Loading...
22064_Landscape CZC-L1.5 V11 2 3 4 5 6 Zuj �z vMM x c7 cW7 yU �aMDvv oZw U ov rnH �� i- HQcv ¢Q�U� .-.2wU o- W o �► Li }U= vUid Ll�x° dwa �LLIU� I p�LLX O¢¢ RODNEY EVANS + PARTNERS a+ T'' + = Q N m 0 LL 0 x resndparmers.com+208-514-3300 + 1450 W. Bannock Street, Boise, Idaho 83702 A below.LANDSCAPE a NOTES: Call 1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT CALL 2 BUSINESS DAYS IN ADVANCE BEFORE THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. RA, OR excavaTE FOR THE 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN MARKING OF UNDERGROUND APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED MEMBER UTILITIES PLANT MATERIALS CAN NOT BE OBTAINED. 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. ¢ w w U 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION w o omw �m r.L� START-UP. w°o wwm¢wzy>ai S. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. azw� ��oo� U O�UmF�w¢t/1r- 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE 2w SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. mc'�s� o g o N y o 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES ¢ o< �wowowa�m3� AND CALL OUT SYMBOL NUMBERS. zero m3000�Qwzzw 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 3" MINUS BARK MULCH. SUBMIT ¢ 3 r w a o- m z w=o �aa�o =�zu:zoc�o��z SAMPLE FOR APPROVAL. ooa< °'6o�`�`�oma�� 9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF u5z m y-Fww�w w� ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION o w w 3 z w ¢ - IMMEDIATELYWITHTHESAMESIZEANDSPECIESATNOCOSTTOTHEOWNER. oor� woc�m�N 5ua�i¢<o 10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE Sza�Q °nwFF¢� izo DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. ac­ri oz¢wa�og ,.A s, 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 a o z ¢ � m z? s z oai �- 3o imw�nw SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. `�omzw w¢��woa3z� 12. FERTILIZE ALL TREES AND SHRUBS WITH'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S i-oaaa �oo?o?rooao RECOMMENDATIONS. 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN 3" DEPTH OF MULCH AT PLANTER BEDS p,'(E 0� 5 SNP' 4-'+14. QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. 8 * PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. .Ly ���!' B "J `J TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS ` w �/^ Q�i 40 WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: A PROVIDE APPROVED IMPORTED TOPSOIL, OR -III- B) IMPROVE ON -SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. ) i-1I 1- -111-1 -1 APPROVED TOPSOIL AND SOIL 1-III- �+'N�SCAPP- g 15. IF IMPORTED TOPSOIL FROM OFF SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL -1-1---I-I-, - AMENDMENTS AS SPECIFIED g o -SITE LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND _III -III -III -I �' FINISH GRADE, FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR PER PLANS ROOT FLARE TO BE AT SOIL LINE TOXIC MATTER HARMFUL TO PLANT GROWTH. A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO PLANTERBED CUT EDGE D PREVAILING WIND DIRECTION THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL -DRAINED SITESWHERE (D(T TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. NOT TO SCALEB) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL AT TREE IN TURF AREA SOIL LINE TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE REMOVE DEAD/DAMAGED BRANCHES AND Q BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. PRUNE TO INTERNATIONAL SOCIETY OF ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. ARBORICULTURE STANDARDS; IMPROPERLY 16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE PRUNED TREES (AS DETERMINED BY THE Z N OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER LANDSCAPE ARCHITECT) SHALL BE REMOVED 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT AND REPLACED. DO NOT REMOVE MAIN FACILITIES. ROOT GROWTH LEADER!! cy) 18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CO CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. CONSTRUCT 2" EARTH BERM TO FORM A WATER RUBBER CINCH TIE 0 19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. RETENTION BASIN, FILL BERM WITH MULCH, AS SPECIFIED 2"x 2" WOOD STAKE (LENGTH AS - PENETRATE ROOTBALL. � TOPSOIL NOTES MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO PARALLEL SEE NOTE 1. SET PARALLEL TO � O Z NOT COVER CROWNS OF PLANTS - PREVAILING WIND. LL I' I Q 1. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO �/\ -= PROVIDE COMMERCIAL FERTILIZER TABLETS AND \/\/ \/\/ - /\ / // - - - BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB o REMOVE TREE WRAP TRUNK PROTECTION, AFTER INSTALLATION Z W� PLANT GROWTH. = /\\/\ //\// // // Q 0 =LU O 2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL =III = = = //\\// // / WITH APPROVED TOPSOIL AND SOIL v CONSTRUCT 2" EARTH BERM AT EDGE OF SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, ORGANIC MATTER LARGER THAN 2 _ __BACKFILL - _ \/\\/ j\\\j\ AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS, v p ROOTBALL, FILL TREE RING W/ MULCH, AS , 0 m - / / / - 1 WATER EACH LAYER, DO NOT TAMP OR OVER -- Z SPECIFIED. �J INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. __/ - I I III III= III- w � �, � TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. - -III„ 11- COMPACT. I- a 3" THICK MULCH LAYER, KEEP MULCH 3" AWAY In m 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A FROM TRUNK. RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND 12" WIDTH OF 12" CONSTRUCT 6" MOUND OF TOPSOIL O C~ LIV RECOMMENDATIONS SHALL BE FURNISHED TO THE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. MIN. ROOTBALL MIN. Z ALL TOPSOIL SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE -TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE NOTES. FINISH GRADE " PLACED WHILE IN A FROZEN OR MUDDY CONDITION. 