HomeMy WebLinkAboutSDetails 1 V1NOTE:
REFER TO ARCHOECTUIWL DRAWINGS ANDIOR TRUSS
MANUFACTURER DRAWINGS FOR SPECIFIC TRUSS PROFILE
INFORMATION. (Le. HEEL HEIGHTS, SLOPE, OVERHANGS)
2x BLOCKING AT SHEATHING
EDGES w/ (3) Ed NAILS INTO TRUSS
CONTINUOUS STRUCTURAL
SHEATHING NAIL PER TYPICAL
SHEATHING DETAIL
FRAMING PER PLAN
STRUCTURAL SHEATHING,
SEE PLAN AND DETAILS FOR
ATTACHMENT
PRE-ENGINEERED WOOD
TRUSSES AT24' O.C. MAX.
TRUSS ANCHOR
STRUCTURAL SHEATHING SEE PLAN
AND DETAILS FOR ATTACHMENT
PRE-ENGINEERED WOOD
TRUSSES AT24' O.C. MAX.
-OR-
2X RIBBON BOARD ATTACHED
TO TRUSS wl0)10d NAILS, 24'
O.C. CENTER MAX. SPACING
CONTINUOUS STRUCTURAL SHEATHING
NAIL PER TYPICAL SHEATHING DETAIL
FRAMING PER PLAN
DETAILAT TRUSS HEEL, 9114' /
PER PLAN FRAMING PER PLAN I
FASCIA, (SEEARCH DWGS) CONTINUOUS STRUCTURAL SHEATHING
DETAILATTYPICALTAUSSWIHEEL<9114' NAIL PER TYPICAL SHEATHING DETAIL
TRUSSATTACHMENT:
AILTRUSS EFDSARETO BE SECURED TOTHEWAIL BELOW USING ONE OFTHE BEIAW METHODS. ONE FULLOPTION MUST
BE USED FOR CONTINUOUS LOAD PATH:
a INSTALL TYPICAL TRUSS ANCHOR THROUGH EXIERKIR%EATHING. EXT. SHEATHING ISCONTIN000SAND WILL
TRANSFER COMBINED SHEAR & UPUFT.
b. INSTALLTYPICAL TRUSS CONNECTOR FROM TRUSS TO TOP PLATE ON INSIDE OF THE WALL wl H25A @ EVERY OTHER
STUDIO TOP PLATE. EXT. SHEATHING IS CONTNUOUS AND WBLTRANSFER COMBINED SHEAR & UPLIFT.
c. INSTALL VICHORAS CALLED FOR ON THE PUNS. TWIST STRAPS ARE TO BE INSTALLED ON THE INSIDEOFTfEWA1L
ANY STRAPS FROM THE SNDSTOTHE UNDERLYING STRUCIUREWILL BECAI.IED FOR ON THE PUNS.
VALDEY SEr
TRUSSES @ 20 O.C.
MIN. 9' LONG 20 GA.
FLAT STRAP wl (8)16d
SHEATHING PER PLAN
2X4 BLOCKING UNDER
TRUSS ENDS, NAIL TO
TRUSS CHORDS wl (3)
10d EA END.
OR
VALLEYSET
TRUSSES @ 24' O.C.
SHEATHING
PER PLAN
2X4 PUAUN @ EA. VAllEYTRUSS, NAILTO
COMMON TRUSS wl (3)16d GUN NAILS
BOTTOM CORD OF VALLEY
TRUSS NAILED TO PURUN
w/ 10d GUN NAIL @ 8' O.C.
SIMPSON 410wI (16) Sd
VALLEY SET NAILS MIN.
TRUSSES @ 24' O.C. 2X4OUTLOOKER FRAMING AT 24' O.C. OVER
DROPPED GABLE END TRUSS. ATTACH TO
SHEATHING TRUSS TOP CHORD wl (2)111 NAILS
PER PLAN
CONT.2X4 (MIN.) wl (2)12d NAILS
SEE REQUIRED BRACING
PER TRUSS MANUFACTURER
(1) SDWC15600 (i.e. BSCI REQUIREMENTS)
TRUSS SCREWTO
MR TRUSS BELOW
Roe ROOF TRUSS ON FRAMING Rob VALLEY SET OVER FRAME me
1 /2 s=1'-0" R W W-020 1 /2 —1.-0.. R WG-060
STRUCTURAL SHEATHING
PER PLAN
X4 LADDER FRAMING AT24' O.C. RED AT
MERHANGSUPTO16. ATTACHTOTRUSS
TOP CHORD wl (2)111 NAILS AT 16' O.C.
