HomeMy WebLinkAboutL1.0_Overall Landscape Plan V1STORAGE SEMI TRAILER
COOP
HOSEBIB
W. TASA STREET
S. SPANISH SUN AVE.
W. OVERLAND RD.
W. OVERLAND RD.
FUTURE S. LINDER RD.
FUTURE S. LINDER RD.
BUILDING 1 BUILDING 2
LANDSCAPE CALCULATIONS
Interstate 84 Street Frontage (~610') 50' setback:
Trees Required: One tree per 35 l.f. = 17 trees required.
Trees Provided: 18 proposed trees
East Perimeter Future Linder Rd (~1,313') 25' buffer:
Trees Required: One tree per 35 l.f. = 37 trees required.
Trees Provided: 37 trees provided.
Southern Perimeter Overland Rd (~833') 25' buffer:
Trees Required:One tree per 35 l.f. = 24 trees required.
Trees Provided: 23 trees provided.
Western lot perimeter future residential (1,018') 25' buffer:
Trees Required:One tree per 35 l.f. = 29 trees required.
Trees Provided: 29 trees provided.
West Tasa Street Frontage (~110') 25' buffer:
Trees Required:One tree per 35 l.f. = 4 trees required.
Trees Provided: 9 trees provided.
South Spanish Sun Ave. Frontage (~560') 25' buffer:
Trees Required:One tree per 35 l.f. = 16 trees required.
Trees Provided: 17 proposed trees
Total Number of Trees / Total Tree Species: 133 / 6
Tree Mitigation: No additional mitigation required.
LANDSCAPE NOTES:
1. All plant material shall conform to the American Nurseryman
Standards for type and size shown. Plants will be rejected if not
in a sound and healthy condition. All plant material shall be
Grade #1 or better.
2. All planting beds and tree wells in lawn areas (wells to be 3' in
diameter) shall be covered with a minimum of 3" depth of BLACK
SOIL-AIDE. Submit sample for approval by Owner.
3. All lawn areas shall be sodded with 100% Turf-type Tall Fescue -
provide sample to owner for review and approval. Contractor
shall verify and match the variety existing in the adjacent
development.
4. Coordinate all plans with Civil drawings for infrastructure
requirements.
5. All plant material shall be guaranteed for a period of one year
beginning at the date of acceptance by Owner. Replace all plant
material found dead or not in a healthy condition immediately
with the same size and species at no cost to the Owner.
6. Planting backfill for trees and planting beds shall be 5 parts
topsoil and 1 part compost with straw. Stake all trees per
details.
7. All seeded or sodded lawn areas shall have 6" of topsoil and all
planting beds shall have 12" of topsoil (minimum). Topsoil shall
be a loose, friable, sandy loam, clean and free of toxic materials,
noxious weeds, weed seeds, rocks, grass, or other foreign
material larger than 1" in any dimension, a pH from 5.5 to 7.0.
Top soil from site shall be used, if meeting these standards.
Place 1/2" compost over all landscaped areas and rototill into top
4". Spread, compact, and fine grade topsoil to a smooth and
uniform grade, 1" below surface of walks and curbs in areas to
be sodded and 3" in planting bed areas.
8. Fertilize all trees and shrubs with 'Agriform" planting tablets, 21
gram. Quantity per manufacturer's recommendation.
9. Plant material shall not be substituted without the written
permission of Owner. Submit names of three suppliers contacted
if substitution is requested and plant material specified is not
available.
10. Shrub planting beds shall be shovel edged to create a distinct
separation of landscape types.
11. Immediately clean up any topsoil, or other debris on site created
from landscape operation and dispose of properly off site.
GENERAL NOTES:
1. No trees shall be planted within the 10 foot clear zone of all ACHD
storm drain pipe structures or facilities.
2. Seepage beds must be protected from any and all contamination
during the construction and installation of any landscape/irrigation.
3. All trees to be located a minimum of 5 feet or greater from back
of any sidewalk.
4. Install new automatic drip irrigation system to irrigate all new
planting areas.
CALL 2 BUSINESS DAYS
IN ADVANCE BEFORE
YOU DIG, GRADE, OR
EXCAVATE FOR THE
MARKING OF
UNDERGROUND
MEMBER UTILITIES
Call before you dig.
Know what's below .
R
South Landscape Architecture P.C.
Dba South Beck & Baird Landscape Architecture P.C.
2002 S. Vista Ave
Boise, ID 83705
208.342.2999 Office
info@sbbgo.com
www.sbbgo.com
All rights reserved. Reproduction or use in any
form or by any means without written permission of
South Landscape Architecture P.C. Dba South
Beck & Baird Landscape Architecture P.C. is
unlawful and subject to criminal prosecution.
No. Date Description
THE PROFESSIONAL SERVICES OF THE DESIGN PROFESSIONAL ARE UNDERTAKEN FOR AND ARE PERFORMED IN THE INTEREST OF "THE CLIENT" NO CONTRACTUAL OBLIGATION IS ASSUMED BY THE DESIGN PROFESSIONAL
FOR THE BENEFIT OF ANY OTHER PERSON INVOLVED IN THE PROJECT.
1 12/8/20 Entrance Sign
2 3/1/21 Revisions
3 7/13/22 ADDENDUMS
4 8/1/22 DR Comments
F
O
S
C
A
P
E
A
R
C
H
I
T
E
C
T
D
N
A
L
D
E
S
N
E
C
I
L
LA - 276
E
T
A
T
S
I
D
A
H
O
G.
M
I
J
M
I
H
A
N
8/3/22
L1.0
SHEET L1.1
SHEET L1.2 SHEET L1.4
SHEET L1.3
08/18/22
A-2022-0104