Loading...
C-500_Details (2) V1�J APPROVED fJ•U _ P/E � P/E � .•.vna,a o �u oo,. *VARIES* 90' '>11 J-U-B ENGINEERS, INC. U 1_ Z : N 3.� ryp 5' *VARIES* *VARIES* *VARIES* gyp t M O M CONCRETE CURB AND GUTTER �.� Ch E PER ACHD SUPPLEMENT TO LLl " O o 2% MAX - 2% ISPWC SD-701 TYP. 2% 2% MAX 180' U Z_ 0 Q) 00 77 PERFORATIONS IN VALLEYS 3/8" LEYS OF CD - � cm '��� '•: : ; •• CORRUGATED PIPE 5 EA. .. a . a .. 3 ILL]N 0 ASPHALT, 1/2' CONCRETE SIDEWALK Iyp C ITO O CONCRETE SIDEWALK PER ACHD SUPPLEMENT TO ISPWC SD-709 �����V� �� MIXPG. 58-28-3 SUPPLEMENT ISPWC SD-709 TYP. N Typ 95% COMPACTED SUBGRADE 6" OF 3/4" CRUSHED GRAVEL PERFORATION SCHEDULE PER ASTM D698 18" OF 6" MINUS PIT RUNO_L8" TYPICAL PRIVATE ROADWAY SECTION SCALE: N.T.S. 1 SCALE: N.T.S. 00 SVONAL FN G/,f FS��CENSLJ F w Z 0 6 DfC) VARIES SEE PLANS a- Os�gP pP�o�i 999g1DS. Q SEEPAGE BED NOTES: M 5, Z 1. REFER TO ACHD BMP-20 FOR SEEPAGE BED DETAILS AND SPECIFICATIONS. 0 00 7/14/2022 2. ACHD REQUIRES ELECTRONIC MARKERS AT ALL CORNERS OF UNDERGROUND INFILTRATION O U�T N WELL -A- SYSTEMSrl:. CONTRACTOR TO COORDINATE WITH ACHD INSPECTION FOR PLACEMENT OF MARKERS DURING CONSTRUCTION AND PRIOR TO BACKFILLING. MARKERS ARE SUPPLIED BY ACHD AT A COST OF $20.00 PER MARKER. FEE SHALL BE PAID PRIOR TO RECORDING FINAL PLAT. 4. CONTRACTOR SHALL PERFORM PERCOLATION TESTING AT PROPOSED UNDERGROUND INFILTRATION n CVQTCAA 1 rATIn NIc r DPInR TO crART nr nnlcTGl IrTIn NI KInTICV Arun IKlcCl� orrnAA W01 II�C o a z w o; Hww� � o a o F o I I ¢ NOTE: LO INSTALL SOLID CAP AT END PRIOR TO TESTING. o 71 w m < SEE PLANS FOR EXACT LOCATIONS N OF PERFORATED PIPE c) Z , J m m OF WELLS, THIS DETAIL ONLY n 5. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF GROUNDWATER IS ENCOUNTERED WITHIN a m o SHOWS THEM FOR REFERENCE. 12" MIN. 3 FEET OF THE BOTTOM DESIGN ELEVATION FOR ANY UNDERGROUND INFILTRATION SYSTEM X WELL 'A' MAY BE LOCATED ON FACILITY AND/OR IF IT IS HIGHER THAN ANTICIPATED. o � z o' ' m a EITHER END OF SEEPAGE BED. z_ a 3 SAND AND GRESE TRAP PER ISPWC SD-624. 6. MAXIMUM DESIGN INFILTRATION RATE OF 1 IN/HR PER THE GEOTECHNICAL EVALUATION DATED 3 , � z w c. z O MAY BE REPLACED WITH _ ? OBSERVATION WELL NOVEMBER 2021 PREPARED BY GEOTEK, INC. o a w o J o> Ln CATCH MANHOLE (ISPWC SD-611) IF 100-YR WRAP TOP AND SIDES OF 3 18" PERFORATED PVC Z w g w PER ACHD d SUPPLEMENT TO 7. FOR UNDERGROUND INFILTRATION SYSTEMS IN THE ACHD RIGHT-OF-WAY, NO TREES MAY BE w w w o T' � `� � > u ¢ z o FLOW RATE IS