DONT. 2A )MIN.) wl (2)10d NAILS
SEE REWIRED BRACING
PER TRUSS MANUFACTURER
(.e. BSCI REQUIREMENTS)
ALT.OVILOOKER FRAMING
GABLE TRUSS wl VERTICAL
WEBS @ 16' O.C.
BLOCKING AS REQUIRED FOR
ZONE 2 SZONE 3 EDGE NAIUNG
REQUIREMENTS & AS REQUIRED
BYTRUSS MANUFACTURER
PERMANENT TRUSS BRACNG PER TRUSS
ENGINEER I BCSI NAILED TO BOTTOM CORD
1Old TOENAILS @8'O.C.TRUSS
TOTOP PLATE
DRYWALLOR
SHEATHING FIELD
SHEATHING PER PLAN
NAIUNG PER PLAN
CONTINUOUS STRUCTURAL SHEATHING,
NOTE THATWHENTHE VERTICAL'L'BRACE ISREQUIRED, HORIZONTAL L'
SEE PLAN FOR ATTACHMENT
BRACES ARE TO BE NAILED TO THESE MEMBERS. NAIL 17 LONG BLOCK
ON ALLTRUSS WEBS WHERE VEFMCAL 1! IS NOT REQUIRED IN ORDER TO
SEE PLAN FOR ATTACHMENTOFADL
CONNECT THE HORIZONTAL'L'BRACE
STRUCTURAL SHEATHING.
GABLE END TRUSS BRACING DETAIL @ INTERIOR WIND ZONES
1/2. 1'-0"
2X4 BLOCKING AT DIAGONALS ONLY.
ATTACH AT EA END wl (2)12d TOENAILS,
9P=10%HOUSE WIDTH 3 'X'=10%HOUSE WIDTH T=10%HOUSE WIDTH 2X4 LADDER FRAMING AT 24' NAIL SHEATHING TOBLOCKING ATS'O.C.
X X 3 O.C. FEUD AT OVERHANGS wl MIN. Bd NAILS, BLOCK 4 BAYS BACK
GREATER THANI7,ATTACH FROM GABLE TRUSS.
TO TRUSS TOP CHORD wI
O
O O X O O 7 (2)16d NAILS AT 16' O.C. 2X4 DIAGONAL N BRACING wl O 3 (5)12d COMMON NAILS EA.
CONT.2X4 wl
E4ND @ 37 MAX. SPACING
/ 2 (2)12d NAILS
O2 < 1O STRUCTURAL SHEATHING
\ PER PLAN
RIDGE X
GABLE END RIDGE RIDGE 2x BLOCKING BETWEEN EA.
1� GABLE END 0 TRUSS MEMBER OR TRUSS WEB.
el
BOSTON HIP 3 GABLE HIP 3
ROOF SHEATHING
NAILS
ROOF FASTENING ZONES
Bd RING SHANK
0.113' z 2318'RATEDSHEATHING
1
2
3
SHINGLE:
7/16' SPAN RATED SHEATHING
OFFSET DIMENSION 'X'=10%HOUSE WIDTH
X
x
TILE:15137SPAN
PANEL EDGES @ SUPPORTS (1)
61O.C.
61O.C.
4'O.C.
METAL:15137 SPAN RATED SHEATHING
PANEL FIELD (1)
6 O.C.
6 O.C.
6 O.C.
NOTES:
1. LONG SIDE OF SHEATHING TO BE PERPENDICULAR TO TRUSSES OR RAFTERS -TYPICAL
2. EDGE SPACING ALSO APPLIES OVER GABLE END WALLS OR TRUSSES.
3. FASTENING ZONES 2 AND 3 ARE EQUAL T010% OF TOTAL HOUSE WIDTH, DIMENSION x OFFSET FROM ROOF EDGE.
39 WIDE HOUSE = T ZONE, 40 WIDE HOUSE = 4 ZONE, 50 WIDE HOUSE = 9 ZONE, SO WIDE HOUSE = B ZONE
ROOF SHEATHING ATTACHMENT DIAGRAM
1/2"=
2x LEDGER wl (2)10d @ EA
L IF LENGTH IS LESS THAN *17 USE 2X4 1!
