PF� ROOF COVERING, DRIP, FASCIA AND SOFFIT
FINISH - PER SPEC
2x4 OUTLOOKER AT 24" O.C.
STUDDED DROP GABLE TRUSS
REFER STRUCTURAL
2x6 SUB -FASCIA
LAP SIDING INSTALL PER
MANUF. o/BUILDING PAPER
PER
ROOF PLAN ROOF COVERING, DRIP, FASCIA AND SOFFIT
FINISH - PER SPEC
2x4 LADDER FRAMING AT 24" O.C.
REFER STRUCTURAL
2x6 SUB -FASCIA
LAP SIDING INSTALL PER
MANUF. o/BUILDING PAPER
1 GABLE END DETAIL (OUTLOOKER) 2 GABLE END DETAIL (LADDER)
N.T.S. FR-010 N.T.S. FR-011
ROOF FINISH
NOT SHOWN.
FOR UPPER ROOF —
TRUSS AND OVERHANG
CONFIGURATION REFER
TO STRUCTURAL
FOR WALL FRAMING OR
TRUSS CONFIGURATION
REFER TO STRUCTURAL
LAP SIDING INSTALL PER -
MANUL o/BUILDING PAPER
WEEP SCREED, OVER -
METAL FLASHING, OVER
PEEL & STICK BRIDGE
FLASHING.
PAPER BACKED METAL LATH, SHINGLE LAP
(W.R.B. LAYER #2 - PER SPEC.)
BUILDING WRAP, SHINGLE LAP
(W.R.B. LAYER #1 - PER SPEC,)
EXTEND OVER WEEP SCREED AT BASE OF WALL
SHEATHING OVER
FRAMING OR TRUSSES.
REFER TO
STRUCTURAL
MATERIAL INFORMATION REFER
TO "STUCCO FINISH MATERIAL
SPECIFICATIONS"
NOTE:
DETAIL APPLIES WHERE ROOF
SLOPES PARALLEL OR
PERPENDICULAR TO WALL
ROOF FINISH NOT SHOWN.
REFER DETAILS AND MFGR.
INSTALLATION SPECS
LOWER ROOF FRAMING OR
TRUSSES REFER TO STRUCTURAL
METAL FLASHING AND PEEL & STICK BRIDGE
FLASHING OVERLAP ROOFING UNDERLAYMENT
WALL TO ROOF TRANSITION w/ SIDING FINISH
NOTE, REFERENCE ROOF PLAN FOR ROOF PITCH
AND OVERHANG INFORMATION
ROOF COVERING PER SPEC
PRE-ENGINEERED ROOF TRUSS AT 24" O.C.
w/ EXT, TAIL w/ 1/2" NOMINAL SHEATHING
REFER TO STRUCTURAL
ROOF INSULATION PER SPEC.
2x SOLID FIRE BLOCKING BETWEEN EACH
TRUSS
5/8" TYPE 'Y' GYP BOARD FOR FIRE
RESISTANCE RATING
DRIP EDGE PER SPEC
FASCIA & FINISH PER SPEC.
EXT, 1/2" FOR DRIP
LAP SIDING INSTALL PER
MANUF. o/BUILDING PAPER
REFER TO WALL SECTIONS FOR WALL
CONSTRUCTION.
NOTE REFERENCE ROOF PLAN FOR ROOF PITCH
AND OVERHANG INFORMATION
LAPSIDING INSTALL PER
MANUF. o/BUILDING PAPER
WEEP SCREED, OVER
METAL FLASHING,
OVER PEEL & STICK
BRIDGE FLASHING.
ROOFING
UNDERLAYMENT OVER
ROOF SHEATHING
ROOF COVERING PER SPEC
PRE-ENGINEERED ROOF TRUSS AT 24" O,C.
2 SEE w/ EXT. TAIL w/ 1/2" NOMINAL SHEATHING
ROOF REFER TO STRUCTURAL
PLAN
ROOF INSULATION PER SPEC.
REFER TO
STRUCTURAL FOR DRIP EDGE PER SPEC
TRUSS TO WALL
CONNECTION 2x6 SUB -FASCIA & FINISH PER
SPEC. EXT 1/2" FOR DRIP
LAP SIDING INSTALL PER
PER MANUF, o/BUILDING PAPER
ROOF PLAN
REFER TO WALL SECTIONS FOR WALL
CONSTRUCTION.
WALL/ROOF FRAMING - STRUCTURAL
LAPS SIDING INSTALL PER MANUF.
o/BUILDING PAPER
PEEL & STICK BRIDGE FLASHING, SHINGLE
LAPPED OVER L-FLASHING
C FLASHING
CAP SHINGLE - DO NOT STAPLE OR NAIL
ASPHALT PLASTIC CEMENT
CORROSION RESISTANT BASE FLASHING
EXTEND UP WALL AND DOWN ROOF 6" MIN,
PRE-ENGINEERED WOOD TRUSSES
SEE STRUCTURAL AND TRUSS
DRAWINGS FOR SPACING AND
CONNECTION DETAILS
qPS SIDING INSTALL PER MANUF.
