HomeMy WebLinkAboutSDetails 1 V1E
APPROVED
NOTE
OW17122
� -
REFER TOARCHDECTUTALDRA'MNGSANDIORTRUSS
MANUFACTURER DRAWINGS FOR SPECIFICTAUSSFAORIE
.: •.vna:a�M"°�
INFORMATION. (�e. HEELFEIGHTS, SLOPE, OVERHANGS)
2x BLOCKING AT SHEATHING
EDGES w/ (3) Ed NAILS INTO TRUSS
CONTINUOUS STRUCTURAL
SHEATHING NAIL PER TYPICAL
SHEATHING DETAIL
FRAMING PER PLAN
STRUCTURAL SHEATHING,
SEE PLAN AND DETAILS FOR
ATTACHMENT
PRE-ENGINEERED WOOD
TRUSSES AT24' O.C. MAX.
TRUSS ANCHOR
STRUCTURAL SHEATHING SEE PLAN
AND DETAILS FOR ATTACHMENT
PRE-ENGINEERED WOOD
TRUSSES AT24' O.C. MAX.
-OR-
2x RIBBON BOARD ATTACHED
TO TRUSS wl0)10d NAILS, 24'
O.C. CENTER MAX. SPACING
CONTINUOUS STRUCTURAL SHEATHING
NAIL PER TYPICAL SHEATHING DETAIL
FRAMING PER PLAN
DETAILAT TRUSS HEEL, 9114' /
PER PLAN FRAMING PER PLAN I
FASCIA, (SEEARCH DINGS) CONTINUOUS STRUCTURAL SHEATHING
DETAILATTYPICALTRUSSWIHEEL<9114' NAIL PER TYPICAL SHEATHING DETAIL
TRUSSATTACHMENT:
ALTRUSS EFDSARETO BE SECURED TOTHEWALL BELOW USING ONE OFTHE BELOW METHODS. ONE FULLOPTKMN MUST
BE USED FOR CONTINUOUS LOAD PATH:
a INSTALL TYPICAL TRUSS ANCHOR THROUGH EXTERIOR SHEATHING. EXT. SHEATHING ISCONRN000SAND WILL
TRANSFER COMBINED SHEAR & UPUFT.
b. INSTALL TYPICAL TRUSS CONNECTOR FROM TRUSS TO TOP PLATE ON INSIDE OF THE WALL wl H25A @ EVERY OTHER
STUDIO TOP PLATE. EXT. SHEATHING IS CONTINUOUS AND WLLTRANSFER COMBINED SHEAR & UPIFT.
c. INSTAULMCHORAS CADS FOR ON THE PUNS. TWIST STRAPS ARE TO BE INSTPIIIlI ON THE INSIDEOFTNEWAIL
ANY STRAPS FROM THE STUDSTOTHE UNDERLYING STRUCNAEWILL BECPLIED FOR ON THE PUNS.
VALLEY SET
TRUSSES @ 20 O.C.
MIN. 9' LONG 20 GA.
FLAT STRAP wl (8)16d
SHEATHING PER PLAN
2X4 BLOCKING UNDER
TRUSS ENDS, NAIL TO
TRUSS CHORDS w/ (3)
10d EA END.
OR
VALLEYSET
TRUSSES @ 24' O.C.
SHEATHING
PER PLAN
2X4 PUAUN @ EA. VAl1EYTRUSS, NAILTO
COMMON TRUSS wl (3)16d GUN NAILS
BOTTOM CORD OF VAI.EEY
TRUSS NAILED TO PURUN
w/ 10d GUN NAIL @ B' O.C.
SIMPSON 410w1(16) Bd
VALLEY SET NAILS MIN.
