June 9, 2022
To: Jackson Cleverley
2775 W Navigator Dr, Ste 200
Meridian, ID 83642
Subject: MPP21-007/ A-2022-0118
1044 S Silverstone Way
ESI Office Building
Mary May, President
Alexis Pickering, Vice -President
Jim D. Hansen, 2nd Vice President
Kent Goldthorpe, Commissioner
Dave McKinney, Commissioner
On January 10, 2022, the Ada County Highway District approved Rackham East Subdivision and
Eagle View Apartments/ H-2021-0075 for a preliminary plat application for 2 multi -family lots and
6 commercial lots on 29.7 acres, and a conditional use permit application for a 396 unit multi -family
development on 15.94 acres. The site -specific conditions of approval also apply to A-2022-0118.
If you have any questions, please feel free to contact me at (208) 387-6329.
Sincerely,
Carbella Loise Medina
Planning Review Intern
Development Services
cc: City of Meridian — Joseph Dodson
Tonn Petersen
Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 2O8-387-6100 • FX 345-7650 • www.achd.ada.id.us
CUEIDR IAy
APPROVED
DATE 07/29/22
FILE NUMBER: ^-z 2z 1I
Standard Conditions of Approval
All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including
all easements). Any existing irrigation facilities shall be relocated outside of the ACHD
right-of-way (including all easements). Private Utilities including sewer or water systems are
prohibited from being located within the ACHD right-of-way.
2. In accordance with District policy, 7203.6, the applicant may be required to update any
existing non -compliant pedestrian improvements abutting the site to meet current
Americans with Disabilities Act (ADA) requirements. The applicant's engineer should
provide documentation of ADA compliance to District Development Review staff for review.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged
during the construction of the proposed development. Contact Construction Services at
387-6280 (with file number) for details.
4. A license agreement and compliance with the District's Tree Planter policy is required for
all landscaping proposed within ACHD right-of-way or easement areas.
5. All utility relocation costs associated with improving street frontages abutting the site shall
be borne by the developer.
6. It is the responsibility of the applicant to verify all existing utilities within the right-of-way.
The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant.
The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business
days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD
Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are
compromised during any phase of construction.
7. Utility street cuts in pavement less than five years old are not allowed unless approved in
writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file
numbers) for details.
8. All design and construction shall be in accordance with the ACHD Policy Manual, ISPVVC
Standards and approved supplements, Construction Services procedures and all
applicable ACHD Standards unless specifically waived herein. An engineer registered in
the State of Idaho shall prepare and certify all improvement plans.
9. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
10. No change in the terms and conditions of this approval shall be valid unless they are in
writing and signed by the applicant or the applicant's authorized representative and an
authorized representative of ACHD. The burden shall be upon the applicant to obtain
written confirmation of any change from ACHD.
11. If the site plan or use should change in the future, ACHD Planning Review will review the
site plan and may require additional improvements to the transportation system at that time.
Any change in the planned use of the property which is the subject of this application, shall
require the applicant to comply with ACHD Policy and Standard Conditions of Approval in
place at that time unless a waiver/variance of the requirements or other legal relief is
granted by the ACHD Commission.
CUEIDR IAy Development Services Department
APPROVED����
DATE: 07/29/22 C H D
FILE NUMBER: n-zozz-ona
610ra _ro
Project/File: Rackham East Subdivision and Eagle View Apartments/ MPP21-0007/ H-2021-
0075
This is an annexation and rezoning application to annex 25.76 acres into the City of
Meridian with C-G zoning, a preliminary plat application for 2 multi -family lots and 6
commercial lots on 29.7 acres and a conditional use permit application for a 396 unit
multi -family development within the site on 15.94 acres.
Lead Agency: City of Meridian
Site address: North of Rolling Hill Drive and Overland Road
Staff Approval: January 10, 2022
Applicant: Josh Beach
Brighton Development, Inc.
2929 W. Navigator Drive, Suite 400
Meridian, ID 83642
Representative: Same as above
Staff Contact: Paige Bankhead, E.I.
Phone: 387-6293
E-mail: pbankhead(a)achdidaho.org
A. Findings of Fact
Vicinity Map
SNOW-
1. Description of Application: This is a preliminary plat application for 2 multi -family lots and 6
commercial lots on 29.7 acres and a conditional use permit application for a 396 unit multi -family
development within the site on 15.94 acres.
The City of Meridian's Future Land Use Map designates this area as Mixed Use Regional.
2. Description of Adjacent Surroundina Area:
Direction
Land Use
Zoning
North
1-84
NA
South
General Retail and Service Commercial District
C-G
East
Residential Ada Count
R1
West
General Retail and Service Commercial District
C-G
3. Site History: ACHD previously reviewed a small eastern portion of this site as part of Rackham
Subdivision in July 2019. The requirements of this staff report for that small portion are
consistent with those of the prior action.
4. Adjacent Development: The following developments are pending or underway in the vicinity of
the site:
1
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
CUEIDR IAN
APPROVED
DATE 07/29/22
FILE NUMBER: a D210 18
;ackham Subdivision, a 20-lot mixed use subdivision with hotel, office buildings, restaurants
nd residential uses on 52 acres located directly west of the site and approved by ACHD on
my 18, 2019.
p� W 1�
L I m1ur A
Site Location - Eagle View Landing Phase 2 (Rackham East Subdivision) located east of Rackham Subdivision
(Original 52 acres)
5. Transit: Transit services are available to serve this site approximately'/4 mile south of the site on
Overland Road via route 29.
6. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use
paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared
use path.
AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection
Treatments: The opening of a shared use path at the roadway should be at least the same width
as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the
path, not including any flared sides if utilized. Detectable warnings should be placed across the full
width of the ramp.
FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related
concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average
width of the trail to improve safety for users who will be traveling at various speeds. In addition, the
overall width of the trail should be increased, so the curb ramp can be slightly offset to the side.
The increased width reduces conflict at the intersection by providing more space for users at the
bottom of the ramp.
7. New Center Lane Miles: The proposed development includes 0.0 centerline miles of new public
road.
8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building
permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time. The impact fee assessment will not be released until the civil plans are approved by ACHD.
9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
• The intersection of Overland Road and Eagle Road is scheduled in the CIP to be widened to
7-lanes on the north and south legs, and 8-lanes on the east and west legs, and
reconstructed/signalized in the future. The design year is listed as 2025 in the IFYWP and the
is listed to be improved between 2031 and 2035.
• Overland Road is listed in the CIP to be widened to 7-lanes from Eagle Road to Cloverdale
Road between 2036 and 2040 and is listed as unfunded.
2
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
IDIA,
he intersection of Cloverdale Road and Overland Road is listed in the CIP to be widened to
APPROVED -lanes on the north and south legs and 8 lanes on the east and west legs and signalized
o7i2sizz e
DATE tween 2026 and 2030.
FILE NUMBER:^-zozz-o>,A ays to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP) was
1-1rd by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to
implement the Planned Bicycle Network to support bicycling as a viable transportation option for
Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of
good repair in order to ensure they are consistently available for use, promote awareness of existing
bicycle routes and features and support encouragement programs and to facilitate coordination and
cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan
recommendations.
The BMP identifies Overland Road as Level 2 facilities that will be constructed as part of a future
ACHD project.
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 4,626 total additional vehicle trips per
day (114 existing); 432 total additional vehicle trips per hour in the PM peak hour (12 existing),
based on the traffic impact study.
2. Traffic Impact Study
Fehr & Peers prepared a traffic impact study for the proposed Eagle View Landing Phase 2
development. An executive summary of the findings as presented by Fehr & Peers can be found
in Attachment 3. The following executive summary is not the opinion of ACHD staff. ACHD has
reviewed the submitted traffic impact study for consistency with ACHD policies and practices, and
may have additional requirements beyond what is noted in the summary. ACHD Staff comments
on the submitted traffic impact study can be found below under staff comments.
16 . r;Ar
Site
Silverstone Way
Rackharn Way Rolling Hills Dfive
Overland Road
LEGEND
!� _ j o ro ect Phase 1 ri ❑
{ �* ■ Project Phase 2
Project Phase 3
OProject Interwnon
Intersections and Road Segments in the Study o Eagle Yew Landing Phase 1 Project Location
3. Mitigation/Required Improvements
a. Policy:
3
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
�E IDR
�J igation Proposals: Mitigation recommendations shall be provided within the report. At a
APPROVED imum, for each roadway segment and intersection that does not meet the minimum
07/29/22 eptable level of service planning threshold or v/c ratio, the report must discuss feasible
DATE asures to avoid or reduce the impact to the system. To be considered adequate, measures
FILE NUMBER: ^--z 1 I I luld be specific and feasible. Mitigation may also include:
• Revision to the Phasing Plan to coincide with the District's planning Capital Projects.
• Reducing the scope and/or scale of the project.
Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures
such as roadway widening and intersection improvements are infeasible as determined by
ACHD, the TIS may recommend alternative mitigation measures. Alternative mitigation
measures shall demonstrate that impacts from the project will be offset.
