HomeMy WebLinkAboutTen Mile Crossing Office Building CZC A-2022-0169 V1`(E IDIAti - E IDIAN =---
IDAHO
APPROVED
DATE: 08/29/22
FILE NUMBER:-0zaoise
Planning Division
Community Development Department
33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
CERTIFICATE OF ZONING COMPLIANCE REPORT
Project Number
A-2022-0169
Project Name
Ten Mile Crossing Office Building
Project Address
2915 W. Excursion Lane
Project Description
Certificate of Zoning Compliance approval to
construct an 8,469 sq. ft. office building on 0.81
acres of land in the C-G zoning district.
Applicant
Glenn Walker, ADP Architects
Assigned Planner
Julia Garofalo, Assistant Planner
Expiration Date
August 29, 2023
Note: This is not a building permit.
Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for Certificate of Zoning Compliance is approved with the conditions
listed below.
NOTE: The proposed building elevations, site plan, and landscape plan for the TM
Crossing Office Building were reviewed and preliminarily approved by the Ten Mile
Crossing Design Review Board. The project was found to be compliant with the TMC
Design Guidelines; therefore, an Administrative Design Review is not required from the
Planning Division for this project. The Ten Mile Crossing Design Review Board
preliminary approval is uploaded to record A-2022-0169 in Project Dox.
Site Specific Conditions of Approval
1. No signs are approved with this application. Prior to installing any signs on the property, the
applicant shall submit a sign permit application consistent with the standards in UDC Chapter
3 Article D and receive approval for such signs.
2. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
3. Upon installation of the landscaping and prior to inspection by Planning Division staff, the
applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A.
4. The approved site plan, landscape plan and/or elevations may not be altered without prior
written approval of the City of Meridian Planning Division.
5. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
6. If any changes must be made to the site plan to accommodate ACHD requirements, the
applicant shall submit a new site plan to the City of Meridian Planning Division for approval
prior to issuance of the building permit.
1 1 P a g e
(E IDS IAN,_
APPROVED
DATE: 08/29/22
FILE NUMBER: a WIDiDD
All ground -level mechanical equipment must be screened to the height of the unit as
viewed from the property line; all rooftop mechanical equipment must be screened as
viewed from the farthest edge of the adjoining right-of-way. This will be verified at the
time of building permit submittal.
The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
9. Prior to Certificate of Occupancy, the applicant shall record a cross-access/ingress-egress
easement to adjoining properties and submit copy of said easement to the Planning Division
in accord with the provisions of UDC 11-3A-3A2.
General Conditions of Approval
1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that
meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14.
2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth
in UDC 11-3A-14.
3. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site. FP H-2016-0099; DA #2016-065448; & PP-12-003.
4. The issuance of this CZC does not release the applicant from any previous requirements of
the other permits issued for the site.
5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
7. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
II. CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before
September 13, 2022, within fifteen (15) days after the written decision is issued, and contain the
information listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.
2 1 P a g e