BACK, IF LENGTH IS GREATER THEN 4' 0' USE
CROSSING TRUSS MEMBER FOR
(2) 2X4'V BACKS, NAIL'V BACKS w112d @ 17
ROOF SHEATHING NAILING
O.C. (NOTCHED @ TOP wl (I TOENAILS
SEE PLAN FOR ATTACHMENT OF All
'L' BACK, EXTEND 6' PAST
LOWER ROOF SHEATHING
STRUCTURAL SHEATHING.
SHEATHING
PER PLAN
2x STUDS, SEE PLAN FOR
SPACING & STRAPPING RED.
FLOOR SHEATHING PER PLAN -
CONTINUOUS UNDER UPPER WALL
TRUSS PER PLAN J
N STUD, SEE PLAN FOR
SPACING & STRAPPING RED.
UP TO 120 MPH, CAT II, W. C
R W Na 090
N4 BLOCKING BETWEEN EA TRUSS (OR
CONTINUOUS AS TRUSS ALLOW) wl(3)10d
TOENAILEDTOEATRIISS. NAILMIYALL
STUDS AS AVAILABLE
PRE4BtlGINEERED ROOF TRUSSES
(Z) 26 LEDGER wl(1)114' z 4117 SIDS
SCREWTO EATRUSS & (1)114' z 4117
SDS SCREW TO RIBBON @ 8' O.C.
"NOTE: DETAILL02BOASIMIARISREOUREDTOACCOMPAWTHISDETAL
nva�
PARTIAL GABLE END TRUSS DETAIL , , FLOOR TO BEARING WALL @ LOW ROOF
i i FeName
�1/2"=1'-0" RWG-093 �1/2"=1'-O" LGW-110
STRUCTURAL SHEATHING
CONTINUOUS THROUGH
FLOOR CONNECTION
N STUDS, SEE PLAN FOR
SPACING & STRAPPING RED.
CONT. N PUTE 16d NAILS @ 8' O.C.
FLOOR SHEATHING PER PLAN
N4 BLOCKING BETWEEN EA TRUSS
(OR CONTINUOUS AS TRUSS ALLOW)
wl(3)10d TOE NAILED TO EA TRUSS.
NAIL TO WALL STUDS AS AVAILAEU
EDGE NAILING
PER DETAILS
PRE. ENG. TRUSSES @ 24' O.0
TRUSS I JOIST PER PLAN J / /
/ HTU26OR HANGER PER
SHEATHING PEA PLAN TRUSS MANUF. OR PLAN
BEAM OR FLOOR *NOTE: AN ALTERNATIVE TO THE WALL SHEATHING
TRUSS GIRDER EDGE NAILING BEING CONTINOUS TITHE BEAM BELOW IS TO USE
PER DETAILS LUA12 @ EA STUD ABOVE TO BEAM BELOW
ENGINEERED TRUSS OR �� �� ENGINEERED TRUSS —,vA—
I -JOIST (ROOF OR FLOOR) (ROOF OR FLOOR)
1,1 NAILER
ATTACHED TO TRUSS
BOTTOM CHORD w/
10d NAILS 0 3" o/c
ATTACH SHEATHING TO
NAILER w/ Sd
COMMON 0 3" o/c
7/16" THICK (MIN.) SHEATHING
w/ 3" o/c 81 NAILING- BLOCK
ALL UNSUPPORTED PANEL
EDGES w/ 2x BLOCKING
— ATTACH SHEATHING TO TOP
PLATES w/ 8d 0 3" o/c.
24 BRACES 0 —
12° o/c ALONG WALL
LENGTH IL
'
ATTACH EACH BRACE
TO TOP PLATE w/
a) Isd NAILS OPTION I OPTION 2
INTERIOR SHEAR WALL BRACING w/
RO7 TRUSS OR I -JOIST PARALLEL TO WALL
2x STUDS, SEE PLAN FOR SPACING
STRUCTURAL SHEATHING CONTINUOUS
AND STRAPPING AEI.