• If the impacted roadway segments and/or intersections are programmed as funded in
the Integrated Five Year Work Plan (IFYWP) or the Capital Improvements Plan (CIP);
no alternative mitigation is required.
• If the impacted roadway segments and/or intersections are not programmed in either
the IFYWP or the CIP; the applicant may (i) analyze the shoulder hour and (ii) provide
a safety analysis to determine alternative mitigation requirements.
o If the impacted roadway segments and intersections meet the minimum
acceptable level of service planning thresholds in the shoulder hour the
applicant may suggest feasible alternative mitigation such as: sidewalks, bike
facilities, connectivity, safety improvements, etc. within 1.5 miles of the
proposed development.
o If the shoulder hour planning thresholds are exceeded the applicant may
request to enter into a Development Agreement and pay into the Priority
Corridor Fund an amount determined by the ACHD to offset impacts from the
project.
• Alternative Mitigation may also include:
o Revision to the Phasing Plan to coincide with the District's future Capital
Projects.
o Reducing the scope and/or scale of the project.
Level of Service Planning Thresholds: District Policy 7206.4.1 states that, Level of Service
Planning Thresholds have been established for principal arterials and minor arterials within
ACHD's Capital Improvement Plan and are also listed in section 7106. Unless otherwise
required to provide a Traffic Impact Study under section 7106, a proposed development with
site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic
shall not be required to provide mitigation for a roadway or intersection that currently exceeds
the minimum acceptable level of service planning threshold or V/C ratio.
b. Staff Comments/Recommendations: The study shows that all intersections and roadway
segments operate acceptably, except for the following that are discussed below.
All road segments are projected to meet ACHD's acceptable level of service (LOS) thresholds
for a 5-lanes principal arterial road under all conditions, except for during the PM peak hour for
the segment of Overland Road between Eagle Road and Silverstone Way and Rolling Hill
Drive under the 2023 total traffic conditions.
Overland Road — Eagle Road to Silverstone Way
This segment of Overland Road is listed in the CIP to be widened to 7-lanes between 2026
and 2030, and the site traffic is projected to be approximately 9.6% of the total 2023 traffic on
4
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAN
APPROVED
DATE: 07/29/22
FILE NUMBER: A- 22-1n
segment. Therefore, staff does not recommend that the applicant be required to widen this
vent consistent with District policy 7106.7.3 Alternative Mitigation Measures, which states,
impacted roadway segment or intersection are programmed as funded in the IFYVVP, or
2.IP; no mitigation is required; and the District's Level of Service Planning Thresholds
:;y, which states that a proposed development with site traffic less than 10% of the existing
nstream roadway or intersection peak hour traffic shall not be required to provide
mitigation for a roadway or intersection that currently exceeds the minimum acceptable level
of service planning threshold or V/C ratio.
Rolling Hill Drive
The applicant has proposed to vacate Rolling Hill Drive within the site, north of the site's south
property line. The study reports the average daily traffic (ADT) for Rolling Hill Drive is
projected to be 2,500 trips with all phases of the development in 2023, and approximately
1,200 for Phases 1 and 2, which consists of 396 apartment units. The phasing plan is shown
below in the shaded regions.
ti � SEES
•
Rolling Hills Drive
land Roan
LEGEND
Prom Phew 1
*.. ■ Projod Fh2m i
v vrojed Phase'
orclect rmerrLKmn
11 Eagle View Landir%Phase 1 Projes'tT.dtatian
ACHD does not set level of service thresholds for local roads, however, District Policy states
that the ADT for local roads shall be less than 2,000. Staff does not recommend that Rolling
Hill Drive be reclassified as a collector road or a commercial road to accommodate the traffic
from all phases of the development due to the fact that there are several existing single family
residential homes that will remain on Rolling Hill Drive to the south of the site and staff has
concerns about the significant increase in traffic on an existing local road that will continue to
serve single family homes after the development is completed. Therefore, staff recommends
that the applicant should be restricted to phases 1 and 2 of the development for the 396
apartment units, and not be allowed to construct the offices proposed for phase 3 of the
development until the existing residential homes on Rolling Hill Drive are purchased and the
properties annexed into the City of Meridian with commercial or mixed use zoning. ACHD
may consider reclassifying Rolling Hills Drive as a collector or commercial road at that time.
In addition, staff recommends that Rolling Hill Drive be restricted to right-in/right-out only at
Overland Road, consistent with the findings of the traffic impact study, which are discussed
below.
5
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
and Road/Rollina Hill Drive
APPROVED study recommends restricting the intersection of Overland Road/Rolling Hill Drive to right -
DATE: 07/29/22
ight-out with phase 2 in 2022, or when the site generates 45 PM peak hour trips. The
licant should be required to restrict the intersection to right-in/right-out only with a 6-inch
E'IE NUMBRA_202�-°"`1 ed candles/median with the first phase of the development prior to ACHD's signature on the
i t final plat and after the private road, Rackham Way, is completed from Silverstone Way to
the Rolling Hill Drive. The applicant should be required to provide a public access easement
over the private road, Rackham Way.
Rolling Hill Drive aligns with an existing driveway on Overland Road for the Movado Green
Subdivision apartments on the south side of Overland Road. As part of ACHD's action on
Movado Greens Subdivision, ACHD approved this driveway as a temporary full access driveway
and indicated that this driveway could be restricted to right-in/right-out at any time in the future.
The study recommends the construction of a westbound right turn lane on Overland Road at
Rolling Hill Drive in 2023 with phase 3. However, there is not enough existing right-of-way for
the applicant to construct a westbound right -turn lane on Overland Road at Rolling Hill Drive
and it is not typical for ACHD to require a right -turn lane for a 5-lane principal arterial road.
Therefore, staff does not recommend that the applicant be required to construct the
westbound right -turn lane with this development application.
Due to concerns from the residents on Rolling Hill Drive about additional traffic from the
Rackham East Subdivision and the Rackham West Subdivision using Rolling Hill Drive when
Rackham East Subdivision connects to Rolling Hill Drive, and that the daily trips on Rolling Hill
Drive at the full build out of the development will exceed ACHD's thresholds for the ADT on
local roads, the applicant has also proposed to restrict the site's access to Rolling Hill Drive to
emergency access only. This would direct all traffic from Rackham East Subdivision to the
Silverstone Way/Overland Road intersection to access Overland Road. Therefore, prior to the
submittal of any construction plans for the development, the applicant should be required to
submit an updated analysis to staff for the intersection of Silverstone Way/Overland Road for
Phases 1 and 2 under the 2022 conditions, and for the final buildout under the 2023
conditions, and the estimated ADT and peak hour trips on Silverstone Way with Phases 1 and
under the 2022 conditions and all Phases under the 2023 conditions. Staff will evaluate if
restricting the site's access onto Rolling Hill Drive to emergency access only is feasible based
on the updated analysis. If staff finds that restricting Rolling Hill Drive to emergency access
only is acceptable, then no additional improvements are required to Rolling Hill Drive.
Rolling Hill Drive/Private road, Rackham Way
The study shows that a mini -roundabout will operate acceptably at the terminus of Rolling Hill
Drive where it will intersect the private road, Rackham Way. The applicant will be required to
construct a mini -roundabout at the terminus of Rolling Hill Drive, see Finding 3.
Eagle Road/Overland Road
The study shows that the intersection of Eagle Road/Overland Road exceeds ACHD's
acceptable LOS thresholds under the existing and future conditions in the AM and PM peak
hours. The study recommends the following improvements with the associated phase/year:
• Add 1 northbound through lane for a total of 3 northbound through lanes (existing)
• Add 1 northbound right -turn storage lane to separate the right -turn movements from the
through movements (existing)
• Restripe the southbound left -turn lanes to increase the total storage length to 500-feet for
existing and 600-feet for 2021 conditions
• Add 1 westbound right -turn lane for a total of 2 westbound right -turn lanes (existing)
6
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
�ERIDIAN'--
�J Add 1 westbound left -turn lane for a total of 2 westbound left -turn lanes (2023)
APPROVED wever, the intersection is projected to exceed acceptable LOS thresholds in the PM peak
DATE.-0729/22 r under all conditions and the AM peak hour in the 2023 background and 2023 total traffic
FILE NUMBER:^- D21011e ditions even with these improvements. In addition, these improvements are not feasible
there is not enough existing right-of-way to improve the intersection with additional lanes
and the site traffic at this intersection is projected to be 4.8% of the 2023 total traffic
conditions. This intersection is also listed in the CIP to be widened to 7-lanes on the north and
south legs and 8-lanes on the east and west legs with a design year of 2025 in the IFYWP
and improved between 2031 and 2035. Therefore, staff does not recommend that the
recommended mitigation be constructed with this development application consistent with the
District's Alternative Mitigation Measures Policy and the District's Level of Service Planning
Thresholds Policy stated above.