LESS TRENCH WITH GEOTEX c-soo PERFORATIONS IN TOP 401 OR ( Z_ d in ISPWC SD-627 PLANTED WITHIN 10' OF THE SYSTEM N w o w m p x r a a THAN 0.5 CFS SIMILAR PER ACHD BMP-20 HALF OF PIPE) o F ir 0-as N o 0 8. FOR UNDERGROUND INFILTRATION SYSTEMS IN A COMMON LOT, NO TREES MAY BE PLANTED = 0 3 U) ABOVE THE SYSTEM OR WITHIN 10'. z m ° wo a�w0 NATIVE BACKFILL%�/./���% 9. EXTERNAL OBSERVATION WELL SHALL BE LOCATED EITHER ON THE OPPOSITE SIDE OF THE STREET OR AT LEAST 50' FROM THE UNDERGROUND INFILTRATION SYSTEM. WELL SHALL EXTEND TO AN w m a SOLID WALL PVC PIPE _ } = I ELEVATION 3' BELOW THE BOTTOM ELEVATION OF THE UNDERGROUND INFILTRATION SYSTEM. a � co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ Y 0 0 0 0 0 0 0 0 0 0 0 0 0 12. WOVEN FILTER FABRIC SHALL BE GEOTEX 401 OR OTHER MEETING STANDARDS IN ACHD SECTION Z cr m= a i o _ I 8202.23, BMP-20. _ ~ = Z ° �o nam ILL in - - 5' MIN -- - - - - - - --;- - - - - - -- - - - -ri I COVER REQUIREMENTS FOR SEEPAGE BEDS WITHIN PARKING LOTS: z _ _ _ _ _ _3/a° 2° CRUSHED, ANGULAR, WASHED DRAIN ROCK � � � � � 13. A MINIMUM 1.0-FT COVER FROM TOP OF BED TO PAVEMENT SUBGRADE IS REQUIRED 5' MIN. _ _ _ _ _�� _ _ � _ _ � _ _ _-_ _ _ � _ _ _ _ _ _ _ _�� _ _ _ �� --BACKFILL OVER BED TO SUBGRADE WITH 6"-8" MINUS PIT RUN o + I --WOVEN GEOTEXTILE FABRIC REQUIRED OVER TOP OF BED FOOT _ --TOP OF BED UNDER SIDEWALK SHALL BE MIN 1.0-FT BELOW PAVEMENT SUBGRADE O MAXIMUM _ - PLATE 0 a GROUNDWATER TYP. 14. IF < 1.0-FT COVER FROM TOP OF BED TO SUBGRADE, ANGULAR" TO 2" ROCK IS REQUIRED z • ELEVATION (15 -20) o r7 WITH MINIMUM 50% SINGLE FRACTURED FACE IN PLACE OF 2" DRAIN ROCK. Lu d w BELOW EXISTING FILTER SAND IN ACCORDANCE WITH ISPWC SECTION 801 OR GRADE 15. FULL ROADWAY SECTION IS REQUIRED OVER SEEPAGE BEDS. SEEPAGE BEDS SHALL NOT EXTEND LL ASTM C-33, WHICHEVER IS ABOVE SUBGRADE. Lu z w MORE STRINGENT EXTERNAL OBSERVATION WELL 16. THE DESIGN PROFESSIONAL IS SOLELY RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE 0 z PER ACHD SUPPLEMENT TO OF THE SUBGRADE SOILS AND DETERMINING THE DEPTH OF FOUNDATION STONE. m ISPWC SD-627. SEE NOTE 10 0 SEEPAGE BED SECTIONLu 2 w w SCALE: N.T.S. Lu J 0 a z Q z LL w I-_ Lu w o LL z m J Y W 0 a� m 0 w W aZD w w Z w w 0 m � c Z L Z w J U FILE : 10-20-143_C-500 U m ¢ JUB PROJ. # : 10-20-143 awDRAWN BY: JGC DESIGN BY: DSM a o o O CHECKED BY: DSM a o n ONE E INCH AT FULL SIZE, IF NOT ONE v INCH SCALE ACCORDINGLY LAST UPDATED: 7/15/2022 o N N SHEET NUMBER: N N C-500 o -� o� a o