PROJECT INFORMATION
LANDSCAPE REQUIREMENTS
TOTAL PROPERTY SIZE = 535,713.73 SF - 12.29 AC
N. WEBB WAY:
ZONING
679LINEAR FE
WEED ABATEMENT NOTES:
LOT IMPROVEMENTS AREA = 528,560 S.F.
IMDISTRICTTSAREA
22' WIDTH LANDSCAPE BUFFER PROVIDED
BUILDABLE LOT COVERAGE = 293,163 S.F.
20' WIDTH LANDSCAPE BUFFER REQUIRED
HARDSCAPE COVERAGE: 118,641 S.F.
I
REQUIRED TREES - 19
1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED
LANDSCAPE COVERAGE: 115,071 S.F.
PROVIDED TREES - 20
ON THEM PRIOR TO PLANTING OR HYDROSEEDING.
N NUMBER OF PARKING STALLS PROVIDED:
*DOES NOT INCLUDE DRIVE ENTRIES, VISION TRIANGLES OR
2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH "ROUND -UP" (CONTACT HERBICIDE) OR APPROVED
z� 8 STANDARD STALLS
SEEPAGE BED AREAS
EQUAL.
0 COMPACT STALLS
3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14)
0 ADA STALLS
COMMON OPEN SPACE REQUIREMENTS:
DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5)
TOTAL: 8 STALLS
TOTAL SITE AREA: 535,713.73 SF - 12.29 AC
DAYS.
TOTAL NUMBER OF TREES: 68
REQUIRED OPEN SPACE:
5. APPLY SECOND APPLICATION OF "ROUND -UP" TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE
TOTAL NUMBER OF TREE SPECIES: 12; 5 SPECIES
10 % OF TOTAL SITE AREA - 53,571.37 SF
WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7)
PROVIDED OPEN SPACE: 74,451.24 SF
DAYS. REMOVE WEEDS FROM THE SITE.
LANDSCAPE BUFFER R QUIREME TS:
(1)-50'X100' OPEN GRASSY AREA: 5,000 SF
6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE
E. WILSON STREET:
COLLECTOR ROAD PARKWAY (N. WEBB WAY): 28,723.20 SF
DIRECTED TO PERFORM A THIRD APPLICATION.
14 LINEA FEET
STORMWATER FACILITY: 40,728.04 SF
7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE.
1 IDSOVIDED
1 TREE PER 8,000 SF
1 10' WIDTH LANDSCAPE BUFFER REQUIRED
REQUIRED TREES - 9
DRYLAND SEEDING REQUIREMENTS
REQUIRED TREES-6
PROPOSEDTREES-9
PROVIDED TREES -6
PROPOSED QUALIFIED AMENITY: PLAY EQUIPMENT WITH
II "
*DOES NOT INCLUDE DRIVE ENTRY, VISION TRIANGLES OR
ADJACENT SEATING AREA
W
SEEPAGE BED AREAS
II
BUFFER BETWEEN INDUSTRIAL USE:
5`
E. JEWEL STREET:
470 LINEAR FEET
87 LINEAR FEET
20' WIDTH LANDSCAPE BUFFER PROVIDED
4.5' TO 1T WIDTH LANDSCAPE BUFFER PROVIDED
25' WIDTH LANDSCAPE BUFFER REQUIRED
10' WIDTH LANDSCAPE BUFFER REQUIRED
REQUIRED TREES - 13
'
REQUIRED TREES-2
PROVIDED TREES -21
T'
1
PROVIDED TREES-2
'DOES NOT INCLUDE DRIVE ENTRY, VISION TRIANGLES OR
I I
SEEPAGE BED AREAS
*INCLUDES BOTH SIDES OF ROADWAY
E. DRUCKER STREET:
I I
433 LINEAR FEET
10' TO 15' WIDTH LANDSCAPE BUFFER PROVIDED
10' WIDTH LANDSCAPE BUFFER REQUIRED
I I
REQUIRED TREES - 12
PROVIDED TREES - 12
I
*DOES NOT INCLUDE DRIVE ENTRY OR VISION TRIANGLES
I
*INCLUDES BOTH SIDES OF ROADWAY
�, ..