Overland Road/Silverstone Way
The intersection of Overland Road/Silverstone Way exceeds ACHD LOS thresholds under the
existing conditions, and thus the future build out conditions. The study recommends the
following mitigation with the associated phase/year:
• Add 1 eastbound right -turn lane (existing)
• Add 1 westbound right -turn lane (existing)
• Add 1 eastbound left -turn lane (2021) for a total of 2 eastbound left -turn lanes
o Convert signal phasing to only allow protected left -turns
• Add 1 southbound right -turn overlap signal timing phase with updated signal splits
(2021)
• Add a southbound right -turn lane for a total of 2 southbound right -turn lanes (2022)
Even with the recommended mitigation, the intersection of Overland Road/Silverstone Way is
still projected to exceed ACHD LOS thresholds with the 2022 and 2023 total traffic conditions.
As part of ACHD's action on Rackham Subdivision in 2019, that applicant was required to
construct an additional southbound left -turn lane for a total of 2 southbound left -turn lanes. This
was completed earlier this year.
Staff is not supportive of the proposal to install an additional southbound right turn lane to create
dual right turn lanes, as this is not ACHD's standard practice and will not be approved. In
addition, there is not enough right-of-way on Overland Road to accommodate the construction
of eastbound dual left turn lanes or the recommended westbound and eastbound right -turn
lanes, making these improvements infeasible. Therefore, staff does not recommend any
additional improvements to the intersection of Overland Road/Silverstone Way with this
development application.
Eagle Road and 1-84 Ramps
Eagle Road north of the eastbound 1-84 off ramp and the 1-84 eastbound and westbound
ramps are under the jurisdiction of the Idaho Transportation Department (ITD). The applicant,
City of Meridian, and ITD should work together to determine if additional right-of-way or
improvements are necessary on Eagle Road abutting the site or the 1-84 eastbound and
westbound ramps.
7
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
�J ion of Area Roadways
APPROVED ount is based on Vehicles per hour (VPH)
DATE: 07/29,
FILE NUMBER:'.
Functional
PM Peak
PM Peak
Existing
L
ay
Frontage
Classification
Hour
Hour Level
Plus
Traffic Count
of Service
Project
Overland Road
Principal
Better than
"F"
Eagle Rd to
0-feet
Arterial
1,369
" D"
Silverstone Way
Overland Road
Principal
Better than
Better than
Silverstone Way to
0-feet
Arterial
1,218
"D"
"D"
Rolling Hill Dr
Silverstone Way
Better than
Better than
Rackham Way to
0-feet
Collector
379
"D"
"D"
Overland Rd
**Rolling Hill Drive
From site to
0-feet
Local
7
N/A
N/A
Overland Rd
Private road -
West leg of
**Rackham Way
intersection of
From site to
0-feet
Rolling Hill
49
N/A
N/A
Silverstone Way
Drive/Rackha
m Way
* Acceptable level of service for a five -lane principal arterial is "E" (1,780 VPH).
* Acceptable level of service for a two-lane collector is "D" (425 VPH).
* Acceptable level of service for a four -lane collector is "D" (1,080 VPH).
** ACHD does not set level of service thresholds for local roads or private roads.
5. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD's most current traffic counts.
• The average daily traffic count for Overland Road from Eagle Road to Silverstone Way was
29,000 on 6/15/2021.
• The average daily traffic count for Overland Road from Silverstone Way to Rolling Hill Drive
was 20,775 on 10/21/2020.
• The average daily traffic count for Silverstone Way from Rackham Way to Overland Road was
6,600 on 10/21/2020.
• The average daily traffic count for Rolling Hill Drive north of Overland Road was 200 on
10/21/2020.
• The average daily traffic count for Rackham Way from Silverstone Way to the site was 400
on 10/21/2020.
C. Findings for Consideration
1. Overland Road/Rolling Hill Drive
The study recommends restricting the intersection of Overland Road/Rolling Hill Drive to right-
in/right-out only with phase 2 in 2022, or when the site generates 45 PM peak hour trips. The
applicant should be required to restrict the intersection to right-in/right-out with a 6-inch raised
candles/median with the first phase of the development prior to ACHD's final approval of the first
final plat and after the private road, Rackham Way, is completed from Silverstone Way to the
8
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
(E NtNr
g Hill Drive. The applicant should be required to provide a public access easement over the
APPROVED to road, Rackham Way.
DATE: 07/29/22
g Hill Drive aligns with an existing driveway on the south side of Overland Road for the
FILE NUMBER: ^-2°22-01A do Green Subdivision apartments. As part of ACHD's action on Movado Greens Subdivision,
D approved this driveway as a temporary full access driveway and indicated that this
driveway could be restricted to right-in/right-out at any time in the future. This is consistent with
ACHD's action on access management on Overland Road with new developments on Overland
Road. Currently, Silverstone Way is signalized on Overland Road and the Movado Way/Overland
Road intersection will be evaluated for signal warrants with the future development north of
Overland Road.
al r
co
r�
a, y �� w%Ci darwood Dr 1
--- > F •o tt �. iE. ,pj l.loridaA1ct �'
m `r d-� it j `C 1-Mewl
Clr
—E Overland -Rd - .. s'Ft .._ A!J
—
1n
f 1 IMF - Traffic Signal J
EiEsperant,, g
RIRO
> io-elurberryr
V1 St
-
I �
Access on Overland Road
If Rolling Hill Drive will be restricted to emergency access only for the site as determined by ACHD,
then the applicant is not required to restrict the intersection of Rolling Hill Drive/Overland Road right-
in/right-out only.
2. Rolling Hill Drive
a. Existing Conditions: Rolling Hill Drive is improved with approximately 24-25 of pavement and
no curb, gutter or sidewalk within the site and to the south of the site. There is 50-feet of right-
of-way for Rolling Hill Drive (25-feet from centerline).
b. Policy:
Off -Site Streets Policy: District Policy 7206.2.3 states that if the proposed development is not
served by a public street that is fully improved to urban standards (curb, gutter, sidewalk) or a
minimum 30-feet of pavement, then the developer shall provide 30-feet of pavement with 3-foot
wide gravel shoulders from the site to the public street specified by the District; OR the
developer shall provide 24-feet of pavement with 3-foot wide gravel shoulders and a minimum
6-foot wide detached asphalt/concrete pedestrian facility, from the site to a public street
specified by the District.
Alternatives to pavement widening including sidewalks and pathways or other proposals, may
be considered by the District. The extent of roadway improvements (improvement type and
length) will be determined by evaluating certain criteria. Criteria to establish improvement type
and length include but are limited to: traffic volumes (existing and projected); number of
pedestrians (existing and projected); location of pedestrian "attractors" and "generators" (i.e.
parks and schools); number of access points/streets serving the proposed development; usable
right-of-way; need for traffic calming; utilities and irrigation facilities. All utility relocation costs
associated with the off -site street widening shall be borne by the developer.
9
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
(E IDIAN —
1-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to
APPROVED vide a minimum turning radius of 50-feet; in rural areas or for temporary cul-de-sacs the
�� 07i29i22
ergency service providers may require a greater radius. Landscape and parking islands may
constructed in turnarounds if a minimum 29-foot street section is constructed around the
FILE NUMBER:^ 22-°11H nd. The pavement width shall be sufficient to allow the turning around of a standard
SHTO SU design vehicle without backing. The developer shall provide written approval from
the appropriate fire department for this design element.
The District will consider alternatives to the standard cul-de-sac turnaround on a case -by -case
basis. This will be based on turning area, drainage, maintenance considerations and the written
approval of the agency providing emergency fire service for the area where the development is
located.
c. Applicant Proposal: The applicant has proposed to vacate Rolling Hill Drive north of the site's
south property line as shown below in yellow in order to construct the development and an
internal private road network. The applicant has proposed to provide a permanent right-of-way
easement for a turnaround at the terminus of Rolling Hill Drive where it intersects the private
road, Rackham Way, within the site. However, a turnaround is not shown on the site plan at this
location.
EB I11terstate $4
Proposed vacation of Rolling Hill Drive in yellow
10
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
4D210118
FUTURE ACHD
TURNAROUND EASEMENT
FOR ROLLING HILLS DR.
VC INSTALLSANITARY
PVC SEWER MANHOLE
TARY
NHOLE SSMH
CONNECT TO EXISTING /
�_RIM:2670.88
IRRIGATION RRIGATION MAIN e t INV UT 5.77 B„ PVC
O-2
INV UT:2655.67 8' PVC
WN 6'0 6'PI T VIM 16 I 6'pl — — 6'PI 6-PI
e`5 8"S— —e„s— -e� /
_"Z:RIM:2671.75
INV IN:2655.14 8" PVC
RIGATION MANHOLE INV OUT:2655.03 8" PVC
EXISTING PIPE I I
INSTALL SANITARY
O I SEWER MANHOLE
N
J_
Z
Z
I ROLLING HILL
SUBDIVISION
I I
d. Staff Comments/Recommendations: The vacation of Rolling Hill Drive north of the private
road requires a separate application and has its own approval process. The applicant should
be required to vacate Rolling Hill Drive prior to ACHD's signature on the first final plat.