TRUSSES @ 24' O.C. 2X4OUTLOOKER FRAMING AT 24' O.C. OVER
DROPPED GABLE END TRUSS. ATTACH TO
SHEATHING TRUSS TOP CHORD wl (2)111 NAILS
PER PLAN
CONT.2X4 (MIN.) wl (2)12d NAILS
SEE REQUIRED BRACING
PER TRUSS MANUFACTURER
(1) SDWC15600 ((i.e. BSCI REQUIREMENTS)
TRUSS SCREWTO
MR TRUSS BELOW
Roe ROOF TRUSS ON FRAMING Fl.me Rob VALLEY SET OVER FRAME me
RW W-020 1 /2"=1'-0" RWG-060
9P=10%HOUSE WIDTH 3 'X'=10%HOUSE WIDTH T=10%HOUSE WIDTH
�. �. x X 3
0 0 3 0 T /
/ 2
o ) O
RIDGE X RIDGE X RIDGE
T GABLE END 1� GABLE END
BOSTON HIP 3 GABLE HIP 3
ROOF SHEATHING
NAILS
ROOF FASTENING ZONES
8d RING SHANK
0.113' z 2318'
1
2
3
SHINGLE:
7/16' SPAN RATED SHEATHING
OFFSET DIMENSION 'X'=10%HOUSE WIDTH
X
x
TILE: 15137SPAN RATED SHEATHING
PANEL EDGES @ SUPPORTS (1)
61O.C.
61O.C.
4'O.C.
METAL: 15137SPAN RATED SHEATHING
PANEL HELD (1)
B'O.C.
61O.C.
61O.C.
NOTES:
1. LONG SIDE OF SHEATHING TO BE PERPENDICULAR TO TRUSSES OR RAFTERS -TYPICAL
2. EDGE SPACING ALSO APPLIES OVER GABLE END WALLS OR TRUSSES.
3. FASTENING ZONES 2 AND 3 ARE EQUAL TO 10% OF TOTAL HOUSE WIDTH, DIMENSION x OFFSET FROM ROOF EDGE.
30 WIDE HOUSE = T ZONE, 40 WIDE HOUSE = 4 ZONE, 50 WIDE HOUSE = 9 ZONE, 60' WIDE HOUSE = B ZONE
ROOF SHEATHING ATTACHMENT DIAGRAM
1 /2"-1'_O..
STRUCTURAL SHEATHING
PER PLAN
X4 LADDER FRAMING AT24' O.C. REDTI AT
MERHANGSUPTO16. ATTACHTOTAUSS
TOP CHORD wl (2)111 NAILS AT 16' O.C.
DONT. 2X4 (MIN.) wl (2)10d NAILS
SEE REWIRED BRACING
PER TRUSS MANUFACTURER
(.e. BSCI REQUIREMENTS)
ALT.OUTLOOKER FRAMING
GABLE TRUSS wl VERTICAL
WEBS @ 16' O.C.
BLOCKING AS REQUIRED FOR
ZONE 2 SZONE 3 EDGE NAIUNG
REQUIREMENTS & AS REQUIRED
BYTRUSS MANUFACTURER
PERMANENT TRUSS BRACNG PER TRUSS
ENGINEER I BCSI NAILED TO BOTTOM CORD
10dTOENAILS @8'O.C.TRUSS
DRYWALLOR
TOTOP PLATE
SHEATHING FIELD
SHEATHING PER PLAN
NAIUNG PER PLAN
CONTINUOUS STRUCTURAL SHEATHING,
NOTE THATWHEN THE VERTICAL'V BRACE IS REQUIRED, HORIZONTAL -V
SEE PLAN FOR ATTACHMENT
BRACES ARE TO BE NAILED TO THESE MEMBERS. NAIL 17 LONG BLOCK
ON ALLTRUSS WEBS WHERE VERTICAL 1! IS NOT REQUIRED IN ORDER TO
SEE PLAN FOR ATTACHMENTOFADL
CONNECT THE HORIZONTAL'L'BRACE
STRUCTURAL SHEATHING.
GABLE END TRUSS BRACING DETAIL @ INTERIOR WIND ZONES
1 /2'1'-0"
2X4 LADDER FRAMING AT 2 r
O.C. FEUD AT OVERHANGS
GREATER THAN 17, ATTACH
TO TRUSS TOP CHORD wl
(2)16d NAILS AT 16' O.C.
CONT.2X4 wl
(2)12d NAILS
STRUCTURAL SHEATHING
PER PLAN
2x BLOCKING BETWEEN EA.
TRUSS MEMBER OR TRUSS WEB.
2x LEDGER wl (2)10d @ EA.
CROSSING TRUSS MEMBER FOR
ROOF SHEATHING NAILING
SEE PLAN FOR ATTACHMENT OF All
STRUCTURAL SHEATHING.
