Loading...
HomeMy WebLinkAboutL1.0_Overall Landscape Plan V1STORAGE SEMI TRAILER COOP HOSEBIB W. TASA STREET S. SPANISH SUN AVE. W. OVERLAND RD. W. OVERLAND RD. FUTURE S. LINDER RD. FUTURE S. LINDER RD. BUILDING 1 BUILDING 2 LANDSCAPE CALCULATIONS Interstate 84 Street Frontage (~610') 50' setback: Trees Required: One tree per 35 l.f. = 17 trees required. Trees Provided: 18 proposed trees East Perimeter Future Linder Rd (~1,313') 25' buffer: Trees Required: One tree per 35 l.f. = 37 trees required. Trees Provided: 37 trees provided. Southern Perimeter Overland Rd (~833') 25' buffer: Trees Required:One tree per 35 l.f. = 24 trees required. Trees Provided: 23 trees provided. Western lot perimeter future residential (1,018') 25' buffer: Trees Required:One tree per 35 l.f. = 29 trees required. Trees Provided: 29 trees provided. West Tasa Street Frontage (~110') 25' buffer: Trees Required:One tree per 35 l.f. = 4 trees required. Trees Provided: 9 trees provided. South Spanish Sun Ave. Frontage (~560') 25' buffer: Trees Required:One tree per 35 l.f. = 16 trees required. Trees Provided: 17 proposed trees Total Number of Trees / Total Tree Species: 133 / 6 Tree Mitigation: No additional mitigation required. LANDSCAPE NOTES: 1. All plant material shall conform to the American Nurseryman Standards for type and size shown. Plants will be rejected if not in a sound and healthy condition. All plant material shall be Grade #1 or better. 2. All planting beds and tree wells in lawn areas (wells to be 3' in diameter) shall be covered with a minimum of 3" depth of BLACK SOIL-AIDE. Submit sample for approval by Owner. 3. All lawn areas shall be sodded with 100% Turf-type Tall Fescue - provide sample to owner for review and approval. Contractor shall verify and match the variety existing in the adjacent development. 4. Coordinate all plans with Civil drawings for infrastructure requirements. 5. All plant material shall be guaranteed for a period of one year beginning at the date of acceptance by Owner. Replace all plant material found dead or not in a healthy condition immediately with the same size and species at no cost to the Owner. 6. Planting backfill for trees and planting beds shall be 5 parts topsoil and 1 part compost with straw. Stake all trees per details. 7. All seeded or sodded lawn areas shall have 6" of topsoil and all planting beds shall have 12" of topsoil (minimum). Topsoil shall be a loose, friable, sandy loam, clean and free of toxic materials, noxious weeds, weed seeds, rocks, grass, or other foreign material larger than 1" in any dimension, a pH from 5.5 to 7.0. Top soil from site shall be used, if meeting these standards. Place 1/2" compost over all landscaped areas and rototill into top 4". Spread, compact, and fine grade topsoil to a smooth and uniform grade, 1" below surface of walks and curbs in areas to be sodded and 3" in planting bed areas. 8. Fertilize all trees and shrubs with 'Agriform" planting tablets, 21 gram. Quantity per manufacturer's recommendation. 9. Plant material shall not be substituted without the written permission of Owner. Submit names of three suppliers contacted if substitution is requested and plant material specified is not available. 10. Shrub planting beds shall be shovel edged to create a distinct separation of landscape types. 11. Immediately clean up any topsoil, or other debris on site created from landscape operation and dispose of properly off site. GENERAL NOTES: 1. No trees shall be planted within the 10 foot clear zone of all ACHD storm drain pipe structures or facilities. 2. Seepage beds must be protected from any and all contamination during the construction and installation of any landscape/irrigation. 3. All trees to be located a minimum of 5 feet or greater from back of any sidewalk. 4. Install new automatic drip irrigation system to irrigate all new planting areas. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES Call before you dig. Know what's below . R South Landscape Architecture P.C. Dba South Beck & Baird Landscape Architecture P.C. 2002 S. Vista Ave Boise, ID 83705 208.342.2999 Office info@sbbgo.com www.sbbgo.com All rights reserved. Reproduction or use in any form or by any means without written permission of South Landscape Architecture P.C. Dba South Beck & Baird Landscape Architecture P.C. is unlawful and subject to criminal prosecution. No. Date Description THE PROFESSIONAL SERVICES OF THE DESIGN PROFESSIONAL ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF "THE CLIENT" NO CONTRACTUAL OBLIGATION IS ASSUMED BY THE DESIGN PROFESSIONAL FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT. 1 12/8/20 Entrance Sign 2 3/1/21 Revisions 3 7/13/22 ADDENDUMS 4 8/1/22 DR Comments F O S C A P E A R C H I T E C T D N A L D E S N E C I L LA - 276 E T A T S I D A H O G. M I J M I H A N 8/3/22 L1.0 SHEET L1.1 SHEET L1.2 SHEET L1.4 SHEET L1.3 08/18/22 A-2022-0104