The applicant's proposal to provide a turnaround easement at the terminus Rolling Hill Drive
does not meet District Policy and is not approved, as proposed. The applicant should be
required to construct a mini -roundabout where Rolling Hill Drive and the private road,
Rackham Way, are proposed to intersect similar to the mini -roundabout at Silverstone Way
and the private road, Rackham Way, directly west of the site that was constructed with
Rackham Subdivision. See Finding 3.
The applicant should be required to improve the off -site portion of Rolling Hill Drive with 24-
feet of pavement, 3-foot wide gravel shoulders and a 6-foot wide detached concrete sidewalk
on one side of the road within the existing right-of-way.
The study reports the average daily traffic (ADT) for Rolling Hill Drive is projected to be 2,500
trips under the 2023 total traffic conditions with all 3 phases, and approximately 1,200 for
Phases 1 and 2, which accounts for the traffic from the 396 apartment units. Phases 1, 2 and
3 are shown in the shaded regions below. ACHD does not set level of service thresholds for
local roads, however, District Policy states that the ADT for local roads shall typically be less
than 2,000. Staff does not recommend that Rolling Hill Drive be reclassified as a collector or
commercial road to accommodate the traffic from all phases of the development because are
several existing single family residential homes that will remain on Rolling Hill Drive to the
south of the site and staff has concerns about the significant increase in traffic on an existing
local road that will continue to serve single family homes. Therefore, staff recommends that
the applicant be restricted to phases 1 and 2 with this development and should not be allowed
to construct the offices proposed for phase 3 of the development until the existing residential
homes on Rolling Hill Drive are purchased and the properties annexed into the City of
Meridian with commercial or mixed use zoning.
11
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
If ACHD determines that it is acceptable for the site to use Rolling Hill Drive as emergency
access only, then the off -site improvements for Rolling Hill Drive and the construction of the
mini -roundabout at the terminus of Rolling Hill Drive are not required and the applicant will be
required to construct a standard cul-de-sac at the terminus of Rolling Hill Drive.
3. Mini -Roundabout - Rolling Hill Drive/Private Road Rackham Way
If the site will use Rolling Hill Drive as a full access, then the applicant should be required to
construct a mini -roundabout at the terminus of Rolling Hill Drive at the private road, Rackham
Way, and follow the guidance provided in NCHRP 672 and will need to design the mini
roundabout meeting the standards ACHD's Roundabout Design Guide policy section 5188.
4. Private Road — Rackham Way
a. Private Road Policy: District policy 7212.1 states that the lead land use agencies in Ada County
establish the requirements for private streets. The District retains authority and will review the
proposed intersection of a private and public street for compliance with District intersection
policies and standards. The private road should have the following requirements:
• Designed to discourage through traffic between two public streets,
• Graded to drain away from the public street intersection, and
• If a private road is gated, the gate or keypad (if applicable) shall be located a minimum of
50-feet from the near edge of the intersection and a turnaround shall be provided.
Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be
located a minimum of 75-feet (measured centerline -to -centerline) from the nearest local street
intersection, and 150-feet from the nearest collector or arterial street intersection.
Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an
intersection shall have no minimum spacing requirements for access points along a local street,
but the District does encourage shared access points where appropriate.
Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required,
residential driveways shall be restricted to a maximum width of 20-feet and may be constructed
as curb -cut type driveways.
12
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAN,-licant
�Jway Paving Policy: Graveled driveways abutting public streets create maintenance
APPROVED ems due to gravel being tracked onto the roadway. In accordance with District policy,
07/29/224.3, the applicant should be required to pave the driveway its full width and at least 30-feet
DATE e site beyond the edge of pavement of the roadway.
fllE NUMBER: n-zozz-ona
Proposal: The applicant has proposed to continue a private road, Rackham Way, from
the west to intersect the terminus of Rolling Hill Drive at the site's south property line.
c. Staff Comments/Recommendations: The applicant's proposal for the private road meets
District Policy with the construction of the mini -roundabout as stated in Findings 2 and 3. If the
City of Meridian approves the private road, the applicant shall be required to pave the private
roadway its full width and at least 30-feet into the site beyond the edge of pavement of all public
streets and install pavement tapers with 15-foot curb radii abutting the existing roadway edge. If
private roads are not approved by the City of Meridian, the applicant will be required to revise and
resubmit the preliminary plat to provide public standard local streets in these locations.
Street name signs are required for the private road. The signs may be ordered through the
District. Verification of the correct, approved name of the road is required.
ACHD does not make any assurances that the private road, which is a part of this application, will
be accepted as a public road if such a request is made in the future. Substantial redesign and
reconstruction costs may be necessary in order to qualify this road for public ownership and
maintenance.
The following requirements must be met if the applicant wishes to dedicate the roadway to ACHD:
• Dedicate a minimum of 50-feet of right-of-way for the road.
• Construct the roadway to the minimum ACHD requirements.
• Construct a stub street to the surrounding parcels.
5. Traffic Calming
a. Speed Control and Traffic Calming Policy (Local): District policy 7207.3.7 states that the
design of local street systems should discourage excessive speeds by using passive design
elements. If the design or layout of a development is anticipated to necessitate future traffic
calming implementation by the District, or the streets extend greater than 750-feet in length, then
the District will require changes to the layout and/or the addition of passive design elements such
as horizontal curves, bulb -outs, chokers, etc. The District will also consider texture changes to
the roadway surface (i.e. stamped concrete) as a passive design element. These alternative
methods may require maintenance and/or license agreement.
b. Staff Comments/Recommendations: There will be approximately 14 residential homes
remaining on Rolling Hill Drive after the northern segment of Rolling Hill Drive is vacated for the
development of the site. Due to the increase in traffic with phases 1 and 2, the applicant should
be required to construct passive traffic calming measures on the off -site segment of Rolling Hill
Drive consistent with District Policy with the first phase of the development. The construction
plans for the passive traffic calming shall be submitted to ACHD with the first set of construction
plans. If Rolling Hill Drive will be restricted to emergency access only for the site as determined
by ACHD, then the applicant is not required to improve Rolling Hill Drive with traffic calming
measures.
6. Bridge for Five Mile Creek
There is 6-inch corrugated metal pipe with a smaller older metal pipe next to it, structure #1218,
that crosses Five Mile Creek on Rolling Hill Drive just south of View Circle, circled in yellow below.
The pipe has significant corrosion with deep pitting and thin sounding based on inspections by
ACHD staff. This crossing is planned to be replaced by ACHD, however, the development is
proposed to be ahead of ACHD's timeline to replace the structure. Staff has concerns about the
13
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAN
APPROVED
DATE: 07/29/22
FILE NUMBER: a 22-1n
crossing's capacity for the construction traffic for the development and additional traffic
t is improved. Therefore, the applicant should be required to enter into a Cooperative
ment Agreement (CDA) with ACHD to replace the crossing with the first phase of the
ment. The applicant will be reimbursed by ACHD for the crossing replacement and
ments.
The District will require that the applicant submit the crossing plans for the crossing of the Five Mile
Creek for review and approval prior to the pre -construction meeting and final plat approval. Note:
all plan submittals for bridges or pipe crossings of irrigation facilities should be submitted to ACHD
for review no later than December 15th for construction in the following year prior to irrigation
season.
If Rolling Hill Drive will be restricted to emergency access only for the site as determined by ACHD,
then the applicant is not required to replace structure #1218.
Site -
Y
L
/
w. Ar s
Ir—
X
m..*._
Five Mile Creek
E-View-Ciir
i�
E Overland 1(d
7. Parking
The applicant has proposed to provide 649 parking stalls to accommodate the residents and
guests for 396 units for the proposed multi -family development, which is approximately 1.63
parking spaces per unit. Staff has concerns about the available parking for the multi -family in
this development and the potential for overcrowded on -street parking on Rolling Hill Drive.
14
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAN
APPROVED
DATE 07/29/22
FIEF NUMBER: ^-z 2z lie
Traffic Services has received several complaints about overcrowded on -street parking in
of Meridian with new apartment complexes. It appears that there are more tenants per
ent unit thus causing parking issues on adjacent public streets near apartment complex
ae to the lack of affordable housing in the Treasure Valley. Parking spots are not allowed
triped on public roadways and on -street parking should not count towards the City's
I requirements as it can be removed any time at the discretion of ACHD. ACHD
recommends that the City of Meridian require adequate on -site parking for the multi -family
development, as well as with the future development of the commercial and office lots to the
north of the multi -family development.
If parking issues develop on Rolling Hill Drive in the future due to insufficient parking within the
site for the development, staff recommends that the residents of Rolling Hill Drive contact ACHD
traffic services to initiate an investigation to determine if No Parking signs are warranted on
Rolling Hill Drive and the extents of the signage for No Parking on Rolling Hill Drive.
8. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
9. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
D. Site Specific Conditions of Approval
If the applicant chooses to request to restrict the site's access to Rolling Hill Drive to emergency
access only, then the applicant should be required to submit an updated operational analysis to
staff for the intersection of Silverstone Way/Overland Road with the traffic from Phases 1 and 2 of
the development under the 2022 conditions and traffic from the full buildout under the 2023
conditions, and the estimated ADT and peak hour trips on Silverstone Way with Phases 1 and 2
under the 2022 conditions and all Phases under the 2023 conditions. ACHD will determine if
restricting the site's access to Rolling Hill Drive to emergency access only will be acceptable based
on the updated analysis and District Policy.
a. If Rolling Hill Drive will be restricted to emergency access only, then the applicant shall be
required to construct a cul-de-sac at the terminus of the street after the vacation of Rolling
Hill Drive within their site is completed.