2X4 BLOCKING AT DIAGONALS ONLY.
ATTACH AT EA END wl (2)12d TOENAILS,
NAIL SHEATHING TO BLOCKING AT S' O.C.
w1 MIN. Bd NAILS, BLOCK4 BAYS BACK
FROM GABLE TRUSS.
2X4 DIAGONAL BRACING WI
(5)12d COMMON NAILS EA.
/ E4ND @ 37 MAX. SPACING
IF LENGTH IS LESS THAN *17 USE 2X4 V
BACK, IF LENGTH IS GREATER THEN 4' 0' USE
(2) 2X4 'V BACKS, NAIL 'V BACKS w112d @ 17
O.C. (NOTCHED @TOP w/ (I 12d TOENAILS
'V BACK, EXTEND 6' PAST
LOWER ROOF SHEATHING
SHEATHING
PER PLAN
2x STUDS, SEE PLAN FOR
SPACING & STRAPPING RED.
FLOOR SHEATHING PER PLAN -
CONTINUOUS UNDER UPPER WALL
TRUSS PER PLAN J
N STUD, SEE PLAN FOR
SPACING & STRAPPING RED.
UP TO 120 MPH, CAT II, EXP. C
RW Na 090
N4 BLOCKING BETWEEN EA TRUSS (OR
CONTINUOUS AS TRUSS ALLOW) wl(3)10d
TOENAILEDTOEATRLISS. NAILTOWALL
STUDS AS AVAILABLE
PRE-ENGINEERED ROOF TRUSSES
(Z) 26 LEDGER wl(1)114' z 4117 SIDS
SCREW TO EA TRUSS & (1)114' z 4117
SDS SCREW TO RIBBON @ 8' O.C.
"NOTE: DETAILL02BOASIMIARISREOUREDTOACCOMPAWTHISDETAL
GABLE END TRUSS DETAIL , i FLOOR TO BEARING WALL @ LOW ROOF
E�_'�PA.RjIAL
Fie ua��eO RW G-093 1 /2-0" LG W-110
STRUCTURAL SHEATHING
CONTINUOUS THROUGH
FLOOR CONNECTION
N STUDS, SEE PUN FOR
SPACING & STRAPPING RED.
CONT. N PUTE 16d NAILS @ B' O.C.
FLOOR SHEATHING PER PLAN
N4 BLOCKING BETWEEN EA TRUSS
(OR CONTINUOUS AS TRUSS ALLOW)
wl(3)10d TOE NAILEDTO EA TRUSS.
NAIL TO WALL STUDS AS AVAILAEU
EDGE NAILING
PER DETAILS
PRE. ENG. TRUSSES @ 24' O.0
TRUSS I JOIST PER PLAN J / /
/ HTU26OR HANGER PER
SHEATHING PEA PLAN TRUSS MANUF. OR PLAN
BEAM OR FLOOR *NOTE: AN ALTERNATIVE TOTHE WALL SHEATHING
TRUSS GIRDER EDGE NAILING BEING CONTINOUS TITHE BEAM BELOW IS TO USE
PER DETAILS LUA12 @ EA STUD ABOVE TO BEAM BELOW
ENGINEERED TRUSS OR �� �� ENGINEERED TRUSS —,vA—
I -JOIST (ROOF OR FLOOR) (ROOF OR FLOOR)
1,1 NAILER
ATTACHED TO TRUSS
BOTTOM CHORD w/
10d NAILS @ 3" o/c
ATTACH SHEATHING TO
NAILER w/ Sd
COMMON @ 3" o/c
7/16" THICK (MIN.) SHEATHING
w/ 3" o/c 8d NAILING- BLOCK
ALL UNSUPPORTED PANEL
EDGES w/ 2x BLOCKING
- ATTACH SHEATHING TO TOP
PLATES w/ 8d @ 3" o/c.
24 BRACES @ —
12° o/c ALONG WALL
LENGTH le'
ATTACH EACH BRACE
TO TOP PLATE w/
a) Isd NAILS OPTION I OPTION 2
INTERIOR SHEAR WALL BRACING w/
RO7 TRUSS OR I -JOIST PARALLEL TO WALL
2x STUDS, SEE PLAN FOR SPACING
STRUCTURAL SHEATHING CONTINUOUS
AND STRAPPING AEI.
