Loading...
HomeMy WebLinkAboutPublic Storage CZC A-2022-0144 V1`(E IDIAti - w IDIAN =--- IDAHO APPROVED DATE: 08/04/22 FILE NUMBER:-0210- Planning Division Community Development Department 33 E. Broadway Avenue, Suite 102 Meridian, Idaho 83642 CERTIFICATE OF ZONING COMPLIANCE REPORT Project Number A-2022-0144 Project Name Public Storage CZC Project Address 3959 N. Ten Mile Road Project Description Addition of three new indoor self -storage buildings to an existing self -storage facility on 9.66 acres of land in the I-L zoning district. Applicant William Juarez Assigned Planner Julia Garofalo, Assistant Planner Expiration Date July 14, 2023 Note: This is not a building permit. Please contact Building Services at (208) 887-2211 to verify if you need a building permit and/or inspection. If you do need a building permit, you must complete that process before you commence the use or construction. Please contact Building Services for additional details about building permits and inspections. I. DECISION The applicant's request for Certificate of Zoning Compliance is approved with the conditions listed below. Site Specific Conditions of Approval 1. The approved site plan, landscape plan and/or elevations may not be altered without prior written approval of the City of Meridian Planning Division. 2. If any changes must be made to the site plan to accommodate ACHD requirements, the applicant shall submit a new site plan to the City of Meridian Planning Division for approval prior to issuance of the building permit. 3. The applicant shall complete all required improvements prior to issuance of a Certificate of Occupancy. It is unlawful to use or occupy any building or structure until the Building Official has issued a Certificate of Occupancy. 4. The City of Meridian requires that the owner enter into a Warranty Surety Agreement and post a Warranty Surety in the amount of 20% of the total construction cost for all completed public sewer and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond, and must be in place prior to Certificate of Occupancy. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Services for more information at 208-887-2211. 5. 100 Watt and 250 Watt, high-pressure sodium street lights shall be required on all public roadways per the City of Meridian Improvement Standards for Street Lighting. All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval. Applicant shall also include the location of any existing street lights in the development plan set. Street lighting is required at intersections, corners, cul-de-sacs, and at a spacing that does not exceed that outlined in the Standards. The 1 1 P a g e (E IDIAN — APPROVED Date 08/04/22 FILE NUMBER' A-2w2 contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. general Conditions of Approval 1. The applicant and/or assigns shall have the continuing obligation to provide irrigation that meets the standards as set forth in UDC 11-3B-6 and to install and maintain all landscaping as set forth in UDC 11-313-5, UDC 11-313-13 and UDC 11-313-14. 2. The applicant shall comply with the outdoor storage as an accessory use standards as set forth in UDC 11-3A-14. 3. The project is subject to all current City of Meridian ordinances and previous conditions of approval associated with this site (A-2016-0368) 4. The issuance of this CZC does not release the applicant from any previous requirements of the other permits issued for the site. 5. The applicant and/or property owner shall have an ongoing obligation to prune all trees to a minimum height of six feet above the ground or sidewalk surface to afford greater visibility of the area. 6. The applicant shall have an ongoing obligation to maintain all pathways. 7. The applicant has a continuing obligation to comply with the outdoor lighting provisions as set forth in UDC 11-3A-11. 8. The applicant and/or property owner shall have an ongoing obligation to maintain all landscaping and constructed features within the clear vision triangle consistent with the standards in UDC 11-3A-3. 9. The applicant and/or assigns shall have the continuing obligation to meet the specific use standards for the proposed use as set forth in UDC 11-4-3-34 Storage facility, self-service.. II. CITY COUNCIL REVIEW The applicant or a party of record may request City Council review of a decision of the Director. All requests for review shall be filed in writing with the Planning Division on or before July 29, 2022, within fifteen (15) days after the written decision is issued, and contain the information listed in UDC 11-5A-613. If City Council review of the decision is not requested, the action of the Director represents a final decision on a land use application. You have the right to request a regulatory taking analysis under Idaho Code 67-8003. 2 1 P a g e