Loading...
HomeMy WebLinkAboutCC - Street Light Plan0 LLJ 0 a J 9 w a w 0 0 3 F- z w ZO of O w H z 1n LL O O Q _U �L 0 O O Ld Ld w ct O F- U o G- w r z Q J Y (if O Ld v) U 0 w o d w v) z z W D ct F- z cn (n 0 3 w _J > U N N O N H U of r o 0 U O I I 27 EXISTING TYPE 2 STREET LIGHT E BINGLEY DRIVE EXISTING TYPE 2 STREET LIGHT EXISTING TYPE 1 STREET LIGHT BLOCK 2 16 13 12 11 14 I 15 17 I 18 BLOCK 2 19 I 20 I 21 22 I 23 EXISTING TYPE 1 STREET LIGHT 24 25 I 26 10 9 28 29 \ \1 � BLOCK 2 \ 30 ' � 31 \ \ 32 \ 33 \ \ 34 35 \ � 36 � \ 37 38 R4gTFRgC \ \ FUTURE PHASE NV0 001 1R01�15 n 6 5 FUTURE PHASE T EXISTING TYPE 2 \ STREET LIGHT A / /--- BLOCK 2 J� / / I 39 40 F� �g5\OtAL �F ��GENSFO ti� N 16970 6-2-22 S pp T�TFOF\OI" /NNE GAP M. 0 25 50 100 150 SCALE: 1" = 50' JW� E >�o 0) rn STREET LIGHTING NOTES ° 00 7 X 0 v 1. ALL STREET LIGHT CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE CURRENT �� �rn o VERSION OF THE ISPWC, THE MERIDIAN SUPPLEMENTAL SPECIFICATIONS TO THE ISPWC, AND a @) THE NATIONAL ELECTRIC CODE. m E " 2. A STREET LIGHTING ELECTRICAL PERMIT SHALL BE OPENED PRIOR TO STARTING WORK. USE THE ONLINE CITIZEN PORTAL AT HTTPS://CITIZENPORTAL.MERIDIANCITY.ORG/CITIZENACCESS/ 6 TO OPEN A PERMIT AND REQUEST INSPECTIONS. 3. INSTALLATION WILL REQUIRE INSPECTIONS FOR THE CONCRETE BASE REINFORCING, BEDDING, BACKFILL, AND FOR THE POLE AND ASSOCIATED WIRING. , " 4. STREET LIGHT BASES SHALL BE LOCATED 10' MIN. FROM TREES, 5' MIN. FROM FIRE HYDRANTS AND 2' MIN. FROM WATER METERS. 5. KEEP ACCURATE NOTES OF CONDUIT, JUNCTION BOX LOCATIONS. ATTACH A REDLINED AS w BUILT DRAWING OF THIS PLAN SHEET TO THE STREET LIGHTING ELECTRICAL PERMIT, OR a SUBMIT A HARD COPY TO THE MERIDIAN PUBLIC WORKS DEPARTMENT PRIOR TO REQUESTING 3 FINAL INSPECTION. o N 6. CONTACT THE CITY TRANSPORTATION AND UTILITY COORDINATOR (208) 898-5500 FOR a QUESTIONS REGARDING UTILITY CONFLICTS, OR TO ACCESS LOCKED METER PEDESTALS. Z 3 a x J KEYNOTES L d' N (D INSTALL TYPE 2 STREET LIGHT WITH 25' MOUNTING HEIGHT PER CITY N 0 OF MERIDIAN STREET LIGHT DESIGN STANDARDS. LED FIXTURE TO BE o LEOTEK JR GCJ1 20H MV NW 2R DB 700 PCR7 WL SPB-DB OR oN APPROVED EQUAL. N w z J LL Z W DESIGNED: C. GRAHAM DRAWN: L. HAASE CHECKED: C. GRAHAM APPROVED: C. GRAHAM z PREPARED FOR: 0 G20 LLC PO BOX 593 U EAGLE, ID 83616 Z) N z O U ce O LL N 0 O W z N Z J ce C)J CL W � 0 V_ O m z Lu N > O W Ce W W Cn L N an L W N d d Q H CSW PROJECT NO, 22001 Q p DRAWING DATE 06/02/2022 a ~ CVR U ■O