THROUGH FLOOR CONNECTION, SEE PLAN
FOR ATTACHMENT
CONT.D(PUTEwl(2)16d
FLOOR SHEATHING PER PLAN NAILS@24'O.C.
2x4EXTENDINGAMINIMUM OF6'4P,
CONNECTED TO THE END GABLE TRUSS AND
AT LEAST (3) FLOOR TRUSS wl(3)10d NAILS.
THIS 2x4 BRACING SHALL BE SPACED A
MAXIMUM OF 6-V APART.
HELD FRAME 2X4 KNEE WALL OR PRE-ENG
-
- - -
- - -
FLOOR TRUSS, STUDS @ 16' O.C. wl (2)16d
NAILS @ EA END
TRUSS PER PLAN SHEATHING
FRAMED BEARING WALL,
PER PLAN
SEE PLAN AND DETAILS
TRUSS TO FRAMED WALL WISHEATHING
U01FLOOR
1/2 _0..
LTW-012
2x STUDS, SEE PLAN FOR SPACING AND
STRUCTURAL SHEATHING CONTINUOUS
STRAPPING REQUIREMENTS
THROUGH FLOOR CONNECTION, SEE PLAN
CONT. 2z PLATE wI (2)161 NAILS @ EA. TRUSS
FOR ATTACHMENT
FLOOR SHEATHING PER PLAN
NAILING PER DETAILS
(4)16d NAILS RIBBON TO EA TRUSS
Lid NAILS 3' O.C. WALL
SHEATHING TO EA TRUSS
(4)16d NAILS RIBBON TO EA TRUSS & (1)10d
NAIL @ 8 O.C. TOE NAILED TO TOP PLATE
TRUSS PEA PUN
NAILING PER DETAILS
TI
2x STUDS, SEE PLAN FOR
SHEATHING PER PUN
SPACING & STRAPPING RED.
TRUSS WILET-IN ON FRAMED WALL
UB02FLOOR
s—
Fle",ema
1/2" = 1'-0"
LTW-022
2x4 UDDER FRAMING AT 24' O.C. FEUD
AT OVERHANGS GREATER THAN IT,
ATTACH TO TRUSS TOP CHORD wl
(016d NAILS AT 16' O.C.
OONT. 2x FASCIA PER
ARCH. wl (412d NAILS
H2.5A @ EA OVER
FRAMED TRUSS
PRE-ENGINEERED WOOD
TRUSSES AT 74P O.C. MAIL
STRUCTURAL
SHEATHING PER PLAN
MSTAM24 @ 48' O.C. MIN. @ TRUSS WEB
MEMBERS, (2) 3116' DIA. z 3'TAPCONS
TO CMU OA HGAM10 @ 48' O.C. TO
BOTTOM CORD TOTOP OFWALL
HELD NAILING
PER PLAN
CONTINUOUS
SHEATHING
LAN
PER PUN "M
�,��c
CONNECTION AT BEAM WI LOW ROOF 7/16/2021 ��OVERFRAMED GABLE END DETAIL 7/16/2021
L07D e. R20 tea. a
1/2" LGG-074 1/2" = 1'-0" R W G-200
L
>°
E 3 a ¢ Q
s s V E o 3
- -NEE
v -000
o a )
Michigan
3400 Auburn Rd
Suite 200
Auburn Hills, MI 48326
+ 1 248.622.4035
Florida
12906 Tampa Oaks Blvd.
Suite 150
Tampa, FL 33637
+ 1 813.466.3310
Minnesota
6500 City West Pkwy
Suite 300
Eden Prairie, MN 55344
+1 612.607.0115
www.fieldstoneae.com
Cl)
Q
O
Z �
O �
H
Z
Q°
W N
g
W Y
LU
—U
LLO�
m
J
Z
w Lu
Q U Y
W
Q �
Z
O_Y
Q
z
o
MY
rn
2
o U
M
2
U
F
■ BEJAMIN NIESE, PE
P.E. # 19770 IDAHO
03/17/2022
DATE
�pF�ss oENS�c�G�L�
19770
NJ xO
OF Q �!
MIN NA
L_
DRAWN BY:
VERSION: 1.0
SHEET NAME
DETAILS -
ROOF
SHEET #
S4m 1