Loading...
HomeMy WebLinkAboutContract Agreement with DC Engineering for Meridian Water Department PRV SCADA .. . .:.. . . ... . . .. ... .:.......:. . . ..: .. ... . ... ..:. .. . . . . .. .. .... .. .: . .. . . . . .... .. ...... . City of Meridian...... ..... .... Public Works Dept. .... .. .. Memo RECEIVED JAN t 9 2006 - G/TY OF M CITY CLERKERIDJAN OFFICE To: Will Berg; Tara Green From: Kyle Radek, P~E., Staff Engineer f4C- CC: File Date: 1/19/05 Re: Execution of Contract with DC Engineering The attached contract with DC Engineering for installation and programming of remote terminal units at 8 pressure reducing valves was approved for signature at the January 17 City Council Meeting. I have attached the original document and a copy that has the correct signature block copied on to it. The intent is to have the mayor sign the copy, unless the signature block on the original is acceptable or can be modified~. Please have the document signed and return to me or call me at 898-5500 if the document I signature block is not acceptable. . Page 1 ::::;,C ENCJ/NEE'R//\/CJ 440 E. Corporate Drive Suite 103 Meridian. Idaho 83642 Phone: 208.288.2181 Fax: 208.288.2182 January 3, 2006 Mr. Len Grady City of Meridian Public Warks 660 E Water tower Suite 200 Meridian, ill 83642 Subject: Meridian Water Dept PRY SCADA Mr. Grady, Thank you very much for the opportunity to propose on the PRY SCADA installation and prograrrnning for the City of Meridian Water Dept The following is our proposed Scope of Service based on the information that you have provided to us and the site visits with Custom Eiectric. Project Understanding We understand that this project will mclude the installation and W onderware programming of the RTUs at 8 PRV locations. The PRY at 41ocations have an existing non-operational RTU and the other 4 will require a new RTU and programming. Electrical Engineering · Determine the Electrical Service requirements. · Coordinate the power facilitation with !pea for all 8 RTU locations. · Develop installation drawings for required locations includ.ing specification of electrical equipment · Coordinate with Custom Electric for the installation of a new RTU at 4 locations. · Co.mplete the .programming at all locations. &fi! Deliverables · 90% review documents · Construction documents incorporating review comments. Schedule · DC Engineering has a capable staff that can start immediately. It is anticipated to take approximately 2 weeks to develop 90% review documents once authorization to proceed has been given. Excluded · All cost associated with and installation of electrical equipment 1 DC Engineering Fee The project will be performed on time and material basis not to exceed $4,950 (Four Thousand Nine Hundred Fifty Dollars). Services will be billed per our standard rate of compensation as follows: · Principal Engineer, PE: $95 per hour · Project Manager: $90 per hour · Engineer: $80 per ho~ · Designer: $70 per hour · Drafting: $50 per hour · Clerical: $35 per hour · Reimbursable expenses will be billed at cost plus 10 percent. (For example: reproduction drawings, shipping expenses, etcetera.) 1 ~ Thank you again for the opportunity to work with you. If you bave any questions7 or require additional information, please do not hesitate to ask Sincerely., // I' ;' // DC ENGINEERING, P.C. // tA 13-~~ Clay Bingham Project Manager Accepted by: Name: Approved by City Council: 01-1-'.- Qip (date) 4 ~f~; Attest · William G. Berg, Jr., City Cle [CORPORATE SEAL] 2 DC Engineering f:::jC E/vC:;//vEER//vC::; 440 E~ Corporate Drive Suite 103 Meridian, Idaho 83642 Phone: 208.288.2181 Fax.: 208~288.2182 January 3, 2006 Mr. un Grady City of Meridian Public Works 660 E Water tower Suite 200 Meridian, II) 83642 Subject: Meridian Water Dept. PRY SCADA Mr~ Grady, Thank you very much for the opportunity to propose on the PRY SCADA installation and programming for the City of Meridian Water Dept The following is our proposed Scope of Service based on the information that you have provided to us and the site visits with Custom Electric. Project Understanding We understand that this project will include the installation and Wonderware programming of the RTUs at 8 PRY locations. The PRY at 41ocations have an existing non-operational RTU and the other 4 will require a new RTU and programming. Electrical Engineering · Determine the Electrical Service requirements. · Coordinate the power facilitation with ll'CO for all 8 RTU locations. · Develop installation drawings for required locations .including specification of electrical equipment. · Coordinate with Custom Electric for the installation of a new RTU at 4 locations. · Complete the programming at all locations. Deliverables · 90% review documents · Construction documents incorporating review co.mments. Schedule · DC Engineering has a capable staff that can start immediately. It is anticipated to take approximately 2 weeks to develop 90% review documents once authorization to proceed has been given. Excluded · All cost associated with and installation of electrical equipment. DC Engineering Fee The project will be performed on time and material basis not to exceed $4,950 (Four Thousand Nine Hundred Fifty Dollars). Services will1Je billed per our standard rate of compensation as follows: · Principal Engineer, PE: $95 per hour · Project Manager: $90 per hour · Engineer: $80 per hour · Designer: $70 per hour · Drafting: $50 per hour · Clerical: $35 per hour · Reimbursable expenses will be billed at cost pluslO percent. (For example: reproduction drawings, shipping expenses~ etcetera.) Thank you again for the opportunity to work with you. If you have any questions, or require additional information) please do not hesitate to ask. Sincerely, DC ENGINEERING, P.C. //.,./ Accepted by: ~t. Clay Bingham Project Manager Printed Name Title Date 2 DC Engineering