HomeMy WebLinkAboutJulie Rivers - Engineer Statement V1CUEIDR IAy
APPROVED
DATE 09/09/22
FILE NUMBER: FPS-za2z- —
Seth Oaks
Land Development Supervisor
City of Meridian Community Development
33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
RE: Sawtooth Landing Office Condominiums (Sugarman Subdivision)
GROUNDWATER ELEVATIONS
Dear Seth:
l
THE
GATEWAY
(�•
LANGDON
MAPPING
GROUP
INC.
J•U•B ENGINEERS, INC.
J-L-B FAMILY
OF COMPANIES
A geotechnical evaluation for the project site was performed by Atlas Technical Consultants, LLC
(Elizabeth Brown, PE) with subsurface soil information summarized in their report dated February 8, 2021.
According to the reports, seasonal high groundwater can be anticipated at depths greater than 3-feet
below the existing ground surface. Based on the information provided in the geotechnical report, the
roadway finished grade centerline elevations were designed to be more than 3-feet above the anticipated
groundwater elevations.
Please feel free to contact me at 208-932-4486 if you have any questions.
Sincerely,
J-U-B ENGINEERS, Inc.
Greg AndAson,
Project Engineer