Loading...
HomeMy WebLinkAbout2022-09-16 COMPASS Communities in Motion 2050 Development Checklist The Community Planning Association of Southwest Idaho (COMPASS) °erla^°Rd is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2050 (CIM 2050), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance l , :,....�.•.. rya: .;`; o Vicloy Rd document based on CIM 2050 goals. J a Development Name: Klein Huis 9 AL7 = V CIM Vision Category: Existing Neighborhood New Jobs: 0 .., CIM Corridor: Victory Road New Households: 134 Safety Economic Vitality aIIIIo Level of Stress measures how safe and These tools evaluate whether the comfortable a bicyclist or pedestrian location of the proposal supports would feel on a corridor and considers economic vitality by growing near multimodal infrastructure number of existing public services. vehicle lanes and travel speeds. Activity Center Access Pedestrian level of stress Farmland Preservation Bicycle level of stress Net Fiscal Impact Within CIM Forecast $ Convenience Quality of Life Residents who live or work less than Checked boxes indicate that additional 1/2 mile from critical services have information is attached. more transportation choices, especially for vulnerable populations. Active Transportation Nearest bus stop Automobile Transportation Nearest public school Public Transportation ✓ Nearest public park Roadway Capacity Improves Does not improve or Reduces performance reduce performance (*) performance Comments: Communities in Motion 2050 ACHD's Capital Improvement Plan shows that Victory Road is planned 2020 Change in Motion Report to be widened to 3 lanes between 2031-2035. The Kuna Express Bus Development Review Process Route, tentatively planned for late 2025, would run along South Stoddard Road, about 0.25 miles from the development. Also, note Web: www.compassidaho.org that the development creates an additional access point on State Email: info@compassidaho.org Highway 69 within 0.25 miles of an existing intersection. Consider /A,,� C Q M PASS accessibility in house design to allow persons with limited mobility .� COMMUNITY PLANNIN&ASSOCIATION access to future transit. 1 °f So h,e 1d,h, Sent: 9/16/22 Public Transportation Infrastructure Providing safe and comfortable transit stops and appropriate amenities can make public transportation a more convenient and competitive option, reduce the overall cost of housing + transportation, and expand the potential customer base for businesses. While stop location and spacing will depend on the circumstances of the route, there are some general guidelines to improve the user experience: Locate bus stop amenities in areas that are expected to generate the most ridership, such as near employment centers, residential areas, retail centers, education centers, or major medical facilities. Provide sidewalks and/or bike paths designed to meet the needs of all users (including elderly, children, and individuals with disabilities) to connect development to transit stops. Provide bicycle parking that includes covered bike racks at transit stops; ensure it does not conflict with vehicular or pedestrian travel. Provide shelters, benches, trash receptacles, lighting, and landscaping to enhance the overall comfort and attractiveness of transit; ensure amenities do not block pathways, sidewalks, or bike lanes. Include doors with 32 inches of clear passage space, and at least one zero-step entrance and ✓ accessible bathroom on the main floor to support those with limited mobility. Join the Valley Regional Transit group pass program: https://www.val leyreciionaltransit.org/ci roup-pass-proci rams Use Valley Regional Transit's Bus Stop Location and Transit Amenities Development Guidelines for siting new bus stops and reviewing current and bus stops. Fiscal Impact Analysis Supplemental for the Development Review Checklist The purpose of the fiscal impact analysis is to better estimate expected revenues and costs to local governments as a result of new development so that the public, stakeholders, and the decision- makers can better manage growth. Capital and operating expenditures are determined by various factors that determine service and infrastructure needs, including persons per household, student generation rates, lot sizes, street frontages, vehicle trip and trip adjustment factors, average trip lengths, construction values, income, discretionary spending, and employment densities. The COMPASS Development Checklist considers the level of fiscal benefits, how many public agencies benefit or are burdened by additional growth, and how long the proposal will take to achieve a fiscal break-even point, if at all. More information about the COMPASS Fiscal Impact Tool is available at: www.compassidaho.org/prodserv/fiscaIimpact.htm Overall Net Fiscal Impact Net Fiscal Impact by Agency O City County O Highway District O School District Break Even: 2 years