMin 0.2247 4.789 OK One Way Shear Load Combination... Vu @ -X Vu @ +X Vu @ -Z Vu @ +Z Vu:Max Phi Vn Vu / Phi*Vn Status +1.40D 0.00 psi 0.00 psi 0.00 psi 0.00 psi 0.00 psi 75.00 psi 0.00 OK +1.20D 0.00 psi 0.00 psi 0.00 psi 0.00 psi 0.00 psi 75.00 psi 0.00 OK +0.90D 0.00 psi 0.00 psi 0.00 psi 0.00 psi 0.00 psi 75.00 psi 0.00 OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 55 of 69 IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 i n g uE NUMBER!A o,ez uild:20.22.6.12 Planter footing Two -Way "Punching" Shear Load Combination... Vu +1.40D 1.36 psi +1.20D 1.17 psi +0.90D 0.87 psi Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER Phi*Vn Vu / Phi*Vn 139.66psi 0.009742 139.66psi 0.008351 139.66psi 0.006263 (c) ENERCALC INC 1983-2022 All units k Status OK OK OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 56 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 umn Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILE NUMBER: Az�z2-2 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 planter pier Code References Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information fc : Concrete 28 day streng = 2.50 ksi E = = 3122 ksi Density = 150 pcf Q = 0.850 fy - Main Rebar = 60 ksi E - Main Rebar = 29000 ksi Allow. Reinforcing Limits AS TM A615 Bars Used Min. Reinf. = 1 % Max. Reinf. = 8 % Column Cross Section Column Dimensions: 18.Oin Square Column, Column Edge to Rebar Edge Cover = 2.Oin Column Reinforcing : 4 - #4 bars @ corners, Overall Column Height = 1.830 ft End Fixity Top & Bottom Pinned Brace condition for deflection (buckling) along colun X-X (width) axis: Fully braced against buckling ABOUT Y-Y Axis Y-Y (depth) axis: Fully braced against buckling ABOUT X-X Axis Applied Loads Entered loads are factored per load combinations specified by user. Column self weight included : 617.63 Ibs " Dead Load Factor DESIGN SUMMARY Load Combination +1.40D Maximum SERVICE Load Reactions. Location of max.above base 1.818 ft Top along Y-Y 0.0 k Bottom along Y-Y 0.0 k Maximum Stress Ratio 0.002: 1 Top along X-X 0.0 k Bottom along X-X 0.0 k Ratio = (PuA2+MuA2)A.5 / (PhiPnA2+PhiMnA2)^.5 Pu = 0.8647 k (P. Pn = 382.096 k Maximum SERVICE Load Deflections . . Mu-x = 0.0 k-ft (P' Mn-x = 0.0 k-ft Mu-y = 0.0 k-ft �' Mn-y = 0.0 k-ft Along Y-Y 0.0 in at 0.0 ft above base for load combination : Mu Angle = 0.0 deg Along X-X O.Oin at 0.0 ft above base Au at Angle = 0.0 k-ft (Mn at Angle = 0.0 k-ft for load combination : Pn & Mn values located at Pu-Mu vector intersection with capacity curve Column Capacities.. General Section Informatiol = 0.650 =0.850 e = 0.80 R Pnmax :Nominal Max. Compressive Axial Capaci 734.80 k Reinforcing 0.2469 % Rebar < Min of 1.0 P Pnmin : Nominal Min. Tension Axial Capacity k Reinforcing Area 0.80 inA2 (P Pn, max: Usable Compressive Axial Capacity 382.096 k Concrete Area 324.0 inA2 (P Pn, min : Usable Tension Axial Capacity k Governing Load Combination Results Governing Factored Moment Dist. from Axial Load Bending Analysis k-ft k Utilization Load Combination X-X Y-Y base ft Pu N " Pn g x gx * Mux g y gy * Muy Alpha (deg) g Mu (p Mn Ratio +1.40D 1.82 0.86 382.10 0.000 0.002 +1.20D 1.82 0.74 382.10 0.000 0.002 +0.90D 1.82 0.56 382.10 0.000 0.001 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 57 of 69 [DATL ' kybreak Subdivision Engineering: Eduado