THROUGH FLOOR CONNECTION, SEE PLAN
FOR ATTACHMENT
CONT.2(PLATEOI2)16d
FLOOR SHEATHING PER PLAN NAILS @ 24'O.C.
20 EXTENDING AMINIMUM OF6'4P,
CONNECTED TO THE END GABLE TRUSS AND
AT LEAST (3) FLOOR TRUSS wl(3)10d NAILS.
THIS 2x4 BRACING SHALL BE SPACED A
MAXIMUM OF 6-V APART.
HELD FRAME 2X4 KNEE WALL OR PRE-ENG
-
- - -
- - -
FLOOR TRUSS, STUDS @ 16' O.C. wl (2)16d
NAILS @ EA END
TRUSS PER PLAN SHEATHING
FRAMED BEARING WALL,
PER PLAN
SEE PLAN AND DETAILS
FLOOR TRUSS TO FRAMED WALL WISHEATHING
LV I o s�,e
F,e,"ame
LTW-012
2x STUDS, SEE PLAN FOR SPACING AND
STRUCTURAL SHEATHING CONTINUOUS
STRAPPING REQUIREMENTS
THROUGH FLOOR CONNECTION, SEE PLAN
CONT. 2z PLATE w1(2)16d NAILS @ EA. TRUSS
FOR ATTACHMENT
FLOOR SHEATHING PER PLAN
NAILING PER DETAILS
(4)16d NAILS RIBBON TO EA TRUSS
8d NAILS 3' O.C. WALL
SHEATHING TO EA TRUSS
(4)16d NAILS RIBBON TO EA TRUSS & (1)10d
NAIL @ 8 O.C. TOE NAILED TO TOP PLATE
TRUSS PEA PUN
NAILING PER DETAILS
TI
2x STUDS, SEE PLAN FOR
SHEATHING PER PUN
SPACING & STRAPPING RED.
FLOOR TRUSS WILET-IN ON FRAMED WALL
� s�ie
E1/2"=1'-O"
Foe
LTW-022
2x4 UDDER FRAMING AT 24' O.C. FEUD
AT OVERHANGS GREATER THAN IT,
ATTACH TO TRUSS TOP CHORD wl
(016d NAILS AT 16' O.C.
OONT. 2x FASCIA PER
ARCH. wl (412d NAILS
H2.5A @ EA OVER
FRAMED TRUSS
PRE-ENGINEERED WOOD
TRUSSES AT 74P O.C. MAIL
STRUCTURAL
SHEATHING PER PLAN
MSTAM24 @ 48' O.C. MIN. @ TRUSS WEB
MEMBERS, (2) 3116' DIA. z 3'TAPCONS
TO CMU OA HGAM10 @ W O.C. TO
BOTTOM CORD TOTOP OFWALL
REM NAILING
PER PLAN
CONTINUOUS
SHEATHING
LAN
PER PLAN "M
���2-STORY CONNECTION AT BEAM WI LOW ROOF 7/16/2021 U20OVERFRAMED GABLE END DETAIL 7/16/2021
LV � v e ®me1/2"=1'-O" L( 741/2.=1'-0" RWGa200
Michigan
3400 Auburn Rd
Suite 200
Auburn Hills, MI 48326
+ 1 248.622.4035
Florida
12906 Tampa Oaks Blvd.
Suite 150
Tampa, FL 33637
+ 1 813.466.3310
Minnesota
6500 City West Pkwy
Suite 300
Eden Prairie, MN 55344
+ 1 612.607.0115
www.fieldstoneae.com
VJ
Q
O
Z
OR_
H
Z
Q°
w c l
g
LUo
wY
VJ
LLO�
v i�
J LU 120
J
Z
ww�
(D 6
W
Of
Q lY
Z
"<
Z
oY
M�
rn=
oU
M
2
U
F
■ BEJAMIN NIESE, PE
P.E. # 19770IDAHO
03/17/2022
DATE
�pF�ss oENS�c�G�Lcz
19770
NJ xO
6 9� OF N �!
MIN N��S
L_
DRAWN BY:
VERSION: 1.0
SHEET NAME
DETAILS -
ROOF
SHEET #
S4m 1