HomeMy WebLinkAboutACHD Comments
"
i -~- f--'-
<~--~
.At'f ~ -~"""7;J; ~ ~
C1'>~D ~
\\~ 1.~U~ (h~ut-:(õ ~u-
f\'{ \ ~ .. " ,.,¡
'" ~ß\.~{[~G
VØO 8L ~O
John S. Franden, President
Carol A. McKee, 1st Vice President
Dave Bivens, 2nd Vice President
Sherry R. Huber, Commissioner
Rebecca W. Arnold, Commissioner
May 18, 2006
To:
Treehaven, LLC
2242 E. Riverwalk Dr. Ste. 200
Boise, 10 83706
RECEIVED
MAY 2 2 2006
Subject:
MAl -06-004
The Tree Farm
Chinden & Blackcat Rd
C}ty of Meridian
CIty Clerk Office
On May 17, 2006, the Ada County Highway District Reviewed the traffic impact study for the above
referenced project. The attached comments are provided to help assist the decision of the Meridian
City Council in the annexation and rezone request.
If you have any questions, please feel free to contact me at 208-387-6170.
¡;;¡ v. ij
Joseph W. Kunz
Right-of-way & Development Services
CC:
Project file, Utilities
Meridian
Ada County Highway District. 3775 Adams Street. Garden City, ID . 83714 . PH 208-387-6100 . FX 345-7650 . www.achd.ada.íd.us
'f
,---^
Right-ot-Way and Development Services Department
-':.~~ t, "-
~
(h~ut-:(õ ~
May 17, 2006
TO:
City of Meridian Planning Department
FROM:
Lori Den Hartog
Planning Review Supervisor
SUBJECT:
MAl-06-004- The Tree Farm Rezone
Traffic Impact Study Summary and District Staff Comments
A traffic impact study for the proposed development was submitted by Thompson Engineers and
reviewed by District staff. Below is a summary of the submitted information.
. The site will generate 16,400 new vehicle trips per day. Of these 700 will occur during the AM
peak hour and 1,241 will occur during the PM peak hour.
. The site will access the transportation system via Chinden Boulevard (Us 20/26) at two major
locations: Black Cat and a proposed Tree Farm Way intersection across from the Bainbridge
Subdivision.
. The proposed access points comply with ITD access policy for Chinden Blvd. (US 20/26). The
intersections are at Y2 mile spacing.
. The project will be phased. Limits of the phasing have not been determined, but the east end of
the site will be developed first. This means the Tree Farm Way intersection will serve as the
initial access to the site and the Black Cat intersection will be developed as market conditions
permit.
. The intersection of Black Cat Road and Chinden Blvd. will operate at LOS E under 2010
background traffic conditions. Under total traffic conditions, the intersection will fail to operate as
a stop controlled intersection. The intersection will require the installation of a traffic signal and
lane widening to operate at an acceptable level of service.
. The intersection of Tree Farm Way and Chinden Blvd. will operate at LOS C under 2010
background traffic conditions. Under total traffic conditions, the intersection will operate at LOS F.
Based on the assignment assumptions, a signal will be required to achieve an acceptable level
of service.
. The intersection ofTen Mile Road and Chinden Blvd. will operate at LOS F under 2010
background traffic conditions. This assumes that improvements are made to the intersection as
recommended in previous traffic impact studies. Without these improvements, the delay is
significantly higher. If site traffic is added the delay increases.
. The US 20/26 corridor is currently the subject of a corridor study to determine what improvements
are required to accommodate expected regional travel demands. The results of this study will not
be available for several months. A review of COMPASS demographics indicates this
development is in conformance with the assumptions of the study.
'"
--,'.
.
This development provides a local stub road for access to Basco Lane north of the project.
Basco Lane will connect to an internal residential collector road.
Staff Comments:
. The TIS could be underestimating the amount of traffic going east of the site. The TIS has 50%
of the traffic going east. Currently 65% of the traffic is from the east.
. The TIS indicates the need for traffic signals at the site access intersections with Chinden
Boulevard. The applicant will be responsible for the installation costs of those signals.
. When the District reviews the preliminary plat, the need for stub streets to the surrounding
properties will be closely examined. District staff anticipates that there may be a need for three
stub streets to the north, potentially one to the east, and potentially one or two to the west.
There is approximately 1 ,OOO-acres of undeveloped property to the north of this site, below the
rim. It will be critical that this site provides adequate connectivity opportunities to the
undeveloped property.
. The applicant is proposing to construct Black Cat Road through the site where it does not exist
today. District staff anticipates that this roadway, at a minimum, will need to be a collector street.
It may be considered for a 3-lane minor arterial through this site.
. It appears that the applicant is proposing an internal street network of residential collectors and
local streets. Upon receiving a preliminary plat application, the District will review the applicant's
proposal in depth and place conditions on the location and design of the proposed roadways.
These comments are provided to help assist the decision of the Meridian City Council in the annexation
and rezone request. The District will provide detailed comments and conditions upon submittal of a
preliminary plat application.
")
~)
)
Legend
~
lliJ"""..,
',',", '
','",,'
,L,,"::':.'.,..
Estate HDuS¡ng
EØs!o CUs1cm Home<
f,¡S1in~ EsIsIe
SIngle Family HDUSing
SlngIo FørnlyDoæchod (SmoI, Me_..,.
l...-¡¡,Jo!s)
tlll!Styt! Housing
Ufo,ljIoSln¡loFomIly
OJsI',rL!ÞllySFA
T<MmOfnOS
As~stodlMng
V;nage HDuslng
T <Mmomes
Condominium
/I¡>orlmonis
MIxed Uee N!ighborbood Cammen:1aJ
?
!
if
".,.~
í
I
i
..
¡ -'~"k""",., " """""'""
....
'"
i!¡
~h
j'~'
",f ~::r': ::-::,';'
:" '
il!i ~
j,,'
,
'I
,- ,;' "';,)::;:;t~¡
.. .. "" ".:'.'"
I':,,' ,,'::-:r,5i
'",
, ,., .. -'
, , f~~i:~::~~
,. ,>0.
j,
!
,.
.
.
MIxed Use CalMlW1i1y Commen:!al
í"
[1
"
;,
<.,.
." Open Spo¡ae""d Recreation
, ConrnLríI¡P R0<f8o11on Conler
" COIMIOn Open Sp'oO
- Tr;¡iVPath Corridors
""~-"',..,
'J~I>"
¡ ; '1..-:::'-
\, I' ,
, \
i='ò. ,.---,¿,""""'~
" ,EIDer¡.
,AUfW
Pedemi
';Jill
",'
"~
".,,-,,',"~
t...',: '/I' ¡
'I '1:..,1' I
ill, I
-""""C:",,--~
, ~"
"',
"",
binin¡ Vehlrubr ACttSI
Mlxe..d Use N~IRhborhøodC~mmeICI31
Enll)'
II OT)DESION
,-...~.-
~
The Tree Farm
LA
0
N
c
E
p.
T
p
N
Th~ pbn k pnov!dtd (or ßlu.nrol/vt
PUIJIQI., onII'. D"1eMIcns orbnd'
uw k corrctpllUl an k .ubject 10
lIoJbllity a¡ described In lit, Tree Farm
DewlDpm'nt ,~rreemrm.
Scal~: 1:=300'
,m~
,-.. 0 n.... ... "'"
' Deœmber 15, 2005
10."'00>""" ,
c
,'J