E. WINSLOW DRIVE:
215 LINEAR FEET
2' TO 42' WIDTH LANDSCAPE BUFFER PROVIDED
p]
10' WIDTH LANDSCAPE BUFFER REQUIRED
''
REQUIRED TREES-6
PROVIDED TREES - 6
*DOES NOT INCLUDE DRIVE ENTRY OR VISION TRIANGLES
Z
*INCLUDES BOTH SIDES OF ROADWAY
{ I
N. MEADOWGLEN AVENUE:
NO LANDSCAPE AREA PROVIDED IN DESIGN
REQUIRED TREES - 0
PROVIDED TREES - 0
1
OVERALL LANDSCAPE PLAN
70 0 70 140 210
SCALE: 1 "= 70'-0"
LANDSCAPE NOTES:
1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR
PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK.
2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN
APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED
PLANT MATERIALS CAN NOT BE OBTAINED.
3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS.
4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO
CONSTRUCTION START-UP.
5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS.
6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE
SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE
QUANTITIES AND CALL OUT SYMBOL NUMBERS.
8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF CASCADE COMPOST (2" MINUS).
SUBMIT SAMPLE FOR APPROVAL.
9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF
ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY
CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER.
10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE
DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN.
11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER
1000 SQUARE FEET, ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL,
12. FERTILIZE ALL TREES AND SHRUBS WITH'AGRI FORM' PLANTING TABLETS. QUANTITY PER
MANUFACTURER'S RECOMMENDATIONS.
13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM
12" DEPTH OF TOPSOIL. SPREAD COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE
3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF
SOD AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS.
14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN
QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM.
PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS.
TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS
WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF
ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS CONTRACTOR IS RESPONSIBLE TO EITHER:
A) PROVIDE APPROVED IMPORTED TOPSOIL, OR
B IMPROVE ON -SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT.
15. IF IMPORTED TOPSOIL FROM OFF -SITE SOURCES IS REQUIRED ENSURE IT IS FERTILE FRIABLE NATURAL
LOAM SURFACE SOIL REASONABLY FREE OF SUBSOIL CLAY LUMPS BRUSH WEEDS AND OTHER LITTER
AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER
EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS
TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL -DRAINED
SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES.
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL
TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING
AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE
BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION.
ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6.
16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE
OPERATIONS AND DISPOSE OF PROPERLY OFF SITE.
17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES,
OR FACILITIES.
18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE
CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM.
19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
IRRIGATION NOTES:
1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES
COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE
IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO ZONES.
3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND 18" AT
PLANTER BEDS.
4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS
GROUND COVERS OR SHRUB MASSINGS SHALL HAVE A POP-UP SPRAY SYSTEM.
5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER
REQUIREMENTS ARE AS FOLLOWS:
a. PRECISE INDIVIDUAL STATION TIMING
b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
C. AT LEAST ONE PROGRAM FOR EACH HYDROZONE
d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF
e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE
DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES.
6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO
RESPECTIVE HYDRO -ZONES.
7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH
TRIANGULAR SPACING.
8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES
(BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS).
9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V.
LOCATIONS WITH LANDSCAPE ARCHITECT.
GENERAL OVERVIEW
THIS REPORT OUTLINES RECOMMENDED REVEGETATION AND SLOPE STABILIZATION MEASURES FOR
DISTURBED CUT AND FILL SLOPES WITHIN THE PROJECT LIMITS AS DEFINED ON THE ACCOMPANYING PLAN
WHICH WILL BE SEEDED WITH THE DRYLAND SEED MIX AND NOT IRRIGATED. THESE RECOMMENDATIONS ARE
MADE TO PREVENT SHORT TERM AND LONG TERM SOIL EROSION AS WELL AS TO PROVIDE AN AESTHETIC
REVEGETATION WHICH WILL BLEND WITH THE EXISTING NATURAL SURROUNDING AREA. THE MEASURES
INCLUDE REVEGETATION AND HYDROMULCHING PROCEDURES FOLLOWING TOPSOIL DISTRIBUTION AND FINE
GRADING. THE AREA TO BE REVEGETATED CONSISTS OF ALL DISTURBED AREAS RELATED TO GRADING FOR
CONSTRUCTION AND ANY OTHER AREAS DISTURBED IN THE PROCESS OF CONSTRUCTION. THE SLOPES TO BE
AFFECTED VARY WIDELY IN DEGREE AND ASPECT.
GENERAL EARTHWORK
ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION WITH MINIMAL, IF ANY,
DISTURBANCE TO THE SURROUNDING NATURAL SLOPE OR VEGETATION. ALL FINISHED GRADES SHALL BE
SMOOTH AND ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO
GRADING AND DRAINAGE PLANS FOR ADDITIONAL REQUIREMENTS.