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. o o//�//�////\// // /.\ //\// //// // / / COMMERCIAL SLOW RELEASE FERTILIZER \j\\j\\j\ / 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. t= \\j /\/\ TABLETS v J DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE, AS REQUIRED. 3. THIN BRANCHES AND FOLIAGE BY Y. / = SIDES OF HOLE ROUGH &UNEVEN Ln a N -III - / / LJJ C 5. COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 5, FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED o-I I -I I I \/ = I ~ 1 \ - C L1J L % A. LAWN AREAS: 91NCHES MINIMUM OR AS NECESSARY TO ACHIEVE EVEN GRADES WITH SURROUNDING III- 11-III--i = BACKFILL WITH APPROVED TOPSOIL AND " Z LAWN AREAS. VERTICAL CUTS. -III III -III -III III- SOIL AMENDMENTS AS SPECIFIED. 11III-III-I -III 1 O 6. B. PLANTER BEDS: 18 INCHES MINIMUM FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES SHRUB PLANTING III-II-BACKFILL IN 6" LIFTS, WATER EACH LAYER, WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL W AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH GRADE OF TOPSOIL SHALL BE 2" 2 OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL, 0 7. BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND 1" FOR SEED. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL NOT TO SCALE DO NOT OVER COMPACT!! 5' MIN. DIA. ' ^ u TREE RING 0� PLAN SET ROOTBALL ON NATIVE, UNDISTURBED CV 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE SOIL STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR PLACED IN ' 'A' 'ATEMPORARILY CONTAMINATED WITH ROCKRMATOERIALS.NCDONTRACTROR SHALL SUBMIT A DEDTAI EPD STOEC PILE P ANINTO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. A = LENGTH, AS SPECIFIED 1. REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 3/3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY ry1 W WEED ABATEMENT NOTES: OR PER PLANT SCHEDULE BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. m 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON 9• ^P B = 85 % OF W THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR THEM PRIOR TO PLANTING OR HYDROSEEDING. AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE 2. CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH'ROUND-UP' (CONTACT HERBICIDE) OR APPROVED + WARRANTY PERIOD. 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE 3. EQUAL. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. ARCHITECT BEFORE PROCEEDING. z 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. PLAN VIEW FINISH GRADE PER PLANS 4. ATDRIAL. CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT 5. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. APPLY SECOND APPLICATION OF "ROUND -UP" TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE GROUNDCOVER PLANTING PER PLANTING PLAN 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING a o WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. REMOVE WEEDS FROM THE SITE. MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. o 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DO NOT COVER CROWNS OF PLANTS 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. DIRECTED TO PERFORM A THIRD APPLICATION. 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT 7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE. TILL SOIL TO A DEPTH OF 12", BACKFILL WITH #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS o APPROVED TOPSOIL AND SOIL AMENDMENTS, AS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. IRRIGATION NOTES: SPECIFIED. �I=ICI= I�� DECIDUOUS TREE PLANTING 1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES iv III =\jj\\//\\//\//\//\\//\\//\\//\\//\//\//\/ / SUBGRADE A o =III- \\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\ NOT TO SCALE ¢ COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE I///1/ice/�l\i//// IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. ! o 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO -ZONES. III III III III III III III DATE: JUNE 2022 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4INCHES AT LAWN AREAS AND 18" AT -III III III III III=III=1 -III-I n- PLANTER BEDS. _ 1 III -III= 11 -1 DRAWN BY: Author 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS CHECKED BY: Checker GROUND COVERS OR SHRUB MASSINGS SHALL HAVE A POP-UP SPRAY SYSTEM. SECTION JOB NUMBER: MKT 22 D 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER D REQUIREMENTS ARE AS FOLLOWS: NOTES. SHEETTITLE a. PRECISE INDIVIDUAL STATION TIMING b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF 2. APPLY SPECIFIED PRE -EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER PRELIMINARY e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE BEDS. DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. LANDSCAPE 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. GROUNDCOVER PLANTING DETAILS 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH TRIANGULAR SPACING. NOT TO SCALE 3 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES (BUILDINGS, SHEET NUMBER SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). 9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V. LOCATIONS WITH LANDSCAPE ARCHITECT. 1.5 1 2 3 4 5 6