2. If the applicant chooses to not use Rolling Hill Drive as emergency access only, or ACHD
determines that access to Rolling Hill Drive for the site is necessary based on the updated analysis,
the applicant shall be required to restrict Rolling Hill Drive on Overland Road to right-in/right-out
only with a 6-inch raised candles/median with the first phase of the development prior to ACHD's
final approval on the first final plat and after the private road, Rackham Way, is completed from
Silverstone Way to Rolling Hill Drive. Provide a public access easement over the private road,
Rackham Way. The following is also required if Rolling Hill Drive will be used to access the site:
15
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAN
APPROVED
DATE 07/29/22
FIEF NUMBER: ^-z 2z 1 I I
Construct passive traffic calming measures on Rolling Hill Drive with the first phase of the
development. Submit the construction plans for the passive traffic calming proposed on
Rolling Hill Drive to ACHD with the first set of construction plans for the development.
Improve Rolling Hill Drive with 24-feet of pavement, 3-foot wide gravel shoulders and a 6-
foot wide concrete sidewalk on one side of the road within the existing right-of-way.
c. Construct a mini roundabout at the terminus of Rolling Hill Drive. The mini roundabout
shall be designed per ACHD's Roundabout Design Guide policy section 5188. Follow
the guidance provided in NCHRP 672. The center island and splitter islands shall be
mountable. The sidewalk at the roundabout shall be detached or separated.
d. Enter into a CDA to replace crossing #1218 on Rolling Hill Drive with the first phase of
the development. Compensation will be provided for the crossing replacement. Submit
the crossing plans for the crossing of the Five Mile Creek for review and approval prior to
the pre -construction meeting and final plat approval. Note: all plan submittals for bridges
or pipe crossings of irrigation facilities should be submitted to ACHD for review no later
than December 15' for construction in the following year prior to irrigation season.
e. The applicant is restricted to Phases 1 and 2 of the development and may not proceed
with Phase 3 until the existing residential homes on Rolling Hill Drive are purchased and
the property annexed into the City of Meridian with commercial or mixed use zoning, per
Finding 2. When there are no remaining residential homes on Rolling Hill Drive, ACHD
may reconsider reclassifying this roadway and additional improvements to Rolling Hill
Drive may be required at that time as determined by ACHD.
3. Vacate the segment of Rolling Hill Drive within the site prior to ACHD's final approval of the first
final plat. The vacation requires a separate application and approval process and is not approved
as part of this application.
4. Street name signs are required for the private road. The signs may be ordered through the District.
Verification of the correct, approved name of the road is required.
5. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
6. Payment of impact fees is due prior to issuance of a building permit.
7. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities
Act (ADA) requirements. The applicant's engineer should provide documentation of ADA
compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
16
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAy
APPROVED
DATE 07/29/22
FIEF NUMBER: ^--2z 1I
relocation costs associated with improving street frontages abutting the site shall be borne
eveloper.
responsibility of the applicant to verify all existing utilities within the right-of-way. The
t at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPVVC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
the planned use of the property which is the subject of this application, shall require the applicant
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
F. Conclusions of Law
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Traffic Impact Study Executive Summary
4. Utility Coordinating Council
5. Development Process Checklist
6. Request for Reconsideration Guidelines OR Appeal Guidelines
17
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
`(E IDI� IAN,—
APPROVED
GATE: 07/29/22
FILE NUMBM A-20uf la
VICINITY MAP
W B F nterfst4te'84'Off'Exit 46'
q6_ .
r
�e
i
-
f._ _ "Irb
f cc
g9gl n t. RCt t .ord
"tall
r
WB.Interstate
EB Interstate 84
'ft.
.�� I -
R'
W-Norristown.st
=, 9
18
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
APPROVED
' j `iUtJB;R'A-2022-0IIe
t
Site Plan for Apartments
0-
FT
T
19
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
(E IDI� I.�111
APPROVED 1ECUTIVE SUMMARY
DATE 07/29/22
fllE NUMBER: ^-prone
fsnturas Ablquist �BVA) is proposing to develop a portion of the area between 1-84 and Overland
Road bordered by Ea91e Road to the west irr Meridian, Idaiha, The mixed -use develaOrr 00 is proposed to
construct a series of multi -family residential units and general office space. The purposc• of this study is to
determinethe potential- impacts to trafficconditions due to the pro -posed develop ai:-r,l.
L' 1 :1 1:103 d4311*It11
This Traffic Impact Study (115) uses the trip generation rates and methodologies published in the Institute
of Transportatlan Englneers (ITE} Trfp Gerrerctror+ Manaof, 1011' Edition, 2017. Refer to Chapter 5 for
additional details on the trip generation methodology. Traffic analysis was performed according to
met♦3odolcglesoutlined in ACHDrs Genera!R€quirements& Procedure5 forDeveiapmentr 2020.
STUDY AREA
The Eagle View Landing phase 2 Development building is proposed to replace the existing FamDas
Potatoes Farmstead and to share the brook with the proposed Idaho Central Credit Unlon (ICCUj Plaza,
This project plans to develop in three phases: Phase 1 In 2021 includes 238 apartment units, Phase 2 in
2022 includes 138 apartment units, and Phase 3 includes 260,000 ftz of office space_
The weekday AM and PM peak hours were included to the transportation analysis to evaluate the
potentlal irmpact on commuter traffic an.d the infrastructure system doe to the cloveloprnent of the
proposed tagle View Landing Phase2 Development. The followingconditionswere analyzed asinditated:
• Existing Conditions (2020)
• Futur-a 12021� Background Conditions
+ Future (2(:21) Plus Project Condition
+ Future (2(1,22� Background Conditions
+ Future ()022� Plus Project Condltloos
• future (2D23Backgrounds Conditions
• future (2023Plus Project Conditions
It should be noti2d that each of the above srerrarjos were analyzed bath with existing roadway
conditions and with mitigated roadway conditions. The phased project is proposed toapen ir) 2023.
HGwever, the project will apen alongside the ICCU development (considered known as Eagle View
LarrdIr`g Phase 1) to the west (some of which is currently under construction`}. The background
conditions for future scenarios include,
• 2021 Background Future Volumes + ICCV Phase 1
+ 2022 Background Future Volumes + ICCV Phase 2
• 2023 Background Future Volumes + ICCU Phase 3
These study conditionsare consistent withthe ACHD TI5 guidelines and the memorandurn of
assumptions thatwas submitted an June 30. 2020 and approved by ACHDon July 27, 2020.
20
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
APPROVED
NDINGS
DAT 07/29/22
SCE %UId BrR'A-2ozz-0iie
is study �Aafalyto-d jie traffic irie%pAcu� From Phdsf- 1 (2.021). 1"1H; [- 2 (21)221. grid I'riase 3 (2023I of rile
lo.posed Eagle View Landing Phase 2 Ereve?aprnent, located In Meridjan, f9. Tne sire is art:cipated to
gene�atr 80 total AM peak hour trips and 102 total PIV, peak hoor trips in 2021, 127 total AM peak hour
t-nP5 and 163 total PPA peak huu= tri95 in 2027, ar%d :31j5 total AM pe-ok Four trips and 432 kokal PW- peak
;roar trips in 2023 (full b.Ljild-out).
.Cey findings of this study show zha: the fagxe View LanJ,ng Phase 2 Deveiopment does impact the
opera:aons of sorne study intr�rsettions -rea: the prajecz site. In 2023, the Eagle Viow i-arid ing ?hose 2
,�evel0pmers! traffii. rantribMes t+a approKimeeIV 4.4-4.81Y. of the traffic a *agIe �psid & Ovpslarsd Road,
and 8.6-10.5% cf the traffic 5ilverstorte Way & ever?and Road in the AM and Purl peak l ou=-s.
Table ES-00-1 shows .fie summary or ove{all intersection vol�jrne m capacity (V/C} ratjcs for !Me analyzes
sconarios. Table ES•00-2 shows the summary of worst maven;errt VIC razacs far the arsalyzed scenarios.
