Loading...
HomeMy WebLinkAboutElevation V129' ERIDIANg- APPROVED 082222 EXISTING FRP SCREEN WALL PANEL (TYP.) EXISTING 100' CONCEALMENT TOWER EXISTING TOWER ELEVATION SCALE: N.T.S. TOP OF EXISTING HIGHEST APPURTENANCE ELEV. 100' TOP OF EXISTING TOWER 4 ELEV. 100' EXISTING FRP SCREEN WALL PANEL (TYP.) 1 PROPOSEDT-MOBILE C-00 EQUIPMENT PROPOSED TOWER MODIFICATIONS AND CONCEALMENT DESIGN TO BE INSTALLED BY OTHERS. SEE TOWER NOTE, THIS SHEET PROPOSED T-MOBILE T/ANTENNA Q TO' PROPOSED Tlv !LE RAD CENTER � fifi' PROPOSED T-MOBILE B/ANTENNA t@ 62' PROPOSED TOWER ELEVATION L SCALE: N.T.S. EXISTING 100' CONCEALMENT TOWER EXISTING TOP OF BASE PLATE ATC IS ANALYZING THE ANTENNA MOUNT UNDER ASEPARATE PROJECT. CONSTRUCTION IS NOT TO PROCEED UNTIL THE MOUNT ANALYSIS IS COMPLETE AND INDICATES THE ADDITIONAL LOADING DOES NOT OVERSTRESS THE MOUNT. NOTES: 1. STRUCTURAL MODIFICATIONSAND CONCEALMENT DESIGN PENDING. CONTRACTOR TO ENSURE THAT TOWER STRUCTURAL MODIFICATIONS AND CONCEALMENT DESIGN IS INSTALLED PRIOR TO CONSTRUCTION. 2. PROPOSED FRP DESIGN IS PENDING BY OTHERS. FRP DESIGN MUST BE INSTALLED PRIOR TO CONSTRUCTION, CONTRACTOR TO VERIFY TOWER NOTE: 1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM WITH THE PROJECT MANAGER THAT THEY HAVE THE MOST RECENT VERSION OF THE STRUCTURAL ANALYSIS BEFORE COMMENCING WORK. EXISTING AND PROPOSED TOWER APPURTENANCES, MOUNTS, AND ANTENNAS ARE SHOWN BASED ON THE STRUCTURAL ANALYSIS. 2. WHERE APPLICABLE, ALL NEW ANTENNAS, EQUIPMENT, MOUNTS, CABLING, ETC. SHALL BE PAINTED/SOCKED TO MATCH EXISTING EQUIPMENT IN ACCORDANCE WITH FAA, JURISDICTION, AND/OR OTHER LOCAL REQUIREMENTS. 3. ROUTE PROPOSED CABLES ALONG SAME PATH AS EXISTING CABLES AND IN ACCORDANCE WITH STRUCTURAL ANALYSIS. IF ADEQUATE SPACE EXISTS, ROUTE CABLES THROUGH ENTRY PORT HOLE, UP INSIDE OF MONOPOLE, AND THROUGH EXIT PORT HOLE. IF ROUTING OUTSIDE THE MONOPOLE, ATTACH CABLES USING STAND-OFF ADAPTERS MOUNTED TO TOWER USING STAINLESS STEEL BANDING. ADEQUATELY SECURE CABLES USING EITHER APPROPRIATELY SIZED STAINLESS STEEL SNAP -INS OR MOUNTING HARDWARE AND BRACKETS AS SPECIFIED BY CABLE MANUFACTURER. 4. TOWER ELEVATIONS ARE MEASURED FROM TOP OF BASE PLATE TO MATCH STRUCTURAL ANALYSIS. ELEVATIONS DO NOT REFLECT TRUE ABOVE GROUND LEVEL (A.G.L.) 5. TOWER ELEVATION DEPICTION MAY NOT REFLECT ALL EQUIPMENT INCLUDED IN STRUCTURAL ANALYSIS. REFER TO STRUCTURAL ANALYSIS FOR FULL TOWER LOADING. AMERIGAN TOWEM 1 .i ANN �� fll�lt EN61miNG PRIIIfEE$9QUIS 326 TRYON ROAD RALEIGH, NC 276033530 OFFICE: (919) 66W51 www.lepgroup.net REV. DESCRIPTION BY DATE ,A PRELIMINARY SSK 04/1822 A 90%CONSTRUCTION SSP 06/09/22 DO 100%CONSTRUCTION SRZ O6/23/22 0 L ATC SITE NUMBER: 415255 ATSITE NAME: BOI FOXTAIL ID T-MOBILE SITE NAME: ATC XTAIL SITE DRESS: 6 N IDIAN RD ME I A 836465902 SEAL: 1 cA, \O L Q V a j0 15814 G'p�r�TE OF �yAM M. PNO 0623/22 T Mobile DATE DRAWN I 06123M ATC JOB NO: 14049009 CUSTOMER NAME: ATC FOXTAIL CUSTOMER ID: SLO3609A TOWER ELEVATION SHEET NUMBER: REVISION: C-201 0