SITE PREPARATION
EARTHWORK PROCESS SHOULD BEGIN WITH CLEARING LARGE SHRUBS FROM THE AREAS TO BE
DISTURBED. WOODY STEMS AND BRANCHES SHALL BE CHIPPED ON SITE TO IMPROVE THE AMOUNT OF ORGANIC
MATERIAL IN THE TOP SOIL. NATURAL TOPSOIL OCCURS AT VARYING DEPTHS ON THE PROJECT SITE. THE
TOPSOIL SHOULD BE EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS PRIOR TO THE PROPOSED
GRADING OPERATIONS.
TOPSOIL DISTRIBUTION
ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN ACCOMPLISHED, THE
TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED,
SLOPES SHOULD BE GRADED WITH SERRATION TO HOLD TOPSOIL ADEQUATELY TOPSOIL SHOULD BE SPREAD
AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS
OR ANOTHER METHOD WITH EQUAL CAPABILITY IT IS OUR RECOMMENDATION THAT ANY NECESSARY
MECHANICAL MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE.
ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL FOLLOW
IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE CRUSTING AND TO FACILITATE BETTER ROOT PENETRATION,
THE SURFACE SHOULD BE SCARIFIED PRIOR TO SEEDING.
SEEDING
APPLY SEED TO THE PROJECT SITE BY HYDROSEEDING.
THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING.
SEED MIXTURE: RATE: PURE LIVE SEED LBS / ACRE
WESTERN YARROW 0.20
FIRECRACKER PENSTEMON 0.40
BLUE FLAX 4.20
CALIFORNIA POPPY 4.20
SHEEPFESCUE 3.00
IDAHO FESCUE 4.00
SANDBERG BLUEGRASS 2.00
ROCKY MOUNTAIN PENSTEMON 2.00
TOTAL SEED INSTALL @ 20 LBS / ACRE
FIBER MULCH MATERIAL
GROW NUTRIBASE FROM QUATTRO ENVIRONMENTAL, A COMPOSTED POULTRY BASED MULCH MATERIAL FREE OF
GROWTH OR GERMINATION INHIBITING INGREDIENTS. APPLY AT THE RATE OF 2000 LBS. PER ACRE.
ORGANIC SOIL AMENDMENT
GROW NUTRIBOOST FROM QUATTRO ENVIRONMENTAL (OR APPROVED EQUAL) APPLIED AT 5 GALLONS PER ACRE.
TACKIFIER
MULCH TACKIFIER SOIL STABILIZER - ECOLOGY CONTROLS M-BINDER. TACKIFIER APPLIED AT THE RATE OF 80
LBS. PER ACRE.
GRANITE SEED
1697 WEST 2100 NORTH
P.O. BOX 177
LEHI, UTAH 84043
1-800-768-4433
(OR APPROVED EQUAL)
HYDROSEEDING
MIX SPECIFIED SEED AND ORGANIC SOIL AMENDMENT IN WATER PER MANUFACTURER'S
RECOMMENDATIONS. APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. DO NOT HYDROSEED
AREA IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. KEEP OFF ROADS, WALKS, STRUCTURES AND
AREAS NOT TO BE SEEDED. CLEAN UP THESE AREAS. AFTER HYDROSEED, TRACK IN SEED USING A CLEATED
CRAWLER WITH TRACK MARKS PERPENDICULAR TO THE SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2O00 LBS.
PER ACRE OF FERTILE -FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER.
MAINTENANCE
IMMEDIATELY RESEED AREAS WHICH SHOW BARE SPOTS. MINIMUM ACCEPTABLE PLANT COVERAGE IS 80
PERCENT AFTER ONE GROWING SEASON. PROTECT SEEDED AREAS WITH WANING SIGNS DURING MAINTENANCE
PERIOD. THE SEED WILL REQUIRE APPROXIMATELY NINETY (90) DAYS OF FAVORABLE GROWING CONDITIONS TO
GERMINATE AND BECOME ESTABLISHED FOR SUCCESSFUL SURVIVAL WITH NORMAL MINIMAL SUMMER
PRECIPITATION.
SEEDING TIME
THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID OCTOBER. IF SEEDING
IS APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY,
THEN RESEEDING SHALL BE APPLIED IN EARLY SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN
MARCH AND MID MAY. THIS PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED
GERMINATION AND SEEDLING SURVIVAL RATE. SEEDING AFTER NOVEMBER 20, 'DORMANT SEEDING' INSURES
THAT THE SEED DOES NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND SEED SHOULD BE IN
PLACE FOR THE EARLY SPRING RAINS.
