Loading...
HomeMy WebLinkAboutMER22-0056 A-2022-0152 Copper Canary Exterior Improvements V1�E roiAN— APPROVED T. Plmt.I,--bandb E complknu wIth ppIi belbing C. Code daeciancI. bond at InepaNana willnW I. urractad regardless of IM blwmatlon on aDPr pp Dla p1b., Wb9 any repom,are required b M on gla conetmctlon u,at Ne gma of inapectlona. te: Permit Number: —- ACHD 'I !gWC11rW 6101wmlar e _r1o5lz,�0151 August 1, 2022 To: Jeff Likes ALC Architecture 1119 E State St, Suite 120 Eagle, ID 83616 Subject: MER22-0056/ A-2022-0152 2590 N Eagle Rd Copper Canary Mary May, President Alexis Pickering, Vice -President Jim D. Hansen, 2nd Vice President Kent Goldthorpe, Commissioner Dave McKinney, Commissioner The Ada County Highway District (ACHD) has reviewed the submitted application for the application referenced above and has determined that there are no improvements required to the adjacent street(s). The applicant shall be required to: 1. Pay a traffic impact fee. If applicable, a traffic impact fee may be assessed by ACHD and will be due prior to the issuance of a building permit by the lead agency. This is a separate review process and it is the applicant's responsibility to submit plans directly to ACHD. 2. Comply with all ACHD Policies and ACHD Standard Conditions of Approval for any improvements or work in the right-of-way. 3. Obtain a permit for any work in the right-of-way prior to the construction, repair, or installation of any roadway improvements (curb, gutter, sidewalk, pavement widening, driveways, culverts, etc.). Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 9 PH 2O8-387-6100 • FX 345-7650 • www.achdidaho.org �fE IDEZ IAN— APPROVED ze plans have Men found ro omvnaa«wan ding codez. COM 11 eioe�a mmev.am�e n �dil, Mw�e<i.a ga+ai... onno ma—aio. o� aDDroved d s1.l .l1h. any m.a aep.<t�oe,. Permit Number: zmsu+sx Traffic Information T-Hs development is estimated to generate 272 additional vehicle trips per day; and 19 additional vehicle trips per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, 11th edition. Condition of Area Roadways: Traffic Count is based on Vehicles per hour (VPH) Roadway Frontage Functional Classification Eagle Road 290-feet Principal Arterial * Acceptable level of service for a five -lane principal arterial is "E" (1,780 VPH). Average Daily Traffic Count (VDT): Average daily traffic counts are based on ACHD's most current traffic counts There is no current average daily traffic count for Eagle Rd. If you have any questions, please feel free to contact me at (208) 387-6329. Sincerely, P114 Carbella Loise Medina Planning Review Intern Development Services cc: City of Meridian — Stacy Hersh East River Valley, LLC — Perry Coles Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achdidaho.org �E roiAN— APPROVED xPl .I,—Men—dtit nMl complknce wIth appIi Mlking c.ae. Code MeciencI. bond at In.it,i n �.11need to Mcorr it gardlaee of IM blwmat` on aDProvetl DIare1bI. b9 any w repmn, are ..q�Iredro-anttlecanatmntlan 1 u,tN.tlm.ainaxnMna. ta: Permit Number: —- Standard Conditions of Approval All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right- of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.6, the applicant may be required to update any existing non -compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387- 6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 a PH 2O8-387-6100 e FX 345-7650 • www.achdidaho.org