21
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
`(E IDI� IAN,-
APPROVED
Table E5.00-1:AM and PM overall V/CCompari5an Summary
07/29/22
DATE
VOLUME f CAPACITY- Elf (STING CONIFI G URA.TI ON
FILE NUMBER:Azozz-o„e
ra�tl6orr
EpriiWn630M
2421
=1PIu5
202i
2onPlus
M3
Z423(1Ivs
Background
Background
Project
Background
Project
Ba€kg ound
Project
ID
Lnefftlon
period
owrAvIt
C"Fah Vlc
qugrpll wJr
Quo-rgil V)r
4werak V/r
Q"raMVN
OffFRII VIC
Eagle Road
AM
1.12
3-09
L10
1.10
1.11
1.3.2
3-11
1
I.84 WB Ramp
Prrl
Im
1-32
1-35
1-14
1 38
1.17
1.41
2
Eagle Road&
AM
0.92
EK94
0.95
0.95
0.%
E},97
0.98
1-94ESRamp
PM
697
LOl
L01
L112
1.03
1.44
LM
3
Eagle Road&
AM
1J08
1.17
1-19
1.20
1.21
I.n
L32
Overland Raad
PM
1.10
1-18
L12
1.24
1.29
1.29
L37
SLlverstone Wsy A
AM
DAR
aE4
065
0.67
0.68
E1.99
fir
Overland Road
PM
0.81
1.42
1.51
1.61
1.73
1.75
L99
Overland Road&
AM
NfA
NJA
NJA
N .A
N/A
N/A
NJA
5
ROklingl-liII� [hive
PM
NJa
NJA
WA
NjA
N/A
N/A
NfA,
Ra€kham Way&
AWN
NJA
N/A
lY)A
6
Sklverstone Way
PM
-
NIA
N/A
NJA
Rackhom Way &
AM
NIA.
N/A
NIA
7
ftorlingHills Driwe
PM
NfA
NJA
NIA
VOLUME f CAPACITY - MITIGATED CONFIGURATION
Ehi$Llrrg202D
3M1
201LPlm
2022
2022PIus
2W3
2423PIu1
IpWl1!lilW
Ba€kgrvund
Oaftraund
project
DmkEround
Project
Ba€kpound
Project
ID
IawfiGrI
period
C-rjmVfc
4renllVIC
Overall Vfc
Ow rall VIC
0raElVEC
OyeraMVft
OwenmVIC
1
Eagle Road &
AM
1.0()
1.00
096
1.03
Q.99
1.04
1.02
I-& WB Ramp
PM
0.97
0-97
1-1:14
1.03
1.06
1.0s
1.CN
€&& R02d $
AM
U.92
OL92
(X95
U.95
4j.96
12.47
aga
1.84 E)B Ramp
PM
R83
EK83
0-86
0.87
0.97
a.88
1150
Eagle Road&
AM
E}.83
QF3
CL93
0.94
0.96
1.01
1.07
Overland Road
PM
1.113
1.10
1-113
1.22
1.24
1.25
1.30
Silwerstanei4@V&
AM
a441
0.4S
053
0.56
4),56
0.65
aG9
Overland Road
PM
D.77
C195
0.96
0.88
1.06
0.99
pwerland Road A
AM
N/A
NIA,
N/A
N/A
N/A
NIA
NIA
5
Rol'IftHiIIs drive
PM
NIA
NIA
NJA
N/A
N/A
N/A
NIA
6
Racirham Way&
AM
N/A
N/A
HIA
Vyetstone Way
PM
NIA
-
N/A
-
HfA
RackhamWay &
AM
NfA
N/A
NfA
7
RallingHLlls DFlwe
12M
NJA
NJA
HIA
Qurrnll VIC
Source: Fehr & Peers, 2021
22
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
`(E IDI� IAN,-
APPROVED
07/29/22
OATS
Table CS-W-L- AM and PM Worst Mlovent¢rtt V f C Comp:anson Summary
VOLUME ! CAPACITY- FX19TING CONFIGURATION
FILE NUMBER:^zozz-o„e
PAlVrdg7n
201
2121 Plus.
2022
2022 Plus
2E123
EMdk vnd
$adgrvund
Proya0
9aGNgmury4
Prviert
&a*VVUhd
Id
L8ttU0Lt
PlriOd
Worst
woeS4
Worn
woks[
wam
worst
LaMWE
Lane YJC
Lace VC
Law Vir
LVW Vic
L..VJC
1
Eagle Road &
A
2.21
7.PG
7-06
7.09
2.09
2.12
1-134WBRamp
PM
1.65
1-E}4
L64
I.6b
1.66
1.69
Eagle Road dk
AM
0.90
q.91
CL91
0 9t
0.91
0.99.
2
1-840 Ramp-
PM
1.01
1.07
L08
1.09
1.21
2.12
Eagle Road &
AM
1A0
1-36
L37
L40
1.42
159
3
Overland Road
PM
1.32
1-19
LZI
L30
1.34
1.39
4
SklrerstoneWay &
A
0.44
0.80
0.85
0.86
0.92
1.47
Overland Rud
PM
04a
2-56
1_Ei5
1-74
1.93
L93
5
Overland Road &
A M1
4,05
0.(4
0 29
005
0.45
0.07
Rol I.InHIllsDrlve
PM
G.10
0.10
CL90
0.12
1.63
0.15
RV611%am 1r Tay &
AILA
-
OAR
-
fl.34
-
6
SfIverstone Wag
?M
0-22
0.35
Ra€kham way &
AM
C.134
11.01
7
Rol Iin&Iii115 Drivo
PM
006
0.08
-
VOLU
ME J cApAETIY
• MITLGATEU
coN FdG uit noN
Intersection
fldstlttg2020
W21
2021 Plus
2022
2022 Pius
M23
Background
Background
pmeeL
Etarkgmund
Project
Background
Id
Lor3G6rr
Period
Wwu
Worst
Worst
Worst
Worst
Warsr
EaneVEC
LanevJS
LaneVJ{
La195VfG
tameV�c
ta+ieVIG
Eagle Road &
AM
1.49
1-49
L3Et
L53
1.40
1-55
1
1-84 WEI Ramp
PM
1.10
IAO
1-09
L33
1.11
2.15
2
Eagle Road &
AM
0.89
0.89
0-98
0.89
0.88
0.89
1-94ES Ramp
PM
G-Ka
aan
CL57
10.e9
0.90
0.912
3
Eaglc Road &
AM
2.16
L.
L37
L40
1.42
1.S8
Overland Road
PM
1.12
1.12
L18
L27
1.29
1.34
511ve rstone Way &
A.M
1).44
Sago
0-90
a.99
0.92
2.49
4
Ovedarld Road
PM
0.77
RSA
Im
1.04
1.22
2.09
5
OYerland Road &
A
G.05
0. CS
G29
0.08
0.08
0.1cl
Rol I irig Hi I Is UrIVe
PM
0.113
4.10
0-90
DAE
O.Ofi
0.23
6
Raaham AIR a
AM
-
-
018
0,29
-
Srlve-rstone Way
f1M
0-22
0.38
Rackham way 9
AM
-
-
0-04
-
0.06
-
1koFIinBHills Drive
PM
006
0.05
Worst movenwnt UIC
Sour: Fetes L Peery. 2021
2im Plus
Projelt
Ward
IBM voc
2112
L69
E7.93
1.15
Lis
1.54
126
Z19
0.5G
198
a47
0.52
El 23
0,1?
2023 Plus
Project
Wor6h
Line Yg
1}43
1.12
D.88
1.75
IAA
1.30
1.36
0.12
Ek 26
(06
13.58
alb
R07
23
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
(E IDI� I.�111
APPROVED INMMENDATIOHS
DATE 07/29/22
troject,
ommenclatiorrs address findings f-of each of the seven scenarios faf which the sturdy was conducted
FILE NUMBEIL^n -o18 eirimpact on the study area: Existing, 2021 Background, 2021 Plus Project, 2022 background, 2022
2023 Background, and 2023 Plus Project- A summary of the study results and
recornmen dal Ions fol lows,
Existing
The existing conditions r-equirethe following mitigationsthrough oLit the study area:
1-84 Westbound gnmp &Eagle Road
o Add 1 northbound left -turn lane fofa total of 2 northbound left-tUirn lanes,
o Add 1 SOW h'..L)IJI, rig-i °.,r17 lane for a total of 2 s ulh€ (Ir -1d i it-h I I urn €ones
o Add 1 westbour--d right -tu-n lane for a total of 3 wF%..%rok.nd �;r� .,�: n lanes,
1-84 eastbound Ramp & Eagle Road
o Add 1 eastbound right turn lane for a total of two eastbound right -turn lanes,
+ Ove rl and Road & Eagle Road
o Add 1 northbound through lame for a total of 3 northbourid through lames,
o Add 1 northbound right -turn storage iane to separate right -turning and through traffic,
o Restripe 50J1'9100LII)d left turn lanes to increase the total storage length to 5,00 feet,
o Add 1 Vwestbuur-d right -turn lane for a total of 2 wesWuL ri0 rid=� -' irn lanes,
* Overland Road & S-krRrc.TonP Way
a Add 1 east bc urd right -turn storage lane tosepairate right -turning and through traffic,
This mitigation is based on the results of the turn lane analysis_
o Add 1 westbound right -#urn storage lane to separate right -turning and through truffle.
■ This mitigation is based on the results of the turn -lane analysis.
Even with the above mitigations, the westbound 1-84 ramp, eastbound 1-84 ramp and the intersection a#
Eagle Road & Overland Road were observed to continue to operate with unacceptable VIC ratios- A
separate comprehensive study to determine further mltlgatlon at the 1-84 Interchange and the
intersection of Eagle Road & Overland Road should be performed, Fehr & Peers anticipates that the study
will Iikeiy recommend a reconfigured interchange and ppsslhly afl alteraatiye intersection configuration
at Eagle Road & Overland Road.