Pelallo `(E IDIA\ - 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE o7i28i2o22 PROVED ENGINEERS osizs, Un1nProject File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 NUMBER:A-zos 162 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 planter pier Maximum Reactions Note: Only non -zero reactions are listed. X-X Axis Reaction k Y-Y Axis Reaction Axial Reaction Mx - End Moments k-ft My - End Moments Load Combination @ Base @ Top @ Base @ Top @ Base @ Base @ Top @ Base @ Top D Only +0.60D Maximum Moment Reactions Load Combination Moment About X-X Axis @ Base @ Top D Only +0.60D Maximum Deflections for Load Combinations Load Combination D Only +0.60D Sketches Interaction Diaarams 0.618 0.371 Note: Only non -zero reactions are listed. Moment About Y-Y Axis @ Base @ Top k-ft k-ft k-ft k-ft Max. X-X Deflection Distance Max. Y-Y Deflection Distance 0.0000 in 0.000 ft 0.000 in 0.000 ft 0.0000 in 0.000 ft 0.000 in 0.000 ft n (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 58 of 69 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: A--2-oi e2 450.0 405.0 360.0 315.0 270.0 225.0 180.0 135.0 N1 e 45.0 ;kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder an, Idaho PERFORMANCE 07/28/2022 E N G I N E E R S Umn Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 planter pier OLoad Comb. = ♦1 40D. Alpha= 0 Ddeg. (0.86. 0.00) Concrete Column P-M Interaction Diagram Phi * Mn @ Alpha (k-ft) 21 c L E L 7 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 59 of 69 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: A--2-oi e2 450.0 405.0 360.0 315.0 270.0 225.0 180.0 135.0 N1 e 45.0 ;kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder an, Idaho PERFORMANCE 07/28/2022 E N G I N E E R S Umn Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 planter pier OLoad Comb.=.120D. Alpha= 0 Odq (0.76. 0.00( Concrete Column P-M Interaction Diagram Phi * Mn @ Alpha (k-ft) 21 c L E L 7 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 60 of 69 CUEIDR IAN APPROVED DATE 09/26/22 FILE NUMBER: A--2-oi e2 450.0 405.0 360.0 315.0 270.0 225.0 180.0 135.0 N1 e 45.0 ;kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder an, Idaho PERFORMANCE 07/28/2022 E N G I N E E R S Umn Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 planter pier OLoad Comb.=.0.90D. NpW= 0 Odeg. (0.56, 0.00) Concrete Column P-M Interaction Diagram Phi * Mn @ Alpha (k-ft) 21 c L E L 7 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 61 of 69 L Q fE IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 Footing Design f I! E NUMBER: A-zDzz-oi ez wont. Footing Design E N G I N E E R S Description: Monumnet min. footing Inputs are in ITALICS and outputs are in BOLDFACE. Soil Bearing Pressure: 1500psf Roof Roof Dead (63psf ) Snow Live (25psf) Misc Wall Load: (34psf) Conc Stem: ( 145pcf) Misc Load: (.Oft) ( 8.Oft ) ( 8.Oft) (10.Oft ) (2 x .5ft) (.Oft) (.Oft) Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 = 500plf = 200plf = 345plf = 145plf = plf 1190pif Use Footing WiLth/L 12 x 8 in (2) #4 Cont. (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 62 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder an, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE.