Loading...
L2.0_Landscape Dtls V1A b li U t r la ri I J PC L DVl APPROVED u�re osrzsrzz I' 3 4 5 WHEN PRESENT: BUD POINT (A MINOR CROOK ROOT FLARE/COLLAR (SWELLING AT SOIL IN THE TRUNK JUST LINE WHERE STEM TISSUE TRANSITIONS ABOVE THE SOIL LINE) INTO ROOT TISSUE) TO BE AT SOIL LINE. TO BE APPROXIMATELY 1 Yz" ABOVE THE SOIL LINE ROOT PROBE PREVAILING WIND DIRECTION SOIL LINE iv _4 REMOVE DEAD/DAMAGED BRANCHES AND 'W^ PRUNE TO INTERNATIONAL SOCIETY OF 1� ) ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN HIGHEST ROOT SHALL BE LEADER!! 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT PROBE AROUND TRUNK .. ("""�"`FFF RUBBER CINCH TIE (APPROX 1"-2" AWAY FROM TRUNK) TO r, 2"x 2" WOOD STAKE (LENGTH AS REQUIRED}DO NOT PENETRATE ROOTBALL. LOCATE HIGHEST ROOTS. % I \` SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION REMOVE BURLAP, TWINE,— CONSTRUCT 2" EARTH BERM AT EDGE OF AND WIRE BASKET FROM n�, I ROOTBALL, FILL TREE RING W/ MULCH, AS TOPy OF ROOTBALL, < , SPECIFIED. REMOVE ALL NAILS, TIES, wN w AND PLASTIC FROM _ O e' 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY ROOTBALL. IF N w O Z \ ,/" ".v_ FROM TRUNK. SYNTHETIC BURLAP IS of O 9 UTILIZED TO WRAP THE p J 00 FINISH GRADE ROOTBALL, IT SHALL BE w V COMPLETELY REMOVED. Q w ���A//A/ / AA//AA VA//A // CIAL SLOW RELEASE FERTILIZER TABLETS ONLY BIODEGRADABLE /A//AA/ a A/VA/VA/ \ VA/V/ \ VA/VA / /VA/VA/ BURLAP SHALL BE LEFT Co j ON THE BOTTOM OF THE \\ SIDES OF HOLE ROUGH &UNEVEN ROOTBALL. V /�/ III=1 _ = BACKFILL WITH APPROVED TOPSOIL AND SOIL AMENDMENTS AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, WIDTH WIDTH WIDDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL, DO NOT OVER COMPACT!! 3' MIN. DIA. TREE ING SET ROOTBALL ON NATIVE, UNDISTURBED NOTES: SAIL 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION' HOWEVER THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICH EVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. CONIFEROUS TREE PLANTING WHEN PRESENT: BUD POINT (A MINOR CROOK ROOT FLARE/COLLAR (SWELLING AT SOIL IN THE TRUNK JUST LINE WHERE STEM TISSUE TRANSITIONS ABOVE THE SOIL LINE) INTO ROOT TISSUE) TO BE AT SOIL LINE. TO BE APPROXIMATELY 1 7 Y2" ABOVE THE SOIL LINE /ROOT PROBE FIN 12 SOIL LINE HIGHEST ROOT SHALL BE o 2" MAXIMUM BELOW SOIL LINE. UTILIZE SOIL/ROOT o 00 PROBE AROUND TRUNK O (APPROX 1"-2" AWAY FROM TRUNK) TO ° LOCATE HIGHEST ROOTS. 0 w Z O U)O Wmx o nOOLL I ~Q NOT TO SCALE PREVAILING WIND DIRECTION REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL BE REMOVED AND REPLACED. DO NOT REMOVE MAIN LEADER!! RUBBER CINCH TIE 2"x 2" WOOD STAKE (LENGTH AS REQUIRED}DO NOT PENETRATE ROOTBALL SEE NOTE 1. SET STAKES PARALLEL TO PREVAILING WIND. REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION CONSTRUCT 2" EARTH BERM AT EDGE OF ROOTBALL, FILL TREE RING W/ MULCH, AS SPECIFIED. 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY FROM TRUNK. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM o _ - FINISH GRADE TOP % OF ROOTBALL, w \/�Y REMOVE ALL NAILS, TIES, m " VA/�//VA/ /A V //V //V// /V / / \ COMMERCIAL SLOW RELEASE FERTILIZER AND PLASTIC FROM 1 w ////j \� /A /\V/V /\/� TABLETS ROOTBALL. IF SYNTHETIC BURLAP IS - SIDES OF HOLE ROUGH & UNEVEN UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE BACKFILL WITH APPROVED TOPSOIL AND COMPLETELY REMOVED. _I SOIL AMENDMENTS AS SPECIFIED. ONLY BIODEGRADABLE — BACKFILL IN 6" LIFTS, WATER EACH LAYER, BURLAP SHALL BE LEFT WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL ON THE BOTTOM OF THE OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL, ROOTBALL. T MIN. DIA. DO NOT OVER COMPACT!! TREE RING SET ROOTBALL ON NATIVE, UNDISTURBED NOTES: SOIL 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. 7. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. EXTEND ROOT BARRIER TO 80 % OF MATURE TREE CANOPY. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DECIDUOUS TREE PLANTING NOT TO SCALE W ■ KEEP GROUND LINE SAME AS NURSERY LINE o REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT e p ROOT GROWTH CONSTRUCT 2" EARTH BERM TO FORM A WATER o °o� RETENTION BASIN, FILL BERM WITH MULCH, AS o a Q SPECIFIED MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS I I I I I- PROVIDE DEWITT PRO 5 WEED BARRIER FABRIC OR APPROVED EQUAL =I II II —I. PROVIDE COMMERCIAL FERTILIZER TABLETS AND =1 1- to — — —I BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB III IF -II I,,,II I,I III II;,II I —I. WIDTH OF BACKFILL WITH APPROVED TOPSOIL AND SOIL W 6" ROOTBALL IDOF 6"1 'I AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, WATER EACH LAYER, DO NOT TAMP OR OVER COMPACT. NOTE: CONSTRUCT 6" MOUND OF TOPSOIL 1. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. SHRUB PLANTING NOT TO SCALE 'A' ,A' A = LENGTH, AS SPECIFIED OR PER PLANT SCHEDULE B=85% OF'A' PLAN VIEW FINISH GRADE PER PLANS EDGING, PER PLANS AND DETAILS GROUNDCOVER PLANTING PER PLANTING PLAN MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO NOT COVER CROWNS OF PLANTS j/�Aj�AjA j/�Aj/�A jAjAAAVA�A///VA SPLIT ALL ROOT BOUND ROOTS WITH 3 EQUAL \//\\/\\//\\//\//\\//�/\\/\\//\\ \/\\ SPACED VERTICAL CUTS. 1=1 / ! //i / !i !i TILL SOIL TO A DEPTH OF 12", BACKFILL WITH IIIIIIIII=III APPROVED TOPSOIL AND SOIL AMENDMENTS, AS III=III=III—III=III=1=111= SPECIFIED. DEWITT Ililllll�,lll—lit— SECTION APPROVEDOEQUAL D BARRIER FABRIC OR NOTES: SDBGRADE 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER BEDS. PERENNIAL & GROUNDCOVER PLANTING NOT TO SCALE 3" DEPTH OF MULCH AT PLANTER BEDS 8" r' APPROVED TOPSOIL AND SOIL —I -- —III— FINISH GRADE, AMENDMENTS AS SPECIFIED PER PLANS CUT EDGE PLANTER BED CUT EDGE (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE 18" PROVIDE CONSISTENT 18" RADIUS SINGLE LOOP BIKE RACK AS SPECIFIED. CONCRETE FLATWORK PER PLANS - z AGGREGATE BASE AS 111-11 111=M M— — SURFACE MOUNT PER —III=III-11 III ,,,III MANUFACTURES RECOMMENDATIONS SECTION VIEW 2'-6" O.C. TYPICAL }} iN F 1 EDGE OF CONCRETE .p .° SINGLE LOOP BIKE RACK ° - AS SPECIFIED. " - CONCRETE FLATWORK PER PLANS PLAN VIEW BIKE RACK 1 2 3 4 5 7 m m Scale: 3/4"= V-0" 2 0 P STAMP: ...••• OFI••�� •�P�E • D. I iA - 1027 • SCP4� •'� DATE: 6/22/2022 ::] >WIYW y W x NWO�Oj� ��/ �p jQI�QCWIu w u u > o @ m o 3 CA: a-,I� U QI o o moo ' Q -9 w - v W N M A o 0 o �_ u Q li Q" a u Q 3 G M Oul U) Q m �I O u mvisIs am a� Id go Copyright © 2022 cenm rem unl _.M abject b—in.l --- REVISIONS: No. Date Description v w r 00Q Wiz aw� U Az zw a DRAWN BY: JR5 CHECKED BY: JDR PROJECT NUMBER 22-20 �] SHEET: L2.0 U N U a 0 A E G H J K L M N