/BUILDING PAPER
EL & STICK BRIDGE FLASHING, SHINGLE
UPPED OVER STUCCO ACCESSORY
NYL PLASTER DRIP SCREED - PER SPEC
STALL PER MANUFACTURER'S INSTALLATION
STRUCTIONS
VP SHINGLE - DO NOT STAPLE OR NAIL
OF CEMENT
LINGLE ROOFING ON ROOFING UNDERLAYMENT- PER
'EC
EL & STICK BRIDGE FLASHING OVERLAP ON TO
DOFING UNDERLAYMENT
x6" CORROSION RESISTANT BASE FLASHING - PER
'EC
ARE -ENGINEERED WOOD TRUSSES SEE STRUCTURAL AND
TRUSS DRAWINGS FOR SPACING AND CONNECTION
DETAILS
NOTE ALL ROOFING MATERIAL (PER ELEVATION) SHALL BE
INSTALLED PER MANUFACTURER'S INSTALLATION
INSTRUCTION. VERIFY ROOF SHEATHING WITH STRUCTURAL
DRAWINGS
EAVE DETAIL R
OOF PERPENDICULAR TO WALL FLASHING DETAIL
3 N.T.S. FR-012 I D I N G F,I. N.- N T 9 FR-014
NOTE
NAILS NOT DRIVEN FLUSH TO UNDERLAYMENT OR ANY OTHER PUNCTURE OR TEAR IN THE
UNDERLAYMENT MUST BE SEALED WITH ROOFING CEMENT OR ASPHALT- COMPATIBLE SEALANT.
FASTNER OPTIONS 1) FLAT HEAD GALVANIZED ROOFING NAIL, 3/4" MIN, 2) PLASTIC OR METAL
CAPPED GALVANIZED NAIL, 1" MIN. 3) GALVANIZED NAIL THROUGH TIN -TAG.
MIN. 2" HEADLAP REQUIRED
MIN. 6" SIDELAP REQUIRED
7/16" O.S.B. ROOF SHEATHI
UNDERLAYMENT (PER SPEC`
TURN UNDERLAYMENT 1" MII
PRE -FINISHED MTL EDGE FI
TYPICAL ROOFING UNDERLAYMENT
e�e
FRN015 N.T.S.
ROOF COVERING PER SPEC
PRE-ENGINEERED ROOF TRUSS AT
24" OC. w/ EXT. TAIL w/ 1/2"
NOMINAL SHEATHING REFER TO
STRUCTURAL
2x4 OUTLOOKER AT 24" O C.
5/8', TYPE "X' GYP BOARD FOR FIRE
RESISTANCE RATING
DRIP EDGE PER SPEC
FASCIA & FINISH PER SPEC.
EXT. 1/2" FOR DRIP
LAP SIDING INSTALL PER
MANUF. o/BUILDING PAPER
PROVIDE END CAPS AND SEAL ALL
JUNCTIONS PER MANUFACTURER
INSTRUCTIONS
PRE -MANUFACTURED RIDGE OR HIP
RIDGE TYPE LINEAR VENT
RIDGE GAP FOR VENTILATION
PRE -MANUFACTURED RIDGE VENT
SET IN ROOF MASTIC PRIOR TO
EAFPT PPOOFING PER BUILDER
ROOFING UNDERLAYMENT PER
ROOFING MANUFACTURER
REQUIREMENTS
ROOF SHEATHING
ROOF FRAMING PER FRAMING PLANS
INSTALL SHINGLES AS REQUIRED
PER ROOF MATERIAL
MANUFACTURER REQUIREMENTS
DURA-RIDGE
OPTION #1 SHINGLE ROOFING PER BUILDER
ROOFING UNDERLAYMENT PER
ROOFING MANUFACTURER
REQUIREMENTS
ROOF SHEATHING
ROOF FRAMING PER FRAMING PLANS
FIRE RATED EAVE DETAIL FIRE RATED RAKE DETAIL RIDGE, SHINGLES
�J N.T.S. FR 012 �J NCTeS. FR-012 \� NSTS. FR 026
FRN025
SHINGLE ROOFING PER BUILDER
VERIFY REQUIRED CLEARANCE PER
ROOF MANUFACTURER REQUIREMENTS
NO FASTENERS WITHIN C OF
CENTERLINE
EXTEND SHINGLES MIN 12" PAST
VALLEY CENTERLINE
WEAVED ROOFING UNDERLAYMENT
PER ROOFING MANUFACTUER'S
RECOMMENDATIONS 0 / 36" WIDE
BITUMINOUS MEMBRANE OR ROLL
ROOFING
ROOF SHEATHING
$ CLOSED VALLEY
N.T.S. FR-027
Q
^c'
W
W
r
Z
N
O
OJ_
v
rn
(D
U
(`D
aI z;
E U) >
Z
=
ca
>
O
2
O
aI Er m
N
Z_
�
a) (D Lo L
QU
a)
IL > 00
= U)
E
O CaO
Q
< N
Q
2
0
C
O
Q
RELEASE DATE: 10/22/2 221
REVISIONS:
U)
0
CD
ZCD
°~
z
QO
W N
J p
W Y
U)
I
J 00
J
Z
(D ;Y
W
Q-
Z
(�
z
—Q
oY
rn�
2
oU
2
M
U
F
L-
JDE # L270
VERSION:1.0w
SHEET DETANAME
ILS
SHEET #
DTL-1