*— 09/26/22 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILE NUMBER: - uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 Ii" a zszz-oi sz Gaurd Shack Foundation Code References Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Material Properties Soil Design Values fc : Concrete 28 day strength = 2.50 ksi Allowable Soil Bearing = 1.50 ksf fy : Rebar Yield = 60.0 ksi Increase Bearing By Footing Weight = No Ec : Concrete Elastic Modulus = 3,122.0 ksi Soil Passive Resistance (for Sliding) = 100.0 pcf Concrete Density = 145.0 pcf Soil/Concrete Friction Coeff. = 0.30 (P Values Flexure = 0.90 Shear = 0.750 Increases based on footing Depth Analysis Settings Reference Depth below Surface 2.0 ft Min Steel % Bending Reinf. = Allow. Pressure Increase per foot of depth - ksf Min Allow % Temp Reinf. = 0.00180 when base footing is below = ft Min. Overturning Safety Factor = 1.0 : 1 Increases based on footing Width Min. Sliding Safety Factor = 1.0 : 1 Allow. Pressure Increase per foot of width = ksf AutoCalc Footing Weight as DL Yes when footing is wider than = ft Adjusted Allowable Bearing Pressure = 1.50 ksf Dimensions Reinforcing Footing Width = 1.167ft Footing Thickness = 8.0 in Bars along X-X Axis Wall Thickness = 6.0 in Rebar Centerline to Edge of Concrete... # of Bars in 12" Width = 2 Wall center offset at Bottom of footing = 3.0 in Reinforcing Bar Size = # 4 from center of footing = 0 in 6" Z N -- 2-#4 Bars 7-7H6" X-X Section Looking W 1Z Applied Loads D Lr L S W E H P : Column Load = OB : Overburden = V-x = M-zz = Vx applied = 0.3966 in above top of footing 0.1330 k ksf k k-ft (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 63 of 69 kybreak Subdivision Engineering: Eduado Pelallo 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILE NUMBER: - uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 a zszz-oisz Gaurd Shack Foundation DESIGN SUMMARY - • • ' Factor of Safety Item Applied Capacity Governing Load Combination PASS n/a Overturning - Z-Z 0.0 k-ft 0.0 k-ft No Overturning PASS n/a Sliding - X-X 0.0 k 0.0 k No Sliding PASS n/a Uplift 0.0 k 0.0 k No Uplift Utilization Ratio Item Applied Capacity Governing Load Combination PASS 0.3670 Soil Bearing 0.5505 ksf 1.50 ksf +D+S PASS 0.004817 Z Flexure (+X) 0.03927 k-ft 8.153 k-ft +1.20D+1.60S PASS 0.002680 Z Flexure (-X) 0.02185 k-ft 8.153 k-ft +0.90D PASS n/a 1-way Shear (+X) 0.0 psi 75.0 psi n/a PASS 0.0 1-way Shear (-X) 0.0 psi 0.0 psi n/a Detailed Results Soil Bearing Rotation Axis & Actual Soil Bearing Stress Actual / Allowable Load Combination... Gross Allowable Xecc -X +X Ratio D Only 1.50 ksf 0.0 in 0.4365 ksf 0.4365 ksf 0.291 +D+S 1.50 ksf 0.0 in 0.5505 ksf 0.5505 ksf 0.367 +D+0.750S 1.50 ksf 0.0 in 0.5220 ksf 0.5220 ksf 0.348 , +0.60D 1.50 ksf 0.0 in 0.2619 ksf 0.2619 ksf 0.175 Overturning Stability Units : k-ft Rotation Axis & Load Combination... Overturning Moment Resisting Moment Stability Ratio Status Footing Has NO Overturning Sliding Stability Force Application Axis Load Combination... Sliding Force Resisting Force Sliding SafetyRatio Status Footing Has NO Sliding Footing Flexure Flexure Axis & Load Combination Mu Which Tension @ Bot. As Req'd Gvrn. As Actual As Phi*Mn k-ft Side ? or Top ? inA2 inA2 inA2 k-ft Status , +1.40D 0.03399 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.40D 0.03399 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D 0.02913 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D 