2021 Background
Background traffic projections were developed for Z021 by growing the existing volumes with the
COMPASS annual growth rates. The trip generation reported in the iCCU Plaza TIS for the first phase of
development was also included in the background growth forthe 2021 horizon yearfar this project as the
first phase of the [CCU Plaza wasanticlpated to be completed by2030-
The above exist€ng mitiSations and tha followine impravzsments are recommended throughout the study
dr@3=
24
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
(E IDI� I.�111
APPROVED
DATE: 07/29/22
FILE NUMBEP.^ n0118
Overland Road & Eagle Road
o Restripe southbourid Ieft turn lames to Increase the total storage ler,gtb to 600 feet, or
as long as ACHU taper rate limitations will allow,
overrand Road & Sihrerst,ane Way
* Add 1 eastbound left -turn lane for a tatRIof Z eastbound left -turn ianas
■ 7his will require converting the signal phasing to only allow protected -lefts,
instead of Dilo ving both pronected and perrnissive-lefts,
■ A total of 96 eastbound left #urn vehicles per hour can be added to the PM peak
period before this mitigation is required,
o Add a south bound right -turn overiap signal timing phase with updated signal splits,
■ A total of 91 southbound right tufn vehicles per hour can be added to the PM
peak period before this mitigation is required.
Even with the above mitigations, the westbound 1-84 ramp, eastbound 1-84 ramp and the intersection at
Eagle Road & Overland Road were observed to continue to operate with unacceptable V/C ratios- A
separate comprehensive study to determine further mitigation at the I-84 interchange and the
intersection of Eagle Road & Overland good should be performed, Fehr & Peers anticipates that the study
will likely recommend a gurr : n-i i i. r Lrr and possibly an alternative intersection configuration
at Eagle Road &Overland Road
2021 Plus Project
The 2-021 Plus Project [ 3 lrliti:] }r included the addition of a NBAB stop -controlled intersection at the
project access intersectiori of Rdckham Way & Rolling Hills Drive. The proposed roundabout that will
provide access to the ICCU Plaza at Rackham Way & Silverstone Way is also included in all Pius Project
conditions analyses_ Due to the proposed connectlon to Polling Hills Drive, and since the ICCU Plaza and
Eagle View Landing developments are adjacent, Borne traffic from thie ICCU Plaza development was
assumed to divert from RacMam Way and Silverstone Way to Rolling Hills Drive in each 'Ius Project
scenario,
While the previously outlines lrnprove the network over the unmitigated network, the intersection at
Overland Road & Silverstone Way was observed to operate at air unacceptable overall V/C ratio, but with
no individually failing movements- Since the intersection was observed to operate just beyond acceptable
V/C ratio thresholds, and no Individual movements art: falling, no additional mItlgatlons are recommended
forthis scenario.
2022 Background
Background traffic projections were developed for 2022 by growing the existing volumes with the
COMPASS annual growth rates. The trip generation reported in the ICCU P laza TIS for the first two phases
of dr-vPIo-:�mt.-7t v;!,ro. a I ; o irr.ILdcd in tht, Imc<grc%iird g•r)w?Ii for th:• 2022 horimn year far this project
as ie hrtr ,IF.;,.ek-- Ihi� IC',.:...:II•iri ,v g i,iI,F::,�iIr:d r(, i)c r;:.•r•-,1�-e,! h
.71 ad M iQrl to themuugatlons inthe Z021I�ackgrvori6cvridit4on, tnefollowing mltlgation isreoommended;
• Overland Road & Silverstona Way
o Add sauthbound rig' it -turn lane for a total of 2 southbound right -turn lanes.
Atotal of 158 southbound right turn vehicles per hour can be added to the P-M
peak period before this mitigation is required -
25
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
(E IDI� I.�1\
APPROVED� with the a bovemitigatlons, the west bound 1-84e-amp,eastboWndl-84rarrrp,thelmersectlortatEaglp
& Overland Road, and the intersection at Overland Road & 5ilverstone 'd,ay were oblcr:vcl to
DATE 07/29/22 Lie too: ,atr, -,,-ith ,Enarc.oplab1-aV/C ratios. As!dc- ;rrn; thn snp, •arc% s-.;cl•r (if tl'o
FILE NUMBEIRLUInz-oiie ercha nge grid tLe in t:: r�.cl4li un of Eagle Road & 0'-(!rI t!n,: It:: ,;d --id -3ti ri?: o l l'• rl i!: riiEed .',r{:'4 r: u`.. v.1rther mitigations are recommended in this scenario.
2022 Plus Project
Like the 20n Plus Project scenario, the intersection of Overland Road & Rolling Hills Drive was analyzed
as both an existing full NB/513 stop -controlled intersection and as a right - in- right -out restricted
intersection- Only the right -Irk -right -out configurations cipera; r 1 at acceptable LOS and V/C,
T'rr'-i:,ldition'othesamemitigationsth;twc,..rr,mr.nWrl'tpdedinpreviousanalysesinthisreport,
i L =,711 .,inu re rri�r,endaLio•� is recornt ii I- n lh� ;lL.d, area;
a Overland Road & Rolling Hills Drive
o Convert the intersection to a RIRo configuration,
■ A total of 45 sauthbound left turn vehicles per hour can be added to the PM
peak period before this mftigation is required -
As mentioned previously, even with the above mitiE;ationsr the wastbocrnd 1-34 rampr eastbound 1-84
..3r-10, the intersection at Eagle Road & Overland Road, and the Intersection at Overland Road &
Silver!'one Way were observed to continue to operate with unacceptable VIC ratios. Aside from the
sr-: ar<Aa eornprehan 5ive study of the 1-84 interchange and the intersection of Eagle Road & Overland Road
vi6' vas recommended previously, rpofurther mitigations are recommended in this scenarlo,
2023 Background
Background traffic projectians were developed for ZD23 by growing the existing volumes with the
COMPA55 anneal � rowth rates. It should be noted that while Phase 3 of the ICCU Plata is not autFdpated
to be complc:ed ay 2023,.which is the horizon year far Phase 3 of the Eagle Yew Landing development,
trlp generation frorn all ttkreo phases i}f the IECQ Plaza were Included In the background of this analysis
to present a holistic understanding of the traffic demands once all three phases of both developments are
completed -
In addition to the improvements recommended in previous chapters of this analysis, the following
recornmend2#ionSare recommended within the Study area-
• Eagle Road & Overland Road
o Add I westbound left -turn Ianefor 2 total of � southbour,,. left -turn lanes.
A total -of 127 eastbourid through, 6 eastbound i ht turn, and 84 westbound
left turn vehicles per hour can be added to the Pr -A peak. period westbound left
turn before this mItlgation is requlred -
As mentioned previously, even with the above mitigations, the westbound 1-84 ramp, easthound 1-84
ramp, the intersection at Eagle Road & Overland Road, and the lntersection at Overland Road &
Silverstone Waywere observed to continue to operate with unacceptable VEC ratios-
Notably, beginning in this Scenario, the southbound left -turn queue at Eagle Road & Overland Road will
likely no longer be ace mrnodated by increasing the storage length- Fehr & Peers recognizes that widening
26
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
(E IDI� I.�1\
APPROVED ersection Is planned For a future project. However, without a reconflguratloo of the Intersectlo:n at
DATE 07/29/22
Road & Overland Road, it is likely that the 95eh percentile 50uthbound left -turning queue wall spill
the eastbound offrarnp interne€tixi and impact operations there. Fehr & Peers recommends
ruteuMettap�o1e rating the pro€ens to evaluate and mfilumerit alterlariui, risnrwrflvn designs 5urtr as contlnuous
tersection (CFI), through -U-turn inters.2ctionr etc. as par: of the redesign of the intersection at Eagle
Road &, Overland 110ad. flkewlse, Fehr & i}c--ers recommends expediting the wldening of eagle Road and
overland Road since acceptable VIC ratios and queues at that intersection cannot be achieved without
either implementing these widening projects or an alternative intersectionconfiguration-
2023 Plus Project
The 2023 Plus Project conditions included the addition of the roundabout at the project access at Rack ham
Way & Silverstone Way as well as the NB/58 stop -controlled intersection at Rackham Way & Rolling Hills
Drive- The intersection of Overland Road & RriI rig Hills Drive we arialyzed as both arT existing full NBl.i
stop -controlled interne€tian and as a right -in rigl}t-o1-it restricted intersection. It was determined L-ia= thr.-
right-in-right-out restricted stop control is re(.:)-n- w-i-d€>d for the 2023 Plus Prof eetcondltions-
As t)cr the rr suits of .he right turn lane anaIvs s pr!i'formad for this srenarlor the following mitiga"on is
:+:r_.c:r,ir,iPnri(�,^ ti+.i;-iin the Study area:
Overland Road & Rellirg Hills Drive
o Add aweswuvi10 ri8{1t-turnstorage lane.
