DESIGN REVIEW COMPLIANCE REPORT
Project Number
A-2022-0149
Project Name
In Time Tee DES
Project Address
580 E. Corporate Drive
Project Description
Design Review approval for exterior modifications to an existing 11,896
square foot single -story building on 1.13 acres of land in the C-G zoning
district. Exterior building modifications include:
• An existing solid overhead door will be replaced with a
glass overhead door.
• An existing rear exterior door will be enlarged to add a side
window.
• A new rear exterior door and window is to be added.
• A new 18' x 52'concrete patio slab is to be installed at the
rear of the building.
Applicant
Matthew Rhees, The Architect's Office
Assigned Planner
Julia Garofalo, Assistant Planner
Expiration Date
August 5, 2023
Note: This is not a building permit. Please contact Building Services at (208) 887-2211
to verify if you need a building permit and/or inspection. If you do need a building
permit, you must complete that process before you commence the use or construction.
Please contact Building Services for additional details about building permits and
inspections.
I. DECISION
The applicant's request for a Design Review is approved with the conditions listed below. The
director determined that the proposed exterior building modifications as noted above conform
to the standards and meet or exceed the intent of the "City of Meridian Architectural Standards
Manual".
Site Specific Conditions of Approval
1. The applicant shall complete all improvements related to public life, safety, and health as set
forth in UDC 11-5C-3B. A surety agreement may be accepted for other improvements in
accord with UDC 11-5C-3C.
2. The approved elevations may not be altered without prior written approval of the City
of Meridian Planning Division. This approval is for exterior building modifications
only. The future parking expansion and metal canopy over the new concrete slab at the
rear of the building is not approved with this application and will be subject to further
review with a future certificate of zoning compliance and administrative design review
application.
3. The applicant shall pay any applicable impact fees prior to the issuance of a building permit.
4. The applicant shall complete all required improvements prior to issuance of a Certificate of
Occupancy. It is unlawful to use or occupy any building or structure until the Building
Official has issued a Certificate of Occupancy.
11Page
(E IDIAN —
APPROVED eneral Conditions of Approval
DATL 08/05/22
The applicant and/or assigns shall have the continuing obligation to provide irrigation that
FILE NUMBEkA-=o 149 meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping
as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14.
2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth
in UDC 11-3A-14.
3. The project is subject to all current City of Meridian ordinances and previous conditions of
approval associated with this site.
4. The issuance of this Design Review does not release the applicant from any previous
requirements of the other permits issued for the site.
5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a
minimum height of six feet above the ground or sidewalk surface to afford greater visibility
of the area.
6. The applicant has a continuing obligation to comply with the outdoor lighting provisions as
set forth in UDC 11-3A-11.
7. The applicant and/or property owner shall have an ongoing obligation to maintain all
landscaping and constructed features within the clear vision triangle consistent with the
standards in UDC 11-3A-3.
IL CITY COUNCIL REVIEW
The applicant or a party of record may request City Council review of a decision of the Director.
All requests for review shall be filed in writing with the Planning Division on or before August
20, 2022 within fifteen (15) days after the written decision is issued, and contain the information
listed in UDC 11-5A-6B.
If City Council review of the decision is not requested, the action of the Director represents a
final decision on a land use application. You have the right to request a regulatory taking analysis
under Idaho Code 67-8003.