Loading...
HomeMy WebLinkAboutC9.1_Storm Drain Details V1E APPROVED W ~ 00 U J 08/22/22 z z0 J � O H SAND AND GREASE TRAP (ACHD BMP #01). SEE DETAIL 2 THIS SHEET. OVEREXCAVATE A MINIMUM OF 2' INTO FREE DRAINING MATERIAL (SEE TABLE FOR PERC RATE) AND BACKFILL WITH 6" MINUS PIT RUN OR ASTM C33 FILTER SAND SAND AND GREASE TRAP (ACHD BMP #01). SEE DETAIL 2 THIS SHEET. INLET PIPE PER PLAN O O 50' MIN. O`\ OBSERVATION WELL PER ACHD SD-627 OBSERVATION WELL PER ACHD SD-627 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • C • • • • • 18" ADS, HOPE OR PVC PERFORATED PIPE. PERFORATIONS IN TOP HALF ONLY. ASTM C33 FILTER SAND PROFILE VIEW PORTION OF OBSERVATION WELL LYING IN DRAINAGE SAND MUST BE WRAPPED WITH TYPE I DRAINAGE GEOTEXTILE PER ISPWC SECTION 2050. 18" PERFORATED PIPE WITH PERFORATIONS TOP HALF ONLY �n WRAP TOP AND SIDES OF TRENCH IN NON -WOVEN FILTER FABRIC. SEAMS SHALL OVERLAP A MINIMUM OF 1'. ESTIMATED HIGH GROUNDWATER NOT ENCOUNTERED uj 0uj z3 O 0 Q z K 0 QO w c� � J zz go MV) 12" INLET PIPE PER PLAN SAND AND GREASE TRAP (BOISE VAULT OR APPROVED EQUAL WITH BAFFLES) SIZE PER TABLE 12" INLET PIPE PER PLAN PROFILE VIEW PLAN VIEW RINGS AS REQUIRED X.) SET RIM FLUSH DISHED GRADE B" OUTLET PIPE PER PLAN NO DETAIL 1 THIS SHEET 24" DIA. TRAFFIC RATED FRAME AND COVER PER 1TLET PIPE PER PLAN AND DETAIL 1 THIS SHEET SAND AND GREASE TRAP TABLE STRUCTURE NAME SIZE RIM ELEV. INV. ELEV. IN BAFFLE "B" ELEV. BAFFLE "C" ELEV. INV. ELEV. OUT SG TRAP #1-1 1000 GALLON 2761.03' 2755.15' 2755.05' 2754.55' 2754.30' SG TRAP #2-1 1500 GALLON 2763.21' 2757.00' 2756.90' 2756.40' 2756.15' SG TRAP #3-1 1000 GALLON 2764.45' 2760.85' 2760.75' 2760.25' 2760.00' SAND AND GREASE TRAP DETAIL (ACHD BMP #01) r2_� SCALE: NOT TO SCALE C9.1 PLAN VIEW 5' MIN. OBSERVATION WELL PER ACHD SD-627 NOTES 1. ACCORDING TO THE PROJECT GEOTECHNICAL REPORT PREPARED BY ATLAS TECHNICAL CONSULTANTS LLC DATED SEPTEMBER 15, 2020, GROUNDWATER WAS NOT ENCOUNTERED DURING GEOTECHNICAL EXPLORATION. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF GROUNDWATER IS ENCOUNTERED WITHIN 3-FEET OF THE BOTTOM DESIGN ELEVATION FROM ANY INFILTRATION FACILITY AND/OR IF IT IS HIGHER THAN ANTICIPATED. 2. REFER TO ACHD BMP 20 FOR ADDITIONAL INFORMATION REGARDING SEEPAGE BED CONSTRUCTION. 3. ACHD STAFF MUST VERIFY FACILITY INFILTRATION RATE AFTER FACILITY IS FULLY EXCAVATED. 4. IF ROCK IS ENCOUNTERED DURING FACILITY EXCAVATION, CONTRACTOR TO HAVE TEST PERFORMED BY SOILS ENGINEER AFTER SEEPAGE TRENCH IS FULLY EXCAVATED. IF THE PERCOLATION TEST IS LESS THAN SPECIFIED BY THE SOILS REPORT AND ENGINEER, CONTRACTOR MAY NEED TO BLAST OR BORE TO CREATE CONDUIT FOR DRAINAGE TO OCCUR OR REDESIGN THE SYSTEM TO ACHIEVE THE REQUIRED INFILTRATION. ELECTRONIC MARKERS PLACED ON CORNER OF FACILITY, TYP. COORDINATE WITH ACHD INSPECTION STAFF FOR PLACEMENT OF MARKERS DURING CONSTRUCTION PRIOR TO BACKFILLING. SEEPAGE BED TABLE SEEPAGE BED NO. SEEPAGE BED DIMENSIONS TOP OF ROCK ELEV. BOTTOM OF ROCK ELEV. BOTTOM OF SAND ELEV. PERF. PIPE INVERT PERF. PIPE DIAMETER 100-YEAR VOLUME DESIGN INFILTRATION RATE ACHD SEEPAGE BED #1 20'Wx93'Lx10'D 2759.00' 2749.00' 2747.50' 2754.30' (18") 2755.75' (12") (1) 18" (1) 12" 8,720 CF 8 IN/HR ACHD SEEPAGE BED #2 15'Wx65'Lx10'D 2760.50' 2750.50' 2749.00' 2756.15' (1) 18" 4,534 CF 8 IN/HR ACHD SEEPAGE BED #3 14'Wx62'Lx11'D 2763.00' 2753.00' 2751.50' 2760.00' (1) 18" 4,426 CF 8 IN/HR SEEPAGE BED DETAIL (ACHD BMP #20) 1 SCALE: NOT TO SCALE C9.1 z 0 a u w O YJ JWI E >�o 6 m c tjN3C- o � yr c r X 0 O rn c Q a O u 0 @1 r� m E m 1 _ J 0 z w DESIGNED: C. GRAHAM DRAWN: L. HAASE CHECKED: C. GRAHAM APPROVED: C. GRAHAM Z O U Z) PREPARED FOR: G20 LLC PO BOX 593 EAGLE, ID 83616 Z O U O LL N 0 O N Lu Z J O CL N j Lu 0 d Q % a Z Z 0 Lu Q O co Z > (% O C Lu Q a cc� N L m 0 C~ G } N Lu d a CSW PROJECT NO. 22001 J Q DRAWING DATE 06/02/2022 0 O ce d d Q C9.1 V