0.02913 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+0.50S 0.0323 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+0.50S 0.0323 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+1.60S 0.03927 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+1.60S 0.03927 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+0.70S 0.03357 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +1.20D+0.70S 0.03357 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK ,+0.90D 0.02185 -X Bottom 0.1728 Min Temp % 0.4 8.153 OK , +0.90D 0.02185 +X Bottom 0.1728 Min Temp % 0.4 8.153 OK One Way Shear Units : k Load Combination... Vu @ -X Vu @ +X Vu:Max Phi Vn Vu / Phi*Vn Status +1.40D 0 psi 0 psi 0 psi 75 psi 0 OK +1.20D 0 psi 0 psi 0 psi 75 psi 0 OK +1.20D+0.50S 0 psi 0 psi 0 psi 75 psi 0 OK +1.20D+1.60S 0 psi 0 psi 0 psi 75 psi 0 OK +1.20D+0.70S 0 psi 0 psi 0 psi 75 psi 0 OK +0.90D 0 psi 0 psi 0 psi 75 psi 0 OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 64 of 69 CUEIDR IAN kybreak Subdivision J 13382 ian, Idaho APPROVED DATE 09/26�22 Embedded in Soil a zszz-oisz FILE NUMBER: - uild:20.22.6.12 gate post embedment. Code References Calculations per IBC 2018 1807.3, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Pole Footing Shape Rectangular Pole Footing Width ........... 20.0 in Calculate Min. Depth for Allowable Pressures Lateral Restraint at Ground Surface Allow Passive ................ 200.0 pcf Max Passive ................ 1,500.0 psf Engineering: Eduado Pelallo Checker: Shawn Reeder 07/28/2022 Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Controlling Values Point Load Governing Load CombinatCk Only Lateral Load 0.40 k Moment 2.20 k-ft Restraint @ Ground Surface Pressure at Depth Actual 526.11 psf Allowable 550.0 psf Surface Retraint Force 2,100.0 Ibs Minimum Required Depth 2.750 ft Footing Base Area 2.778 ft^2 Maximum Soil Pressure 0.0 ksf Applied Loads io EO Soil Surface Surface Latepi Restraint CP (V Lateral Concentrated Load (k) Lateral Distributed Loads (k Applied Moment (kft) Vertical Load (k) D : Dead Load 0.40 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k Lr: Roof Live 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k L : Live 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k S : Snow 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k W : Wind 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k E : Earthquake 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k H : Lateral Earth 0.0 k 0.0 0.0 0.0 k/ft 0.0 k-ft 0.0 k Load distance above TOP of Load above ground surface ground surface 5.50 ft 0.0 0.0 0.0 ft BOTTOM of Load above ground surface 0.0 0.0 0.0 ft Load Combination Results Load Combination D Only +0.60D Forces @ Ground Surface Required Loads - (k) Moments - (ft-k) Depth - (ft) 0.400 2.200 2.75 0.240 1.320 2.38 Pressure at Depth Soil Increase Actual - (psf) Allow - (psf) Factor 526.1 550.0 1.000 423.2 475.0 1.000 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 65 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE 09/26/22 M Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 FILE NUMBER: Az�zz-",sz uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 Shack conc. cap det. Detailed Shear Information Span Distance 'd' Vu (k) Mu d"Vu/Mu Phi'Vc Comment Phi"Vs Phi'Vn Spacing (in) Load Combination Number (ft) (in) Actual Design (k-ft) (k) (k) (k) Req'Suggest +1.20D+1.60S 1 1.25 2.00 -0.62 0.62 0.50 0.21 3.65 Vu < PhiVc/2 )t Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.27 2.00 -0.63 0.63 0.49 0.21 3.66 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.29 2.00 -0.63 0.63 0.47 0.22 3.67 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.31 2.00 -0.63 0.63 0.46 0.23 3.68 Vu < PhiVc/2 )t Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.33 2.00 -0.63 0.63 0.45 0.24 3.69 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.36 2.00 -0.64 0.64 0.43 0.25 3.70 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.38 2.00 -0.64 0.64 0.42 0.25 3.71 Vu < PhiVc/2 )t Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.40 2.00 -0.64 0.64 0.40 0.26 3.72 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.42 2.00 -0.64 0.64 0.39 0.28 3.73 Vu < PhiVc/2 A Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.44 2.00 -0.64 0.64 0.38 0.29 3.74 Vu < PhiVc/2 )t Reqd 9.E 3.7 0.0 0.0 +1.20D+1.60S 1 1.46 2.00 -0.65 0.65 0.36 0.30 3.76 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.49 2.00 -0.65 0.65 0.35 0.31 3.77 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.51 2.00 -0.65 0.65 0.33 0.33 3.79 Vu < PhiVc/2 )t Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.53 2.00 -0.65 0.65 0.32 0.34 3.80 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.55 2.00 -0.66 0.66 0.30 0.36 3.82 Vu < PhiVc/2 A Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.57 2.00 -0.66 0.66 0.29 0.38 3.85 Vu < PhiVc/2 )t Reqd 9.E 3.8 0.0 0.0 +1.20D+1.60S 1 1.60 2.00 -0.66 0.66 0.28 0.40 3.87 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 1.62 2.00 -0.66 0.66 0.26 0.42 3.90 Vu < PhiVc/2 A Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 1.64 2.00 -0.66 0.66 0.25 0.45 3.93 Vu < PhiVc/2 )t Reqd 9.E 3.9 0.0 0.0 +1.20D+1.60S 1 1.66 2.00 -0.67 0.67 0.23 0.48 3.96 Vu < PhiVc/2 A Reqd 9.E 4.0 0.0 0.0 +1.20D+1.60S 1 1.68 2.00 -0.67 0.67 0.22 0.51 4.00 Vu < PhiVc/2 A Reqd 9.E 4.0 0.0 0.0 +1.20D+1.60S 1 1.70 2.00 -0.67 0.67 0.20 0.55 4.04 Vu < PhiVc/2 )t Reqd 9.E 4.0 0.0 0.0 +1.20D+1.60S 1 1.73 2.00 -0.67 0.67 0.19 0.60 4.09 Vu < PhiVc/2 A Reqd 9.E 4.1 0.0 0.0 +1.20D+1.60S 1 1.75 2.00 -0.68 0.68 0.17 0.65 4.15 Vu < PhiVc/2 A Reqd 9.E 4.2 0.0 0.0 +1.20D+1.60S 1 1.77 2.00 -0.68 0.68 0.16 0.71 4.22 Vu < PhiVc/2 )t Reqd 9.E 4.2 0.0 0.0 +1.20D+1.60S 1 1.79 2.00 -0.68 0.68 0.14 0.79 4.31 Vu < PhiVc/2 A Reqd 9.E 4.3 0.0 0.0 +1.20D+1.60S 1 1.81 2.00 -0.68 0.68 0.13 0.88 4.42 Vu < PhiVc/2 A Reqd 9.E 4.4 0.0 0.0 +1.20D+1.60S 1 1.84 2.00 -0.68 0.68 0.11 1.00 4.55 Vu < PhiVc/2 )t Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.86 2.00 -0.69 0.69 0.10 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.88 2.00 -0.69 0.69 0.08 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.90 2.00 -0.69 0.69 0.07 1.00 4.55 Vu < PhiVc/2 )t Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.92 2.00 -0.69 0.69 0.05 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.95 2.00 -0.70 0.70 0.04 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.97 2.00 -0.70 0.70 0.02 1.00 4.55 Vu < PhiVc/2 )t Reqd 9.E 4.5 0.0 0.0 +1.20D+1.60S 1 1.99 2.00 -0.70 0.70 0.01 1.00 4.55 Vu < PhiVc/2 A Reqd 9.E 4.5 0.0 0.0 Maximum Forces & Stresses for Load Combinations Load Combination Location (ft) Bending Stress Results ( k-ft ) Segment Span # along Beam Mu: Max Phi"Mnx Stress Ratio MAXimum BENDING Envelope Span # 1 1 2.000 0.65 4.45 0.15 +1.40D Span # 1 1 2.000 0.06 4.45 0.01 +1.20D Span # 1 1 2.000 0.05 4.45 0.01 +1.20D+0.50S Span # 1 1 2.000 0.24 4.45 0.05 +1.20D+1.60S Span # 1 1 2.000 0.65 4.45 0.15 +1.20D+0.70S Span # 1 1 2.000 0.31 4.45 0.07 +0.90D Span # 1 1 2.000 0.04 4.45 0.01 Overall Maximum Deflections Load Combination Span Max. "-" Defl (in) _ocation in Span (ft Load Combination Max. "+" Defl (in_ocation in Span (ft +D+S 1 0.0009 1.000 0.0000 0.000 (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 66 of 69 CUEIDR IAN kybreak Subdivision Engineering: Eduado Pelallo J 13382 Checker: Shawn Reeder ian, Idaho PERFORMANCE 07/28/2022 APPROVED ENGINEERS DATE09/26/22 ing Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 zozz-ot sz FILE NUMBER: - uild:20.22.6.12 SHAWN REEDER (c) ENERCALC INC 1983-2022 a Planter footing Code References Calculations per ACI 318-14, IBC 2018, CBC 2019, ASCE 7-16 Load Combinations Used : IBC 2018 General Information Material Properties Soil Design Values fc : Concrete 28 day strength = 2.50 ksi Allowable Soil Bearing = 1.50 ksf fy : Rebar Yield = 60.0 ksi Soil Density = 110.0 pcf Ec : Concrete Elastic Modulus = 3,122.0 ksi Increase Bearing By Footing Weight = No Concrete Density = 145.0 pcf Soil Passive Resistance (for Sliding) = 100.0 pcf T Values Flexure = 0.90 Soil/Concrete Friction Coeff. = 0.30 Shear = 0.750 Increases based on footing Depth Analysis Settings Footing base depth below soil surface = ft Min Steel % Bending Reinf. = Allow press. increase per foot of depth = ksf Min Allow % Temp Reinf. = 0.00180 when footing base is below = ft Min. Overturning Safety Factor = 1.0 : 1 Min. Sliding Safety Factor = 1.0 : 1 Increases based on footing plan dimension Add Ftg Wt for Soil Pressure Yes Allowable pressure increase per foot of depth Use ftg wt for stability, moments & shears Yes = ksf Add Pedestal Wt for Soil Pressure Yes when max. length or width is greater than = ft Use Pedestal wt for stability, mom & shear No Dimensions Width parallel to X-X Axis = 4.250 ft Length parallel to Z-Z Axis = 7.830 ft Z Footing Thickness = 8.0 in Load location offset from footing center... ex: Prll to X-X Axis = 7.5 in = in Pedestal dimensions... XEx px : parallel to X-X Axis = 24.0 in m "' pz : parallel to Z-Z Axis =_ 24.0 in Height 20.0 in Rebar Centerline to Edge of Concrete... "' II at Bottom of footing = 3.0 in m 2'-9" a Reinforcing L a " w Bars parallel to X-X Axis Number of Bars - 7 Reinforcing Bar Size = # 4 Bars parallel to Z-Z Axis Number of Bars = 4 Reinforcing Bar Size = # 4 Bandwidth Distribution Check (ACI 15.4.4.2)-#4t3a Direction Requiring Closer Separation Z-ZSedonLoolongto -X Bars along X-X Axis X-X Section Looking to +Z # Bars required within zone 70.4 % # Bars required on each side of zone 29.6 % Applied Loads D Lr L S W E H P : Column Load = 4.756 k OB : Overburden = ksf M-xx = k-ft M-zz = k-ft V-x = k V-z = k (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 01 of 69 CUEJ­2uild:20.22.6.12 kybreak Subdivision 13382 an, Idaho APPRO DATE 09/i n g RIENUMBER: Planter footing DESIGN SUMMARY Min. Ratio Item Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER (c) ENERCALC INC 1983-2022 Applied Capacity Governing Load Combination PASS 0.2793 Soil Bearing 