Overland Road from Eagle Road to511verstone way
o Either advencethe planned C1P projectto widen Overland Roadfrorn a five-Ianeto
seven -lane Bross section .,- implernent sufPiclentTdM measures to reduce the total
traffic demand by 35 vehid. !� p -r hour irti the shoulder hour before the PM peak period.
■ This mitigation is basserl on the results of the segment analysis -
As mentioned previously, even with the previous mitigations, the westbound 1-18 Tamp and the
intersection at Eagl a Road & Overland Road were abse rued to cantin ue to operate with u naeceptable VIC
ratios and will require further study to eraluate alternative interchange and intersection oonflguratloos
at those locations. Fehr & Peers does not recommend furth-er widening of either of these locations before
obtaining the fenuIts frarn that study-
Also, while improved over the unm ftig2ted scan arip, the intar5Wion at $ilveMurke Way & Overland Road
was still observed to operate at kinarrE�ptahle VIC ratlo in the eastbound left turn movement, MitigAtirp.
the failing movement beyond the is_ec re€ommendation5 would likely require extensive inter:ser,ior
reconfiguration, so no additional mitigations are recommended lorthis scenaria-
Project Contribution to Traffic
Fehr & Pegs compared the trips generated by the development at ea€h intersection to the total trips at
each intersection during the Plus Project conditions analyses- Table ES-00.3 outlines the percentage of
traffic at each intersection that is generated by the development, table ES-00-4 -outlines the percentage
of traffic at each study segment that is generated by the development-
27
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
`(E IDI� IAN,-
APPROVED
DATE: 07/29/22
FILE NUMBEF• A-nuf 18
1
3
4
5
6
7
Table E"0-3: Project Trips as a Percent of Total Plus Project Inter ctlan Volume
2021 Plus
2022 Mus
2023 Plus
Location
Period
Projlect!
Project
Protect
Eagle Road &
AM
0.3%
0.4%
1.5%
1-84 WB Ramp
PM
0.3%
0.5%
13%
Eagfe Road &
AM
0.5%
0.8%
2.3%
1-84 EB Ramp
PM
0.6%
1.0%
2.6%
Eagle Road &
AM
1.1%
1.7%
4.8%
Overlannd Road
PIA
1.1%
1.8%
4.4%
Silverstone Way &
AM
2_6%
4.0%
10.S%
Overland Road
PM
2.5%
3.7%
8,6%
Overland Road &
AM
15%
5.2%
13.3%
Rolling Hills Drive
PM
3.096
4.5%
10.6%
Rackharn way &
AM
9.6%
10.4%
22.9%
Silverstone way
PM
10.9%
12.1%
23.1%
Rackharn Way &
AM
48.9%
51.1%
72.2r%
Rolling Hills Drive
.j3V
49,1%
si.5%
70.3
$i uirrt� F�-v a Prrry 2021
Table ES-00-4; Project Trips as a Pereew of Total Plus Project Segment Volume
Roadway
Segment
Period
2021 Plus
202.2 Plus
2021 Plus
Project
project
Project
Eagle Road to
AM
2.4%
3.7%
9.6%
Overland Road
Silverstone way
PM
2.2%
3.3%
7.9%
Silverstone way to
AM
2.7%
4.0%
10.9%
Overland Road
Rolling Hills Drive
PM
2.1%
3.2%
7.9%
Rackharn way to
AM
S.1%
10,796
21.9%
SilverstoneLYay
Overland Road
PM
6.3%
8,0%
16,7%
Overland Road to
AM
38.9%
43.15%
66.8%
Rolling Hills Drive
North End of Study Area
PM
42.8%
46.8%
66.0%
SilverstorneWay to
AM
7.7%
5.9%
8.1%
tiacl€ham WayNorth
Er,d of Study Area
PM
1.9%
2.S%
10.0%
5oueCe: Fever & Peers ZQ} 1.
Internal Project Site Circulation
8VA's proposed Eagle View Landing Phase 2 Development is planned to include one site access at the
N8/SB stop -controlled driveway at Rolling Hills Drive & Rackham Way and two connections on the west
side of the development to the Eagle View Landing Phase 1 Development. The ITE Trlp Generation
Handbook, 3`a Edition reports that pass -by trips are not likely to occur with the Planned land uses_ The
internal roadways include an extension of Rolling Hills Drive north to meet at a T-i ntersecti o n between
the residential and office land use sites. Fehr 84 Peers suggests two-lane {one lane In each diFe#ian)
roadways for all internal streets. Fehr & Peers' operational analysis showed that shared through/left-
turn/right-turn configurations at the Internal T-Intersectlom for would be meet acceptable l.DS aknd V?C,
providing, separate Ianesfiorturning movements would provide increased capacity.
28
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAy
APPROVED
DATE: 07/29/22
FILE NUMBER: a D210 18
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway and
road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way improvements
by Highway entities, developers shall provide written notification to the affected utility owners and
the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to,
project limits, scope of roadway improvements/project, anticipated construction dates, and any
portions critical to the right of way improvements and coordination of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the utility
owners. Conference notification shall also be sent to the UCC. During the review meeting the
developer shall notify utilities of the status of right of way/easement acquisition necessary for their
project. At the plan review conference each company shall have the right to appeal, adjust and/or
negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter
of review indicating the costs and time required for relocation of its facilities. Said letter of review
is to be provided within thirty calendar days after the date of the plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the anticipated
date work will commence. This notification shall indicate that the work to be performed shall be
pursuant to final approved plans by the highway entity. The developer shall schedule a
preconstruction meeting prior to right of way improvements. Utility relocation activity shall be
completed within the times established during the preconstruction meeting, unless otherwise
agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com
for e-mail notification information.
29
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
CUEIDR IAy
APPROVED Development Process Checklist
DATE 07/29/22
FILE NUMBER: ^-z 2z lie
Ileted to Date:
❑Submit a development application to a City or to Ada County
❑The City or the County will transmit the development application to ACHD
❑The ACHD Planning Review Section will receive the development application to review
❑The Planning Review Section will do one of the following:
❑Send a "No Review" letter to the applicant stating that there are no site specific conditions of approval at
this time.
❑Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
❑Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
❑For ALL development applications, including those receiving a "No Review" letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non -Subdivisions)
❑ Driveway or Property Approach(s)
• Submit a "Driveway Approach Request" form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
❑ Working in the ACHD Right -of -Way
• Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit
Application" to ACHD Construction — Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you
are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
❑ Sediment & Erosion Submittal
• At least one week prior to setting up a Pre -Construction Meeting an Erosion & Sediment Control Narrative & Plan, done
by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
❑ Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being
scheduled.
❑ Final Approval from Development Services is required prior to scheduling a Pre -Con.
30
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075
IDS IAy_
APPROVED
DATE: 07/29/22
FILE NUMBER: A-2022-0 11
Request for Appeal of Staff Decision
al of Staff Decision: The Commission shall hear and decide appeals by an applicant of
nal decision made by the Development Services Manager when it is alleged that the
opment Services Manager did not properly apply this section 7101.6, did not consider all of
the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily
and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
and Clerk of the District, which must be filed within ten (10) working days from the date of
the decision that is the subject of the appeal. The notice of appeal shall refer to the
decision being appealed, identify the appellant by name, address and telephone number
and state the grounds for the appeal. The grounds shall include a written summary of the
provisions of the policy relevant to the appeal and/or the facts and law relied upon and
shall include a written argument in support of the appeal. The Commission shall not
consider a notice of appeal that does not comply with the provisions of this subsection.
Time to Reply: The Development Services Manager shall have ten (10) working days
from the date of the filing of the notice of appeal to reply to the notice of the appeal, and
may during such time meet with the appellant to discuss the matter, and may also consider
and/or modify the decision that is being appealed. A copy of the reply and any
modifications to the decision being appealed will be provided to the appellant prior to the
Commission hearing on the appeal.
Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the Development Services
Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice
of appeal and the reply shall be delivered to the Commission at least one (1) week prior
to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
31
Rackham East Subdivision/Eagle View Apartments
M PP21-0007/H-2021-0075
�E IDIAN--
Request for Reconsideration of Commission Action
APPROVED
DATE 0729/22 est for Reconsideration of Commission Action: A Commissioner, a member of ACHD
or any other person objecting to any final action taken by the Commission may request
FILE NUMBER: A —2 o1 I
sideration of that action, provided the request is not for a reconsideration of an action
previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for
reconsideration, but the motion may be seconded by any Commissioner and is voted on
by all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no
later than 11:00 a.m. 2 days prior to the Commission's next scheduled regular meeting
following the meeting at which the action to be reconsidered was taken. Upon receipt of
the request, the Secretary shall cause the same to be placed on the agenda for that next
scheduled regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth
new facts and information not presented at the earlier meeting, or a changed situation that
has developed since the taking of the earlier vote, or information establishing an error of
fact or law in the earlier action. The request may also be supported by oral testimony at
the meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to
ACHD staff for further review. The Commission may set the date of the meeting at which
the matter is to be returned. The Commission shall only take action on the original matter
at a meeting where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.
32
Rackham East Subdivision/Eagle View Apartments
MPP21-0007/H-2021-0075