WATER
THE CONTRACTOR WILL PROVIDE SUPPLEMENTAL WATER TO ENSURE PROPER SEED GERMINATION.
FERTILIZATION
FERTILIZATION IS NOT RECOMMENDED FOR RECLAMATION SEEDING DUE TO PROMOTION OF WEED
COMPETITION. IF WEEDS ARE APPARENT, CONTACT LANDSCAPE ARCHITECT FOR WEED REMOVAL
REQUIREMENTS.
EROSION CONTROL
UNDER NORMAL CIRCUMSTANCES AND ADHERENCE TO THE CONSTRUCTION PRACTICES DESCRIBED IN
THE SPECIFICATIONS, THE ABOVE RECOMMENDED EROSION CONTROL MEASURE SHOULD PROVIDE A STABLE
SLOPE CONDITION. TO AVOID INCIDENTAL EROSION, IT IS IMPERATIVE THAT THE SLOPES, ONCE PREPARED,
REMAIN UNDISTURBED UNTIL SEEDING GERMINATES AND IS ESTABLISHED.
AN 80% VEGETATION COVER IS RECOMMENDED TO CONTROL EROSION. SURFACE CONDITIONS SHOULD BE
MONITORED DAILY. IF EROSION DETRIMENTAL TO THE SLOPE IS OBSERVED OR ANTICIPATED DUE TO EXCESSIVE
RAINFALL, REMEDIAL MEASURES SHALL BE IMPLEMENTED AS REQUIRED. REFER TO THE STORM WATER
POLLUTION PREVENTION PLAN FOR ADDITIONAL REQUIREMENTS.
3" DEPTH OF MULCH AT PLANTER
BEDS
h
APPROVED TOPSOIL AND SOIL
FINISH GRADE, AMENDMENTS AS SPECIFIED
'I IIIIIIIIIIII IIIIIIIII�"I III III I III,
PER PLANS
1 PLANTER BED CUT EDGE
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
r -
NOT COVER CROWNS OF PLANTS
i
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
<1
_
BACKFILL WITH APPROVED TOPSOIL AND SOIL
I1=,
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
-
-
WATER EACH LAYER, DO NOT TAMP OR OVER
=
_
COMPACT.
12'
WIDTH OF
12"
CONSTRUCT 6" MOUND OF TOPSOIL
MIN.
ROOTBALL
MIN.
NOTES:
1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY.
2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
3. THIN BRANCHES AND FOLIAGE BY Y.
4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB
SHAPE.
5. FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED
VERTICAL CUTS.
))SHRUB PLANTING
NOT TO SCALE
'A' 'A'
A = LENGTH, AS SPECIFIED
OR PER PLANT SCHEDULE
9• P m
B = 85% OF'A'
FINISH GRADE PER PLANS
GROUNDCOVER PLANTING PER PLANTING PLAN
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED.
DO NOT COVER CROWNS OF PLANTS
TILL SOIL TO A DEPTH OF 12", BACKFILL WITH
APPROVED TOPSOIL AND SOIL AMENDMENTS, AS
SPECIFIED.
SECTION
NOTES:
1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN.
2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER
BEDS.
GROUNDCOVER PLANTING
NOT TO SCALE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1
CIVIL REVISIONS
04/28/22
NO.
REVISION/ISSUE
DATE
pO0JEO"DI �� ■
OF �o
/ o
=
EV D O�
o * Knwvwh ftbOIOW.
gr �o Callnem.eyo„dg.
U o ALL 2 BUSINESS DAY C US SS S g-
J
m
F
LA-2 8 ti� YOu DIG, GRADE OR
2� 04/28 ,22 EXCAVATE FOR THE
(� C, MARKING OF
Q
_
-
UNDERGROUND
MEMBER UTILITIES
ooo
gNDSCAP
0000�°
-
w z
� G
F
~ <
0 uzi
F
?w
roz5z
cw¢G�
,Z�c�
w
E
z�aza
RODNEY EVANS + PARTNERS + +�
�,andput.....,om 1 208-514-3300 11014 S. L, Point,, Bois,, Idaho 83706
3
PINE 43 PH. 3
RESIDENTIAL
E. WILSON STREET, MERIDIAN, ID 83642
FINAL PLAT LANDSCAPE
OVERALL LANDSCAPE PLAN
PROJECT
20014
SHEET
L l .0
-
=
0
c.1
N
m
-
T
l
c
DAIF
09/24/21
[)HAWN RV
LP
CHECKED RV
RE
AGENCY REVIEW