0.4189 ksf 1.50 ksf D Only about Z-Z axis PASS n/a Overturning - X-X 0.0 k-ft 0.0 k-ft No Overturning PASS n/a Overturning - Z-Z 0.0 k-ft 0.0 k-ft No Overturning PASS n/a Sliding - X-X 0.0 k 0.0 k No Sliding PASS n/a Sliding - Z-Z 0.0 k 0.0 k No Sliding PASS n/a Uplift 0.0 k 0.0 k No Uplift PASS 0.01385 Z Flexure (+X) 0.05336 k-ft/ft 3.854 k-ft/ft +1.40D PASS 0.03739 Z Flexure (-X) 0.1441 k-ft/ft 3.854 k-ft/ft +1.40D PASS 0.2527 X Flexure (+Z) 1.023 k-ft/ft 4.048 k-ft/ft +1.401D PASS 0.2527 X Flexure (-Z) 1.023 k-ft/ft 4.048 k-ft/ft +1.401D PASS 0.008290 1-way Shear (+X) 0.6218 psi 75.0 psi +1.40D PASS 0.02964 1-way Shear (-X) 2.223 psi 75.0 psi +1.40D PASS 0.1341 1-way Shear (+Z) 10.054 psi 75.0 psi +1.40D PASS 0.1341 1-way Shear (-Z) 10.054 psi 75.0 psi +1.40D PASS 0.0820 2-way Punching 11.451 psi 139.655 psi +1.40D Detailed Results Soil Bearing Rotation Axis & Xecc Zecc Actual Soil Bearing Stress @ Location Actual / Allow Load Combination... Gross Allowable (in) Bottom, -Z Top, +Z Left, -X Right, +X Ratio X-X, D Only 1.50 n/a 0.0 0.2686 0.2686 n/a n/a 0.179 X-X, +0.60D 1.50 n/a 0.0 0.1612 0.1612 n/a n/a 0.108 Z-Z, D Only 1.50 4.801 n/a n/a n/a 0.1184 0.4189 0.279 Z-Z, +0.60D 1.50 5.342 n/a n/a n/a 0.06090 0.2615 0.174 Overturning Stability Rotation Axis & Load Combination... Overturning Moment Resisting Moment Stability Ratio Status Footing Has NO Overturning Sliding Stability All units k Force Application Axis Load Combination... Sliding Force Resisting Force Stability Ratio Status Footing Has NO Sliding Footing Flexure Flexure Axis & Load Combination Mu Side Tension As Req'd Gvrn. As Actual As Phi*Mn Status k-ft Surface inA2 inA2 inA2 k-ft X-X, +1.40D 1.023 +Z Bottom 0.1728 AsMin 0.1882 4.048 OK X-X, +1.40D 1.023 -Z Bottom 0.1728 AsMin 0.1882 4.048 OK X-X, +1.20D 0.8767 +Z Bottom 0.1728 AsMin 0.1882 4.048 OK X-X, +1.20D 0.8767 -Z Bottom 0.1728 AsMin 0.1882 4.048 OK X-X, +0.90D 0.6575 +Z Bottom 0.1728 AsMin 0.1882 4.048 OK X-X, +0.90D 0.6575 -Z Bottom 0.1728 AsMin 0.1882 4.048 OK Z-Z, +1.40D 0.1441 -X Bottom 0.1728 AsMin 0.1788 3.854 OK Z-Z, +1.40D 0.05336 +X Bottom 0.1728 AsMin 0.1788 3.854 OK Z-Z, +1.20D 0.1194 -X Bottom 0.1728 AsMin 0.1788 3.854 OK Z-Z, +1.20D 0.04616 +X Bottom 0.1728 AsMin 0.1788 3.854 OK Z-Z, +0.90D 0.08245 -X Bottom 0.1728 AsMin 0.1788 3.854 OK Z-Z, +0.90D 0.03536 +X Bottom 0.1728 AsMin 0.1788 3.854 OK One Way Shear Load Combination... Vu @ -X Vu @ +X Vu @ -Z Vu @ +Z Vu:Max Phi Vn Vu / Phi*Vn Status +1.40D 2.22 psi 0.62 psi 10.05 psi 10.05 psi 10.05 psi 75.00 psi 0.13 OK +1.20D 1.85 psi 0.54 psi 8.62 psi 8.62 psi 8.62 psi 75.00 psi 0.11 OK +0.90D 1.29 psi 0.41 psi 6.46 psi 6.46 psi 6.46 psi 75.00 psi 0.09 OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 08 of 09 IDIAN> kybreak Subdivision 13382 ian, Idaho APPROVED DATE: 09/26/22 i n g uE NUMBER!A o,ez uild:20.22.6.12 Planter footing Two -Way "Punching" Shear Engineering: Eduado Pelallo Checker: Shawn Reeder PERFORMANCE 07/28/2022 E N G I N E E R S Project File: 05 beams 2022-13382 Blackrock Homes - Skybreak Subdiv.EC6 SHAWN REEDER Load Combination... Vu Phi*Vn Vu / Phi*Vn +1.40D 11.45 psi 139.66psi 0.082 +1.20D 9.82 psi 139.66psi 0.07028 +0.90D 7.36 psi 139.66psi 0.05271 (c) ENERCALC INC 1983-2022 All units k Status OK OK OK (208)475-0040 1102 N FRANKLIN BLVD, NAMPA, ID 83687 Page 69 of 09